DI and RO Loop Plan - Current.pdf

PDF 469 KB Posted

Attached to
Reverse Osmosis System Modifications
Solicitation number
36C26326Q1027
Issued by

About this file

This is a technical architectural drawing showing a basement interstitial floor plan for above-ground piping systems. The document is prepared by Office of Facilities Management and is dated 10/06/17, with revision notes and general notes included for construction guidance.

The drawing depicts piping layout and system expansion details for what appears to be a mechanical or building systems installation. Key features include existing DI (District Heating/Cooling) loops marked in blue, existing RO (Reverse Osmosis) loops marked in red, and various pipe runs with dimensional annotations throughout the floor plan. The document contains detailed specifications regarding pipe sizes, vent connections, drain locations, and interconnections between systems. General notes address operational safety during construction, inspection requirements, and coordination with existing infrastructure. The plan includes revision notes referencing previous modifications such as adding bypass piping, vent connections, and drain line adjustments. Multiple reference circles and dimensional callouts are distributed across the plan to facilitate construction coordination and installation accuracy.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VHAMINKaediC Line

VHAMINKaediC Line

VHAMINKaediC Line

VHAMINKaediC Line

VHAMINKaediC Line

VHAMINKaediC Line

VHAMINKaediC Line

VHAMINKaediC Line

VHAMINKaediC Line

VHAMINKaediC Line

VHAMINKaediC Line

VHAMINKaediC Line

VHAMINKaediC Line

VHAMINKaediC Line

VHAMINKaediC Line

VHAMINKaediC Line

VHAMINKaediC Line

VHAMINKaediC Line

VHAMINKaediC Line

VHAMINKaediC Line

VHAMINKaediC Line

VHAMINKaediC Line

VHAMINKaediC Line

VHAMINKaediC Line

VHAMINKaediC Line

VHAMINKaediC Line

VHAMINKaediC Line

VHAMINKaediC Line

VHAMINKaediC Line

VHAMINKaediC Line

VHAMINKaediC Line

VHAMINKaediC Line

VHAMINKaediC Line

VHAMINKaediC Line

VHAMINKaediC Line

VHAMINKaediC Line

VHAMINKaediC Line

VHAMINKaediC Line

VHAMINKaediC Line

VHAMINKaediC Line

VHAMINKaediC Line

VHAMINKaediC Line

VHAMINKaediC Line

VHAMINKaediC Line

VHAMINKaediC Line

VHAMINKaediC Line

VHAMINKaediC Line

VHAMINKaediC Line

VHAMINKaediC Line

VHAMINKaediC Line

VHAMINKaediC Line

VHAMINKaediC Line

VHAMINKaediC Line

VHAMINKaediC Line

VHAMINKaediC Line

VHAMINKaediC Line

VHAMINKaediC Line

VHAMINKaediC Line

VHAMINKaediC Line

VHAMINKaediC Line

VHAMINKaediC Line

VHAMINKaediC Line

VHAMINKaediC Line

VHAMINKaediC Line

VHAMINKaediC Highlight

VHAMINKaediC Highlight

VHAMINKaediC Line

VHAMINKaediC Line

VHAMINKaediC Line

VHAMINKaediC Text Box

VHAMINKaediC Text Box Existing RO Loop

VHAMINKaediC Text Box Existing DI loop

File details come from the government source that posted it. Updated .