STATEAPPROVED - Randall Park Bathroom Renovation - Combined Bid Set_reduced.pdf
PDF 13 MB Posted
- Attached to
- RANDALL PARK RESTROOM RENOVATION - EPF # 240025
- Solicitation number
- 2135574
- Issued by
- Clinton County, New York
About this file
This is a combined bid set document and contract opportunity notice for the Randall Park Restroom Renovation project (EPF # 240025) issued by the City of Cortland, New York. The project involves selective demolition of an existing restroom facility, construction of a new concrete pad and timber pavilion, renovation of the existing structure, grading and drainage improvements, and modifications to on-site utilities including water supply, sewer, electrical, and communications systems. The project scope includes three accessible bathrooms, mechanical/janitor room, closet, concession/storage area, and an open pavilion with heavy timber framing. The site is located at 35 Huntington Street, Cortland, New York. Pre-bid walkthroughs are available June 2-4, 2026 by appointment with Andrea Piedigrossi. Bidder questions must be submitted by 3:00pm on Wednesday, June 17, 2026. Final addenda will be issued by Monday, June 22, 2026. Sealed bids are due by 11:00am on Friday, June 26, 2026, with public opening at 11:10am that same day. Contract award is anticipated for July 2026. The project must comply with the 2025 New York State Building Code (2024 IBC), NFPA standards, OSHA regulations, and ADA requirements.
The bid documents include comprehensive architectural, structural, mechanical, plumbing, electrical, and landscape drawings prepared by Saratoga Associates. Bid documents are available beginning May 29, 2026, from the City of Cortland with no deposit required. The General Contractor is responsible for all site work, utility work outside the 5-foot building perimeter, and coordination of trades. Separate contracts are anticipated for mechanical (exhaust ventilation), plumbing, and electrical work. The facility will include emergency lighting, smoke and fire detection systems, and fire extinguishers positioned within 75-foot travel distances. The construction documents specify materials including standing seam metal roofing, pressure-treated and stained timber framing, poly-ash siding, ceramic tile finishes in bathrooms, epoxy-sealed concrete floors, and specialized fixtures for ADA accessibility. The contractor must submit detailed schedules, coordinate with the Director's Representative, maintain site safety protocols, and comply with all applicable federal, state, and local codes and regulations.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RANDALL PARK
RESTROOM
RANDALL PARK
RANDALL
MIDDLE
SCHOOL
RANDALL ST
HUNTINGTON ST
C H
U R
C H
S T
CORTLAND
I-81
N
UNAUTHORIZED ALTERATION OR ADDITION TO THIS
DOCUMENT IS A VIOLATION OF SECTION 7209 OF THE
NEW YORK STATE EDUCATION LAW. COPYRIGHT © 2026
ALL RIGHTS RESERVED SARATOGA ASSOCIATES
SARATOGA ASSOCIATES PROJECT #
Plot Date:
REVISIONS
300' 600' 900' 1200'
Graphic Scale: 1 inch = 300 feet
SITE LOCATION MAP
PROJECT LOCATION MAP
DRAWING LIST
PHASE:
DATE:
CHECKED BY:
DRAWN BY:
89 123467 5
B
D
E
F
G
H
C
A
C:\Users\amartini\Documents\Randall Park Bathroom Renovation_amartini62BWC.rvt 5/22/2026 10:09:58 PM
G100COVER SHEET
2025-116.10
RANDALL PARK
RESTROOM
CITY OF CORTLAND
RANDALL PARK RESTROOM
RENOVATION AND PAVILION PROJECT
35 HUNTINGTON ST, CORTLAND, NY 13045
BID SET
RDD
BID SET
5/22/26
ACM
RENOVATION AND
PAVILION PROJECT
DRAWING LIST - ARCHITECTURAL
Sheet Number Sheet Name
A001 LIFE SAFETY PLAN
A100 FIRST FLOOR PLAN & RCP
A101 ROOF PLAN
A200 BUILDING ELEVATIONS
A201 BUILDING ELEVATIONS
A300 BUILDING SECTIONS
A400 ENLARGED PLANS
A500 WALL SECTIONS
A600 DETAILS
A700 INTERIOR ELEVATIONS & FINISH
SCHEDULES
A701 INTERIOR ELEVATIONS
A800 DOOR AND WINDOW SCHEDULES
A801 WALL TYPES
DRAWING LIST - LANDSCAPE
Sheet Number Sheet Name
L100 EXISTING CONDITIONS PLAN
L200 DEMOLITION PLAN
L300 LAYOUT PLAN
L400 GRADING AND DRAINAGE PLAN
L500 PLANTING & SEEDING PLAN
L600 SITE DETAILS
L601 SITE DETAILS
DRAWING LIST - STRUCTURAL
Sheet Number Sheet Name
S001 GENERAL STRUCTURAL NOTES
S100 FOUNDATION PLAN
S101 LEVEL 1 FRAMING PLAN
S102 ROOF FRAMING PLAN
S300 CONCRETE & CMU DETAILS
S500 CFS DETAILS
S600 TIMBER DETAILS
DRAWING LIST - PLUMBING
Sheet Number Sheet Name
P101 PLUMBING FLOOR PLAN
P201 PLUBING DETAILS AND ISOMETRICS
DRAWING LIST - ELECTRICAL
Sheet Number Sheet Name
E001 ELECTRICAL SITE PLAN
E101 ELECTRICAL FLOOR PLANS,
SCHEDULES, AND LEGEND
DRAWING LIST - GENERAL
Sheet Number Sheet Name
G100 COVER SHEET
G101 GENERAL INFORMATION
DRAWING LIST - HVAC
Sheet Number Sheet Name
H101 HVAC FLOOR PLAN
RANDALL PARK
DRAWING LIST - DEMOLITION
Sheet Number Sheet Name
D100 DEMOLITION PLANS
OWNER ARCHITECT / LANDSCAPE
ARCHITECT / CIVIL ENGINEER
STRUCTURAL ENGINEER MECHANICAL/ PLUMBING/ ELECTRICAL/
FIRE PROTECTION ENGINEERS
CITY OF CORTLAND
25 COURT ST
CORTLAND, NY 13045
(607) 753-3021
PROJECT MANAGER: ANDREA PIEDIGROSSI
SARATOGA ASSOCIATES
21 CONGRESS STREET, SUITE 201
SARATOGA SPRINGS, NY 12866
(518) 587-2550
PROJECT MANAGER: ALISON YOVINE
HERRMANN ENGINEERING
464 MAIN ST
ONEONTA, NY 13820
(607) 267-4258
APD ENGINEERING & ARCHITECTURE, PLLC
615 FISHERS RUN
VICTOR, NY 14564
(585) 742-2222
NO DATE DESCRIPTION DRAWN
EPF #240025
N
Room name
1i
View Name 1/8" = 1'-0"
DOOR TAG
ROOM TAG
WALL TAG
NORTH ARROW
CENTERLINE
BUILDING SECTION
EXTERIOR ELEVATION
VIEW TITLE
LEVEL/ ELEVATION TAG
(RELATIVE TO PROJECT DATUM)
8' - 1"
BREAK LINE
NEW CONSTRUCTION LINE TYPE
(LINE WEIGHT VARIES, SHEET DEPENDENT)
WALL ABOVE, WALL BELOW OR DEMOLISHED LINE TYPE
(LINE WEIGHT VARIES, SHEET DEPENDENT)
A600 DETAIL CALLOUT
A200
DRAWING LEGEND
5' - 0" DIMENSION. WALL DIMENSIONS ARE TO FACE OF
STUD, UNLESS OTHERWISE NOTED. DIMENSIONS
LABELED AS CLEAR ARE TO THE OUTERMOST EDGE
OF INDICATED CONSTRUCTION.
INTERIOR ELEVATION
A700
A300
WALL SECTION/ SECTION DETAIL
A300
DETAIL NO.
SHEET NO.
1t WINDOW TAG
1 REVISION
ABBREVIATIONS
ACT ACOUSTIC CEILING TILE
ADJ ADJUSTABLE
AFF ABOVE FINISH FLOOR
AHJ AUTHORITY HAVING JURISDICTION
AHU AIR HANDLING UNIT
ALUM ALUMINUM
ALT ALTERNATE
ANOD ANODIZED
ARGWB ABUSE RESISTANT GYPSUM WALL BOARD
B.O. BOTTOM OF
BLDG BUILDING
CFS COLD-FORMED STEEL
CH CEILING HEIGHT
CI CONTRACTOR INSTALLED
CIP CAST IN PLACE
CL CENTER LINE
CLG CEILING
CLR CLEAR
CJ CONTROL JOINT
CM CONSTRUCTION MANAGER
CMU CONCRETE MASONRY UNIT
CONC CONCRETE
CONT CONTINUOUS
CPT CARPET
CT CERAMIC TILE
CTB CERAMIC TILE BASE
CWB COMPOSITE WOOD DECKING
DBL DOUBLE
DEMO DEMO
DF DRINKING FOUNTAIN
DIA DIAMETER
DIM, DIMS DIMENSIONS
DN DOWN
DR DOOR
DTL DETAIL
DWG, DWGS DRAWING(S)
EA EACH
EIFS EXTERIOR INSULATION AND FINISH SYSTEM
EJ EXPANSION JOINT
ELECT ELECTRICAL
ELEV ELEVATION
ENG, ENG'D ENGINEER, ENGINEERED
EP ELECTRICAL PANEL
EPDM ETHYLENE PROPYLENE DIENE M-CLASS
EQ EQUAL
EXIST EXISTING
EXT EXTERIOR
FD FLOOR DRAIN
FEC FIRE EXTINGUISHER CABINET
FIN FINISH
FIXT FIXTURE
FF FINISH FACE OF FINISH FLOOR
FG FIBERGLASS
FLR FLOOR
FO FACE OF
FRP FIBER REINFORCED PLASTIC PANELS
FTG FOOTING
GA GAUGE
GB GRAB BAR
GC GENERAL CONTRACTOR
GALV GALVANIZED
GFRC GLASS FIBER REINFORCED CONCRETE
GSB GLAZED STRUCTURAL BLOCK
GWB GYPSUM WALL BOARD
GYP GYPSUM
HC HOLLOW CORE
HDWD HARDWOOD
HGT HEIGHT
HM HOLLOW METAL
HORIZ HORIZONTAL
HR HOUR
HVAC HEATING, VENTILATING, AND AIR CONDITIONING
ID INSIDE DIAMETER
ILO IN LIEU OF
INSUL INSULATION
INT INTERIOR
