This is an Addendum No. 2 issued by Saratoga Associates on June 22, 2026, for the City of Cortland's Randall Park Restroom Renovation project (SA Project #2025-116.10). The addendum modifies the bid documents originally issued on May 29, 2026, and addresses submitted bidder questions and incorporates technical clarifications into the contract documents. The primary changes include: confirmation that a reduced pressure zone (RPZ) backflow preventer must be provided on the incoming domestic water line with engineering paperwork and balancing included in the plumbing scope; clarification that the electrical contractor is responsible for excavation of their own utilities; confirmation that existing communication lines are excluded from this contract and will be handled by the city under a separate agreement; and specification that the city will install the water meter with the plumbing contractor responsible for coordinating the installation. Additional modifications include removal of "seat wall" language from Specification Section 011000, with the item now reading "Furnish and install timber pavilion," and removal of item 1.03.B from the same specification section. The bid submission deadline has been moved from June 26, 2026 at 11:00 a.m. to July 2, 2026 at 11:00 a.m., with bids to be opened at 11:15 a.m. Updated plumbing drawings P101 and P201 are attached to address the incorporation of the RPZ, expansion tank, and backflow prevention device requirements.
No pricing information, set-asides, incumbent contractor data, or funding sources are disclosed in this addendum document. The addendum serves as a technical clarification instrument to ensure all bidders operate from the same specifications and revised contract documents prior to the rescheduled bid submission date.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Randall Park Restroom Renovation ADDENDUM #2 June 22, 2026 -- Page 1 of 2
ADDENDUM NO. 2
June 22, 2026
City of Cortland
Randall Park Restroom Renovation
SA PROJECT # 2025-116.10
This addendum, issued to bid document holders of record, indicates changes to the Bid Documents issued May 29, 2026. All changes described herein shall be incorporated into the contractor’s bid proposal. This addendum is part of the Contract Documents.
Acknowledgement of receipt of this Addendum is required on the respective Bid Form.
Prepared By:
Saratoga Associates Landscape Architects, Architects, Engineers, and Planners, P.C.
21 Congress Street Saratoga Springs, New York 12866
Attachments:
Updated P101, P201
Schedule Updates:
Bid Submission Deadline: Bid date has been moved from June 26th at 11am to
July 2nd at 11:00am. Bids will be opened at 11:15am.
The following notes, changes, additions, and replacements shall be incorporated into the Project Manual or drawings as applicable:
ITEM 1. Submitted Questions
A. Drawing P-101 gives no indication of a R.P.Z. on the incoming domestic, nor is it listed on the fixture schedule. Should an R.P.Z. be incorporated into the plumbing scope? Please Advise.
• RPZ should be provided. See attached updated P101 and P201.
B. If a R.P.Z. is necessary should the plumbing bid cover the engineering paperwork and balancing of said R.P.Z. Please Advise.
• See attached updated drawings P101 and P201.
C. Is the Electrical Contractor responsible for their own excavation?
• The EC is responsible for all excavation of their utilities.
D. There is a spec section for electrical metering, this seems moot if renovated building is to fed existing panel owned by the City of Cortland.
• There is no metering called for on the plans and the existing service is provided from a nearby meter.
E. Is there a detail or plan for a communication service? Internet or phone? Existing?
• There is an existing line that is not part of the contract. That work will be done by the
Randall Park Restroom Renovation ADDENDUM #2 June 22, 2026 -- Page 2 of 2 city under a different contract.
F. Refer to specification section 22116, page 5, paragraph 3.5B. This states that the water meter will be provided and installed by the City of Cortland. Refer also to drawing P101, Water Floor Plan Notes. Note 3. This states to provide water meter. Please clarify who will provide and install water meter.
• Water meter will be installed by the city. The PC is responsible to coordinate the install with the city.
G. There is no domestic water backflow prevention device or expansion tank shown. Please clarify if these items will be required.
• Please see revised P101 and P201.
ITEM 2. Additional Information
A. Specification Section 011000 – Remove “seat wall” from item 1.02, I. Item I to now read as “Furnish and install timber pavilion.”
