SRW_BID_04_-__EXHIBIT_A_-_PLAN_LAYOUT4.pdf
PDF 610 KB Posted
- Attached to
- 1428-20260202112937 Clarksdale
- Solicitation number
- 3170034935
- Issued by
- Mississippi
About this file
This is a design and engineering reference document for the Sunflower River Walk Pedestrian Bridge project in Clarksdale, Mississippi. The contract calls for the design, fabrication, and delivery of one prefabricated pedestrian bridge that will span the Sunflower River, connecting raised boardwalks on the east and west banks. The bridge design features an 80-foot pedestrian truss structure, 8 feet wide, with a total span of 80 feet 5 inches from backwall to backwall. The project includes raised boardwalk approaches on both the north and south banks, with the bridge profile and abutment specifications detailed in the engineering drawings. The document explicitly states that the design and layout drawings provided are for bidding reference purposes only, with final design documents to be provided at the time of construction.
The engineering plans, prepared by John D. Crawley, P.E., CFM, show detailed abutment sections and foundation concepts utilizing helical piers for structural support. The bearing plates are positioned at elevation 154.0, with grade elevations approximately 143.0 on the south side and 145.0 on the north side. The design accommodates the natural topography and water flow of the Sunflower River. The document references supporting sheets including bridge profile details and bridge foundation plans. No specific pricing, contract award dates, or response deadlines are indicated in this reference document, as it serves as a technical exhibit for prospective bidders to understand the project scope and engineering requirements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SRW_BID_02_-_004113_-_BID_FORM2.pdf | ||
| 1428-20260202112937 CLARKSDALE.pdf | ||
| SRW_BID_03_-_323413_SF_-_PREFAB_PEDESTRIAN_BRIDGE3.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUNFLOWER RIVER WALK
PEDESTRIAN BRIDGE DESIGN, FABRICATION, DELIVERY 23 JANUARY 2026 EXHIBIT A–1
EXHIBIT A
THE FOLLOWING ARE REFERENCE FOR BIDDING PURPOSES ONLY.
FINAL DESIGN AND DOCUMENTS WILL BE PROVIDED AT TIME OF CONSTRUCTION.
DRAWN BY:
JDC
DATE:
11/21/2025
REVISIONS:
SHEET NO.
JO
HN
D . C
RA
W
LE
Y, P E, C
FM
S
TA
TE
H
W Y
E
NE
W
A
LB
AN
Y, M S
2-
1-
SU
NF
LO
W
ER
R
IV
ER
P
ED
ES
TR
IA
N
BR
ID
GE
CL
AR
KS
DA
LE
, M
IS
SI
SS
IP
PI
jrc s9 gm ail
.co m
RAISED BOARDWALK
RAISED BOARDWALK
80' PEDESTRIAN TRUSS BRIDGE
8' WIDE
TOP BANK LINE
TOP BANK LINE
ABUTMENT SECTION
80'-5" BACKWALL TO BACKWALL
80'-0" TRUSS OUT TO OUT
PEDESTRIAN BRIDGE PROPOSED PROFILE
NOT TO SCALE
SUNFLOWER RIVER
DRAWN BY:
JDC
DATE:
11/21/2025
REVISIONS:
SHEET NO.
JO
HN
D . C
RA
W
LE
Y, P E, C
FM
S
TA
TE
H
W Y
E
NE
W
A
LB
AN
Y, M S
2-
1-
SU
NF
LO
W
ER
R
IV
ER
P
ED
ES
TR
IA
N
BR
ID
GE
CL
AR
KS
DA
LE
, M
IS
SI
SS
IP
PI
jrc s9 gm ail
.co m
Bearing Plate El - 154.0
Bearing Plate El - 154.0
2'-0"
11'-0" South 9'-0" North
1'-6"
13'-0" South 11'-0" North
15'-10"
8'-2"
8'-2"
2'-0"4'-0"
Grade El. - 143.0 Approx. South
145.0 Approx. North
2'-0"
ABUTMENT SECTION
NO SCALE
ABUTMENT PLAN
NO SCALE
8"
8'-8"
OUT - OUT
BRIDGE
Helical Pier
Centerline Bearing Plate
Helical Pier
Bearing Plate El - 154.0
Centerline Bearing Plate
Helical Pier
Helical Pier
Helical Pier
Helical Pier
Helical Pier
Helical Pier
Stem Wall Outline
Stem Wall Outline
| Sheets and Views |
| JOHN CIVIL BASE-Layout2 |
| BRIDGE PROFILE.pdf |
| Sheets and Views |
| BRIDGE FOUNDATIONS-foundation concept (2) |
| FOUNDATION PLAN.pdf |
| Sheets and Views |
| BRIDGE FOUNDATIONS-foundation concept |
File details come from the government source that posted it. Updated .