QA2_04-12-2022.pdf
PDF 100 KB Posted
- Attached to
- ID FS ERFO 2017(1)-29(1), Stoddard Bridge Federal contract opportunity
- Solicitation number
- 69056719B000031
About this file
This document contains answers to technical questions regarding federal contract solicitation number 69056719B000031 for the Stoddard Bridge project. The government will not obtain permits for a temporary work bridge or in-water work that would be required for the contractor's use of drilling equipment or transport of materials on the south side of the river. No existing bridge is available for walking across the site. Amendment A001 will address whether construction personnel can camp at the nearby Ebenezer Campground and any associated fees. Bore log information for holes BH1801 through BH1806 referenced in the plans can be found in the physical data file GR 0621 ID FS ERFO 2017(1) 29(1) Final.pdf posted to sam.gov.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| BidSum_Stoddard_5.3.2022.pdf | ||
| QA_04-29-2022.pdf | ||
| QA_04-28-2022.pdf | ||
| QA_04-27-2022.pdf | ||
| Amendment 3_Stoddard Bridge.pdf | ||
| QA2_04-27-2022.pdf | ||
| QA2_04-25-2022.pdf | ||
| Amendment 2_Stoddard Bridge.pdf | ||
| QA_04-25-2022.pdf | ||
| QA_04-19-2022.pdf | ||
| QA_04-18-2022.pdf | ||
| Amendment 1_Stoddard Bridge.pdf | ||
| GR 06-21 ID FS ERFO 2017(1)-29(1) Final.pdf | ||
| Stoddard_Bridge_TSL_Hydraulics_Report.pdf | ||
| EW_Calc_Report_20210510.pdf | ||
| Stoddard_HA_Report_20210510.pdf | ||
| Stoddard Full Set - Plans - Signed.pdf | ||
| IFB_Stoddard Bridge.pdf | ||
| Stoddard_VA_Report_20210510.pdf | ||
| Stoddard_Bridge_ControlSheet.xlsx | XLSX spreadsheet | |
| ID USFS Stoddard Pack Suspension - 2010.pdf | ||
| FS ERFO 2017(1)-29(1)_XS_20210510.pdf |
Show all 22
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ID FS ERFO 2017(1)‐29(1)
Stoddard Bridge
# General Technical Question Answer Date
1 X
We have been going through the pre‐ solicitation plans on the Stoddard Bridge. We see there is a highline system in place for construction of the bridge. In order to get drilling equipment in place on the south side of the river as well as other construction materials, will a temporary work bridge be allowed (Contractor Designed) for this job?
The Government does not intend to obtain a permit for a temporary work bridge on this project.
8/2/2021
2 X
Is there an in‐water permit that has been secured for this project? Use of a temporary work bridge would also allow for use of a crane in lieu of the highline system if acceptable.
The Government does not intend to obtain an in‐water permit for this project.
8/2/2021
3 X Is the existing bridge usable for walking across?
No. The previous bridge shown on the plans has been removed.
4/4/2022
4 X
Page E‐10 of the Solicitation Document reads:
Contractor shall have access to Ebenezer
Campground facility (river side of Salmon River
Road) and is responsible for coordinating access to the north side of the road with the
Forest service. Contractor will be responsible for personal/business equipment and items. A fence will be allowed at open area located at
SW corner of campground. Does this paragraph indicate that construction personnel will be permitted to camp at the Ebenezer campground? If so, is there a fee for use of the campground?
This will be addressed under Amendment
A001.
4/12/2022
5 X
I am inquiring about the bore holes 01 through
06 shown on sheet j.09. Where can I find the records/information/results of those bore holes
(BH18‐01 through BH18‐06)? It also appears that the file “GR 06‐21 ID FS ERFO 2017(1)‐29(1)
Final” is not posted with the solicitation. Please make this available (or let me know if I missed it).
The information for BH18‐01 through BH18‐
06 is in the Boring Log within the physical data file “GR 06‐21 ID FS ERFO 2017(1)‐
29(1) Final.pdf”, and we have posted this physical data file on sam.gov as this file is listed under FAR Clause 52.236‐4.
4/12/2022