B. Specification Section 011000 – Remove item 1.03, B.
B
E X
C W
EX4" SAN
SLAB TO BE DEMOLISHED
1 2 3
A
B
CONCESSIONS /
STORAGE
CLOSET
MECH / JAN
BATH 3
BATH 2
BATH 1
ACCESSIBLE
MB-AWH-1
SK-A
LAV-A
WC-A
WC-A
LAV-A
WC-A
LAV-A
HB-1
/2
C
W
/2
H
W
1/2" HW
C W
/2
H
W
3/4" CW
HB-1 3/4" CW
E X
C W
1 2 3
A
B
CONCESSIONS /
STORAGE
CLOSET
MECH / JAN
BATH 3
BATH 2
BATH 1
ACCESSIBLE
MB-A
SK-A
LAV-A
WC-A
WC-A
LAV-A
WC-A
LAV-A
FD-1
FD-1 FD-1
FD-1
FD-1
4" FCO
3" FCO
EX
4"
S A N
3" VTR
UNAUTHORIZED ALTERATION OR ADDITION TO
THIS DOCUMENT IS A VIOLATION OF SECTION
7209 OF THE NEW YORK STATE EDUCATION
LAW. COPYRIGHT © 2026 ALL RIGHTS
RESERVED SARATOGA ASSOCIATES
SARATOGA ASSOCIATES PROJECT #
Plot Date:
REVISIONS
PHASE:
DATE:
CHECKED BY:
DRAWN BY:
89 123467 5
B
D
E
F
G
H
C
A
CITY OF CORTLAND
RENOVATION AND
PAVILION PROJECT
Autodesk Docs://25-0151 Randall Park Bathroom Renovations/25-0151 Randall Park Bathroom Renovations.rvt 6/22/2026 12:55:49 PM
P101PLUMBING
FLOOR PLANS
2025-116.10
RANDALL PARK
RESTROOM
KAG
CONSTRUCTION
DOCUMENTS
5/22/26
NPM
PLUMBING DEMO NOTES
# DESCRIPTION
1 REMOVE AND DISPOSE OF EXISTING PLUMBING FIXTURES.
PATCH ANY UNUSED OPENINGS TO MATCH EXISTING.
2 CAP AND COVER EXISTING SLAB PENETRATIONS. REMOVE
EXISTING CLEANOUT.
3 REMOVE AND DISPOSE OF EXISTING WATER LINES BACK TO
STUB. DISCONNECT PIPING BELOW SLAB AND CAP FOR
CONTINUATION IN NEW WORK.
4 EXISTING 3/4" DRAIN FOR WINTERIZATION (ON SITE) TO
REMAIN.
5 REMOVE AND DISPOSE OF EXISTING VTR.
SANITARY FLOOR PLAN NOTES
# DESCRIPTION
1 CONNECT TO EXISTING 4" SANITARY MAIN.
2 PROVIDE CLEANOUT.
3 PROVIDE 3" VTR.
4 ROUTE T&P RELIEF DISCHARGE FROM WH-1 TO MB-A.
5 PROVIDE 12"X12" ACCESS PANEL FOR DF-A TRAP AND
SUPPLY STOP ACCESS FOR WINTERIZATION BELOW SK-A.
FIXTURE SCHEDULE
FIXTURE SYMBOL
CONNECTION SIZE
MFG / MODEL DESCRIPTION
HOT COLD WASTE VENT
DRINKING FOUNTAIN DF-A 3/8" 1 1/2" 1 1/2"
ELKAY /
LK4409BFBLU
OUTDOOR EZH2O® BOTTLE FILLING STATION WALL MOUNT WITH BI-LEVEL
FOUNTAIN NON-FILTERED NON-REFRIGERATED BLUE.
FLOOR CLEANOUT FCO
SEE
PLANS
ZURN / Z1400
"LEVEL-TROL" ADJUSTABLE FLOOR CLEANOUT. DURA-COATED CAST IRON BODY
FLOOR CLEANOUT WITH EXTRA HEAVY DUTY CAST IRON TOP.
FLOOR DRAIN FD-1 3" 2" ZURN / FD1
ADJUSTABLE FLOOR DRAIN WITH ROUND TOP. PROVIDE WITH STAINLESS STEEL
FINISH.
