About this file

This statement of work and related federal contract opportunity outline requirements for construction services to renovate Building 39 at the Lexington Veterans Affairs Medical Center campus in Kentucky. The project scope includes general construction, abatement, demolition, mechanical, electrical and utility systems work to prepare the site and complete the renovation. The construction schedule is 455 calendar days from notice to proceed. The single bid item is for all work required to fully complete the project as outlined in the contract documents, specifications and drawings. The solicitation was issued by the Department of Veterans Affairs Veterans Health Administration VISN 9 for project number 596-19-102. The deadline to respond has not been provided.

View the file

Other files

File Type Posted
09 3013 TILING.pdf PDF
A-401 Revised.pdf PDF
CU 001 CU 002 CU 003.pdf PDF
A-601 Revised.pdf PDF
07 7200 ROOF ACCESSORIES.pdf PDF
36C24921R0056 0002.docx DOCX document
Roof Pictures.pdf PDF
Solicitation Questions and Answers.pdf PDF
36C24921R0056 0001.docx DOCX document
Site Visit Sign-In Sheet.pdf PDF
Project Drawings 3 of 3.pdf PDF
Project Specifications.pdf PDF
Project Drawings 1 of 3.pdf PDF
Pricing Schedule.xlsx XLSX spreadsheet
Project Drawings 2 of 3.pdf PDF
Past Performance Questionnaire.pdf PDF
36C24921R0056_1.docx DOCX document
Wage Determination KY20210090 01-15-2021.pdf PDF
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK , SCHEDULE and BID ITEMS

VA NRM PROJECT # 596-19-102

RENOVATE B-39 FOR TRANSPORTATION AND GROUNDS

Lexington VAMC, Franklin Sousley Campus

PROJECT DESCRIPTION:

Contractor shall completely prepare site for building operations, including demolition and removal of existing equipment and ancillary structures, and furnish labor and materials and perform work for Project 596-19-102, RENOVATE B-39 FOR TRANSPORTATION AND GROUNDS as required by contract, specifications, and drawings. All work includes General Construction, Abatement, Demolition, Mechanical and Electrical work, Utility Systems, and necessary Removal of existing equipment and certain other items. Furnish all labor, tools, materials and expertise to complete Project 596-19-102 in strict accordance with the contract documents, specifications, and drawings.

Some work will be required after standard administrative hours; work may be limited to periods shorter than a standard shift, etc for specific locations in the project. This is a medical environment and contractor shall take into consideration Infection Control, Demolition Noise, Dust Control, Security, Safety, and Specialized facility requirements as medical environment requires. It may be necessary to phase the project or work shifts as required by the contract or as any coordination with safety is required. The medical center must remain in continuous operation at all times, and any utility interruptions shall be planned and executed as required, so as to minimize any disruptions.

PROJECT SCHEDULE:

COMPLETION TIME from NOTICE TO PROCEED : 455 Calendar days..

The Construction Schedule or Period of Performance for this project is 455

CALENDAR DAYS for all bid items and detail requirements for submission as described in SECTION 01 32 16.15 PROJECT SCHEDULES and 01 00 00 GENERAL

REQUIREMENTS.

STATEMENT OF BID ITEM :

A. BID ITEM No. 1: Base Bid All Work: Work will include all labor, materials, equipment and supervision required to complete project 596-19-102, RENOVATE B-39 FOR TRANSPORTATION AND GROUNDS, Lexington VAMC-Franklin Sousley Campus . Work includes general construction, abatement, mechanical and electrical work, utility systems work, necessary demolition and certain other items shown and identified. Work includes all activities identified or referenced for completion in Contract, Specifications and Drawings.

File details come from the government source that posted it. Updated .