SRW_BID_04_-__EXHIBIT_A_-_PLAN_LAYOUT4.pdf

PDF 610 KB Posted

Attached to
1428-20260202112937 Clarksdale
Solicitation number
3170034935
Issued by
Mississippi

About this file

This is a design and engineering reference document for the Sunflower River Walk Pedestrian Bridge project in Clarksdale, Mississippi. The contract calls for the design, fabrication, and delivery of one prefabricated pedestrian bridge that will span the Sunflower River, connecting raised boardwalks on the east and west banks. The bridge design features an 80-foot pedestrian truss structure, 8 feet wide, with a total span of 80 feet 5 inches from backwall to backwall. The project includes raised boardwalk approaches on both the north and south banks, with the bridge profile and abutment specifications detailed in the engineering drawings. The document explicitly states that the design and layout drawings provided are for bidding reference purposes only, with final design documents to be provided at the time of construction.

The engineering plans, prepared by John D. Crawley, P.E., CFM, show detailed abutment sections and foundation concepts utilizing helical piers for structural support. The bearing plates are positioned at elevation 154.0, with grade elevations approximately 143.0 on the south side and 145.0 on the north side. The design accommodates the natural topography and water flow of the Sunflower River. The document references supporting sheets including bridge profile details and bridge foundation plans. No specific pricing, contract award dates, or response deadlines are indicated in this reference document, as it serves as a technical exhibit for prospective bidders to understand the project scope and engineering requirements.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUNFLOWER RIVER WALK

PEDESTRIAN BRIDGE DESIGN, FABRICATION, DELIVERY 23 JANUARY 2026 EXHIBIT A–1

EXHIBIT A

THE FOLLOWING ARE REFERENCE FOR BIDDING PURPOSES ONLY.

FINAL DESIGN AND DOCUMENTS WILL BE PROVIDED AT TIME OF CONSTRUCTION.

DRAWN BY:

JDC

DATE:

11/21/2025

REVISIONS:

SHEET NO.

JO

HN

D . C

RA

W

LE

Y, P E, C

FM

S

TA

TE

H

W Y

E

NE

W

A

LB

AN

Y, M S

2-

1-

SU

NF

LO

W

ER

R

IV

ER

P

ED

ES

TR

IA

N

BR

ID

GE

CL

AR

KS

DA

LE

, M

IS

SI

SS

IP

PI

jrc s9 gm ail

.co m

RAISED BOARDWALK

RAISED BOARDWALK

80' PEDESTRIAN TRUSS BRIDGE

8' WIDE

TOP BANK LINE

TOP BANK LINE

ABUTMENT SECTION

80'-5" BACKWALL TO BACKWALL

80'-0" TRUSS OUT TO OUT

PEDESTRIAN BRIDGE PROPOSED PROFILE

NOT TO SCALE

SUNFLOWER RIVER

DRAWN BY:

JDC

DATE:

11/21/2025

REVISIONS:

SHEET NO.

JO

HN

D . C

RA

W

LE

Y, P E, C

FM

S

TA

TE

H

W Y

E

NE

W

A

LB

AN

Y, M S

2-

1-

SU

NF

LO

W

ER

R

IV

ER

P

ED

ES

TR

IA

N

BR

ID

GE

CL

AR

KS

DA

LE

, M

IS

SI

SS

IP

PI

jrc s9 gm ail

.co m

Bearing Plate El - 154.0

Bearing Plate El - 154.0

2'-0"

11'-0" South 9'-0" North

1'-6"

13'-0" South 11'-0" North

15'-10"

8'-2"

8'-2"

2'-0"4'-0"

Grade El. - 143.0 Approx. South

145.0 Approx. North

2'-0"

ABUTMENT SECTION

NO SCALE

ABUTMENT PLAN

NO SCALE

8"

8'-8"

OUT - OUT

BRIDGE

Helical Pier

Centerline Bearing Plate

Helical Pier

Bearing Plate El - 154.0

Centerline Bearing Plate

Helical Pier

Helical Pier

Helical Pier

Helical Pier

Helical Pier

Helical Pier

Stem Wall Outline

Stem Wall Outline

Sheets and Views
JOHN CIVIL BASE-Layout2
BRIDGE PROFILE.pdf
Sheets and Views
BRIDGE FOUNDATIONS-foundation concept (2)
FOUNDATION PLAN.pdf
Sheets and Views
BRIDGE FOUNDATIONS-foundation concept

File details come from the government source that posted it. Updated .