IRGWB IMPACT RESISTANT GYPSUM WALL BOARD
LA LANDSCAPE ARCHITECTURE
LVL LAMINATED VENEER LUMBER
LVT LUXURY VINYL TILE
MAT'L, MATL MATERIAL
MAX MAXIMUM
MECH. MECHANICAL
MDF MEDIUM DENSITY FIBER BOARD
MEP MECHANICAL (HVAC), ELECTRICAL, AND PLUMBING
MIN MINIMUM
MIRR, MR MIRROR
MANUF, MRF MANUFACTURER
MRGWB MOISTURE RESISTANT GYPSUM WALL BOARD
MTD MOUNTED
MTL METAL
MO MASONRY OPENING
N/A, NA NOT APPLICABLE
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NTS NOT TO SCALE
OC ON CENTER
OD OUTSIDE DIAMETER
OI OWNER INSTALLED
OP OWNER PROVIDED
OPNG OPENING
OPP OPPOSITE OF
OZ OUNCE
PCC PRECAST CONCRETE
PL PLATE
PLAM PLASTIC LAMINATE
PLUMB PLUMBING
PLYWD PLYWOOD
PREP PREPARE
PT/ P.T. PRESSURE TREATED
PNT PAINT/ PAINTED
PTD PAPER TOWEL DISPENSER
PVC POLYVINYL CHLORIDE
RB RESILIENT BASE
RBR RUBBER
RCP REFLECTED CEILING PLAN
RD ROOF DRAIN
REINF REINFORCED/ REINFORCING
REQ'D, REQD REQUIRED
RFG RECESSED FLOOR GRILLE
RM ROOM
R.O. ROUGH OPENING
SC SEALED CONCRETE
SD SMOKE DETECTOR
SECT SECTION
SF SQUARE FEET
SHWR SHOWER
SIM SIMILAR
SPEC SPECIFICATIONS
SPK SPRINKLER
SQ SQUARE
SS STAINLESS STEEL
STC SOUND TRANSMISSION COEFFICIENT
STN STAIN
STRUCT STRUCTURAL
STL STEEL
SV THIN STONE VENEER
TEMP TEMPERED OR TEMPORARY
T/D TELEPHONE/ DATA
T&G TONGUE AND GROOVE
T.O. TOP OF
TPO THERMOPLASTIC POLYOLEFIN
TPD TOILET PAPER DISPENSER
TYP TYPICAL
UON UNLESS OTHERWISE NOTED
VIF VERIFY IN FIELD
VCT VINYL COMPOSITION TILE
VERT VERTICAL
VRN VARNISHED
W/, W/I, W/O WITH, WITHIN, WITHOUT
WC WATER CLOSET
WD WOOD
WR WASTE RECEPTACLE
WS WINDOW SHADES
WWF WELDED WIRE FABRIC
MATERIALS LEGEND
EXISTING
NEW CONSTRUCTION
CONCRETE (SECTION)
BRICK (ELEVATION)
BRICK (SECTION)
SHINGLES (WOOD, SLATE, OR ASPHALT)
CMU (SECTION)
STEEL
FINISHED WOOD
CONTINUOUS WOOD MEMBER
CMU (ELEVATION)
PLYWOOD
RIGID OR SEMI RIGID INSULATION
BATT INSULATION
GWBCONCRETE (ELEVATION)
NON-CONTINUOUS WOOD MEMBER
EARTH
GRAVEL OR STONE FILL
GLASS/ GLAZING
UNAUTHORIZED ALTERATION OR ADDITION TO THIS
DOCUMENT IS A VIOLATION OF SECTION 7209 OF THE
NEW YORK STATE EDUCATION LAW. COPYRIGHT ©
2026 ALL RIGHTS RESERVED SARATOGA ASSOCIATES
SARATOGA ASSOCIATES PROJECT #
Plot Date:
REVISIONS
PHASE:
DATE:
CHECKED BY:
DRAWN BY:
89 123467 5
B
D
E
F
G
H
C
A
C:\Users\amartini\Documents\Randall Park Bathroom Renovation_amartini62BWC.rvt 5/22/2026 10:10:00 PM
G101GENERAL
INFORMATION
2025-116.10
RANDALL PARK
RESTROOM
CITY OF CORTLAND
RDD
BID SET
5/22/26
ACM
RENOVATION AND
PAVILION PROJECT
DEMOLITION NOTES
1. DRAWINGS SHOW GENERAL SCOPE OF REMOVAL WORK. CONTRACTOR IS TO PROVIDE ALL WORK AS REQUIRED TO
ALLOW FOR INSTALLATION OF NEW WORK AS SHOWN ON DRAWINGS.
2. REMOVE DEBRIS FROM DEMOLITION AREA AS IT IS PRODUCED. LEGALLY DISPOSE OF MATERIALS OFF SITE.
REMOVE ALL EXISTING EXPOSED OR CONCEALED CONDUIT, WIRING INSTALLATION, WIRING DEVICES, ELECTRICAL EQUIPMENT, PIPING, DUCTWORK, AND EQUIPMENT RENDERED OBSOLETE BY THE DEMOLITION OR ALTERATIONS.
3. WIRING RENDERED USELESS BY THE DEMOLITION SHALL BE REMOVED TO ITS POINT OF SUPPLY. CAP UTILITIES
RENDERED OBSOLETE.
RESTORE ANY EXISTING ELECTRICAL INSTALLATION DISTURBED DURING THE COURSE OF CONSTRUCTION AND NOT
INDICATED FOR REMOVAL.
SCOPE OF WORK SUMMARY:
THIS IS A GENERAL SCOPE OF WORK ONLY TO FACILITATE PROJECT UNDERSTANDING. THIS PROJECT INCLUDES, BUT NOT NECESSARILY LIMITED TO THE FOLLOWING SCOPE OF WORK AND ALL RELATED WORK TO ACCOMPLISH IT.
1. SELECTIVE DEMOLITION OF EXISTING BUILDING, INCLUDING INTERIOR WALLS, CONCRETE FLOOR, AND ALL
FIXTURES AND FINISHES.
2. EXCAVATION FOR AND INSTALLATION OF CONCRETE FOUNDATION UNDER PAVILION.
2. CONSTRUCTION OF NEW CONCRETE PAD, TIMBER PAVILION, AND RENOVATION OF EXISTING STRUCTURE.
3. GRADING AS REQUIRED FOR BUILDING CONSTRUCTION.
4. MODIFICATIONS OF CONNECTIONS TO EXISTING ON-SITE UTILITIES, INCLUDING BUT NOT LIMITED TO WATER
SUPPLY, SEWER, ELECTRICAL, AND COMMUNICATIONS AS REQUIRED.
GENERAL CONSTRUCTION NOTES
1. ALL WORK SHALL COMPLY WITH THE 2025 NEW YORK STATE UNIFORM CODE WHICH ADOPTS THE 2024 INTERNATIONAL BUILDING CODE, FIRE CODE AND ENERGY CONSERVATION CODE OF NEW YORK STATE, AS WELL AS ANY REFERENCED CODES WITHIN. ALL WORK MUST ALSO BE IN COMPLIANCE WITH THE STANDARDS
ESTABLISHED BY THE NATIONAL FIRE PROTECTION ASSOCIATION, OSHA, AND ADA.
2. CONSTRUCTION DOCUMENTS FOR THIS WORK HAVE BEEN PREPARED IN ACCORDANCE WITH GENERALLY ACCEPTED ARCHITECTURAL AND ENGINEERING PRACTICES TO MEET MINIMUM REQUIREMENTS OF THE LATEST
EDITION OF THE BUILDING CODE OF NEW YORK STATE.
3. IN THE EVENT OF CONFLICT BETWEEN PERTINENT CODES, REGULATIONS, AND REFERENCED STANDARDS OF
THESE DRAWINGS AND SPECIFICATIONS, THE MORE STRINGENT PROVISIONS SHALL GOVERN.
4. EACH PRIME CONTRACTOR SHALL RIGIDLY ADHERE TO ALL LAWS, CODES, AND ORDINANCES, WHICH APPLY TO
THE WORK.
5. EACH PRIME CONTRACTOR SHALL NOTIFY AND RECEIVE WRITTEN CLARIFICATION FROM THE DIRECTOR'S REPRESENTATIVE OF ANY VARIATIONS BETWEEN CONTRACT DOCUMENTS AND GOVERNING REGULATIONS.
6. A GENERAL BUILDING PERMIT WILL BE PROVIDED BY GENERAL CONTRACTOR AT NO CHARGE TO THE OWNER OR
UNLESS OTHERWISE AGREED TO IN WRITING WITH THE OWNER, THE CONTRACTOR SHALL BE RESPONSIBLE FOR SECURING ALL PERMITS (BUILDING, OCCUPANCY, ETC.) AND FEES FOR SAME, AS REQUIRED BY STATE AND LOCAL
RULES AND REGULATIONS.
7. THE WORK TO BE PERFORMED CONSISTS OF FURNISHING ALL LABOR, EQUIPMENT, TOOLS, TRANSPORTATION, SUPPLIES, FEES, MATERIALS, AND SERVICES IN ACCORDANCE WITH THESE NOTES AND DRAWINGS, AND PERFORMING ALL OPERATIONS NECESSARY TO CONSTRUCT AND INSTALL IN A COMPLETE MANNER THE VARIOUS MATERIALS AND EQUIPMENT AT THE LOCATIONS INDICATED IN THE CONTRACT DOCUMENTS AND IN CONFORMITY
WITH THE DIMENSIONS, DESIGN, AND DETAILS INDICATED IN THE CONTRACT DOCUMENTS.
8. EACH PRIME CONTRACTOR SHALL HOLD THE OWNER AND ARCHITECT HARMLESS AGAINST ANY AND ALL CLAIMS ARISING FROM WORK PERFORMED BY THE CONTRACTOR ON THE SITE. THIS INCLUDES (BUT IS NOT LIMITED TO) ALL MATERIALS, CONSTRUCTION METHODS, CRAFTSMANSHIP, CONFORMANCE, PROCEDURES, AND CONDITIONS
(INCLUDING SAFETY) OF ON-SITE WORK RELATING TO THE CONSTRUCTION DOCUMENTS.
9. DRAWINGS AND SPECIFICATIONS ARE INTENDED TO PROVIDE THE BASIS FOR THE PROPER COMPLETION OF THE
PROJECT SUITABLE FOR THE INTENDED USE OF THE OWNER.
10. ALL INFORMATION SHOWN ON THE DRAWINGS RELATIVE TO EXISTING CONDITIONS IS GIVEN AS THE BEST PRESENT KNOWLEDGE. WHERE ACTUAL CONDITIONS CONFLICT WITH THE DRAWINGS, THEY SHALL BE REPORTED
TO THE ARCHITECT IN WRITING, SO THAT THE PROPER REVISIONS CAN BE MADE.
11. CONTRACTOR TO NOTE THAT ANY DISCREPANCY FOUND BETWEEN DRAWINGS AND SPECIFICATIONS AND/OR ON
DRAWINGS OR SPECIFICATIONS MUST BE REPORTED TO THE DIRECTOR'S REPRESENTATIVE.
12. DEVIATIONS FROM THESE DRAWINGS WHICH ARE NOT PERFORMED WITH PROPER WRITTEN CONSENT FROM DIRECTOR'S REPRESENTATIVE ARE SOLELY AT THE RESPONSIBLE CONTRACTOR'S RISK AND THEY SHALL ACCEPT FULL LIABILITY. DEVIATIONS FROM THE APPROVED CONTRACT DOCUMENTS SHALL BE APPROVED BY THE
DIRECTOR'S REPRESENTATIVE PRIOR TO INSTALLATION OF THE ASSOCIATED WORK.
13. DO NOT SCALE DRAWINGS. USE DIMENSIONS AS INDICATED FOR ALL LOCATIONS.
14. ALL DIMENSIONS ARE FRAMING TO FRAMING OF LUMBER OR FACE TO FACE OF CONCRETE/ MASONRY UNLESS
OTHERWISE NOTED. WINDOWS ARE DIMENSIONED TO CENTERLINE OF UNIT.
15. THE WORDS "PROVIDE" OR "SUPPLY" SHALL INCLUDE BOTH FURNISHING AND INSTALLING THE SPECIFIED OR
DETAILED ITEM, IN PLACE AND READY FOR OPERATION AND USE.
16. "TYPICAL" OR "TYP." SHALL MEAN THAT THE CONDITION IS REPRESENTATIONAL FOR SIMILAR CONDITIONS
THROUGHOUT, UNLESS OTHERWISE NOTED (U.O.N.).
17. MINOR DETAILS NOT SHOWN OR SPECIFIED, BUT NECESSARY FOR PROPER CONSTRUCTION OF ANY PART OF THE
WORK SHALL BE INCLUDED AS IF THEY WERE INDICATED IN THE DRAWINGS.
18. ALL MATERIALS USED TO BE SELECTED AND INSTALLED IN ACCORDANCE WITH STATE, FEDERAL, NATIONAL AND
LOCAL CODES AND INSTALLED IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDED INSTALLATION
PROCEDURES.
19. ALL MATERIALS SHALL BE AS SPECIFIED, OR EQUAL AS APPROVED BY DIRECTOR'S REPRESENTATIVE. MATERIALS SPECIFIED INDICATE QUALITY INTENT THAT WILL BE USED AS A BASIS FOR REVIEW OF PRODUCT SUBSTITUTES.
SEE GENERAL CONDITIONS.
20. ALL ITEMS, WHICH ARE NOT SPECIFICALLY REFERRED TO, ON THESE DRAWINGS ARE TO BE SELECTED BY THE DIRECTOR'S REPRESENTATIVE FROM THE MANUFACTURER'S SAMPLES SHOWING FULL RANGE OF TEXTURES AND
COLORS AVAILABLE.
21. ITEMS NOT EXPRESSLY SET FORTH, BUT WHICH ARE REASONABLY IMPLIED OR NECESSARY FOR THE PROPER
PERFORMANCE OF THIS WORK SHALL BE INCLUDED.
22. ALL MANUFACTURED MATERIALS, COMPONENTS, FASTENERS, ASSEMBLERS, ETC., SHALL BE HANDLED AND INSTALLED IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS AND PROVISIONS OF APPLICABLE INDUSTRY STANDARDS. WHERE SPECIFIC MANUFACTURED PRODUCTS ARE CALLED FOR, GENERIC EQUALS THAT MEET
APPLICABLE STANDARDS AND SPECIFICATIONS MAY BE USED UNLESS OTHERWISE NOTED.
23. EACH PRIME CONTRACTOR SHALL BE RESPONSIBLE FOR CHECKING ALL DIMENSIONS AND CONDITIONS, BOTH EXISTING AND PROPOSED, AS SHOWN ON THE DRAWINGS AND VERIFICATION OF THE SITE CONDITIONS WHICH MAY AFFECT THE WORK DESCRIBED HEREIN. DISCREPANCIES, VARIANTS OR DEFECTS SHALL BE IMMEDIATELY REPORTED TO THE DIRECTOR'S REPRESENTATIVE (EXCEPT FOR PROVISIONAL SAFETY MEASURES, IF SUCH ARE NECESSARY), SHALL BE MADE SAFE AT THE CONTRACTORS TOTAL RESPONSIBILITY AND EXPENSE, INCLUDING THE COST OF RECTIFICATION, IF SUCH DEEMED NECESSARY BY THE DIRECTOR'S REPRESENTATIVE.
24. EACH PRIME CONTRACTOR SHALL PROTECT ALL EXISTING SURFACES AND ADJACENT STRUCTURES FOR THE DURATION OF THE CONTRACT WORK AND SHALL REPAIR ANY DAMAGE RESULTING FROM WORK AT NO EXTRA COST OR CONTRACT TIME. THE CONTRACTOR SHALL DOCUMENT ON DRAWINGS, ANY AND ALL DAMAGE RESULTING FROM: THE REMOVALS OF EXISTING MATERIALS AND/OR INSTALLATION OF SALVAGED OR NEW MATERIAL. SUCH ITEMS SHALL BE REPAIRED OR REPLACED TO THE SATISFACTION OF THE DIRECTOR'S
REPRESENTATIVE .
25. EACH PRIME CONTRACTOR SHALL PROVIDE PROTECTION OF ADJACENT PROPERTY INCLUDING ALL EXISTING SITE AND LANDSCAPING ELEMENTS. IN ADDITION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTION OF
WORK IN PROGRESS THROUGH COMPLETION.
26. GENERAL CONTRACTOR SHALL PROVIDE A BENCHMARK AT CENTER LINE OF STRUCTURAL FRAMING MEMBERS ON EVERY FLOOR LEVEL FROM SLAB ON GRADE TO THE TOP OF ROOF FRAMING. LAYOUT SHALL BE CONDUCTED
PRIOR TO ANY CONSTRUCTION.
27. EACH PRIME CONTRACTOR SHALL MAKE NO STRUCTURAL CHANGES WITHOUT WRITTEN APPROVAL FROM THE
DIRECTOR'S REPRESENTATIVE.
28. EACH PRIME CONTRACTOR SHALL LAY OUT THEIR OWN WORK, AND PROVIDE ALL DIMENSIONS REQUIRED FOR
OTHER TRADES. (PLUMBING, ELECTRICAL, ETC.)
29. EACH PRIME CONTRACTOR SHALL DO ALL CUTTING, PATCHING AND REPAIRING AS REQUIRED TO PERFORM ALL OF THE WORK INDICATED ON THE DRAWINGS, AND ALL OTHER WORK THAT MAY BE REQUIRED TO COMPLETE
CONSTRUCTION.
30. PRIOR TO STARTING WORK, SUBMIT FOR APPROVAL TO THE DIRECTOR'S REPRESENTATIVE A DETAILED SCHEDULE INDICATING ALL WORK THAT MIGHT AFFECT OWNER'S USE OF PROJECT SITE SUCH AS UTILITY SHUT
DOWNS, NOISE GENERATING CONSTRUCTION, ETC.
31. SCHEDULE AND COORDINATE ACTIVITIES WITH DIRECTOR'S REPRESENTATIVE. ALL ACTIVITIES MUST BE
ACCOMMODATED WITHIN THE CONTRACT TIME.
32. EACH PRIME CONTRACTOR SHALL COORDINATE WITH DIRECTOR'S REPRESENTATIVE ALL WORK PROCEDURES
AND ANY LOCATION OF POSSIBLE TEMPORARY UTILITIES BEFORE BEGINNING ANY WORK.
33. PERFORM WORK IN A MANNER, WHICH MINIMIZES NOISE. SCHEDULE OPERATIONS AS DIRECTED BY DIRECTOR'S
REPRESENTATIVE.
34. DO NOT INTERRUPT EXISTING UTILITY SERVICE WITHOUT AUTHORIZATION FROM DIRECTOR'S REPRESENTATIVE.
PROVIDE TEMPORARY SERVICE DURING INTERRUPTIONS.
35. EACH PRIME CONTRACTOR SHALL PROVIDE BARRICADES AROUND WORK AREAS AS REQUIRED TO PREVENT
UNAUTHORIZED PERSONS FROM ENTERING THEREIN.
36. EACH PRIME CONTRACTOR SHALL STORE MATERIALS IN AREAS DESIGNATED BY DIRECTOR'S REPRESENTATIVE.
DELIVERY OF MATERIALS SHALL BE AS DIRECTED BY DIRECTOR'S REPRESENTATIVE.
37. UPON EXECUTION OF THE CONTRACT WITH THE OWNER AND AFTER THE PRECONSTRUCTION MEETING, COMMENCE WORK AND PROCEED DILIGENTLY AND CONTINUOUSLY TO COMPLETION.
38. EACH PRIME CONTRACTOR SHALL KEEP WORK SITE FREE FROM DEBRIS AND ACCUMULATED REFUSE, AND SHALL HAVE SOLE RESPONSIBILITY FOR PROTECTING ALL DANGEROUS AREAS FROM ENTRY BY UNAUTHORIZED PARTIES. SITE WILL BE LEFT BROOM CLEAN AT THE END OF EACH WORKING DAY DEPENDING ON THE STATUS AND
LEVEL OF COMPLETION OF CONSTRUCTION.
39. EACH PRIME CONTRACTOR, FOR A PERIOD OF ONE YEAR FROM THE DATE OF COMPLETION AND ACCEPTANCE BY THE OWNER, SHALL ADJUST, REPAIR, OR REPLACE AT NO COST TO THE OWNER ANY ITEM OF EQUIPMENT, MATERIAL, OR WORKMANSHIP FOUND TO BE DEFECTIVE.
CONTRACTORS RESPONSIBILITIES
1. EACH PRIME CONTRACTOR SHALL REVIEW AND FAMILIARIZE THEMSELVES WITH THE GENERAL NOTES AND SPECIFICATIONS AND DETERMINE WHICH NOTES APPLY DIRECTLY TO THEIR RESPONSIBILITY AND WHICH NOTES
APPLY TO THEIR SUB-CONTRACTORS.
2. THE SUBMISSION OF A PROPOSAL BY EACH PRIME CONTRACTOR WILL BE CONSTRUED AS EVIDENCE THAT A CAREFUL AND THOROUGH EXAMINATION OF THE PREMISES AND SITE HAVE BEEN MADE AND LATER CLAIMS FOR LABOR, MATERIALS OR EQUIPMENT REQUIRED OR FOR DIFFICULTIES ENCOUNTERED, WHICH COULD HAVE BEEN FORESEEN HAD SUCH AN EXAMINATION BEEN MADE, WILL NOT BE RECOGNIZED. IT SHALL ALSO CONSTITUTE A REPRESENTATION THAT THE CONTRACTOR HAS CHECKED AND VERIFIED ALL DIMENSIONS, QUANTITIES, WORK, AND MATERIALS INVOLVED AND THAT THEY SHALL TAKE RESPONSIBILITY FOR ANY DEFICIENCIES THEREIN.
3. EACH PRIME CONTRACTOR SHALL SUBMIT IN WRITING ALL PROPOSALS FOR ADDITIONAL WORK TO THE DIRECTOR'S REPRESENTATIVE OFFICE FOR REVIEW AND APPROVAL. WORK IS NOT TO PROCEED UNTIL A SIGNED AUTHORIZATION IS RETURNED TO THE GENERAL CONTRACTOR UNLESS WORK INVOLVES AN IMMEDIATE OR IMMINENT SAFETY HAZARD. SEE GENERAL CONDITIONS AND SECTION 012600 CONTRACT MODIFICATION
PROCEDURES.
4. PROGRESS SCHEDULE MUST BE SUBMITTED IN ACCORDANCE WITH DIVISION 01 ADMINISTRATIVE REQUIREMENTS
(10 DAYS PRIOR TO PRE-CONSTRUCTION MEETING).
5. EACH PRIME CONTRACTOR SHALL KEEP THE DIRECTOR'S REPRESENTATIVE INFORMED OF THE PROGRESS OF
THEIR WORK.
6. CONSTRUCTION CONTRACTOR (ALSO KNOWN AS GENERAL CONTRACTOR) SHALL BE RESPONSIBLE FOR ALL SITE WORK AS WELL AS SITE UTILITY WORK OUTSIDE OF 5'-0" BUILDING PERIMETER (UNLESS OTHERWISE NOTED), INCLUDING BUT NOT LIMITED TO WATER DISTRIBUTION PIPING, SANITARY AND STORM SEWERS, UNDERGROUND
DUCTS AND RACEWAYS FOR ELECTRICAL SYSTEMS.
