Statement_of_Qualifications_Requirements_-_Addendum_No._2.pdf

PDF 115 KB Posted

Attached to
Continuing Construction Services – Water Resources Repair and Rehabilitation
Solicitation number
RFQ- 27 - 001
Issued by
Pinellas County, Florida

About this file

This is an Addendum No. 2 to the Statement of Qualifications Requirements for the City of St. Petersburg, Florida Water Resources Department's solicitation for continuing construction services in water resources repair and rehabilitation. The solicitation encompasses five work categories: SAN Annual Pipe Repair and Replacement, SAN Annual CIPP Lining and Manhole Rehabilitation, Lift Station Rehabilitation, Potable and Reclaimed Water Main Repair and Replacement, and Unscheduled Repairs, with projects located citywide. Statements of Qualifications responses are due December 17, 2026 at 3:00 p.m. through the OpenGov Procurement portal. The City intends to select one or more firms for each work category. The initial contract term is three years with one optional two-year renewal by mutual written amendment. Work will be issued through Field Orders with no guaranteed minimum, and Unscheduled Repairs will be compensated on a time-and-materials basis.

Qualified contractors must hold the required Florida contractor licenses under Chapter 75-489, register with the Florida Division of Corporations, and comply with E-Verify requirements. Each firm must furnish a Public Construction Bond approved by the City Attorney's Office in an amount at least equal to work issued, with an initial bond of at least $100,000. Criminal background checks under Florida Statute 373.6055 apply to employees with regular worksite access. Each work category submission is limited to 10 pages and must include five reference projects exceeding $50,000 completed within the preceding five years, three client references, and project managers with a minimum of five years of applicable experience. Evaluation criteria consist of Qualifications and Experience of Firm and Staff (50 points), Project Approach (40 points), and Business Enterprise Program Outreach and Utilization (10 points). Projects may be funded by the City, the Florida Department of Environmental Protection (FDEP), other agencies, or a combination of sources; projects funded in whole or in part by non-City sources must conform to the funding agency's requirements. No set-aside applies, and participation in small, veteran, minority, and women business programs is voluntary.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Rev: 11/19/26 Page 1 of 4

Exhibit C - Statement of Qualifications Requirements

Continuing Construction Services -- Water Resources Repair and Rehabilitation

Water Resources Department City of St. Petersburg, Florida

The Request for Qualifications shall include the following information in the order listed. Upload all responses as one PDF labeled “Statement of Qualifications Requirements”. Page size shall be limited to 8 ½ x 11, except that 11 x 17 pages may be used for the Key Personnel section.

Common sections, such as the Transmittal Letter and Table of Contents, need to be provided only once.

The City intends to select one or more firms for each Work Category. Firms are encouraged to submit Qualifications for all Work Categories in which they are eligible.

The SOQ shall be limited to 10 pages per Work Category. For example, firms applying for all five

Work Categories may submit up to 50 pages. Each page of the PDF counts as one page. SOQs exceeding 10 pages per Category may be deemed non-responsive by the Procurement and

Supply Management Director. The page counts listed for each section below are guidelines;

respondents may adjust page counts between sections, provided the SOQ does not exceed 10 pages per Work Category.

The following do not count toward the page limit: cover pages, section dividers, the Key Personnel

Resume Appendix (Section D), the Subcontractor Utilization Form (Section I.E), and the

Contractor Response Chart. The Contractor Response Chart is required and may be placed anywhere in the PDF.

A. Submittal Requirements

Section

Transmittal Letter (1 page)

Table of Contents (1 page)

Key Personnel (1 page)

Reference Projects (2 pages)

Firm Specific Qualifications and Licenses (2 pages)

References (1 page)

Contractual Failures (1 page)

Business Enterprise Outreach and Utilization (1 page)

Maximum Number of Pages for SOQ Responses – 10 per Category

B. Transmittal Letter

Contractors must submit a transmittal letter (maximum one page) on the firm’s letterhead.

It must be signed by a representative of the Contractor who is authorized to sign such material and to commit the Contractor to the obligations contained in the offer. The transmittal letter must include the name, title, address, phone number and e-mail address

Rev: 11/19/26 Page 2 of 4 for the Contractor’s contact, and must specify the firm’s signatory to any contract documents executed with the City. The transmittal letter may include other information deemed relevant by the Contractor.

C. Table Of Contents

Include a Table of Contents.

D. Key Personnel

1. Identify all key personnel (and their firm affiliations) on the project team and describe their specific responsibilities throughout the project.

