Standard_Drawing_6912.pdf
PDF 470 KB Posted
- Solicitation number
- 2025.111-ITQ
- Issued by
- Washington County, Oregon
About this file
This is a standard drawing document for Washington County, Oregon, detailing specifications for traffic signal poles and associated hardware required for the SE River Road/Witch Hazel Road Intersection project in Hillsboro. The drawing provides technical specifications and installation requirements for the manufacture and delivery of signal poles, mast arms, and related hardware that contractors must follow to meet project standards. The document serves as the engineering reference for bidders to understand the exact configuration, dimensions, materials, and quality standards required for the poles and supporting infrastructure.
The standard drawing establishes the technical baseline for all signal pole components and their installation methodology at the intersection project site. Contractors responding to the pre-order opportunity must manufacture and deliver poles and hardware in strict accordance with the specifications depicted and detailed within this drawing. The document ensures consistency between the engineering design phase and actual procurement, allowing Washington County to evaluate bids based on a clear, standardized set of technical requirements rather than variable interpretations of project needs.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Standard_Drawing_6911.pdf | ||
| Standard_Drawing_6913.pdf | ||
| Signal_Plans.pdf | ||
| 2025-GOODS-REQUIREMENTS.pdf | ||
| SUBSTITUTION_REQUEST_FORM_.pdf | ||
| 2022-ATTACHMENT-C-MASTERformGOOD_(18).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .