This is a Preliminary Staff Report from Pinellas County Utilities detailing a new bid solicitation for the Keller Water Treatment Plant (WTP) 60" Valve Insertion and By-pass Project (PID005224A). The project involves installing a 60" valve and a 42" by-pass at the Keller WTP to improve emergency response capabilities for the North Pinellas County Water Service area. The current water transmission main lacks an in-line valve for emergency shutdowns, and this project will address that critical infrastructure limitation. The project is scheduled for fiscal years 2025-2026, with a total construction cost of $2.55 million.
The project will be funded through the Water Capital Improvement Program (CIP) Fund, with William Peters serving as the Project Manager/Construction Administrator and oversight from Susan Goebel-Canning (Planning & Project Management Division Director), Jeremy Waugh (Utilities Director), and Merry Celeste (Purchasing Director). The project aligns with the county's strategic plan objectives of maintaining resilient infrastructure, ensuring sustainable water management, and pursuing continuous improvement. The installation will enable emergency shutdown and pressure redirection for the water transmission system, enhancing the overall reliability of the water infrastructure in North Pinellas County.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Preliminary Staff Report
New Bid UTL Contract Subject:
New Bid Solicitation of Keller WTP 60” Valve Insertion and By-pass Project (PID005224A).
Recommended Action:
Approval by the County Administrator of New Bid Solicitation of Keller WTP 60” Valve Insertion and By-pass Project (PID005224A).
Strategic Plan:
Resilient Infrastructure and Environment:
1.2 Maintain and enhance County infrastructure
1.6 Ensure sustainable water management
Smart Service Delivery:
4.4 Pursue continuous improvement
Summary:
Scope - Installation of a 60” valve and a 42” by-pass at the Keller WTP.
Background/Explanation:The current configuration of the 60” Steel Water Transmission Main does not have an in-line valve that can be shut down in case of emergency. The current configuration only allows for all Region Water supply to be shut off at the twin barrells within the Keller WTP. Installation of the 42” bypass and the insertion of a 60” line valve will allow for emergency shut down and redirection of pressure if needed throughout the North Pinellas County Water Service area.
Fiscal Impact:
Design Cost Construction Cost - $2.55M Project duration: FY25 – FY26 Funding for this project is through the Water CIP Fund Project Manager/Subject Matter Expert:
Project Manager/ Subject Matter Expert:
William Peters PCU Construction Adminstrator
Staff Member Responsible:
Susan Goebel-Canning, Planning & Project Management Division Director, Utilities Jeremy Waugh, Director, Utilities Merry Celeste, Director, Purchasing
Partners:
Attachments:
Approved By:
image1.wmf image2.wmf image3.wmf image4.wmf image5.wmf image6.wmf image7.wmf
File details come from the government source that posted it. Updated .