This document appears to be a Solicitation, Offer, and Award (Standard Form 1442) for a federal contract opportunity related to the design and construction services for the replacement of the failing waterproofing system, refinishing and reinforcement of structural steel, repairs to fireproofing, and fulfillment of an unconstructed plaza area at the Carl B. Stokes U.S. Courthouse in Cleveland, Ohio. The project is funded under the Inflation Reduction Act and is being procured by the General Services Administration (GSA) Public Buildings Service Region 5. The Design-Build scope of work includes design, construction, and operational services, and the procurement will be a full and open competition. Proposals are due by 4:00 PM CT on October 28, 2024, and a maximum of three offerors will be selected to proceed to the second phase of the competition. The contract will be awarded to a single offeror and will be a Firm Fixed Price type. The solicitation includes requirements for the use of low embodied carbon construction materials, such as concrete, asphalt, steel, and glass, which must comply with specific global warming potential limits established by GSA's Interim IRA Low Embodied Carbon Material Requirements.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 47PF0024R0073 Amendment 002.pdf | ||
| Stokes PreProposal Agenda.pdf | ||
| 47PF0024R0073 Amendment 001.pdf | ||
| Stokes DB Preproposal Invite.pdf | ||
| Stokes_Sol_DB_2_Phase_Part_I.pdf | ||
| Stokes Plaza IRA Project Submittal_ Reporting Form.xlsx | XLSX spreadsheet | |
| Stokes Plaza DRAFT Agr_DB_MAY 2024.pdf | ||
| Stokes Plaza Reps and Certs GC May 2024.pdf | ||
| PBS_Past_Performance_Form_Rev_6_12_15 .docx | DOCX document | |
| Stokes Plaza AWARD ALLOCATION FORM IRA .xlsx | XLSX spreadsheet | |
| Instructions for Questionnaire.docx | DOCX document |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(See ).
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair) IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
9. FOR INFORMATION
CALL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".
SOLICITATION
1. SOLICITATION NUMBER
5. REQUISITION/PURCHASE REQUEST NUMBER
CODE
6. PROJECT NUMBER
8. ADDRESS OFFER TO
4. CONTRACT NUMBER
7. ISSUED BY
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)
11. The contractor shall begin performance within
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES", indicate within how many calendar days after award in Item 12b.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and
b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d. Offers providing less than
STANDARD FORM 1442 (REV. 8/2014)
Prescribed by GSA - FAR (48 CFR) 53.236-1(d) calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
is, is not required.
local time containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes copies to perform the work required are due at the place specified in Item 8 by (hour) award, YES NO notice to proceed. This performance period is mandatory negotiable.
calendar days and complete it within calendar days after receiving
a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
12b. CALENDAR DAYS
2. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
3. DATE ISSUED PAGE OF PAGES
47PF0024R0073
R5 AMD Capital & Customer Projects Contracting Branch Capital Construction Team 230 S Dearborn St Chicago, IL 60604 USA
5P2QEB
Jennifer Styzek 312-353-1214
1 39/20/2024
10/28/2024
4:00 PM (CST)
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement by the Government in writing within stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
OFFER (Must be fully completed by offeror)
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT
NUMBER
DATE.
AWARD (To be completed by Government)
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)
CODE FACILITY CODE
15. TELEPHONE NUMBER (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14.)
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)
21. ITEMS ACCEPTED:
22. AMOUNT
26. ADMINISTERED BY
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)
31c. DATE
STANDARD FORM 1442 (REV. 8/2014) BACK
31b. UNITED STATES OF AMERICA
BY
31a. NAME OF CONTRACTING OFFICER (Type or print)
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30b. SIGNATURE 30c. DATE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
copies to issuing office.) Contractor agrees to furnish
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
23. ACCOUNTING AND APPROPRIATION DATA
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
27. PAYMENT WILL BE MADE BY
10 U.S.C. 2304(c) ( ) 41 U.S.C. 3304(a) ( )
20b. SIGNATURE 20c. OFFER DATE
5P2QEB
R5 AMD Capital & Customer Projects Contracting Branch Capital Construction Team 230 S Dearborn St Chicago, IL 60604 USA
Jennifer Styzek
PAGE
GENERAL SERVICES ADMINISTRATION
OF
ITEM NO.
(a)
SUPPLIES OR SERVICES
(b)
QUANTITY
ORDERED
(c)
UNIT
(d)
UNIT PRICE
(e)
AMOUNT
(f)
Place of Performance: 801 W. SUPERIOR CLEVELAND, OH 44113-1829
Acquisition and installation of low embodied carbon materials
IRA emerging and sustainable Technologies
PoP: 09/09/2025 - 04/09/2029
PoP: 09/09/2025 - 04/09/2029
Deliverable
000203
10003
Informational
Informational
LS
See attached for description.
Contract Type: Firm Fixed Price
See attached for description.
and associated expenses
Contract Type: Firm Fixed Price
Place of Performance: 801 W. SUPERIOR CLEVELAND, OH 44113-1829
Informational
See attached for description.
PSC: Y1AA -- CONSTRUCTION OF OFFICE BUILDINGS
PSC: Y1AA -- CONSTRUCTION OF OFFICE BUILDINGS
Non IRA Project Expenditures
See attached for description.
PoP: 09/09/2025 - 04/09/2029 and associated expenses
Acquisition and installation of low embodied carbon steel
Deliverable and associated expenses
Contract Type: Firm Fixed Price
LS
000202
Deliverable
LS
Acquisition and installation of low embodied carbon asphalt
See attached for description.
See attached for description.
Acquisition and installation of low embodied carbon concrete
000201
Place of Performance: 801 W. SUPERIOR CLEVELAND, OH 44113-1829
PSC: Y1AA -- CONSTRUCTION OF OFFICE BUILDINGS
GSA’s Interim IRA Low Embodied Carbon Material Requirements establish numeric global warming potential (GWP) limits for each of the EPA-approved construction materials: concrete (and cement), asphalt, steel, and glass (IRA-Eligible Materials). For each IRA-Eligible Material, GWP limits have been established for the best performing 20% of materials in terms of embodied carbon, as reported in terms global warming potential (Top 20% Limits), the best performing 40% of materials in terms of embodied carbon (Top 40% Limits) and better than industry average (Better Than Average Limit).
In accordance with its proposal, Contractor shall provide all IRA-Eligible Materials required for performance of the Contract in compliance with the following IRA Limits.
IRA-Eligible Material* IRA Limit (e.g., Top 20% Limit, Top 40%, Better than Average)
GWP Value for IRA Limit
Concrete Specified concrete strength class (compressive strength [f'c] in pounds per square inch [PSI])
≤ 2499 PSI [CO to specify each limit as applicable - limits for the Top 20%, Top 40% and Better than Average prepopulated below]
228 261 277 kgCO2e/m3
3000 PSI 257 291 318 kgCO2e/m3
4000 PSI 284 326 352 kgCO2e/m3
5000 PSI 305 357 382 kgCO2e/m3
6000 PSI 319 374 407 kgCO2e/m3
≥7200 PSI 321 362 402 kgCO2e/m3
Cement** 751 819 858 kgCO2e/metric ton
Concrete Masonry Units 217 256 290 kgCO2e/m3
Asphalt 55.4 64.8 72.6 kgCO2e/metric ton
Steel
Fabricated Rebar 728 794 850 kgCO2e/metric ton
Unfabricated Rebar 611 716 760 kgCO2e/metric ton
Hollow Structural Sections (fabricated)
1,778 1,854 1,898 kgCO2e/metric ton
Hollow Structural Sections from Electric Arc Furnaces (unfabricated)
1,580 1,620 1,652 kgCO2e/metric ton
Hot-Rolled Sections (fabricated)
1,022 1,128 1,163 kgCO2e/metric ton
Hot-Rolled Sections (unfabricated)
686 713 869 kgCO2e/metric ton
Cold-Formed and Galvanized (stud, track, framing, etc.)
2,228 2,324 2,408 kgCO2e/metric ton
Structural Steel Plate from Electric Arc Furnaces (unfabricated)
987 1,152 1,190 kgCO2e/metric ton
Flat Glass 1,331 1,370 1,401 kgCO2e/metric ton
* Required construction product assemblies (such as window assemblies) are included in IRA-Eligible Material categories, and are bound by IRA Limits. At least 80% of the assembly’s total cost or total weight must be composed of compliant IRA-Eligible Materials.
**Where provision of concrete that qualifies under these GSA IRA Limits is impractical, GSA’s IRA Limits for cement may be applied to the cement being used in the concrete Mix.
Contractor compliance with IRA Limits will be verified by reference to provided materials’ environmental product declarations (EPDs). EPDs must meet the standards reflected in GSA’s Interim IRA Low Embodied Carbon Material Requirements (see Compliance Documentation criteria listed for each IRA-Eligible Material).