This document is a technical specification and guidance document for the SPS Project, detailing modifications to deionized (DI) water and reverse osmosis (RO) piping systems.
The project requires several key modifications to existing water distribution infrastructure. The primary work involves upgrading the DI critical loop in the interstitial space from 1 1/4" to 2" piping to match the RO loop size, including a section where the DI loop currently drops. The DI supply and return main branch lines must be cut out and reconnected to the lab using 90-degree elbows to redirect DI water supply and return lines exclusively to the lab area. The RO return line must be connected to the DI supply side of the SPS loop where the existing RO main branch is replaced with 2" piping per the Statement of Work (SOW). Additionally, the new DI 2" main branch return must be connected to the RO return line. The 3/4" sink branch lines that T off the interstitial loop must be left in place and reattached after modifications. The existing 1 1/4" DI supply and return lines should remain in service with 90-degree elbows added to reconnect the lab-side piping back to the DI water supply. The document includes annotated photographs showing current conditions and the specific locations where connections, disconnections, and sizing upgrades are required.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cut out DI supply and return lines
Add 90 degree elbows to direct DI water
Supply and return lines to Lab only.
Connect RO return to DI supply side
Of SPS loop where RO main branch is
Replaced with 2" per SOW
Connect DI New 2" main branch return to RO Return
1 1/4" DI Critical loop is in the interstitial only
Sink branch lines T off of the loop in the interstitial
These are 3/4" Leave these and re-attach.
Leave existing 1 1/4" DI supply and Return lines and add 90 degree elbows to reconnect lab side back to
DI water supply
DI to LAB
DI from LAB
DI supply of existing main branch loop
DI return of existing main branch loop
RO/DI connection Tuesday, December 9, 2025 9:24 AM
SPS Project Page 1
Change 1 1/4" loop in interstitial
To same size as RO loop (2")
DI loop does drop in one location. Change this pipe to
Same size as RO as well.
SPS Project Page 2
Connect existing sink lines back to new 2" main loop
SPS Project Page 3