Amendment 3_Stoddard Bridge.pdf
PDF 676 KB Posted
- Attached to
- ID FS ERFO 2017(1)-29(1), Stoddard Bridge Federal contract opportunity
- Solicitation number
- 69056719B000031
About this file
This document is an amendment to a solicitation for construction services related to the Stoddard Bridge project. The amendment provides revisions to special contract requirements, including stipulations for approved staging and stockpile areas as well as camping arrangements for contractor personnel at the Ebenezer Campground site. Contractors must coordinate directly with the USDA Forest Service to obtain approval for fuel storage locations, establish a fenced perimeter for closed contractor use of the designated camping area, and adhere to applicable camping fees and ordinances. The solicitation number is 69056719B000031 and is being issued by the US Department of Transportation Federal Highway Administration for construction services under ID FS ERFO 2017(1)-29(1) pertaining to the Stoddard Bridge. The contact for coordinating camping details with the Forest Service is provided.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| BidSum_Stoddard_5.3.2022.pdf | ||
| QA_04-29-2022.pdf | ||
| QA_04-28-2022.pdf | ||
| QA2_04-27-2022.pdf | ||
| QA_04-27-2022.pdf | ||
| QA2_04-25-2022.pdf | ||
| Amendment 2_Stoddard Bridge.pdf | ||
| QA_04-25-2022.pdf | ||
| QA_04-19-2022.pdf | ||
| QA_04-18-2022.pdf | ||
| QA2_04-12-2022.pdf | ||
| Amendment 1_Stoddard Bridge.pdf | ||
| GR 06-21 ID FS ERFO 2017(1)-29(1) Final.pdf | ||
| ID USFS Stoddard Pack Suspension - 2010.pdf | ||
| FS ERFO 2017(1)-29(1)_XS_20210510.pdf | ||
| EW_Calc_Report_20210510.pdf | ||
| Stoddard_HA_Report_20210510.pdf | ||
| Stoddard Full Set - Plans - Signed.pdf | ||
| IFB_Stoddard Bridge.pdf | ||
| Stoddard_VA_Report_20210510.pdf | ||
| Stoddard_Bridge_ControlSheet.xlsx | XLSX spreadsheet | |
| Stoddard_Bridge_TSL_Hydraulics_Report.pdf |
Show all 22
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
N/A
PAGE
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE NO. 5. PROJECT NO. (If applicable)
A003 04/27/2022 N/A See Box 14
6. ISSUED BY CODE N/A 7. ADMINISTERED BY (If other than Item 6) CODE N/A
Department of Transportation Federal Highway Administration 610 East Fifth Street Vancouver WA 98661-3801
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and Zip Code) 9A. AMENDMENT OF SOLICITATION NO.
X
69056719B000031
9B. DATED (SEE ITEM 11)
03/30/2022
10A. MODIFICATION OF CONTRACT/ORDER NO.
N/A
10B. DATED (SEE ITEM 13)
CODE: N/A FACILITY CODE: N/A
N/A
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
| X | The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
(__ ) is extended, ( x ) is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
N/A
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A THIS CHANGE ORDER IS ISSUED PURSUANT TO (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN
ITEM 10A.
N/A
B THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (Such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D OTHER (Specify type of modification and authority)
N/A
E. IMPORTANT: Contractor n/a is not, n/a is required to sign this document and return n/a copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
ID FS ERFO 2017(1)-29(1), Stoddard Bridge
See page 2.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15a. NAME AND TITLE OF SIGNER (Type or print) 15a. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
N/A
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY_________________________________________ BY N/A___________________________ N/A (Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITION NOT USABLE
30-105 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
Amendment No. A003, dated 04-27-2022 ID FS ERFO 2017(1)-29(1)
Solicitation No. 69056719B000031 Stoddard Bridge
REVISIONS ARE AS FOLLOWS:
SPECIAL CONTRACT REQUIREMENTS
Page E-10, Subsection 105.04, Handling and Storing Material. Adds information.
Page F-21, Subsection 552.03, Composition (Concrete Mix Design). Adds Pay Item 55201-
0200 – Structural Concrete, Class A (AE) to list of pay items requiring integrally colored concrete..
ENCLOSURES
Pages:
E-10
F-21
E-10 DIVISION 100
Special Contract Requirements Project: ID FS ERFO 2017(1)-29(1), Stoddard Bridge
Subsection 107.10(d). Submit copies of agreements and documents and do not use property until approved by CO.
Add the following:
Do not use Cache Bar and Cupper Canyon as a staging and stockpile area. Equipment used will be fueled and serviced at the staging areas only. Obtain Forest Service approval for fuel storage locations at staging areas and keep spill cleanup kits onsite at all times. There will be no fuel storage below the ordinary high-water line or within the active floodplain. When not in use, vehicles will be parked in the designated staging areas indicated above.
Contractor shall have access to Ebenezer Campground facility (river side of Salmon River Road) and is responsible for coordinating access to the north side of the road with the Forest service.
Contractor will be responsible for personal/business equipment and items. A fence will be allowed at open area located at SW corner of campground.
The southside of Ebenezer Campground (river side of Salmon River Road) site is available for contractors to camp at no cost, which excludes the upper portion of Ebenezer above the road. The CO will identify the exact limits of this site in field, and use of this site is subject to the following requirements.
(a) Follow the established Forest Service Campground rules, restrictions, and requirements for using the designated site.
(b) Establish a CO-approved fenced perimeter with signs indicating the area being used is closed to the public.
(c) Vehicles are required to stay on existing roads and parking areas because the Ebenezer Campground is a historic site.
Camping outside of the aforementioned limits require additional fees and ordinances.
Coordinate camping fees and ordinances to follow for camping at Ebenezer Campground with the Forest Service.
The Forest Service contact information for coordinating camping fees and ordinances for camping at Ebenezer Campground is as follows.
Michael Carroll USDA-FS Engineer 1206 South Challis Street Phone: (208) 756-5101 Email: michael.d.carroll@usda.gov
Revised by Amendment A003
Revised by Amendment A002
Revised by Amendment A001
File details come from the government source that posted it. Updated .