7. MECHANICAL CONTRACTOR WORK INVOLVES THE INSTALLATION OF ALL ITEMS OF MECHANICAL (EXHAUST VENTILATION) WORK SHOWN IN THE CONTRACT DOCUMENTS (UNLESS OTHERWISE NOTED), REQUIRED FOR A COMPLETE AND CODE COMPLIANT SYSTEM. NO WORK OUTSIDE 5’-0” OF BUILDING(S) PERIMETER IS INCLUDED IN THE MECHANICAL CONTRACT. ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR 120 VAC ELECTRICAL CONNECTIONS. MECHANICAL CONTRACTOR SHALL COORDINATE THEIR WORK WITH OTHER CONTRACTORS AND
UTILITIES.
8. PLUMBING CONTRACTOR WORK INVOLVES THE INSTALLATION OF ALL ITEMS OF PLUMBING WORK SHOWN IN THE CONTRACT DOCUMENTS (UNLESS OTHERWISE NOTED), REQUIRED FOR A COMPLETE AND CODE COMPLIANT SYSTEM. NO WORK OUTSIDE 5’-0” OF BUILDING(S) PERIMETER IS INCLUDED IN THE PLUMBING CONTRACT EXCEPT AS OTHERWISE NOTED. PLUMBING CONTRACTOR IS RESPONSIBLE FOR CONNECTION AT THE TRANSITION POINT.
PLUMBING CONTRACTOR SHALL COORDINATE THEIR WORK WITH OTHER CONTRACTORS AND UTILITIES.
9. ELECTRICAL CONTRACTOR WORK INVOLVES THE INSTALLATION OF ALL ITEMS OF ELECTRICAL WORK SHOWN IN THE CONTRACT DOCUMENTS (UNLESS OTHERWISE NOTED), REQUIRED FOR A COMPLETE AND CODE COMPLIANT SYSTEM. ELECTRICAL CONTRACTOR SHALL PROVIDE WEATHERHEAD WITH DRIP LOOP, INSULATORS, AND ASSOCIATED EQUIPMENT. ELECTRICAL CONTRACTOR SHALL PROVIDE OVERHEAD ELECTRICAL SERVICE CONDUCTORS BETWEEN WEATHERHEAD AND ELECTRIC UTILITY DISTRIBUTION WIRING ON THE SITE AND MAKE ALL NECESSARY CONNECTIONS. ELECTRICAL CONTRACTOR SHALL COORDINATE THEIR WORK WITH OTHER
CONTRACTORS AND ELECTRIC UTILITY
10. ELECTRICAL INSPECTIONS, BY A NYS QUALIFIED ELECTRICAL INSPECTOR, SHALL BE PERFORMED FOR ALL ELECTRICAL WORK, INCLUDING WORK THAT IS TO BE CONCEALED. THE ELECTRICAL INSPECTOR SHALL BE ENGAGED BY THE OWNER OR THE OWNER’S AGENTS, AND NOT BY THE CONTRACTOR WHOSE WORK IS TO BE INSPECTED. ANY CONFLICT OF INTEREST MUST BE DISCLOSED TO THE OWNER PRIOR TO COMMENCING INSPECTIONS. THE ELECTRICAL INSPECTOR IS TO SUBMIT DETAILED INSPECTION REPORTS SUBSEQUENT TO EACH INSPECTION AND A FINAL CERTIFICATE OF INSPECTION UPON COMPLETION OF CONSTRUCTION.
11. ALL WORK MATERIALS ARE TO BE ORDERED SUFFICIENTLY AHEAD OF TIME SO THAT THE WORK CAN PROCEED AS
SCHEDULED.
12. ANY MATERIALS DELIVERED OR WORK PERFORMED CONTRARY TO THE DRAWINGS, SPECIFICATIONS AND APPROVED SHOP DRAWINGS SHALL BE REMOVED BY THE CONTRACTOR AT THEIR EXPENSE AND SHALL BE REPLACED WITH THE OTHER MATERIALS OR WORK SATISFACTORY TO THE DIRECTOR'S REPRESENTATIVE. THE CONTRACTOR SHALL ALSO ASSUME THE COST OF REPLACING ADJACENT OR CONTINGENT WORK, WHICH MAY BE
DISTURBED BY THIS REPLACEMENT.
13. EACH PRIME CONTRACTOR WILL BE RESPONSIBLE FOR ALL COSTS INCURRED FOR DAMAGES CAUSED BY THEIR SUB-CONTRACTORS AND SHALL HAVE A COMPETENT SUPERINTENDENT ON THE PREMISES AT ALL TIMES WHEN
WORK IS IN PROGRESS.
14. ANY DAMAGE TO NEW OR EXISTING BUILDING FABRIC NOT DESIGNATED FOR REPAIR OR OTHER APPROVED TREATMENT DURING CONSTRUCTION IS TO BE CORRECTED AT THE CONTRACTOR’S EXPENSE ONLY AFTER
THOROUGH EXAMINATION BY THE DIRECTOR'S REPRESENTATIVE.
15. EACH PRIME CONTRACTOR SHALL PERFORM ALL CUTTING AND PATCHING REQUIRED TO COMPLETE THE WORK OR TO MAKE ITS PARTS FIT TOGETHER PROPERLY WITHOUT COMPROMISING THE QUALITY OF THE WORK. ANY REPAIRS TO THE EXTERIOR SURFACES AND COMPONENTS MUST BE DISCUSSED WITH THE DIRECTOR'S
REPRESENTATIVE PRIOR TO EXECUTING THE WORK.
16. EACH PRIME CONTRACTOR SHALL BE RESPONSIBLE FOR ACCURATELY BRACING AND PROTECTING ALL WORK DURING CONSTRUCTION AGAINST DAMAGE, BREAKAGE, COLLAPSE, DISTORTIONS, AND FOR CORRECT ALIGNMENT WITH ADJACENT MATERIALS AND SURFACES, ACCORDING TO CODES AND STANDARDS OF GOOD PRACTICE.
17. CONSTRUCTION LOADS SHALL NOT OVERLOAD STRUCTURE NOR SHALL BE IN EXCESS OF DESIGN LOADINGS
INDICATED HEREIN.
18. AT ALL TIMES EACH PRIME CONTRACTOR WILL BE RESPONSIBLE TO MAINTAIN AND PROTECT ALL EXISTING SYSTEMS FROM THE EFFECTS OF ADVERSE WEATHER (RAIN, SNOW, COLD, ETC.) WITHIN AREAS OF WORK UNDER
THIS CONTRACT AT NO ADDITIONAL CHARGE.
19. ALL LADDERS, AND SCAFFOLDING SHALL BE IN GOOD OPERATING CONDITION, AND SHALL CONFORM TO ALL APPLICABLE STANDARDS. ALL DAMAGED LADDERS, AND ROLLING SCAFFOLDING WILL BE IMMEDIATELY REMOVED FROM THE JOB SITE. ALL PLATFORM, ACCESS, SITE SCAFFOLDING SHALL CONFORM TO THE LATEST
REQUIREMENTS STANDARDS AND GUIDELINES ESTABLISHED BY OSHA.
20. DURING WORK, ALL ELECTRICAL HAND TOOLS MUST BE GROUNDED PROPERLY. ALL APPROPRIATE PROTECTIVE GEAR, INCLUDING EYE GOGGLES, WILL BE WORN DURING ANY CUTTING, WHETHER BY HAND OR BY MECHANICAL MEANS OF MASONRY COMPONENTS AND ANY OTHER CONSTRUCTION OPERATIONS, WHICH REQUIRE SAFETY
CLOTHING AND PROTECTIVE EQUIPMENT.
21. EACH PRIME CONTRACTOR TO COORDINATE LOCATION OF ALL PARTITIONS ENCLOSING EQUIPMENT, INCLUDING WATER COOLERS, WITH APPROVED SHOP DRAWINGS PRIOR TO BEGINNING ERECTION OF PARTITIONS.
22. PARTITION CONSTRUCTION IS INDICATED BY WALL TYPES AND ROOM FINISH SCHEDULE.
23. NEW PARTITIONS:
A. EXTEND ALL PARTITIONS TO STRUCTURE ABOVE, UNLESS OTHERWISE NOTED.
B. EXTEND NON-FULL HEIGHT PARTITIONS 6" ABOVE CEILING MINIMUM BRACE HORIZONTALLY TO STRUCTURE
ABOVE, AT 4'-0" O.C. STAGGERED.
24. PROVIDE 3/4" PLYWOOD BLOCKING OR 6" HIGH X 18 GA. STEEL SHEET BLOCKING IN PARTITIONS AS REQUIRED TO
ACHIEVE FIRM ATTACHMENT OF ALL WALL-MOUNTED ITEMS INCLUDING BUT NOT LIMITED TO ARCHITECTURAL WOODWORK, ALL WALL AND/OR CEILING MOUNTED FINISHES, EQUIPMENT AND ACCESSORIES, GRAB BARS, CABINETRY, FIXTURES, SIGNAGE, ETC. COORDINATE LOCATIONS WITH ARCH/ DIRECTOR'S REPRESENTATIVE.
25. CLOSETS SHALL HAVE THE SAME FLOORING BASE, WALL, AND CEILING FINISHES AS THE ROOM INTO WHICH THEY
OPEN.
26. CONFIRM CHASE WALL DIMENSIONS WITH PLUMBING CONTRACTOR. NOTIFY ARCHITECT OF ANY DISCREPANCIES.
27. RESTORE DAMAGED AND EXPOSED FINISHES OR PATCHED AREAS IN A MANNER WHICH ELIMINATES EVIDENCE OF
PATCHING AND REFINISHING.
28. INSPECT SUBSTRATES AND REPORT UNSATISFACTORY CONDITIONS IN WRITING. DO NOT PROCEED UNTIL
UNSATISFACTORY CONDITIONS HAVE BEEN CORRECTED.
29. LOCATE HINGE SIDE OF DOOR FRAMES 6" FROM PERPENDICULAR WALL UNLESS OTHERWISE NOTED.
30. PAINT ALL EXPOSED INTERIOR AND EXTERIOR PIPING, CONDUITS, ETC. TO MATCH ADJACENT WALL SURFACE.
31. ALL DOORS IN A FIRE-RATED PARTITION ARE TO BE FIRE-RATED AS REQUIRED BY STATE CODE.
SAFETY PLAN:
1. ALL WORK TO BE DONE IN ACCORDANCE WITH THE NEW YORK STATE BUILDING CODE, AND REGULATIONS OF ALL
OTHER AGENCIES HAVING JURISDICTION.
2. FIRE EXTINGUISHERS FOR CLASS A FIRE HAZARDS SHALL BE PROVIDED BY CONSTRUCTION CONTRACTOR IN CONSPICUOUS LOCATION(S) THROUGHOUT THE FACILITY DURING CONSTRUCTION AND WITH THE MAXIMUM
TRAVEL DISTANCE OF 75 FEET TO ANY FIRE EXTINGUISHER.
3. STORAGE OF MATERIALS AND BUILDING SAFETY:
A. ALL BUILDING MATERIALS STORED AT THE SITE OR ANY AREAS OF THE BUILDING ARE TO BE STORED IN
AN ORDERLY MANNER AND SECURED IN A LOCKED AREA(S). ACCESS TO SUCH AREA IS TO BE
CONTROLLED BY BOTH THE CONTRACTORS AND THE DIRECTOR'S REPRESENTATIVE. THE DIRECTOR'S
REPRESENTATIVE MUST APPROVE STORAGE OF ALL MATERIALS.
B. NO FLAMMABLE MATERIALS ARE TO BE STORED AT THE SITE. ALL MATERIALS USED ON A DAILY BASIS ARE TO BE KEPT TIGHTLY SEALED IN THEIR RESPECTIVE MANUFACTURES’ CONTAINERS. SUCH MATERIALS ARE TO BE KEPT AWAY FROM HEAT. ALL FLAMMABLE MATERIAL IS TO BE USED IN AN ADEQUATELY VENTED
SPACE.
C. ALL ELECTRICAL POWER TO BE SHUT OFF WHERE THERE ARE EXPOSED CONDUITS.
4. DUST CONTROL:
A. DEBRIS, DIRT AND DUST TO BE KEPT AT A MINIMUM AND CONFINED TO SCAFFOLDING AND TO THE
IMMEDIATE CONSTRUCTION AREA.
B. DEBRIS, DIRT AND DUST TO BE CLEANED UP AND CLEARED FROM THE BUILDING PERIODICALLY TO AVOID EXCESS ACCUMULATION. NO DEBRIS SHALL BE ALLOWED TO ACCUMULATE; DUMPSTERS ARE TO BE
REMOVED AS FILLED.
5. CONSTRUCTION OPERATION AND HOURS:
A. CONSTRUCTION OPERATIONS WILL BE CONFINED TO NORMAL WORKING HOURS: MONDAY THROUGH
FRIDAY, 7AM - 4:30 PM. SATURDAY WORK IS SUBJECT TO PRIOR APPROVAL BY THE DIRECTOR'S REPRESENTATIVE OPERATIONS OUTSIDE OF THESE HOURS, WEEKENDS, AND DESIGNATED HOLIDAYS ARE SUBJECT TO SPECIAL PERMITS THAT MUST BE FILED NO LATE THAN THE TUESDAY PRECEDING THE
SUNDAY WORK BEING REQUIRED.
B. EACH PRIME CONTRACTOR TO OBTAIN CONSENT OF ALL PARTIES AFFECTED BY WORK, OCCURRING
OUTSIDE OF REGULAR HOURS AND SUBJECT TO CURRENT APPLICABLE BUILDING DEPARTMENT
REGULATION GOVERNING HOURS OR WORK.
6. CONSTRUCTION WORK WILL BE CONFINED TO THE AREA(S) DEFINED BY THE WORK AREA LIMITS AND WILL NOT CREATE DUST, DIRT OR OTHER SUCH INCONVENIENCES TO ADJACENT BUILDINGS OR PEDESTRIANS.
7. THE SITE WILL REMAIN OPEN TO THE PUBLIC DURING THE WORK OF THIS CONTRACT. EACH PRIME CONTRACTOR SHALL TAKE EVERY REASONABLE PRECAUTION TO PROTECT THE FACILITY, STAFF, AND THE PUBLIC FROM THE WORK OF THIS CONTRACT, INCLUDING PREVENTING UNAUTHORIZED ACCESS TO LADDERS, SCAFFOLDING, EQUIPMENT, OPEN TRENCHES AND OTHER HAZARDOUS AREAS.
ADD ALTERNATES:
1. NONE
NO DATE DESCRIPTION DRAWN CHK
07.5' 15'15'
SCALE: 1"=15'-0"
N
SARATOGA ASSOCIATES PROJECT #
REVISIONS
NO. DATE DESCRIPTION DRAWN CHK
A
B
C
D
E
F
G
H
I
A
B
C
D
E
F
G
H
II
2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
UNAUTHORIZED ALTERATION OR ADDITION TO
THIS DOCUMENT IS A VIOLATION OF SECTION
7209 OF THE NEW YORK STATE EDUCATION
LAW. © 2026 ALL RIGHTS RESERVED
SARATOGA ASSOCIATES
DATE:
DRAWN BY:
CHECKED BY:
PHASE:
DWG SCALE:
Fi le
N am e:
S
:\2
5\
-1
.1
C or tla nd
R an da ll
Pa rk
B at hr oo m R en ov at io n\ C
.4 P ro du ct io n\ C
.4 .3
-C D
\S
IT
E\
_1
.1
0_ C or tla nd _R an da ll Pa rk _S ite B as e_
C D
6.
dw g
U se r:
- P lo t D at e an d Ti m e:
5/
/2
2:
P
M
05/22/2026
JMM
APY
CD
RANDALL PARK
RESTROOM
CITY OF CORTLAND
RENOVATION AND
PAVILION PROJECT
2025-116.10
L100
EXISTING
CONDITIONS
PLAN
1" = 15'-0"
SAWCUT CONCRETE WALK
REMOVE CONCRETE
WALK & SUBBASE
300 SF
TREE PROTECTION
FENCE 55 LF
CLEAR
EXISTING LAWN
1386 SF
O
O
O O
O O
TREE PROTECTION
FENCE 55LF
TREE PROTECTION
FENCE 55 LF
EROSION CONTROL
WATTLE
60 LF
EROSION CONTROL
WATTLE
120 LF
EROSION CONTROL WATTLE
75 LF
STABILIZED
CONSTRUCTION ENTRANCE
'-0
'-0
'-0
CONCRETE
WASHOUT
REMOVE CONCRETE PAVEMENT
AND SUBBASE
CLEAR AND GRUB EXISTING
VEGETATION
TREE PROTECTION
FENCE
SEDIMENT CONTROL
WATTLE
CONTRACT LIMIT LINE
DESCRIPTIONSYMBOL
DEMOLITION LEGEND
1. ANY DISTURBED AREAS THAT ARE LEFT EXPOSED MORE THAN 14 DAYS, AND
ARE NOT SUBJECT TO CONSTRUCTION TRAFFIC, SHALL IMMEDIATELY RECEIVE
A TEMPORARY MULCHING AND/OR SEEDING IF ESTABLISHING THE
PERMANENT COVER IS NOT FEASIBLE. IF THE SEASON PREVENTS THE
ESTABLISHMENT OF A TEMPORARY SEEDED COVER, THE DISTURBED AREAS
WILL BE MULCHED WITH STRAW, OR EQUIVALENT MATERIAL.
2. EXISTING PAVED ROADWAYS AND PARKING LOTS SHALL BE KEPT CLEAN AT
ALL TIMES.
3. DUST CONTROL - WATER SHALL BE APPLIED BY SPRINKLER OR WATER TRUCK
DURING CONSTRUCTION OPERATIONS TO MINIMIZE SEDIMENT TRANSPORT
AND MAINTAIN ACCEPTABLE AIR QUALITY CONDITIONS. REPETITIVE
TREATMENTS SHALL BE DONE AS NEEDED UNTIL THE SITE IS STABILIZED.
4. THE CONTRACTOR SHALL INSPECT THE EFFECTIVENESS AND CONDITION OF
EROSION CONTROL DEVICES DURING STORM EVENTS, AFTER EACH RAINFALL
OF 0.5 INCH MAGNITUDE OR GREATER, PRIOR TO WEEKENDS AND PRIOR TO
FORECASTED STORM EVENTS.
5. THE CONTRACTOR SHALL REPAIR OR REPLACE DAMAGED EROSION CONTROL
DEVICES IMMEDIATELY OR AS SOON AS PRACTICAL.
EROSION CONTROL NOTES:
DEMOLITION NOTES:
1. THIS DRAWING IS BASED ON A SURVEY OF CORTLAND RANDALL PARK, DATED
MAY 4TH 2023, PREPARED BY REAGAN LAND SURVEYING.
2. PRIOR TO COMMENCING WORK THE CONTRACTOR SHALL VERIFY THE
LOCATIONS OF ALL UNDERGROUND UTILITIES. IT IS THE RESPONSIBILITY OF THE
CONTRACTOR TO UTILIZE A LOCATING SERVICE TO VERIFY UNDERGROUND
UTILITY LOCATIONS. CALL 1-800-962-7962 OR VISIT WWW.DIGSAFELYNEWYORK.COM
FOR MORE INFORMATION.
3. THE CONTRACTOR SHALL EXERCISE CARE DURING ALL REMOVAL OPERATIONS
TO ENSURE THE PROTECTION OF EXISTING FACILITIES TO REMAIN. DAMAGED
FACILITIES INTENDED TO REMAIN SHALL BE REPAIRED AT CONTRACTOR'S
EXPENSE.
4. THE CONTRACTOR SHALL VERIFY WITH OWNER ANY ITEMS INDICATED TO BE
REMOVED THAT WILL BE SALVAGED. DELIVER SALVAGED MATERIALS TO A
STORAGE AREA DESIGNATED BY THE OWNERS'S REPRESENTATIVE.
5. ANY WORK ALONG THE SIDEWALKS WILL REQUIRE A CITY PERMIT TO BE
OBTAINED BY THE CONTRACTOR.
6. CONTRACTOR TO LABEL ALL EXISTING BLUESTONE WITH NUMBER AND
ORIENTATION. LIFT, STORE, AND PROTECT ALL BLUESTONE PAVEMENT IN A
SECURE AREA TO AVOID IMPACTS DURING CONSTRUCTION.
7. TREE REMOVAL ALLOWED ONLY FROM OCTOBER 31, TO APRIL 1, TO PRESERVE
BAT HABITAT.
8. CONTRACTOR SHALL PROVIDE A CERTIFIED ARBORIST TO BE ON SITE DURING
EXCAVATION AND REMOVAL OPERATIONS AROUND EXISTING TREES TO REMAIN.
9. NO STORAGE OR STOCKPILES SHALL BE CONDUCTED WITHIN DRIP LINE OF
EXISTING TREES TO REMAIN.
10. TREES SHALL BE PROTECTED AT ALL TIMES.
CONCRETE WASHOUT
STATION
STABILIZED CONSTRUCTION
ENTRANCE
L200DEMOLITION
PLAN
1" = 10'-0"
05' 10'10'
SCALE: 1"=10'-0"
N
SARATOGA ASSOCIATES PROJECT #
REVISIONS
NO. DATE DESCRIPTION DRAWN CHK
A
B
C
D
E
F
G
H
I
A
B
C
D
E
F
G
H
II
2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
UNAUTHORIZED ALTERATION OR ADDITION TO
THIS DOCUMENT IS A VIOLATION OF SECTION
7209 OF THE NEW YORK STATE EDUCATION
LAW. © 2026 ALL RIGHTS RESERVED
SARATOGA ASSOCIATES
DATE:
DRAWN BY:
CHECKED BY:
PHASE:
DWG SCALE:
Fi le
N am e:
S
:\2
5\
-1
.1
C or tla nd
R an da ll
Pa rk
B at hr oo m R en ov at io n\ C
.4 P ro du ct io n\ C
.4 .3
-C D
\S
IT
E\
_1
.1
0_ C or tla nd _R an da ll Pa rk _S ite B as e_
C D
6.
dw g
U se r:
- P lo t D at e an d Ti m e:
5/
/2
3:
P
M
05/22/2026
JMM
APY
CD
RANDALL PARK
RESTROOM
CITY OF CORTLAND
RENOVATION AND
PAVILION PROJECT
2025-116.10
BATH 1ACCESSIBLE100
BATH 2
MECH / JAN
CONCESSIONS /STORAGE
PAVILION
BATH 3
CLOSET
CONCRETE
PAVEMENT
CONCRETE
PAVEMENT
CONCRETE
PAVEMENT
LAWN
LAWN
LAWN
LAWN
5' -0
6'-0"
6'-0"
6' -0
PICNIC TABLES
(BY OTHERS)
LAWN
EJ
EJ
EJ
EJ
EJ
EJ
EJ
EJ
EJ
EJ
EJ
EJ
EJ
EJ
EJ
EJ
EJ
EJ
RESTROOM
CONCESSION
BUILDING
STORMWATER DRY WELL
- SEE GRADING PLANS
STORMWATER DRY WELL
- SEE GRADING PLANS
'-0
6' -1
0"
27'-4"
'-3
LAYOUT & MATERIALS LEGEND
SYMBOL DESCRIPTION
CONCRETE PAVEMENT
PEDESTRIAN TRAFFIC
EJ = EXPANSION JOINT
EJ 7
1. PRIOR TO COMMENCING WORK THE CONTRACTOR SHALL
VERIFY THE LOCATIONS OF ALL UNDERGROUND UTILITIES.
IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO UTILIZE
A LOCATING SERVICE TO VERIFY UNDERGROUND UTILITY
LOCATIONS.
2. THE CONTRACTOR SHALL STAKE OUT ALL WORK IN THE
FIELD PRIOR TO COMMENCING CONSTRUCTION AND NOTIFY
THE DIRECTOR'S REPRESENTATIVE OF ANY
DISCREPANCIES.
3. ALL DIMENSIONS SHALL BE FROM THE FACE OF EDGING,
CURBS, OR WALLS UNLESS OTHERWISE NOTED.
4. ALL NEW PAVEMENTS AND CURBS SHALL MEET EXISTING
PAVEMENTS AND CURBS WITH A SMOOTH TRANSITION AND
FLUSH JOINT.
5. THE CONTRACTOR SHALL PROVIDE A 1.5% CROSS SLOPE
ON ALL CONCRETE WALKS CONFORMING TO ADA
REQUIREMENTS.
6. THE CONTRACTOR SHALL PROVIDE WARNING CONES AND
BARRICADES AS REQUIRED TO PROTECT THE PUBLIC FROM
CONSTRUCTION OPERATIONS.
7. SUCCESSFUL LOW BIDDER WILL BE PROVIDED A CAD FILE
FOR LAYOUT PURPOSES.
LAYOUT NOTES
STORMWATER
DRY WELL
STORMWATER
MANHOLE
PICNIC TABLES
CONCRETE SEAT WALL
05' 10'10'
SCALE: 1"=10'-0"
N
SARATOGA ASSOCIATES PROJECT #
REVISIONS
NO. DATE DESCRIPTION DRAWN CHK
A
B
C
D
E
F
G
H
I
A
B
C
D
E
F
G
H
II
2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
UNAUTHORIZED ALTERATION OR ADDITION TO
THIS DOCUMENT IS A VIOLATION OF SECTION
7209 OF THE NEW YORK STATE EDUCATION
LAW. © 2026 ALL RIGHTS RESERVED
SARATOGA ASSOCIATES
DATE:
DRAWN BY:
CHECKED BY:
PHASE:
DWG SCALE:
Fi le
N am e:
S
:\2
5\
-1
.1
C or tla nd
R an da ll
Pa rk
B at hr oo m R en ov at io n\ C
.4 P ro du ct io n\ C
.4 .3
-C D
\S
IT
E\
_1
.1
0_ C or tla nd _R an da ll Pa rk _S ite B as e_
C D
6.
dw g
U se r:
- P lo t D at e an d Ti m e:
5/
/2
3:
P
M
05/22/2026
JMM
APY
CD
RANDALL PARK
RESTROOM
CITY OF CORTLAND
RENOVATION AND
PAVILION PROJECT
2025-116.10
L300LAYOUT
1" = 10'-0"
MECH / JAN
CONCESSIONS /STORAGE
PAVILION
DRINKINGFOUNTAIN
CONCESSION WINDOW
BATH 3
CLOSET
1122.22
1122.31
1122.31
1122.31 1122.24+
1122.24
1122.22
1122.31
1122.31
1.0%
SLOPE
1.5%
SLOPE
1.5%
SLOPE
1.5%
SLOPE
1.5%
SLOPE
1.5%
SLOPE
0.5%
SLOPE
0.5%
SLOPE1122.22
1122.32
ST
MH#1 (8")
RIM 1122.25
INV 1120.16
DOWNSPOUT
INV 1120.4
DOWNSPOUT
INV 1120.4
LF
O F
6" H
D
PE
.0
S
LO
PE
16 LF OF 8" HDPE
@1.0% SLOPE
LF
O F
6" H
D
PE
.0
S
LO
PE
INV 1120.05
STORMWATER DRY WELL - 6FT
MANHOLE RIM 1122.25
TOP OF STRUCTURE
ELV. 1121.50
8LF O
F 8" H
D
PE
1.0%
SLO
PE
MH#2 (8")
RIM 1122.25
INV 1120.32
'-0
5'-8"
FFE
1122.4
1122.40
1122.15
1122.31
1122.15+
1122.15
1122.15
1122.15
0.75%
SLOPE
1122.10
1122.10
L
F O
F 6"
H D
PE
.0
S
LO
PE
DOWNSPOUT
INV 1120.4
CO
CO
CLEANOUT
CLEANOUT
STORMWATER DRY WELL - 4FT
MANHOLE RIM 1122.25
TOP OF STRUCTURE
ELV. 1121.50
CO
CLEANOUT
INV 1120.04
S
ST
W
PROPOSED CONTOUR LINE
PROPOSED SPOT ELEVATION
EXISTING CONTOUR LINE
DIRECTION OF SURFACE FLOW
384.90
PROPOSED MANHOLE
CO PROPOSED CLEAN OUT
PROPOSED SANITARY LINE
PROPOSED STORM LINE
PROPOSED WATER LINE
EXISTING SPOT ELEVATION
GRADING & DRAINAGE LEGEND
SYMBOL DESCRIPTION
1. PRIOR TO COMMENCING WORK THE CONTRACTOR SHALL VERIFY THE LOCATIONS OF ALL
UNDERGROUND UTILITIES. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO UTILIZE A
LOCATING SERVICE TO VERIFY UNDERGROUND UTILITY LOCATIONS.
2. THE CONTRACTOR SHALL STAKE OUT ALL GRADES IN THE FIELD AND NOTIFY THE DIRECTOR'S
REPRESENTATIVE IMMEDIATELY OF ANY DISCREPANCIES.
3. THE CONTRACTOR SHALL GRADE THE SITE TO PROVIDE POSITIVE DRAINAGE TO CATCH BASINS.
LOWER RIM OF EXISTING CATCH BASINS WHERE SHOWN.
4. TRANSITIONS FROM ALL NEW PAVEMENTS TO EXISTING PAVEMENTS SHALL BE SMOOTH AND
FLUSH. SIDEWALK CROSS-SLOPES SHALL NOT EXCEED 1.5% IN ACCORDANCE WITH ADA
STANDARDS. DIRECTION-OF-TRAVEL SLOPES SHALL NOT EXCEED 4.75%. ALL EXISTING
PAVEMENTS SHALL BE ADJUSTED AS NEEDED TO MEET SLOPE REQUIREMENTS AND PROVIDE
SMOOTH TRANSITIONS.
5. REFER TO ENGINEERING DRAWINGS FOR SITE ELECTRICAL.
GRADING, DRAINAGE, AND UTILITY NOTES
PROPOSED STORMWATER
DRY WELL
DS PROPOSED DOWNSPOUT
CONNECTION
05' 10'10'
SCALE: 1"=10'-0"
N
SARATOGA ASSOCIATES PROJECT #
REVISIONS
NO. DATE DESCRIPTION DRAWN CHK
A
B
C
D
E
F
G
H
I
A
B
C
D
E
F
G
H
II
2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
UNAUTHORIZED ALTERATION OR ADDITION TO
THIS DOCUMENT IS A VIOLATION OF SECTION
7209 OF THE NEW YORK STATE EDUCATION
LAW. © 2026 ALL RIGHTS RESERVED
SARATOGA ASSOCIATES
DATE:
DRAWN BY:
CHECKED BY:
PHASE:
DWG SCALE:
Fi le
N am e:
S
:\2
5\
-1
.1
C or tla nd
R an da ll
Pa rk
B at hr oo m R en ov at io n\ C
.4 P ro du ct io n\ C
.4 .3
-C D
\S
IT
E\
_1
.1
0_ C or tla nd _R an da ll Pa rk _S ite B as e_
C D
6.
dw g
U se r:
- P lo t D at e an d Ti m e:
5/
/2
3:
P
M
05/22/2026
JMM
APY
CD
RANDALL PARK
RESTROOM
CITY OF CORTLAND
RENOVATION AND
PAVILION PROJECT
2025-116.10
L400
GRADING
AND
DRAINAGE
MECH / JAN
CONCESSIONS /STORAGE
PAVILION
DRINKINGFOUNTAIN
CONCESSION WINDOW
BATH 3
CLOSET
LAWN RESTORATION
SEED MIX 3,320 SF
PLANTING LEGEND
SYMBOL DESCRIPTION
1. THE CONTRACTOR SHALL VERIFY FIELD CONDITIONS PRIOR TO
COMMENCING PLANTING WORK AND NOTIFY THE OWNER'S
REPRESENTATIVE IMMEDIATELY IF CONDITIONS DETRIMENTAL TO
NEW AND EXISTING PLANT MATERIAL ARE ENCOUNTERED.
2. PRIOR TO COMMENCING WORK, THE CONTRACTOR SHALL VERIFY
THE LOCATIONS OF ALL UNDERGROUND UTILITIES. IT IS THE
RESPONSIBILITY OF THE CONTRACTOR TO UTILIZE A LOCATING
SERVICE TO VERIFY UNDERGROUND UTILITY LOCATIONS.
3. THE CONTRACTOR SHALL FURNISH AND INSTALL 4" DEPTH OF
TOPSOIL AND SEED LAWN AREAS AND ALL AREAS DISTURBED AS A
RESULT OF NEW CONSTRUCTION.
PLANTING NOTES
LAWN SEED MIX
LAWN SEED MIX NOTES:
1. SEE SPECIFICATIONS FOR SEED MIX.
05' 10'10'
SCALE: 1"=10'-0"
N
SARATOGA ASSOCIATES PROJECT #
REVISIONS
NO. DATE DESCRIPTION DRAWN CHK
A
B
C
D
E
F
G
H
I
A
B
C
D
E
F
G
H
II
2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
UNAUTHORIZED ALTERATION OR ADDITION TO
THIS DOCUMENT IS A VIOLATION OF SECTION
7209 OF THE NEW YORK STATE EDUCATION
LAW. © 2026 ALL RIGHTS RESERVED
SARATOGA ASSOCIATES
DATE:
DRAWN BY:
CHECKED BY:
PHASE:
DWG SCALE:
Fi le
N am e:
S
:\2
5\
-1
.1
C or tla nd
R an da ll
Pa rk
B at hr oo m R en ov at io n\ C
.4 P ro du ct io n\ C
.4 .3
-C D
\S
IT
E\
_1
.1
0_ C or tla nd _R an da ll Pa rk _S ite B as e_
C D
6.
dw g
U se r:
- P lo t D at e an d Ti m e:
5/
/2
3:
P
M
05/22/2026
JMM
APY
CD
RANDALL PARK
RESTROOM
CITY OF CORTLAND
RENOVATION AND
PAVILION PROJECT
2025-116.10
L500
PLANTING
SEEDING
PUBLIC
ROADWAY
50'-0"
SECTION
PLAN
STABILIZATION
GEOTEXTILE
6" M
IN
NOTE:
1. STONE SIZE: USE NYSDOT SIZE
DESIGNATION 4 CRUSHED STONE
MIXTURE OR RECLAIMED OR RECYCLED
CONCRETE EQUIVALENT.