HOSE BIBB HB-1 3/4" ZURN / Z1320-CXL
ENCASED, ECOLOTROL™, LEAD-FREE, NON-FREEZE AUTOMATIC DRAINING WALL
HYDRANT FOR FLUSH INSTALLATION.
LAVATORY LAV-A 1/2" 1/2" 1 1/4" 1 1/4" ZURN / ZZ5834
21 IN WALL MOUNT RECTANGULAR CAST IRON BATHROOM SINK IN WHITE.
PROVIDE WITH 0.5GPM TWO HANDLE CENTERSET BATHROOM SINK FAUCET IN
CHROME PLATED, ZURN ZZ81101XL3M, AND CARRIER SYSTEM, ZURN Z1231.
PROVIDE WITH ADA TRAP, STOP, AND SUPPLY PROTECTORS, Z896-1-NT IN BATH 1.
MOP BASIN MB-A 1/2" 1/2" 3" 2"
PROFLO /
PFMB3624S
LINWALD 36X24 IN MOP BASIN IN WHITE WITH STAINLESS STEEL DRAIN. PROVIDE
WITH TWO HANDLE WALL MOUNT SERVICE SINK FAUCET IN POLISHED CHROME,
PROFLO PF1119LF.
SINK SK-A 1/2" 1/2" 3" 1 1/2"
PROFLO /
PFSR2521553CA
BEALETON 25X21 IN 3 HOLE STAINLESS STEEL SINGLE BOWL DROP-IN KITCHEN SINK.
PROVIDE WITH SINGLE HANDLE KITCHEN FAUCET IN POLISHED CHROME, PROFLO
PFXC3107CP.
WATER CLOSET WC-A 1" 3" 2" KOHLER / K-84325-0
KINGSTON ELONGATED WALL MOUNT TOILET BOWL WITH TOP SPUD IN WHITE.
PROVIDE WITH ELONGATED OPEN FRONT TOILET SEAT IN WHITE, KOHLER K4731-C-0,
1.28 GPF MANUAL FLUSH VALVE, KOHLER K80TM00N10-CP, AND WALL MOUNT
CARRIER SYSTEM. CONFIRM CARRIER SYSTEM COMPLIES WITH METAL STUDS.
WATER HEATER WH-1 3/4" 3/4" RHEEM / ELDS30
LIGHT DUTY 28 GAL. SHORT 208V 6 KW MULTI PHASE FIELD CONVERTIBLE
COMMERCIAL ELECTRIC WATER HEATER. PROVIDE WITH PLUMBFLEX 26 IN
ALUMINUM WATER HEATER DRAIN PAN AND WALL MOUNTED EQUIPMENT
PLATFORM, HOLDRITE 50-SWHP-W.
SCALE: 1/4" = 1'-0"
PLUMBING DEMO PLAN
SCALE: 1/4" = 1'-0"
WATER FLOOR PLAN
SCALE: 1/4" = 1'-0"
SANITARY FLOOR PLAN
WATER FLOOR PLAN NOTES
# DESCRIPTION
1 CONNECT TO EXISTING 1" DOMESTIC WATER. WATER
SERVICE TO BE EXTENDED BELOW SLAB.
2 PROVIDE 1" CW STUB UP AND SHUT OFF VALVE.
3 WATER METER PROVIDED BY THE CITY WATER DEPARTMENT.
4 PROVIDE WATTS 1" LF0071QT LEAD FREE DOUBLE CHECK
VALVE ASSEMBLY BACKFLOW PREVENTER.
