Statement of Work Weight Handling Equipment.pdf

PDF 307 KB Posted

Attached to
Weight Handling Equipment Inspection, Load Testing, and Preventive Maintenance Services
Solicitation number
70Z03126QALAM349
Issued by

About this file

This is a Statement of Work (SOW) for annual weight handling equipment inspection, load testing, and preventative maintenance services at United States Coast Guard Base Alameda in California.

The Contractor shall provide comprehensive inspection, testing, reporting, and preventative maintenance services for weight handling equipment including cranes, hoists, forklifts, and chain falls across multiple facilities on Coast Guard Island. Core deliverables include: (1) one annual inspection per equipment piece incorporating full functional no-load operational testing and rated load testing up to 110% of manufacturer capacity; (2) written reports and certification labels; (3) preventative maintenance visits per manufacturer specifications and Coast Guard operational requirements; and (4) corrective maintenance and unscheduled repairs. The contract period is twelve (12) months from award. All personnel performing inspections must be certified by the U.S. Department of Labor per 29 CFR 1919. Work is performed between 0730-1600 hours Monday through Friday, with weekend/holiday work requiring prior Contracting Officer approval. The Contractor must provide an access list 48 hours before starting work; all personnel require valid government-issued identification. Equipment is subject to prevailing wage requirements, the Service Contract Act (WD 2015-5623), and the Buy American Act. Primary points of contact are Mr. Christopher A. Jones (POC) and MK1 Jeffrey S. Watson (APOC) at USCG Base Alameda, 1 Eagle Road, Alameda, California 94501. Key submittals include inspector certificates (14 days prior to inspections), test equipment accuracy certificates (14 days prior), preventative maintenance schedules (30 days after award), initial inspection reports (7 days after completion), and final reports (14 days after completion).

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF HOMELAND SECURITY

UNITED STATES COAST GUARD

STATEMENT OF WORK

Annual Weight Handling Equipment Inspection, Load Testing, & Preventative Maintenance Services

UNITED STATES COAST GUARD BASE ALAMEDA

TABLE OF CONTENTS

Contents

1. INTRODUCTION/BACKGROUND

2. SCOPE OF WORK

3. LOCATION OF SERVICES & UNIT POINTS OF CONTACT

4. PERIOD OF PERFORMANCE AND WORK HOURS

5. GENERAL

6. TESTING AND INSPECTION REQUIREMENTS

7. PREVENTATIVE MAINTENANCE SERVICE

8. CORRECTIVE MAINTENANCE AND UNSCHEDULED REPAIRS

9. SUBMITTALS

1. INTRODUCTION/BACKGROUND

Coast Guard units at Base Alameda on Coast Guard Island operate various weight handling equipment that require annual inspection and load testing certificates in accordance with OSHA, ANSI, and Coast Guard regulations. The Contractor shall perform all professional services described herein. These services include inspection, testing, reporting and preventative maintenance of weight handling equipment in multiple performance locations across Coast Guard Island. The Contractor shall provide an inspector accredited by the U.

S. Department of Labor to test, inspect, and report the condition of weight handling equipment in accordance with 29 CFR 1919. Per COMDTINST M11000.11B, weight handling equipment is defined as “any equipment used for lifting or moving loads to provide a mechanical advantage for lifting, moving, excavating, or placing materials. This project is subject to Prevailing Wages, the Service Contract Act (WD 2015-5623), and the Buy American Act.

2. SCOPE OF WORK

The Contractor shall provide all necessary transportation, labor, equipment, materials, weights, measures, testing materials, and perform all operations in conjunction with testing, inspecting, and reporting the condition of the equipment. The Contractor shall certify that each piece of equipment tested and inspected meets the requirements set by 29 CFR 1910. Equipment is geographically located at multiple facilities as detailed in Section 3.

