QA2_04-12-2022.pdf

PDF 100 KB Posted

Attached to
ID FS ERFO 2017(1)-29(1), Stoddard Bridge Federal contract opportunity
Solicitation number
69056719B000031
Issued by
Department of Transportation Federal Highway Administration

About this file

This document contains answers to technical questions regarding federal contract solicitation number 69056719B000031 for the Stoddard Bridge project. The government will not obtain permits for a temporary work bridge or in-water work that would be required for the contractor's use of drilling equipment or transport of materials on the south side of the river. No existing bridge is available for walking across the site. Amendment A001 will address whether construction personnel can camp at the nearby Ebenezer Campground and any associated fees. Bore log information for holes BH1801 through BH1806 referenced in the plans can be found in the physical data file GR 0621 ID FS ERFO 2017(1) 29(1) Final.pdf posted to sam.gov.

View the file

Other files for this federal contract opportunity

Other files attached to ID FS ERFO 2017(1)-29(1), Stoddard Bridge, newest first.
File Type Posted
BidSum_Stoddard_5.3.2022.pdf PDF
QA_04-29-2022.pdf PDF
QA_04-28-2022.pdf PDF
QA_04-27-2022.pdf PDF
Amendment 3_Stoddard Bridge.pdf PDF
QA2_04-27-2022.pdf PDF
QA2_04-25-2022.pdf PDF
Amendment 2_Stoddard Bridge.pdf PDF
QA_04-25-2022.pdf PDF
QA_04-19-2022.pdf PDF
QA_04-18-2022.pdf PDF
Amendment 1_Stoddard Bridge.pdf PDF
GR 06-21 ID FS ERFO 2017(1)-29(1) Final.pdf PDF
Stoddard_Bridge_TSL_Hydraulics_Report.pdf PDF
EW_Calc_Report_20210510.pdf PDF
Stoddard_HA_Report_20210510.pdf PDF
Stoddard Full Set - Plans - Signed.pdf PDF
IFB_Stoddard Bridge.pdf PDF
Stoddard_VA_Report_20210510.pdf PDF
Stoddard_Bridge_ControlSheet.xlsx XLSX spreadsheet
ID USFS Stoddard Pack Suspension - 2010.pdf PDF
FS ERFO 2017(1)-29(1)_XS_20210510.pdf PDF
Show all 22

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ID FS ERFO 2017(1)‐29(1)

Stoddard Bridge

# General Technical Question Answer Date

1 X

We have been going through the pre‐ solicitation plans on the Stoddard Bridge. We see there is a highline system in place for construction of the bridge. In order to get drilling equipment in place on the south side of the river as well as other construction materials, will a temporary work bridge be allowed (Contractor Designed) for this job?

The Government does not intend to obtain a permit for a temporary work bridge on this project.

8/2/2021

2 X

Is there an in‐water permit that has been secured for this project? Use of a temporary work bridge would also allow for use of a crane in lieu of the highline system if acceptable.

The Government does not intend to obtain an in‐water permit for this project.

8/2/2021

3 X Is the existing bridge usable for walking across?

No. The previous bridge shown on the plans has been removed.

4/4/2022

4 X

Page E‐10 of the Solicitation Document reads:

Contractor shall have access to Ebenezer

Campground facility (river side of Salmon River

Road) and is responsible for coordinating access to the north side of the road with the

Forest service. Contractor will be responsible for personal/business equipment and items. A fence will be allowed at open area located at

SW corner of campground. Does this paragraph indicate that construction personnel will be permitted to camp at the Ebenezer campground? If so, is there a fee for use of the campground?

This will be addressed under Amendment

A001.

4/12/2022

5 X

I am inquiring about the bore holes 01 through

06 shown on sheet j.09. Where can I find the records/information/results of those bore holes

(BH18‐01 through BH18‐06)? It also appears that the file “GR 06‐21 ID FS ERFO 2017(1)‐29(1)

Final” is not posted with the solicitation. Please make this available (or let me know if I missed it).

The information for BH18‐01 through BH18‐

06 is in the Boring Log within the physical data file “GR 06‐21 ID FS ERFO 2017(1)‐

29(1) Final.pdf”, and we have posted this physical data file on sam.gov as this file is listed under FAR Clause 52.236‐4.

4/12/2022