Statement of Work.pdf
PDF 409 KB Posted
- Attached to
- Triangle Chapel A/V Upgrade
- Solicitation number
- FA301025Q0036
About this file
This Statement of Work details a video installation and integration project for Triangle Chapel's Sanctuary. The project requires the contractor to provide and install three LED monitors (two 100-inch monitors at the front of house and one 75-inch monitor at the rear of house), with Wi-Fi capabilities and the ability to display different or synchronized video feeds. The installation includes running new cabling within the building's interior, removing existing projection screens and projectors, and using a licensed electrician to manage electrical connections. The contractor must also provide training for five chapel personnel and offer a standard warranty with specified duration and terms. The government will supply a Mac Mini with an Apple M1 Chip for video and audio transmission.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 0002.pdf | ||
| Triangle Chapel Blueprint.pdf | ||
| Amendment 0001.pdf | ||
| Revised Statement of Work Triangle.pdf | ||
| Questions and Answers- Triangle Chapel.pdf | ||
| Solicitation - FA301025Q0036.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work Triangle Chapel Sanctuary
1. Scope:
Triangle Chapel’s Sanctuary requires a professional Video Installation and Integration project to facilitate religious services, training and resiliency events, and unit functions. The room has a cathedral ceiling. The dimensions of the room are as follows:
Back row to Front of House (FOH) screen location: 154’ Width of room: 49’6” Wall from floor to edge of ceiling (beginning of slant) – 17’8” 2nd Floor Balcony Height: 10’10” higher than floor level.
Ceiling at midpoint: 37’7”
2. Collaborative Equipment
The Contractor shall provide all required technology and installation to equip the sanctuary for video and image presentation. This shall be accomplished through the installation of two LED monitors installed at the front of house (FOH), and an additional LED monitor at rear of house (ROH). The ROH monitor shall be programmed with the capability to show either the same video feed as FOH, or different. The minimum size must be100 inches for the FOH monitors and 75 inches for the ROH monitor. The monitors must also be Wi-Fi capable. This will allow for the ROH monitor to function as a confidence screen, or as an additional presentation screen. The video feed shall originate at the production booth, located in the center of the balcony. New cable shall be run from the production booth to the FOH and ROH LED monitors. New cabling is required for the current theater lighting and the new monitors. Cabling shall be routed within the building's interior. Ideally, the cabling should run along the center wooden beam and then, once the beam ends, follow the trim towards the FOH monitor location. The contractor is responsible for selecting and installing conduit/panduit that is aesthetically compatible with the existing interior finishes, specifically the wood tones and ceiling color.
The contractor must provide a licensed electrician to safely disconnect existing hardwired electrical connections and install new electrical wiring to the proper location for each monitor.
The contractor shall remove three powered projection screens and three projectors currently installed in the chapel. See photos for locations. The contractor shall also remove all old cabling currently being run outside for the lighting and video.
3. User Training
The contractor shall provide training for a minimum of five chapel personnel.
4. Warranty
The contractor shall provide a standard warranty. Quotes shall specify the duration and terms of this warranty. The contractor shall specify how to make warranty calls.
The government will provide:
Computer: Mac Mini with Apple M1 Chip, with HDMI send, split for video and audio.
#1 is the closest floor outlet, which is located on either side. #2 is the location of the current powered screens to be removed, and an additional source for electrical power.
#1 is current LED screen to be removed, #2 is current projector to be removed, #3 is production booth located in balcony.
File details come from the government source that posted it. Updated .