The following services shall be performed:

2.1. Annual inspections, which include full functional no load operational test and a rated load test

2.2. Written reports

2.3. Certificates and decals

2.4. Preventative maintenance services, such as lubrication, minor adjustments, and replacement of worn parts (e.g., belts, filters, seals), in accordance with manufacturer’s specifications and Coast Guard operational standards.

2.5. Corrective Maintenance and Unscheduled Repairs

3. LOCATION OF SERVICES & UNIT POINTS OF CONTACT

USCG BASE Alameda, 1 Eagle Rd. Alameda CA. 94501 POC: Mr. Christopher A. Jones APOC: MK1 JeƯrey S. Watson

4. PERIOD OF PERFORMANCE AND WORK HOURS

The period of performance (PoP) for this contract shall be twelve (12) months from the date of the award. Within this PoP, the Contractor shall complete the following:

4.1. One (1) annual inspection, which includes operational testing and required load testing of all listed weight handling equipment.

4.2. Preventative maintenance (PM) visits for each piece of equipment, performed in accordance with the manufacturer’s recommended service intervals and Coast Guard operational requirements. The number of PM visits may vary by equipment type. The Contractor shall propose and coordinate a PM schedule with the Contracting OƯicer’s Representative (COR) within thirty (30) days of award.

4.3. Work may be performed between 0730-1600.

4.4. No work shall be allowed on weekends or holidays without prior approval by the Contracting OƯicer.

5. GENERAL

5.1. Contract Points of Contact

Contracting OƯicer’s Representative: The Government will have a

Contracting OƯicer’s Representative (COR) as well as unit POCs who will be at the site, listed in Section 3. The contractor shall inform the COR as well as the unit POC of day-to-day activities and plans. At the start of each workday, the contractor shall check in with the unit POC.

5.2. Unit Access

The contractors shall provide an access list of personnel authorized access to the Coast Guard facilities 48 hours before starting work. All persons must have/present a valid government issued ID to enter the unit, there will be no exceptions.

5.3. Contractor Employee Qualifications & Responsibilities

5.3.1. The Contractor shall employ competent and qualified technicians and engineers to perform the required work of this contract. All personnel performing tests and inspections shall be certified by the U.S.

Department of Labor as authorized to inspect, test and issue documents and/or papers of certification on cranes, hoists, forklifts, chain falls and other weight handling and material handling equipment. Each inspector shall be qualified academically and operationally in the practical application of the equipment listed in enclosure (1). All personnel assigned by the Contractor to perform work under this contract shall be physically able to perform assigned work.

5.3.2. Fourteen (14) calendar days prior to the commencement of inspections, the Contractor shall submit the names of proposed inspector(s) and a copy of each inspector’s certification to the COR.

5.3.3. The Contractor shall be responsible for setting-up and performing all operational tests and rated load tests as described in this specification. The Contractor shall attach and inspect all rigging in accordance with the rated load test and be responsible for determining the setup of the specific piece of equipment, i.e. boom angle, radius and all other operational factors including the calculation of appropriate weights to be imposed on equipment.

5.4. Onsite Coordination

All tests and inspections shall be observed by a Coast Guard representative designated by the COR, usually the unit POC. The Contractor shall check in with the COR upon arrival and the designated representative each day thereafter while performing inspections. The Contractor shall conduct a closing conference with the COR and the Coast Guard representative, upon completion of inspection to inform Coast Guard personnel of the results of the tests and inspections, and to make recommendations relative to correction, maintenance procedures, operations and any other considerations for continued safe operation of the equipment. The Contractor shall immediately notify the COR and Coast Guard representative if a piece of equipment is found to be deficient, so that the equipment can be immediately removed from service until repairs have been made and a follow-on inspection and load test have been completed. When deficiencies are found the Contractor shall provide a written estimate for repairs.

