Steam Test Port Additions.pdf

PDF 210 KB Posted

Attached to
Reverse Osmosis System Modifications
Solicitation number
36C26326Q1027
Issued by

About this file

This document is a floor plan diagram depicting the layout of a laboratory or medical facility with decontamination and sterilization capabilities. The plan shows multiple specialized rooms including offices (BM-107D, BM-108, BM-111, BM-114), an ante room (BM-107C), a clean storage area (BM-109), a pass-through cart wash station (BM-108A), a scope decontamination room (BM-111D), a cart lift area (BM-119), and a drying room (BM-119D). Additional rooms are labeled BA-101, BA-104, BA-105, and BA-R, with various corridors and support spaces throughout the facility.

The floor plan includes marked steam distribution lines (Steam #1, #3, and #4 highlighted in orange) running horizontally through the middle section of the facility, indicating a steam sterilization or decontamination system. Blue-highlighted elements appear to indicate specific equipment or utility locations, while pink diagonal lines suggest architectural features such as sloped ceilings or roof lines. The grid reference system (columns labeled HH through AA, rows numbered 1-21) and circular navigation points facilitate spatial orientation. This appears to be a technical architectural document for a biomedical or healthcare decontamination facility, likely used for sterilization of medical instruments and equipment.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CC BB AA VWXY

ANTE ROOM

OFFICE

Z

DDEEFFGGHH

OFFICE

BM-107D

CLEAN

STORAGE

STAIR

BM-109

PASS

THROUGH

CART WASH

BM-108A

ANTE ROOM

CB90

COORIDOR

BM-105

HAC

BM-104

LOCKER

ROOM

BM-103

LOCKER

ROOM

CB88

COORIDOR

BM-107C

SCOPE

DECON

BM-111D

OFFICE

BM-108

OFFICE

BM-111

RoomBM-112

Room

M2

ELEVATOR

CB-79A

Room

BA-104

Room

BA-105

Room

BA-103

Room

BA-102

Room

C10

Room

BA-101

Room

BM-111B

Room

BA-106

Room

M3

CART LIFTBM-119

Room

BM-119E

DRYING

ROOM

BM-101

Room

BM-102

Room

BA-107

Room

CB-87

Room

BG-101

Room

BM-119D

Room

BM-114

OFFICE

BM-111C

Room

VHAMINKaediC Image

VHAMINKaediC Image

VHAMINKaediC Image

VHAMINKaediC Callout Steam #1

VHAMINKaediC Callout Steam #2

VHAMINKaediC Callout Steam #3

VHAMINKaediC Callout Steam #4

Floor Plans
0-Floor Plan Existing

File details come from the government source that posted it. Updated .