Stoddard_Bridge_ControlSheet.xlsx

XLSX spreadsheet 39 KB Posted

Attached to
ID FS ERFO 2017(1)-29(1), Stoddard Bridge Federal contract opportunity
Solicitation number
69056719B000031
Issued by
Department of Transportation Federal Highway Administration

About this file

This document contains survey control point data and related details for the Stoddard Bridge project. The file provides state plane and geographic coordinates, elevations, and descriptions for five survey control points used to establish horizontal and vertical control for the project. It also lists the federal solicitation number and project name for the Stoddard Bridge ID FS ERFO 2017(1)-29(1) opportunity through the Department of Transportation Federal Highway Administration. The survey control data sheet is intended to transfer point information from an Excel source file to plan sheets for the bridge project.

View the file

Other files for this federal contract opportunity

Other files attached to ID FS ERFO 2017(1)-29(1), Stoddard Bridge, newest first.
File Type Posted
BidSum_Stoddard_5.3.2022.pdf PDF
QA_04-29-2022.pdf PDF
QA_04-28-2022.pdf PDF
Amendment 3_Stoddard Bridge.pdf PDF
QA_04-27-2022.pdf PDF
QA2_04-27-2022.pdf PDF
QA2_04-25-2022.pdf PDF
Amendment 2_Stoddard Bridge.pdf PDF
QA_04-25-2022.pdf PDF
QA_04-19-2022.pdf PDF
QA_04-18-2022.pdf PDF
Amendment 1_Stoddard Bridge.pdf PDF
QA2_04-12-2022.pdf PDF
GR 06-21 ID FS ERFO 2017(1)-29(1) Final.pdf PDF
EW_Calc_Report_20210510.pdf PDF
Stoddard_HA_Report_20210510.pdf PDF
Stoddard Full Set - Plans - Signed.pdf PDF
IFB_Stoddard Bridge.pdf PDF
Stoddard_Bridge_TSL_Hydraulics_Report.pdf PDF
Stoddard_VA_Report_20210510.pdf PDF
ID USFS Stoddard Pack Suspension - 2010.pdf PDF
FS ERFO 2017(1)-29(1)_XS_20210510.pdf PDF
Show all 22

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Information

Information
1.This file transfers the Survey Control point list (in Excel format) to an Excel plan sheet. Open the point list files in Excel. Select the tab at the bottom of the worksheet and drag it to this spreadsheet. It will become a new tab. Place the name of this tab in the "Data Location" block below. The Survey Control point list will appear.
2.If extra sheets are needed, copy the original plan sheet by holding the left mouse button on the worksheet's tab (below) and hold the <CTRL>key. A mini sheet with a plus sign should appear. Drag this and drop it to the desired location.
Common Sheet Information
Insert the following values. They will appear on every sheet.
State:IDNote: If there is more than one project number, use <ALT><ENTER> to insert page break for additional lines.
Project:FS ERFO 2017(1)-29(1)
NPS PMIS /

Drawing No:

Designed by:WFLHD Survey
Date:1/1904
Checked by:WFLHD Survey
Date:1/1904
First sheet #:D.51.0
Title block text:SURVEY CONTROL
Show Totals?TRUE
Data location:Page 1Worksheet found
Data begins in col:A
Min. rows/table53.0
Base sheet name:Sheet5rows w/dataOK - no spaces in data
Max. row/table405data rowsWarnings:
40rows/table
PROJECT : Stoddard Bridge