6. TESTING AND INSPECTION REQUIREMENTS

6.1. General Requirements

The Contractor shall inspect all weight handling equipment listed in Appendix C of this specification. The inspection shall include all accessories generic to the piece of equipment. Equipment identified as requiring a rated load and unit proof test shall also have the tests performed in accordance with the applicable sections of the references identified previously. As part of the annual inspection requirement, the Contractor shall conduct a full functional no-load operational test and a rated load test (up to 110% of equipment capacity). Load testing is an inseparable component of the annual inspection and shall be included in the unit price. No separate pricing or invoicing for load testing will be accepted.

6.2. Frequent and Periodic Requirements

Equipment to be tested and inspected shall have all tests and inspections performed under two general classifications designated "frequent" and "periodic" inspections as indicated in the applicable chapter of the latest edition of the ANSI series. When applicable to the individual piece of equipment, an inspection shall include, but is not limited to, the following items:

6.2.1. All safety devices for malfunction and compliance with applicable 29 CFR 1900 series regulations

6.2.2. All control mechanisms for adjustment, wear, and

lubrication.

6.2.3. Gasoline, diesel, electric, or other power plants for

improper performance or noncompliance with safety requirements.

6.2.4. Electrical apparatus for malfunctioning, signs of excessive deterioration, dirt or moisture accumulation.

6.2.5. All limit switches or limiting devices without a load on the hoist.

6.2.6. Loose bolts or rivets (fasteners).

6.2.7. Foundation supports for continued ability to sustain

imposed loads.

6.2.8. Structural members for deformation, cracks and corrosion.

6.2.9. Load carrying ropes or hoist rope for excessive wear and distortion.

6.2.10. Dye check hooks for deformations or cracks, wear, severs, nicks or gouges, latch enlargement and damaged or malfunctioning latch (if provided).

6.2.11. Cracked or worn sheaves and drums.

6.2.12. Worn, cracked or distorted parts such as pins, bearings, shafts, gears, rollers and locking devices.

6.2.13. Excessive wear of chain drive sprockets and excessive chain stretch.

6.2.14. Hoist brakes, clutches and operating levers for proper functioning before beginning any operational tests.

6.2.15. Travel steering, braking and locking devices for

malfunction.

6.2.16. Excessive wear on brake and clutch system parts, linings, pawls and ratchets.

6.2.17. Load, boom angle, and other indicators over their full range, for any significant inaccuracies.

6.2.18. Radiators and oil coolers, for leakage, improper

performance, or blockage of air passages.

6.2.19. Deterioration or leakage in air or hydraulic systems.

6.2.20. Cleanliness of oil filters and strainers.

6.2.21. Excessively worn tires.

6.2.22. Plumb of mast, chords, lacing, and tension in guys.

6.2.23. Rust on piston rods and control valves when a crane has been idle for a period of time.

6.3. Operational Testing

The Contractor shall perform an operational test on each piece of equipment. Tests shall include the operation of all moving mechanisms.

Tests shall note improper function, maladjustment, and excessive component wear. The operational test shall include operation of all components with partial load, in which all functions and movements including rotations (where applicable) are performed.

6.4. Rated Load Testing

6.4.1. General

All equipment shall be rated or unit proof tested during base year of this contract. The Contractor shall submit to the COR a list of Coast Guard equipment that requires annual rate testing, so that this list may be included in future year awards.

All required tests shall be carried out using weights as a dead load, limited to 110% of the manufacturer’s rated load for the applicable piece of equipment. However, if the configuration of the equipment presents a risk of damage to surrounding structures or systems during testing, the Contractor shall use dynamometers or other calibrated test equipment certified to equivalent accuracy in place of dead loads.

The Contractor shall ensure that accuracy is maintained, and proof loads adjusted accordingly.

6.4.2. Dynamometers

Any dynamometers or recording test equipment, owned by an accredited person meeting the requirement of 29 CFR 1919, shall have been tested for accuracy within six (6) months of the start of this contract. Such test shall be performed with calibrating equipment which has been checked in turn, so that indications are traceable to the National Bureau of Standards. The Contractor shall submit the certificate of accuracy to the COR fourteen (14) calendar days prior to the commencement of inspections.

6.4.3. Test Equipment Not Property of Accredited Person

Where test equipment is not the property of the accredited person meeting the requirements of 29 CFR 1919, that person shall not issue any certificate based upon the use of such equipment unless the owner of said equipment has made available a certificate of accuracy based on the requirements of this specification obtained within six (6) months prior to the start of this contract, and stating the errors of the equipment. The Contractor shall submit the certificate of accuracy to the COR fourteen (14) calendar days prior to the commencement of inspections.

6.5. Newfound or Decommissioned Equipment

While on site, the Contractor shall notify the COR immediately of any newfound equipment meeting the description of weight handling equipment as defined previously or if unable to find any equipment listed in enclosure

(1) while onsite. The COR shall review the equipment with the unit and determined whether or not there is an operational need for it or if it is good enough condition to pass both an inspection and load test. After consultation with the unit, the COR shall notify the contractor if the newfound equipment needs to be added to the contract equipment list and if unfound equipment needs to be removed.

6.6. Re-inspection and Follow-on Load Tests

If during any test or inspection defined in this specification, the equipment fails to meet the reference requirements, the Contractor shall re-inspect said equipment after the Coast Guard has accomplished repair. This re-inspection shall include operational and rated load tests as required and described in this specification. Re-inspections shall be completed, within thirty (30) calendar days after notification by the Coast Guard that the equipment is ready for re-inspection. The Coast Guard will notify the Contractor of the repair by providing a “Discrepancy Repair Memorandum” which identifies how each discrepancy was addressed. If equipment was found to be deficient in a previous test or inspection, the Contractor shall not re-test or re-inspect without a signed memorandum. Re-inspections may be required up to ninety (90) calendar days after contract completion date.

6.7. Certification Labels

When a piece of equipment has been certified, the Contractor shall aƯix a 3” x 5” stamped metal plate or punched plastic tag on the equipment as a certification label. Paper product labels or stick on decals are not acceptable. The label shall contain the following information:

6.7.1. Certification number

6.7.2. Location at unit

6.7.3. Make

6.7.4. Model

6.7.5. Serial number

6.7.6. Inspection date

6.7.7. Load test date

6.7.8. Inspector’s name

This label shall be impervious to weather, shall be attached with hardware that must be destroyed to remove the label, and shall not interfere with the operation of the equipment.

Within thirty (30) days after the receipt of award, the Contractor shall provide the COR a sample of the certification label.

6.8. Inspection and Testing Reports

The Contractor shall provide written reports to the Coast Guard stating the results of tests and inspections. The reports shall be of two types, Initial Reports and Final Reports. Each piece of equipment tested and inspected shall have a separate initial and final report completed for it. Each report shall contain the signature of the certified inspector who performed the test and inspection. Each report shall also include:

6.8.1. U. S. Department of Labor Certification Form.

6.8.2. A title block containing the Contractors name and address; the equipment manufacturer’s name; equipment type, model number, serial number, capacity; Coast Guard unit and building name location of the equipment; and the date equipment was tested.

6.8.3. A diagram/schematic containing a checklist for the specific piece of equipment that was tested and inspected.

6.8.4. A Deficiency and Recommendation Report noting in detail any deficiencies and/or recommendations. Violations of 29 CFR 1900 series, shall be addressed in a separate paragraph of the report.

6.8.5. Initial Report. One (1) legible, hand-written copy of the inspection report shall be submitted to the Coast Guard representative at the unit for signature upon completion of the inspection. The signature attests the fact that tests and inspections were performed as required. A copy of each Initial

Report shall be forwarded by the Contractor to the COR within seven (7) calendar days after completion of the test and inspection.

6.8.6. Final Report. Within fourteen (14) calendar days after the test and inspection, the Contractor shall submit a typewritten report containing the information included on the initial report, to the COR. A Final Report shall be submitted for each piece of equipment tested and inspected.

7. PREVENTATIVE MAINTENANCE SERVICE

7.1. Scope and Frequency

The Contractor shall perform preventative maintenance (PM) on each piece of weight handling equipment in accordance with the manufacturer’s recommended service intervals and specifications. PM shall not be limited to annual inspection events and may be required at diƯerent intervals.

Preventative maintenance is not a substitute for corrective repairs but is intended to extend service life and reduce unscheduled downtime.

7.2. Required Actions

PM activities shall include, but are not limited to:

7.2.1. Lubrication of moving parts per manufacturer's specifications.

7.2.2. Tightening or replacing loose fasteners.

7.2.3. Adjusting alignment or tension on mechanical systems.

7.2.4. Replacing minor worn components such as belts, hoses, or filters.

7.3. Coordination Requirements

7.3.1. Coordinate all PM with the COR and unit POC to avoid

operational disruption.

7.3.2. Ensure that PM actions do not interfere with Coast Guard operations unless authorized.

7.3.3. Notify the COR if manufacturer’s guidance requires PM during restricted periods.

7.4. Documentation and Submittals

The Contractor shall:

7.4.1. Submit a Preventative Maintenance Schedule based on

manufacturer’s specifications within 30 calendar days of award.

7.4.2. Maintain a Preventative Maintenance Log that includes the date performed, tasks completed, parts used, and equipment status.

7.4.3. Submit this log with the Final Report for each applicable piece of equipment.

8. CORRECTIVE MAINTENANCE AND UNSCHEDULED REPAIRS

8.1. Scope of Repairs:

Corrective maintenance covers unplanned repairs necessary to restore equipment to a safe and fully operational condition. This includes deficiencies identified by the Contractor during scheduled PM/inspections, as well as unexpected equipment breakdowns reported by the Coast Guard outside of the normal service schedule.

8.2. On-Call Service & Diagnostics:

In the event of an unexpected equipment failure, the Coast Guard (COR or designated representative) will notify the Contractor. The Contractor shall dispatch a technician to diagnose the issue within 5 business days of notification. The cost of this diagnostic visit (labor and travel) will be billed against the approved T&M repair line item, subject to KO approval.

8.3. Repair Estimates:

Following a diagnostic visit, or upon identifying a deficiency during scheduled maintenance, the Contractor shall submit a detailed, written repair estimate to the COR and KO within 3 business days.

8.3.1. The estimate must itemize:

8.3.2. Diagnostic fees already incurred (if an unscheduled

breakdown).

8.3.3. Required repair labor hours by labor category and fully burdened hourly rates.

8.3.4. An itemized list of required parts and materials (billed at actual cost).

8.3.5. Estimated timeline for repair completion.

8.4. Authorization of Work:

The Contractor shall not commence the actual repair work without written authorization from the KO. Authorization will be provided in the form of a funded contract modification or task order explicitly approving the repair estimate.

8.5. Execution & Re-inspection:

Upon written authorization from the KO, the Contractor shall perform the repairs in accordance with OEM specifications. Re-inspection and load testing (if applicable) following a major repair must be included in the estimate and completed before the equipment is returned to service.

9. SUBMITTALS

Contractor shall provide submittals as pdf or word documents to the US Coast Guard for approval. The contractor must receive in writing from the US Coast Guard that the submittals are approved.

Submittal Reference Section Due Date Schedule of Work 4.1 30 days after award

Inspector Certificates 5.3. b 14 days prior to start of inspections

Certificate of Accuracy for Test Equipment

6.4.b & 6.4.c 14 days prior to start of inspections

Re-inspection Report 6.6 Within 30 days of Coast Guard notification that repairs are complete

Certification Label Sample 6.7 30 days after award

Initial Annual Inspection & load test report

6.8 7 days after test and inspection

Final Annual Inspection & load test report

6.8 14 days after test and inspection

Preventative Maintenance Schedule (Manufacturer-based)

7.1 30 days after award

Preventative Maintenance Log (with actions and parts used)

7.4 Submitted with Final Report