2. Identify the proposed project manager(s) or primary contact(s) for City projects. The persons in this role shall each have a minimum of five (5) years of applicable experience and shall remain with the projects throughout the term of the City’s base agreement. The five (5) year minimum applies only to the project manager(s) or primary contact(s), not to all personnel. Their experience may include projects beyond the five (5) reference projects, provided those projects were completed within the past five (5) years. The key project manager or their approved substitutes shall be available for all meetings.

Key Personnel Resume Appendix. Resumes for key personnel may be submitted in a single appendix at the end of the SOQ, which does not count toward the page limit.

Respondents submitting for more than one Work Category should include each resume only once and identify which Work Categories that person would support. Resumes shall be limited to one page per person. Experience included on the resume must be limited to projects completed within the past five (5) years.

E. Reference Projects

Describe the performance history and experience of the project team on similar projects.

Provide a separate summary of experience for each Work Category (see Scope of

Services for details), as applicable. Project Approach, as listed in the Evaluation Criteria, should be addressed in this section by describing the processes and methods used on similar projects.

The information should demonstrate the firm’s ability to work cooperatively with third parties, including other Contractors or City Departments who may be performing construction. Submit five (5) reference projects per Work Category, completed within the five (5) years preceding the advertisement for this Solicitation, that demonstrate relevant experience. Each of the five (5) projects must have a cost in excess of $50,000; there is no maximum project value. A project may be used in more than one Work Category if it meets these requirements for each category, and the description in each category should show the scope and contract value that apply to that category. Work previously performed for the City of St. Petersburg may be used as a reference project; for City projects, identify the City department and project name instead of a City employee contact. Each project description shall contain the following information:

1. Name of owner.

2. Owner reference and contact information.

Rev: 11/19/26 Page 3 of 4

3. Role of Contractor and relevant scope performed.

4. Contract value for the relevant scope.

5. Year started and year completed.

6. Description of the project showing relevance to this project.

7. If applicable, names of firms and key personnel who participated in similar project(s) and are included in this SOQ, along with a clear description of the roles and responsibilities of each.

Contractors are also encouraged to provide details or references related to past or ongoing continuing services agreements with other Agencies or Owners which are relevant to this Solicitation.

F. Firm Specific Qualifications and Licenses

The Contractor should identify the key strengths of the firm. Highlight capabilities and areas of specialization provided by the firm. Provide copies of Contractor’s and individual’s current applicable Florida License.

Project Approach, as listed in the Evaluation Criteria, should also be addressed in this section by describing the approach envisioned for this engagement based on the key strengths of the firm. Project Approach content counts toward the page limit.

G. References

Provide a list of three (3) client contact persons for whom the Contractor has recently provided services similar in nature to the services identified in this RFQ.

H. Contractual Failures

Describe any alleged, significant prior or ongoing contract failures, licensing or permit violations, claims on bonds, any civil or criminal litigation or investigation pending

(including wage theft complaints filed) which involves the firm or in which the firm has been judged guilty or liable.

I. Business Enterprise Outreach and Utilization

Proposers must indicate if the company is a SBE, MBE, WBE, combination; and describe how the company plans to utilize the various business enterprise programs in the company’s fulfilment of the contract. At a minimum, proposers must address the following:

A. A detailed description of your organization’s efforts to identify and contact City of St.

Petersburg SBEs, MBEs, and WBEs to inform them of opportunities to work as subcontractors for this proposal.

i. Attending relevant opportunities offered by the City’s Office of Supplier

Development including outreach events and matchmaking sessions.

ii. Documentation of planned or prior outreach efforts.

B. Planned efforts such as mentoring, training, and other capacity building programs for

SBEs, MBEs, and WBEs.

Rev: 11/19/26 Page 4 of 4

C. Detailed description of your organization’s process for ensuring small businesses have enough time and information to provide your firm with bids.

i. Description of how your firm considers SBEs, MBEs, and WBEs in the development of proposal and bid packages.

ii. Explanation of how your firm ensures SBEs, MBEs, and WBEs understand the bid and specifications and are able to learn ways to improve.

D. Provide past performance in utilizing SBEs, MBEs, and WBEs on past projects within the last five (5) years.

E. Provide a detailed Subcontractor Utilization Form, placed at the end of this section.

The form does not count toward the page limit. At the RFQ stage, proposers are not expected to identify final subcontractors or commit to fixed participation percentages, since project scopes and contract values have not yet been established. The form should be completed in good faith based on the proposer’s anticipated approach.

Where specific subcontractors have not yet been identified, proposers may enter

“TBD” and indicate the anticipated scope of work and estimated participation.