5 PROVIDE AMTROL ST-5 EXPANSION TANK.
NO DATE DESCRIPTION DRAWN CHK
1 06/22/26 Utility Coordination
NOT FOR
CONSTRUCTION
1/2 " C
W
1/2 " H
W
/4
C
W
C W
1/2 " C
W 1/2" HW 1/2
" H
W
C W
C W
SK-A
DF-A
WC-A
WC-A
LAV-A
LAV-A
WC-A
WH-1
LAV-A
HB-1
HB-1
3/4" CW
/2
C
W
C W
/2
C
W
/2
H
W
EX1" C
W
WATER METER
BACKFLOW
PREVENTER
EXPANSION
TANK
2" V
4" S
AN
4" S
AN
S A
N
/2
V
V
/4
V
V
V
V
V
V
/4
V
V
2" V 2" V
3" S
AN
SK-A
DF-A
LAV-A
WC-A
WC-A
MB-A
LAV-A
WC-A
LAV-A
FD-1
FD-1
FD-1
FD-1
FD-1
EX4" SAN
FCO
3" VTR
SHUT-OFF VALVE
UNION
DIELECTRIC COUPLING
(AT CONNECTION TO
UNIT)
3/4 "C
W
3/4"HW(120°F)
HW TO FIXTURES
PER PLAN
WH-1
DRAIN PAN
3/4" DRAIN
LINE ROUTED
TO MOP BASIN.
ASME T&P RELIEF
VALVE TO DRAIN PAN
CW TO FIXTURES
PER PLAN
GENERAL NOTES:
1. CLEANOUTS SHALL BE PROVIDED IN SANITARY WASTE LINES AS
SHOWN AND AS OTHER WISE REQIRED BY CODE. ALL CLEANOUTS
SHALL BE READILY ACCESSIBLE. CAULK ALL CLEANOUT GRATINGS
FLUSH TO AVOID TRAPPING OF DIRT.
2. ALL PLUMBING PIPING SHALL BE ROUTED AROUND ELECTRICAL
AREAS WHERE POSSIBLE.
3. ALL SANITARY PIPING BELOW FLOOR TO HAVE A MINIMUM 1/8"
PER FOOT SLOPE.
4. ALL DOMESTIC WATER PIPING TO BE FLUSHED PRIOR TO
CONNECTING TO FIXTURES.
5. ALL DOMESTIC WATER LINES TO BE ABOVE CEILING AND
CONCEALED WITHIN WALLS WHENEVER POSSIBLE.
6. ALL EXTERIOR WALL AND FLOOR PENETRATIONS SHALL BE
COMPLETELY SEALED WATERTIGHT WITH FLEXIBLE WATERPROOF
SEALANT.
7. SEAL BETWEEN WALLS, FLOORS, AND PLUMBING FIXTURES AS
REQUIRED BY CODE.
8. ALL PENETRATIONS OF RATED ASSEMBLIES SHALL BE FIRESTOPPED
PER NFPA.
9. CONTRACTOR SHALL KEEP A CLEAN SET OF DRAWINGS ON THE
JOB SITE, NOTING DAILY, ALL CHANGES MADE ON THESE
DRAWINGS IN CONNECTION WITH THE FINAL INSTALLATION OF
ALL NEW AND UNCOVERED EXISTING UTILITIES.
10. CONTRACTOR TO PROVIDE TRAINING ON THE WINTERIZATION OF
THE BUILDING.
UNAUTHORIZED ALTERATION OR ADDITION TO
THIS DOCUMENT IS A VIOLATION OF SECTION
7209 OF THE NEW YORK STATE EDUCATION
LAW. COPYRIGHT © 2026 ALL RIGHTS
RESERVED SARATOGA ASSOCIATES
SARATOGA ASSOCIATES PROJECT #
Plot Date:
REVISIONS
PHASE:
DATE:
CHECKED BY:
DRAWN BY:
89 123467 5
B
D
E
F
G
H
C
A
CITY OF CORTLAND
RENOVATION AND
PAVILION PROJECT
Autodesk Docs://25-0151 Randall Park Bathroom Renovations/25-0151 Randall Park Bathroom Renovations.rvt 6/22/2026 12:56:02 PM
P201
PLUMBING
DETAILS AND
ISOMETRICS
2025-116.10
RANDALL PARK
RESTROOM
KAG
CONSTRUCTION
DOCUMENTS
5/22/26
NPM
NTS
WATER ISOMETRIC
NTS
SANITARY ISOMETRIC
NTS
WH-1 Piping Diagram
NO DATE DESCRIPTION DRAWN CHK
1 06/22/26 Utility Coordination
NOT FOR
CONSTRUCTION
June 22, 2026