Statement of Work.pdf

PDF 54 KB Posted

Attached to
FCI Big Spring - HVAC Package Units
Solicitation number
15B50325PR000159
Issued by

About this file

This Statement of Work details a procurement by the Federal Bureau of Prisons (FBOP) for the Federal Correctional Institution (FCI) in Big Spring, Texas. The solicitation is for three 12.5-ton HVAC Package Units to replace existing Trane units, with specific technical requirements including 460v/60hz/3ph power, R-410A refrigerant, two-stage cooling, 150 MBH gas heat, and hail guards. All proposed equipment must be submitted with complete product specifications for FBOP review and approval prior to award.

Delivery requirements specify that construction-related shipments can only be received at the institution between 8:00 AM and 2:30 PM, Monday through Friday, excluding federal holidays. The project is identified as Project 25Z5AF1 and is located at 1900 Simler Avenue, Big Spring, Texas 79720. Curb adapters are mandatory and must be included with the proposed HVAC units.

View the file

Other files

File Type Posted
HVAC PACKING Q-A-3.pdf PDF
HVAC UPDATED QA.pdf PDF
HVAC PACKING Q-A.pdf PDF
HVAC Packing Units.pdf PDF
Submittal_KCC-131147.1745862691001.pdf PDF
Submittal_YSK150A4S0L0000.1745862663000.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Approved 03/27/2025 SCRO

Statement of Work Repair HVAC FCI Food Service

FCI Big Spring – Project 25Z5AF1

I. SPECIFICATIONS

A. Scope Of Work

The Federal Bureau of Prisons (FBOP), Federal Correctional Institution (FCI) Big Spring intends to purchase three

(3) 12.5-ton HVAC Package Units for FCI Big Spring, located at 1900 Simler Avenue, Big Spring, Texas 79720. The package units must be equal to or equivalent to the listed specifications within this Statement of Work.

All proposed equipment must be submitted with full product detail sheets and specifications for review and approval by FBOP prior to award.

These units will be replacing Trane Model #YCD150D4L0BB. Curb adapters are required and shall be included.

B. Equipment Specifications

1. 12.5-ton packaged unit

2. 460v/60hz/3ph

3. Refrigerant R-410A

4. Two stage cooling

5. Gas heat (150 MBH)

6. Hail guards

C. Delivery of Equipment

1. Construction related deliveries which are directly shipped to the institution can be received between the hours of 8:00 AM - 2:30 PM, Monday - Friday, excluding federal holidays.

End of Statement of Work