Statement of Work.pdf
PDF 2 MB Posted
- Attached to
- FEMA -Self-Supporting Tower, Log Periodic Antenna, Grounding, and Transmission Line Installation
- Solicitation number
- WX03345Y2025T
About this file
This Statement of Work (SOW) details a communication infrastructure installation project for the Federal Emergency Management Agency (FEMA) Office of National Continuity Programs at Camp Denali, JBER, Alaska. The project requires installing a USAP model 3002SS 100 Ft Self-Supporting Tower with a rotor bypass modification, a USAP model 1001CA Log Periodic Antenna, comprehensive grounding systems, and approximately 400 feet of Commscope AVA5-50 or AVA5P-50-C 7/8" feedline. Specific requirements include site preparation, antenna positioning at 113° true north, tower and antenna installation per manufacturer specifications, external ground ring installation, and RF radiation hazard signage.
The contractor must complete all work within 90 days of the award date, with deliverables including tower installation, antenna installation, grounding installation, transmission line installation, and comprehensive testing. The project mandates strict adherence to manufacturer specifications, with required documentation including as-built drawings, digital photographs, and detailed installation and modification records. Additional requirements include tower climbing certification for personnel, compliance with safety standards, and coordination with the Contracting Officer's Representative (COR) throughout the project. The contractor is responsible for all equipment, tools, materials, and ensuring minimal site damage during installation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Current Vendor Q and As updated 6.27 .xlsx | XLSX spreadsheet | |
| Current Vendor Q and As.xlsx | XLSX spreadsheet | |
| Current Vendor Q and As. Updated 6.4.xlsx | XLSX spreadsheet | |
| Current Vendor Q and As Updated 6.4.xlsx | XLSX spreadsheet | |
| Current Vendor Q and As updated 6.3.xlsx | XLSX spreadsheet | |
| Solicitation WX03345Y2025T updated 6.3.pdf | ||
| Current Vendor Q and As. 06.02.xlsx | XLSX spreadsheet | |
| Current Vendor Q and As 06022025 1028AM.xlsx | XLSX spreadsheet | |
| Current Vendor Q and As.xlsx | XLSX spreadsheet | |
| Solicitation WX03345Y2025T.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FEMA Office of the National Continuity Programs Statement of Work (SOW)
Self-Supporting Tower, Log Periodic Antenna, Grounding, and Transmission Line Installation Camp Denali, JBER, Alaska
Apr 23, 2025
PREPARED BY:
Federal Emergency Management Agency
Office of the National Continuity Programs Continuity Communications Division
Location:
State of Alaska Division of Homeland Security and Emergency Management (DHSEM) Bldg 49000 Army Guard Rd, JBER, AK 99505
Contracting Officers Representatives (COR): Rodel S Delacruz Technical Monitor (TM): Rodel S Delacruz
Specific:
1. Site preparation to include clearing and grubbing, grading, sediment and erosion control including herbicide treatment and geotextile fabric, and silt fence. (This is a clear field site).
2. FEMA will supply United States Antenna Products (USAP) model 1001CA Log Periodic
(LP) Antenna (Attachments B and D) and USAP model 3002SS Self-Supporting Tower (Attachment C) modified for rotor bypass (Attachment F).
3. The contractor is responsible for any cost and repair of any existing utilities, piping, wiring, equipment, or structure damaged during this installation.
4. Antenna will be pointed at 113° true north. (Attachments A, E, and H)
5. Install USAP 3002SS 100 Ft Self Supporting Tower & Mast with rotor bypass modification (Attachments C and F), with Climbing ladder kit, and 80-foot safety climb according to manufacturer’s specifications.
6. Install USAP 1001CA antenna (Attachments B and D) according to manufacturer’s specifications.
7. The newly installed antenna and tower shall be grounded to the manufacturer’s standards throughout. In addition to the manufacturer’s standards, each tower leg and the center mast will be grounded to a #2 AWG solid copper wire ground ring. Connections to tower legs, mast, and ground ring will be made using exothermic welding. (Attachment I)
8. The contractor will install an external ground ring around the tower. The ring will be installed at a depth of 30” below grade. The ring conductor wire will be #2 AWG solid copper ground wire. Ground Rods will be installed at 16’ intervals throughout the ring.
All connections made below ground will be made using exothermic welding.
(Attachment I)
9. Install a 10” x 14” ANSI/OSHA compliant rust-free aluminum RF Radiation Hazard sign on the tower at a height of 5’ and facing the parking lot.
10. Contractor will provide (approximately 400 feet) Commscope AVA5-50 or AVA5P-50- C, 7/8” feedline and all required connectors. Feedline will be installed by the contractor inside the conduit. Cable will then run vertical up the tower and mast 100 feet to the antenna connection and fastened every 3 vertical feet utilizing an industry standard method. (See Attachment K for examples).
11. Utilizing zip ties, tape, or wire tie for fastening to the tower will not be acceptable.
Contractor will terminate the feedline with an N type male connector mating with the existing N type female surge protector inside the radio building and terminate with 1 5/8” EIA Flange at the antenna. Feedline ground kits will be installed near the bottom of the tower, and on the outside of the building prior to entry. (Attachments G, H, and J)
12. The contractor shall preform a 2 to 30 MHz VSWR sweep along with a DTF sweep and document results on the newly installed antenna/transmission line.
13. All discrepancies in the installation of the antenna/feedline assemblies found to be outside manufactures specifications shall be resolved and the testing & documentation process repeated.
14. Inspections will be conducted by the COR or appointed personnel.
15. As-built drawings and digital photographs of installation to be submitted to the COR electronically. The contractor shall document all installation and modifications to include tower, antenna, ground ring, and transmission line sweep tests.
Deliverables:
1. Tower installation.
2. Antenna installation.
3. Grounding installation.
4. Transmission line installation.
5. Testing.
Completion Criteria:
This project will be considered complete when the tasks identified in the SOW have been completed, tested and the final documentation has been delivered to and accepted by the COR.
Period of Performance (POP): All work shall be completed by the contractor within 90 days from the award date of the resulting order.
General Requirements:
1. The contractor shall provide all labor, personnel, equipment, tools, materials and supplies necessary for completion of this task.
2. The contractor shall schedule a start date for the project within 5 calendar days of receipt award for this project. The contractor shall coordinate with the COR and/or the Technical Monitor (TM) in advance of commencing any work.
3. No deviation or substitution of materials specified shall be done without prior approval of the COR or Contracting Officer (CO).
4. The COR will work with the contractor to determine if any inspections and/or permits are needed.
5. Contractor will ensure that all site access requests are provided to the COR NLT 72 hours from the start of the project.
6. The Contractor shall establish that FEMA ONCP is the owner of record of all materials procured for this project, such that FEMA ONCP may exercise all warranty and technical support rights following final acceptance.
7. All data, software, equipment, analysis results, and reports/briefings generated are the property of the United States Government and may not be released to third parties without the express written consent of the Contracting Officer Representative (COR)/Contracting Officer (CO).
8. Inspection and maintenance may require personnel to climb. Maintenance personnel will be certified to climb towers and will adhere to all safety standards. Work to be performed under this SOW requires a minimum of two (2) tower and antenna certified people to be present at the job site. The Contractor shall provide all equipment and certified personnel associated with the entire project to operate in a safe manner and adhere to all Federal, State and local safety standards, including OSHA standards. The CO/COR or facility safety officer may require a copy of the certifications prior to the start of the project.
9. Confined Space requirements: If work to be performed under this SOW requires below grade manholes and or confined space entry the contractor shall ensure all personnel entering and working within the below grade manholes or a confined space are confined space certified as required by federal, state or local regulations. Contractor is required to have at least one other confined space certified individual when operating in confined spaces. Contractor is required to have all required confined space safety equipment setup and ready for operation when required. The CO/COR or facility safety officer may require a copy of the certifications prior to the start of the project.
10. Environmental Issues: Contractor will coordinate with the COR before any work is started and/or equipment is set up on the site. Any known environmental issues will be disclosed to the Contractor prior to the start of the project. Any environmental issues identified by the Contractor will be reported to the onsite Technical Monitor or the COR.
11. Telephone: Telephone service should not be expected to be available onsite for the
Contractor’s use. Contractors may use cellular phone devices onsite. Depending on the cell phone service, reception may or may not be present.
12. Restroom Facilities: There are normally no publicly accessible restroom facilities at most sites. The Contractor must provide their own restroom facilities.
13. Utilities: If the Contractor requires a generator(s) then the Contractor must provide one.
14. Contractor employees working onsite shall wear an identification badge that at minimum displays the Contractor name, the employee’s photo, and the employee’s name. All Contractor employees shall identify themselves as Contractors when their status is not readily apparent and display all identification and visitor badges in plain view above the waist at all times.
15. The Federal Government owns the hardware and associated systems. The contractor shall use only such equipment in support of requirements outlined in this SOW.
16. In accordance with this SOW, the Government shall exercise its right to review deliverables prior to formal delivery and acceptance.
17. The Contractor shall coordinate services, deliverables, and delivery schedules with the
COR or his/her designee, with the understanding that all work shall be within scope of this SOW. Contractor shall submit all deliverables to the COR for inspection and acceptance.
18. All cyber identity and cyber attribute data—including data at rest, data in transit, generated data, and metadata—will always remain the property of the United States Government. None of this data will be shared or distributed, other than within the operating parameters of the program, without prior written permission from FEMA. At the conclusion of the contract, the Contractor shall return all Government-owned data to FEMA on an appropriate storage medium and will definitively purge all Contractor-owned equipment of Government-owned data.
19. Normal business hours shall be Monday thru Friday, from 8:00 a.m. to 4:30 p.m. No onsite work shall be performed outside these hours or on holidays unless prior approval is obtained from the CO or the COR. The Contractor shall coordinate with the COR to arrange access to the work site. The Contractor will be required to report to the appropriate facility and submit to (if required) vehicle searches before access will be granted. Contractor will be prepared to provide their employees’ personal information (Full Name, social security number, date of birth, place of birth, driver’s license number, and home address) to the COR 72 hours prior to beginning work so that information can be vetted with Security. For emergency work, information will be provided as soon as it is practical, but Contractors will not be able to access sites until vetting procedures are complete. Contractors will be escorted by a properly cleared/badged Government employee. The Contractor shall make the effort to cause a minimum damage to parking lots, other paved areas, items that need to be moved during the course of the project, and other areas not included in this SOW. Damage caused by the Contractor will be repaired at the Contractor’s expense.
20. All trash & debris generated during the installation including shipping containers, packing material, and removed feedline/conduit shall be collected, contained throughout the process and removed from the facility at the end of the install.
21. Contractor Required Insurance to Work on a Government Installation: The contractor shall, at its own expense, provide and maintain during the entire performance period of this contract at least the kinds and minimum amounts of insurance required in paragraph 3). below.
1). Five days after contract award, the contractor shall certify to the CO in writing that the required insurance has been obtained. The policies evidencing required insurance shall contain an endorsement to the effect that any cancellation or any material change adversely affecting the Government's interest shall not be effective (l) for such period (cont.) as the laws of the State in which this contract is to be performed prescribe, or (2) until 30 days after the insurer or the contractor gives written notice to the CO, whichever period is longer.
2). The Contractor shall insert the substance of this clause, including this paragraph 3)., in subcontracts under this contract that require work on a Government installation and shall require subcontractors to provide and maintain a copy of all subcontractors' proofs of required insurance and shall make copies available to the Contracting Officer upon request.
3). The following coverage is the minimum insurance required for work Under this contract:
(a) Workers' compensation and employer's liability. Contractors are required to comply with applicable Federal and State workers' compensation and occupational disease statutes. If occupational disease is not compensable under those statutes, it shall be covered under the employer's liability section of the insurance policy, except when contract operations are so commingled with a contractor’s commercial operations that it would not be practical to require this coverage. Employer's liability coverage of at least $100,000 shall be required, except in States with exclusive or monopolistic funds that do not permit workers' compensation to be written by private carriers.
(b) General Liability.
The CO requires bodily injury liability insurance coverage w ritten on the comprehensive form of the policy of at least $500,000 per occurrence.
Attachment A
Attachment B
Attachment C
Attachment D
Attachment E
Attachment F
Attachment G
Attachment H
Attachment I
S1-S2 DHSEM
Antenna Fdn. Bldg 4
Attachment J
Attachment K
File details come from the government source that posted it. Updated .