2. MAINTENANCE: THE ENTRANCE SHALL
BE MAINTAINED IN A CONDITION WHICH
WILL PREVENT TRACKING OR FLOWING
OF SEDIMENT ONTO ADJACENT ROAD,
ALL SEDIMENT SPILLED, DROPPED,
WASHED OR TRACKED ONTO ADJACENT
ROAD MUST BE REMOVED IMMEDIATELY.
3. WHEN WASHING IS REQUIRED, IT
SHALL BE DONE ON AN AREA STABILIZED
WITH STONE.
STONE
MAINTAIN PUBLIC ROADWAYS FREE
OF SEDIMENT AND DEBRIS
SECTION A-A
50'-0"
SCALE 1/2" = 1'-0"
STABILIZED CONSTRUCTION ENTRANCE2
PUBLIC
ROADWAY
PROJECT
SITE
PROJECT
SITE
UNDISTURBED GROUND
9" FILTRATION STRAW/COIR WATTLEFLOW
SEDIMENT BUILD-UP, MAINTAIN AT 4" MAX.
24" HARDWOOD POST, DRIVEN MINIMUM 12"
THROUGH WATTLE INTO GROUND.
SCALE 1/2" = 1'-0"
SEDIMENT CONTROL WATTLE1
DISTURBED
AREA
UNDISTURBED
AREA
SECTION
ISOMETRIC
6" COMPACTED AGGREGATE
SUBBASE MATERIAL
NYSDOT TYPE 2, ITEM 304.12
STABILIZATION GEOTEXTILE
MIRAFI 500X OR APPROVED EQUAL
CLEAR AND STRIP ROADBED AREA OF
ALL VEGETATION, ROOTS AND OTHER
OBJECTIONABLE MATERIAL. RESTORE
TO EXISTING CONDITIONS ONCE
TEMPORARY ROADWAY HAS BEEN
REMOVED.
NOTES:
1. MAXIMUM GRADE 15%
2. STABILIZE DISTURBED SIDE SLOPES WITH
VEGETATION AS SOON AS GRADING IS
ACCOMPLISHED.
3. SPREAD SUBBASE MATERIAL OVER THE FULL
WIDTH OF THE ROAD AND SMOOTH TO AVOID
DEPRESSIONS.
4. INSPECT CONSTRUCTION ROAD
PERIODICALLY FOR CONDITION OF SURFACE.
TOPDRESS WITH NEW GRAVEL AS NEEDED.
CHECK FOR EROSION AND SEDIMENTATION
AFTER ALL RAINFALL EVENTS AND AREAS
PRODUCING SEDIMENT SHOULD BE TREATED
IMMEDIATELY.
18'-0" TRAVEL LANE
SCALE 1/2" = 1'-0"
TEMPORARY CONSTRUCTION ROAD STABILIZATION3
SCALE 1/2" = 1'-0"
TREE PROTECTION FENCE6
7' -0
3'
-0
18"
30"± 18"±
ALL CONCRETE
TRUCKS SHALL
WASHOUT HERE
PLANWASHOUT SIGN
TYPICAL SECTION
SCALE 1/2" = 1'-0"
CONCRETE WASHOUT STATION4
10' MIN
VA
R
IE
S
SCALE 1" = 1'-0"
CONCRETE PAVEMENT - PEDESTRIAN TRAFFIC7
3/8" WIDE COMPRESSIBLE
EXPANSION JOINT FILLER WITH
SEALANT SEE PLANS FOR LAYOUT
1" DEEP x 1/4" WIDE TOOLED SCORE
JOINT, SEE PLANS FOR LAYOUT
COMPACTED SUB-GRADE
3/4"Ø x 15" LONG STEEL DOWELS @ 24"
O.C., 7 1/2" EMBEDMENT EACH END,
GREASE ONE END
6" THICK CONCRETE PAVEMENT
6X6 - W2.9XW2.9 WWM (2" CLEAR)
6" COMPACTED AGGREGATE
SUBBASE MATERIAL, NYSDOT
TYPE 2, ITEM NO. 304.12,
6" 6"
STABILIZATION GEOTEXTILE
SMOOTH
FINISH 2" WIDE
SOFT BRISTLE
BROOM FINISH
2"
CONCRETE FINISH
1" DEEP x 1/4" WIDE
TOOLED SCORE JOINT,
SEE PLANS FOR LAYOUT
LOCATE FENCE AT DRIP
EDGE OF TREE (TYP.)
4' HIGH ORANGE
PLASTIC SNOW
FENCE
STEEL FENCE
POSTS AT 6' O.C.
R35', TYP.
GALVANIZED "U"
CHANNEL POST
BLACK LETTERS ON
WHITE BACKGROUND
GRADE
STRAW BALE ON SIDE
(TYP)
BINDING WIRE
10 MIL
POLYETHYLENE
SHEETING
6" MIN
EMBEDMENT
(TYP)
GRADE
WOOD STAKE
(TYP)
6" MIN DEPTH
AGGREGATE ALL
AROUND
SEASONAL HIGH
GROUNDWATER
SO
IL
EM
BE
D M
EN
T
TO
B
O
TT
O M
O F
SI
G
N
M
AX
M
IN
SIGN SHALL BE PLACED IN A
PROMINENT LOCATION AT
WASHOUT AREA
ANCHOR BALES WITH
(2) 2"X2"X4' STAKE
PER BALE
10 MIL POLYETHYLENE
SHEETING
BALES TO
BUTT
6" MIN DEPTH
AGGREGATE ALL
AROUND
NOT TO SCALE
STOCKPILE STABILIZATION5
SARATOGA ASSOCIATES PROJECT #
REVISIONS
NO. DATE DESCRIPTION DRAWN CHK
A
B
C
D
E
F
G
H
I
A
B
C
D
E
F
G
H
II
2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
UNAUTHORIZED ALTERATION OR ADDITION TO
THIS DOCUMENT IS A VIOLATION OF SECTION
7209 OF THE NEW YORK STATE EDUCATION
LAW. © 2026 ALL RIGHTS RESERVED
SARATOGA ASSOCIATES
DATE:
DRAWN BY:
CHECKED BY:
PHASE:
DWG SCALE:
Fi le
N am e:
S
:\2
5\
-1
.1
C or tla nd
R an da ll
Pa rk
B at hr oo m R en ov at io n\ C
.4 P ro du ct io n\ C
.4 .3
-C D
\S
IT
E\
_1
.1
0_ C or tla nd _R an da ll Pa rk _S ite D et ai ls .d w g
U se r:
- P lo t D at e an d Ti m e:
5/
/2
3:
P
M
05/22/2026
JMM
APY
CD
RANDALL PARK
RESTROOM
CITY OF CORTLAND
RENOVATION AND
PAVILION PROJECT
2025-116.10
L600SITE
DETAILS
AS SHOWN
SCALE 1/2" = 1'-0"
STORMWATER DRY WELL - 4FT DIA.2
4'-0"
4' -0
9"
2' -0
6"
6"
6"
2'-0"2'-0"
4'-0" DIA.
6"
5' -9
7' -9
SCALE 1/2" = 1'-0"
STORMWATER DRY WELL - 6FT DIA. 1
6'-0"
4' -0
9"
2' -0
6"
6"
6"
2'-0"2'-0"
6'-0" DIA.
6"
5' -9
7' -9
24" COMPACTED WASHED
#2 DRAINAGE STONE
UNCOMPACTED WASHED
#2 DRAINAGE STONE
FILTRATION GEOTEXTILE
ALL SIDES
UNDISTURBED
SUBGRADE
PRECAST
CONCRETE COVER
PRECAST CONCRETE
LEACH BASIN
PRECAST CONCRETE
FOOTING RING
HDPE INLET PIPE
PRECAST CONCRETE
LEACH BASIN
PRECAST CONCRETE
COVER OVERHANG
24" DIA. MANHOLE
FRAME AND COVER
MORTAR FRAME TO
CONCRETE COVER
RISER FRAME
AS NEEDED
COMPACTED NATIVE
EXCAVATED SOIL
6" MIN IMPORTED TOPSOIL
PRECAST CONCRETE
FOOTING RING
24" COMPACTED WASHED
MIXED #1 & #2 DRAINAGE STONE
UNCOMPACTED WASHED
#2 DRAINAGE STONE
FILTRATION GEOTEXTILE
ALL SIDES
UNDISTURBED
SUBGRADE
PRECAST
CONCRETE COVER
PRECAST CONCRETE
LEACH BASIN
PRECAST CONCRETE
FOOTING RING
HDPE INLET PIPE
PRECAST CONCRETE
LEACH BASIN
PRECAST CONCRETE
COVER OVERHANG
24" DIA. MANHOLE
FRAME AND COVER
MORTAR FRAME TO
CONCRETE COVER
RISER FRAME
AS NEEDED
COMPACTED NATIVE
EXCAVATED SOIL
6" MIN IMPORTED TOPSOIL
PRECAST CONCRETE
FOOTING RING
SCALE 1/2" = 1'-0"
CLEAN OUT6
FINISH GRADE
CAST IRON PUSH-ON
CLEANOUT. TO BE FLUSH
WITH FINISH GRADE
COMPACTED SUITABLE FILL
TAMPED IN 6" LAYERS
6" Ø HDPE PIPE RISER
HDPE LONG SWEEP 45°
BEND OR (2) 22.5° BENDS
COMBINATION WYE, AND
45° BEND
6"Ø HDPE STORM LINE
FITTING/90° BEND
HDPE PIPING
2' -0
FERNCO ADAPTER
DOWNSPOUT, SEE
ARCHITECTURAL PLANS
SCALE 1/2" = 1'-0"
DOWNSPOUT CONNECTION5
BUILDING FACE
EXTEND DOWNSPOUT
BELOW FINISH GRADE
SCALE 1/2" = 1'-0"
MANHOLE / AREA DRAIN3
SLOPE
FINISH
GRADE
VARIES
6"
12" NYLOPLAST DRAIN
BASIN WITH PVC BODY
AND CAST IRON FRAME
AND DRAINAGE GRATE
SMOOTH INTERIOR
CORRUGATED
POLYETHYLENE
STORM PIPE
6" DEPTH, NYSDOT
SIZE DESIGNATION
2 WASHED
CRUSHED STONE
MIX
DUCTILE IRON FRAME
AND COVER,
PAINTED BLACK FINISH
PEDESTRIAN TRAFFIC
NOTE:
SEE L400 SERIES DRAWINGS
FOR DRAINAGE INFORMATION
SIZE VARIES
MANHOLE
SOLID COVER
SCALE 1/2" = 1'-0"
STORM SEWER PIPE TRENCH4
6"
PI
PE
2'
-0 " M
IN
. C
O
VE
R
6"
6" D
IA
FINISH GRADE
STABILIZE SIDE SLOPES IN ACCORDANCE
WITH OSHA REQUIREMENTS
FINAL BACKFILL, COMPACTED
SUITABLE NATIVE BACKFILL
STORM SEWER PIPE
UNDISTURBED SUBGRADE
INITIAL BACKFILL AND HAUNCH MATERIAL,
COMPACTED NYSDOT #2 CRUSHED STONE MIX
PIPE BEDDING, 6" COMPACTED
NYSDOT #2 CRUSHED STONE MIX
FINAL BACKFILL, COMPACTED
AGGREGATE SUBBASE MATERIAL,
NYSDOT TYPE 2, ITEM 304.12
6"
PIPE
DIA.