DATE OF FIELD WORK : May 2018 DATE OF FINAL ADJUSTMENT : May 2018

PROJECT UNITS : US SURVEY FOOT

COORDINATE SYSTEM :Idaho Central SPCS NAD83 2011

EPOCH DATE : 2010.0000

VERTICAL DATUM :Orthometric Elevations based on the NAVD88 GEOID12b

Sheet Names
Input the names of the worksheets in the order you would like the sheets numbered.
Worksheet NameSheetHeader rowSheet NumberNotes
SheetD.535OK
Sheet (2)UndefinedFALSE5
Sheet (3)UndefinedFALSE5
Sheet (4)UndefinedFALSE5
Sheet (5)UndefinedFALSE5
Sheet (6)UndefinedFALSE5
Sheet (7)UndefinedFALSE5
Sheet (8)UndefinedFALSE5
Sheet (9)UndefinedFALSE5
Sheet (10)UndefinedFALSE5
Sheet (11)UndefinedFALSE5
Sheet (12)UndefinedFALSE5
Sheet (13)UndefinedFALSE5
Sheet (14)UndefinedFALSE5
Sheet (15)UndefinedFALSE5
Sheet (16)UndefinedFALSE5
Sheet (17)UndefinedFALSE5
Sheet (18)UndefinedFALSE5
Sheet (19)UndefinedFALSE5
Sheet (20)UndefinedFALSE5
Total Sheets:10sheets missing

Revised: 15 June 2015

Sheet

Sheet Information
Sheet num:D.5Filename0
Sheet name:SheetC:\MyFiles\Projects\Idaho\Stoddard_Bridge\Control\[Stoddard_Bridge_ControlSheet.xlsx]Sheet
Reference:Time
8-Aug-2019 2:35 PM
Begin Column:ABCDEFGHI

PROJECT : Stoddard Bridge DATE OF FIELD WORK : May 2018 DATE OF FINAL ADJUSTMENT : May 2018 PROJECT UNITS : US SURVEY FOOT COORDINATE SYSTEM :Idaho Central SPCS NAD83 2011

STATE PLANE COORDINATESGEO COORDINATES
3.0POINT
NUMBERNORTHEASTELEVATIONLATITUDELONGITUDEELLIPSOID
HEIGHTCOMBINED
FACTORDESCRIPTIONNOTE:
SPB11323735.1591484847.7393074.53845°17'48.579872"N114°36'16.375910"W3028.93390.999830315/8" IR w/FHWA Alum Cap1.To precisely check distances between points as measured on the ground, inverse the state plane coordinates and divide the computed distance by a mean combined factor of the two points.
SPB21323571.2861485038.6103042.06545°17'46.976060"N114°36'13.688635"W2996.46430.999831795/8" IR w/FHWA Alum Cap
SPB31323688.4261484961.6593081.49345°17'48.126902"N114°36'14.777372"W3035.88940.999829935/8" IR w/FHWA Alum Cap
SPB41323232.1701485090.3993029.14045°17'43.631740"N114°36'12.928645"W2983.53950.999832395/8" IR w/FHWA Alum Cap
SPB51323435.0011484594.6563064.47545°17'45.597615"N114°36'19.884740"W3018.87450.999830885/8" IR w/FHWA Alum Cap
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000

PROJECT : Stoddard Bridge DATE OF FIELD WORK : May 2018 DATE OF FINAL ADJUSTMENT : May 2018

PROJECT UNITS : US SURVEY FOOT

COORDINATE SYSTEM :Idaho Central SPCS NAD83 2011

STATE PLANE COORDINATESGEO COORDINATES
POINT
NUMBERNORTHEASTELEVATIONLATITUDELONGITUDEELLIPSOID
HEIGHTCOMBINED
FACTORDESCRIPTION
SPB11323735.1591484847.7393074.53845°17'48.579872"N114°36'16.375910"W3028.9340.999830315/8" IR w/FHWA Alum Cap
SPB21323571.2861485038.6103042.06545°17'46.976060"N114°36'13.688635"W2996.4640.999831795/8" IR w/FHWA Alum Cap
SPB31323688.4261484961.6593081.49345°17'48.126902"N114°36'14.777372"W3035.8890.999829935/8" IR w/FHWA Alum Cap
SPB41323232.1701485090.3993029.14045°17'43.631740"N114°36'12.928645"W2983.5400.999832395/8" IR w/FHWA Alum Cap
SPB51323435.0011484594.6563064.47545°17'45.597615"N114°36'19.884740"W3018.8750.999830885/8" IR w/FHWA Alum Cap

File details come from the government source that posted it. Updated .