Critical Water Loop Plan - New.pdf
PDF 471 KB Posted
- Attached to
- Reverse Osmosis System Modifications
- Solicitation number
- 36C26326Q1027
About this file
This document is a basement interstitial floor plan for above-ground piping, prepared by the Office of General Services Management. The plan is dated 10/26/17 and appears to be a technical architectural/mechanical drawing that details the layout and configuration of piping systems in a building's basement interstitial space.
The drawing includes several key specifications and revisions: an existing DI main branch loop to be replaced with 2" Schedule 80 PVC, and a new RO loop after SPS DI that is separated and added to the RO loop. The plan contains detailed measurements in inches and feet, various pipe sizes and materials noted throughout, and reference circles corresponding to a "Revised Notes" section in the upper right corner. General notes indicate the document addresses operational constraints, construction sequencing, inspection protocols, and maintenance access requirements. The drawing employs standard architectural notation with dimensions, symbols, and call-outs to identify specific pipe runs, fittings, and system connections throughout the basement interstitial floor plan.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Line
VHAMINKaediC Text Box New RO loop after SPS DI is separated and added to the RO loop.
VHAMINKaediC Arrow
VHAMINKaediC Cloud+
VHAMINKaediC Cloud+ Existing DI main branch loop to be replaced with 2" schedule 80 PVC
File details come from the government source that posted it. Updated .