Critical Water Loop Plan - New.pdf

PDF 471 KB Posted

Attached to
Reverse Osmosis System Modifications
Solicitation number
36C26326Q1027
Issued by

About this file

This document is a basement interstitial floor plan for above-ground piping, prepared by the Office of General Services Management. The plan is dated 10/26/17 and appears to be a technical architectural/mechanical drawing that details the layout and configuration of piping systems in a building's basement interstitial space.

The drawing includes several key specifications and revisions: an existing DI main branch loop to be replaced with 2" Schedule 80 PVC, and a new RO loop after SPS DI that is separated and added to the RO loop. The plan contains detailed measurements in inches and feet, various pipe sizes and materials noted throughout, and reference circles corresponding to a "Revised Notes" section in the upper right corner. General notes indicate the document addresses operational constraints, construction sequencing, inspection protocols, and maintenance access requirements. The drawing employs standard architectural notation with dimensions, symbols, and call-outs to identify specific pipe runs, fittings, and system connections throughout the basement interstitial floor plan.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VHAMINKaediC Line

VHAMINKaediC Line

VHAMINKaediC Line

VHAMINKaediC Line

VHAMINKaediC Line

VHAMINKaediC Line

VHAMINKaediC Line

VHAMINKaediC Line

VHAMINKaediC Line

VHAMINKaediC Line

VHAMINKaediC Line

VHAMINKaediC Line

VHAMINKaediC Line

VHAMINKaediC Line

VHAMINKaediC Line

VHAMINKaediC Line

VHAMINKaediC Line

VHAMINKaediC Line

VHAMINKaediC Line

VHAMINKaediC Line

VHAMINKaediC Line

VHAMINKaediC Line

VHAMINKaediC Line

VHAMINKaediC Line

VHAMINKaediC Line

VHAMINKaediC Line

VHAMINKaediC Line

VHAMINKaediC Line

VHAMINKaediC Line

VHAMINKaediC Line

VHAMINKaediC Line

VHAMINKaediC Line

VHAMINKaediC Line

VHAMINKaediC Line

VHAMINKaediC Line

VHAMINKaediC Line

VHAMINKaediC Line

VHAMINKaediC Line

VHAMINKaediC Line

VHAMINKaediC Line

VHAMINKaediC Line

VHAMINKaediC Line

VHAMINKaediC Line

VHAMINKaediC Line

VHAMINKaediC Line

VHAMINKaediC Line

VHAMINKaediC Line

VHAMINKaediC Line

VHAMINKaediC Line

VHAMINKaediC Line

VHAMINKaediC Line

VHAMINKaediC Line

VHAMINKaediC Line

VHAMINKaediC Line

VHAMINKaediC Line

VHAMINKaediC Line

VHAMINKaediC Line

VHAMINKaediC Line

VHAMINKaediC Line

VHAMINKaediC Line

VHAMINKaediC Line

VHAMINKaediC Line

VHAMINKaediC Line

VHAMINKaediC Line

VHAMINKaediC Line

VHAMINKaediC Line

VHAMINKaediC Text Box New RO loop after SPS DI is separated and added to the RO loop.

VHAMINKaediC Arrow

VHAMINKaediC Cloud+

VHAMINKaediC Cloud+ Existing DI main branch loop to be replaced with 2" schedule 80 PVC

File details come from the government source that posted it. Updated .