LAWNPAVEMENT
SARATOGA ASSOCIATES PROJECT #
REVISIONS
NO. DATE DESCRIPTION DRAWN CHK
A
B
C
D
E
F
G
H
I
A
B
C
D
E
F
G
H
II
2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
UNAUTHORIZED ALTERATION OR ADDITION TO
THIS DOCUMENT IS A VIOLATION OF SECTION
7209 OF THE NEW YORK STATE EDUCATION
LAW. © 2026 ALL RIGHTS RESERVED
SARATOGA ASSOCIATES
DATE:
DRAWN BY:
CHECKED BY:
PHASE:
DWG SCALE:
Fi le
N am e:
S
:\2
5\
-1
.1
C or tla nd
R an da ll
Pa rk
B at hr oo m R en ov at io n\ C
.4 P ro du ct io n\ C
.4 .3
-C D
\S
IT
E\
_1
.1
0_ C or tla nd _R an da ll Pa rk _S ite D et ai ls .d w g
U se r:
- P lo t D at e an d Ti m e:
5/
/2
3:
P
M
05/22/2026
JMM
APY
CD
RANDALL PARK
RESTROOM
CITY OF CORTLAND
RENOVATION AND
PAVILION PROJECT
2025-116.10
L601SITE
DETAILS
AS SHOWN
DEMOLITION NOTES:
1. PERFORM ALL WORK IN STRICT ACCORDANCE WITH ALL APPLICABLE CODES,
LAWS AND ORDINANCES.
2. DRAWINGS SHOW GENERAL SCOPE OF REMOVAL WORK. CONTRACTOR IS TO
PROVIDE ALL WORK AS REQUIRED TO ALLOW FOR THE FULL REMOVAL OF ALL
PORTIONS INDICATED ON THE DRAWINGS.
3. REFER TO ABATEMENT DRAWINGS AND HAZARDOUS MATERIALS
REPORT/SURVEY FOR EXTENT OF ASBESTOS CONTAINING MATERIALS.
4. REFER TO ABATEMENT DRAWINGS FOR EXTENT OF LEAD CONTAINING
MATERIALS.
5. REMOVE DEBRIS FROM DEMOLITION AREA AS IT IS PRODUCED. LEGALLY
DISPOSE OF MATERIALS OFF SITE.
6. SHORE EXISTING CONSTRUCTION FOR DEMOLITION AND REMOVALS.
7. PROMPTLY REPAIR ADJACENT SURFACES DAMAGED BY THE DEMOLITION
THAT ARE NOT LABELED FOR REMOVAL.
8. GENERAL TRADES CONTRACTOR IS TO BE RESPONSIBLE FOR COORDINATING
ALL REMOVALS WITH OTHER TRADES.
9. ALL SLAB REMOVALS SHOWN ON PLANS TO BE SAW CUT REMOVALS.
CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF ALL SAW CUTS WITH
ALL OTHER TRADES. CONTRACTOR SHALL CUT AND REMOVE EXISTING SLAB &
SUB BASE TO EXTENT REQUIRED BY TRADES SCOPE OF WORK. CONTRACTOR
IS RESPONSIBLE FOR STRUCTURAL SUB SLAB FILL/COMPACTION.
10. REMOVE ALL EXTERIOR DOORS AND WINDOWS UNLESS NOTED OTHERWISE.
11. REMOVE ALL EXISTING EXPOSED OR CONCEALED CONDUIT, WIRING
INSTALLATION, WIRING DEVICES, ELECTRICAL EQUIPMENT, PIPING,
DUCTWORK, AND EQUIPMENT RENDERED OBSOLETE BY THE DEMOLITION.
12. WIRING RENDERED USELESS BY THE DEMOLITION SHALL BE REMOVED TO ITS
POINT OF SUPPLY. CAP UTILITIES RENDERED OBSOLETE BELOW FLOOR
LEVEL, ABOVE CEILING, OR BEHIND WALL FINISHES UNLESS NOTED
OTHERWISE.
13. REMOVE ALL LIGHT FIXTURES AND ASSOCIATED WIRING.
14. RESTORE ANY EXISTING ELECTRICAL OR GAS INSTALLATION DISTURBED
DURING THE COURSE OF CONSTRUCTION AND NOT INDICATED FOR REMOVAL.
15. REMOVE ALL EXISTING ROOFING, ROOF DECKING, AND FASCIA IN THEIR
ENTIRETY.
16. REFER TO LANDSCAPE DRAWINGS FOR EXTENT OF EXTERIOR DEMOLITION.
CUT NEW DOOR OPENINGS
IN EXISTING CMU WALL, TYP.
DEMO EXISTING CONC.
FLOOR AS INDICATED.
COORDINATE EXACT
LOCATIONS WITH
PLUMBING CONTRACTOR
DURING CONSTRUCTION
REMOVE ALL
EXISTING FIXTURES
REMOVE ALL
EXISTING INTERIOR
WALLS
REMOVE ALL
EXISTING CEILINGS
DOWN TO FRAMING
CUT OPENINGS IN EXISTING
WALLS FOR MECH EQUIP.
REF HVAC DWGS.
REMOVE ALL EXISTING METAL ROOFING PANELS,
UNDERLAYMENT, ROOF DECKING, FASCIAS AND
SOFFITS. ROOF FRAMING IS TO REMAIN.
UNAUTHORIZED ALTERATION OR ADDITION TO THIS
DOCUMENT IS A VIOLATION OF SECTION 7209 OF THE
NEW YORK STATE EDUCATION LAW. COPYRIGHT ©
2026 ALL RIGHTS RESERVED SARATOGA ASSOCIATES
SARATOGA ASSOCIATES PROJECT #
Plot Date:
REVISIONS
PHASE:
DATE:
CHECKED BY:
DRAWN BY:
89 123467 5
B
D
E
F
G
H
C
A
C:\Users\amartini\Documents\Randall Park Bathroom Renovation_amartini62BWC.rvt 5/22/2026 10:10:01 PM
D100DEMOLITION
PLANS
2025-116.10
RANDALL PARK
RESTROOM
CITY OF CORTLAND
RDD
BID SET
5/22/26
AMC
RENOVATION AND
PAVILION PROJECT
1/4" = 1'-0"
FIRST FLOOR DEMOLITION PLAN
N
NO DATE DESCRIPTION DRAWN CHK
1/4" = 1'-0"
ROOF DEMOLITION PLAN
GENERAL NOTES
1. REFER TO ELECT. DWGS. FOR EXIT SIGNAGE LOCATIONS.
2. PROJECT WILL BE EQUIPPED WITH EMERGENCY
LIGHTING. REF. ELECT. DWGS. FOR LOCATIONS.
3. PROJECT WILL BE EQUIPPED WITH SMOKE AND FIRE
DETECTION SYSTEM. REF. TO ELECT. DWGS. FOR
LOCATIONS.
4. FIRE EXTINGUISHERS REQUIRED BY CODE TO BE PLACED
WITH 75' TRAVEL DISTANCE WITHIN BUILDING (AS
SHOWN)
M A
X
T Y
P
HORN STROBE
SWITCH OR
PULL BOX
ELECT. OUTLET,
PHONE JACK,
DATA PORT
NOTE: ALIGN
DEVICES WHEN
POSSIBLE
FIRE
ANNUNCIATOR
INTERCOM
THERMOSTAT
EXIT / DOOR WIDTH
OCCUPANCY COUNT
REQUIRED WIDTH (INCHES)
ACTUAL EXIT WIDTH
USE GROUP IN SPACE
MAX OCCUPANCY
FIRE EXTINGUISHER
CABINET
SIGN LOCATION, SEE
SPECIFICATIONS
INDICATES 1-HR FIRE BARRIER
INDICATES EGRESS PATH AND
DISTANCE TO EXITS
DRAWING LEGEND
INDICATES 2-HR FIRE BARRIER
EXIT
A-3
FEC
ST-EX
FIRE EXTINGUISHER
(NO CABINET)FE
ALL WORK SHALL COMPLY WITH THE RELATED PROVISIONS OF THE 2025 UNIFORM CODE OF NEW YORK STATE WHICH
ADOPTS THE 2024 IBC, ITS REFERENCE STANDARDS, AND ALL LOCAL LAW REGULATIONS.
BUILDING CODE: 2025 INTERNATIONAL ENERGY CONSERVATION CODE (2024 IECC) WITH 2025 NYS SUPPLEMENT
BUILDING CODE SECTION REQUIRED/ ALLOWABLE PROVIDED
SECTION C301 CLIMATE ZONE 5
SECTION C402.1.1 LOW ENERGY BUILDINGS:
LOW ENERGY BUILDINGS SHALL BE EXEMPT FROM THE BUILDING THERMAL ENVELOPE
PROVISIONS OF C402 WHEN THEY DO NOT CONTAIN CONDITIONED SPACE.
GENERAL CONSTRUCTION CODE DATA
BUILDING CODE: 2025 NYS BUILDING CODE (2024 IBC)
BUILDING CODE SECTION REQUIRED PROVIDED
SECTION 302.1 USE GROUP B (PER 303.1.1)
SECTION 504.3 BUILDING HEIGHT 40 FT MAX 12 FT
SECTION 504.4 STORIES ABOVE GRADE PLANE 2 MAX 1
SECTION 506.2 AREA - VB CONSTRUCTION 9,000 SF MAX PER STORY 973 SF
TABLE 601 CONSTRUCTION CLASSIFICATION TYPE VB
STRUCTURAL FRAME 0 HR. 0 HR.
BEARING WALLS - EXTERIOR 0 HR. 0 HR.
BEARING WALLS - INTERIOR 0 HR. 0 HR.
NON-BEARING WALLS - EXTERIOR 0 HR. 0 HR.
NON-BEARING WALLS - INTERIOR 0 HR. 0 HR.
FLOORS 0 HR. 0 HR.
ROOF 0 HR. 0 HR.
SECTION 713.4 SHAFT ENCLOSURE 1 HR. N/A
SECTION 903.2 SPRINKLERS NOT REQUIRED NOT PROVIDED
SECTION 1004.5 OCCUPANT LOAD VARIOUS, SEE PLAN 33 TOTAL
SECTION 1005.3 EGRESS WIDTH
STAIRS 0.3" / OCC. MIN N/A
OTHER COMPONENTS 0.2" / OCC. MIN 12" / OCC.
SECTION 1006.2.1 NUMBER OF EXITS 1 / FLOOR MIN 4 / FLOOR
SECTION 1007.1.1 ARRANGEMENT N/A N/A
SECTION 1017.2 TRAVEL DISTANCE 200 FT MAX 25 FT MAX
TABLE 2902.1 PLUMBING FIXTURES
MALE WATER CLOSETS 1 3 GENDER NEUTRAL
FEMALE WATER CLOSETS 1 WATER CLOSETS
MALE LAVATORIES 1 3 GENDER NEUTRAL
FEMALE LAVATORIES 1 LAVATORIES
WATER FOUNTAINS 1 2 WATER FOUNTAINS
SERVICE SINKS 1 1 SERVICE SINKU
U
U
B
B
B
B
25 FEET
EXIT
EXIT
EXIT
EXIT
FE
ST-EX
ST-EX
S T
-E X
A N
D S
ID
E
R E
A C
H
M
A X
F O
R…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .