Standard_Drawing_6913.pdf
PDF 350 KB Posted
- Solicitation number
- 2025.111-ITQ
- Issued by
- Washington County, Oregon
About this file
This is a standard drawing document for Washington County, Oregon, related to the manufacture and delivery of traffic signal poles and associated hardware for the SE River Road/Witch Hazel Road Intersection improvement project in Hillsboro. The drawing specifies the engineering standards and technical specifications for the fabrication of signal poles, mast arms, and related hardware that must be constructed in accordance with the provided plan sheets and delivered to the project site.
The document serves as the technical reference standard for all bidders and manufacturers responding to the signal pole pre-order contract. It establishes the design criteria, material requirements, and manufacturing tolerances that all submitted products must meet or exceed to qualify for award consideration.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Standard_Drawing_6911.pdf | ||
| Standard_Drawing_6912.pdf | ||
| Signal_Plans.pdf | ||
| 2022-ATTACHMENT-C-MASTERformGOOD_(18).pdf | ||
| 2025-GOODS-REQUIREMENTS.pdf | ||
| SUBSTITUTION_REQUEST_FORM_.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .