DI Sinks to Remove from DI Loop.pdf

PDF 6 MB Posted

Attached to
Reverse Osmosis System Modifications
Solicitation number
36C26326Q1027
Issued by

About this file

This is a facility floor plan and schematic diagram for a laboratory decontamination infrastructure project. The document illustrates the physical layout of a building with detailed room designations, DI (deionized water) system components, and sink locations requiring modification or removal from the DI loop.

The plan identifies multiple laboratory spaces (Lab Sinks 1-10), equipment locations, scope rooms, and decontamination areas throughout the facility. Key features include the SPS (Sample Preparation System) area and various building rooms (BR) and areas labeled with designations such as BA, BB, BC, and BD. The diagram highlights Lab DI Sinks marked for removal from the DI Loop system and indicates rough sink locations throughout the facility. A legend provides cross-references between sample locations and room numbers with corresponding sign labels (DI #1 through DI #14, CW #1 through CW #9). The schematic shows the interconnected piping systems for the DI generation loop and return lines, with annotations noting that connections should be removed to tie main supply and return lines back together at specified locations. This appears to be a technical specification document for facility modifications related to deionized water system reconfiguration.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UP

UP

HJKLMNPQRSTUVWXYAABB

VHAMINFahM Polygon

VHAMINFahM Polygon

VHAMINFahM Line

VHAMINFahM Line

VHAMINFahM Rectangle

VHAMINFahM Text Box DI to Machine

VHAMINFahM Text Box DI to potential Machine

VHAMINFahM Text Box Rough sink location

VHAMINKaediC Cloud

VHAMINKaediC Text Box

SPS

VHAMINKaediC Text Box Lab DI Sinks to remove from the DI Loop

VHAMINKaediC Cloud

VHAMINKaediC Callout

DI #1

VHAMINKaediC Callout

DI #2

VHAMINKaediC Callout

DI #3

VHAMINKaediC Callout

DI #4

VHAMINKaediC Callout

DI #5

VHAMINKaediC Callout

DI #6

VHAMINKaediC Callout

DI #7

VHAMINKaediC Callout

DI #8

VHAMINKaediC Callout

DI #9

VHAMINKaediC Callout

DI #10

VHAMINKaediC Callout

DI #11

VHAMINKaediC Callout

DI #12

VHAMINKaediC Rectangle

VHAMINKaediC Polygon

VHAMINKaediC Polygon

VHAMINKaediC Polygon

VHAMINKaediC Rectangle

VHAMINKaediC Rectangle

VHAMINKaediC Rectangle

VHAMINKaediC Rectangle

VHAMINKaediC Rectangle

VHAMINKaediC Rectangle

VHAMINKaediC Cloud

VHAMINKaediC Cloud

VHAMINKaediC Rectangle

VHAMINKaediC Rectangle

VHAMINKaediC Rectangle

VHAMINKaediC Rectangle

VHAMINKaediC Text Box Remove these connections to sinks in the interstial space and tie main supply and return lines back together at each location

VHAMINKaediC Image

VHAMINKaediC Image

VHAMINKaediC Arrow

VHAMINKaediC Arrow

File details come from the government source that posted it. Updated .