Statement of Work Part II pg.5-8.pdf

PDF 3 MB Posted

Attached to
Barricade System -FEMA Region IV - Federal contract opportunity
Solicitation number
70FBR425Q00000080
Issued by
Federal Emergency Management Agency Region 4

About this file

This document appears to be pages 5-8 of a Statement of Work (SOW) for a barricade system installation at a FEMA Region IV facility. The section on facility access specifies that all personnel must complete a Facilities Access Request Form (FARF) and pass a background check, and must adhere to all site security protocols. The accompanying images show multiple views of an existing surface-mounted gate system, including detailed photographs of the gate mechanism, control panel, and electronic gate controls. The images depict a parking lot environment with asphalt surface, surrounding fence, and various technical equipment for gate operation, including a slide gate control box with colored buttons and a digital control screen labeled "FEMA Region IV HQ Gate Controls".

The images provide technical documentation of the current gate infrastructure, showing different angles and components of the existing barricade system, which appears to be critical for understanding the current setup and potential requirements for the solicitation. The control interfaces suggest a sophisticated electronic access control system with multiple operational modes and monitoring capabilities. These visual details would likely be important for potential contractors bidding on the barricade system replacement or upgrade project outlined in the related federal contract opportunity.

View the file

Other files for this federal contract opportunity

Other files attached to Barricade System -FEMA Region IV -, newest first.
File Type Posted
Sequence of Operations Wedge Barrier Project June 2025 v2.pdf PDF
Questions and Respones_ Region 4 Gate Project.pdf PDF
1 Question _ Location.pdf PDF
WD Service Contract Act.pdf PDF
Statement of Work Part I Pg.1.4.pdf PDF
Spec for entry Gate 22.04.2025.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

J. Access to Facility:

All personnel must complete a Facilities Access Request Form (FARF) and pass the associated background check.

All personnel must adhere to all required security protocols for the agency while on site.