ExhibitC.doc
DOC document 48 KB Posted
- Attached to
- AmEmbassy Kolonia Local Guard Program
- Solicitation number
- SRP380-07-R-0002
- Issued by
-
Department of State US Embassy Manila
About this file
Exhibit C
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A001.doc | DOC document | |
| AmdSecG.doc | DOC document | |
| AmdSecL.doc | DOC document | |
| AmdSecB.doc | DOC document | |
| AmdSecK.doc | DOC document | |
| AmdExhABaseyr.doc | DOC document | |
| AmdExhAOptionyrs.doc | DOC document | |
| AmdExhF.doc | DOC document | |
| MinutesPreproposalconference.doc | DOC document | |
| AmdSecK5.doc | DOC document | |
| Coverltr.doc | DOC document | |
| ExhibitAOptions.doc | DOC document | |
| EXHIBITG.doc | DOC document | |
| ExhibitF.doc | DOC document | |
| RFP.doc | DOC document | |
| ExhibitE.doc | DOC document | |
| ExhibitD.doc | DOC document | |
| ExhibitABaseYear.doc | DOC document | |
| ExhibitB.doc | DOC document |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Exhibit C
QUALITY ASSURANCE AND SURVELLANCE PLAN
Exhibit C.1. General
This plan is designed to provide an effective surveillance method to promote effective contractor performance. The Quality Assurance Plan provides a method for the Contracting Officer’s Representative (COR) to monitor contractor performance, advise the contractor of unsatisfactory performance, and notify the Contracting Officer of continued unsatisfactory performance. The contractor, not the Government, is responsible for management and quality control to meet the terms of the contract. The role of the Government is to monitor contractor performance to ensure that contract standards are achieved.
Exhibit C.1.1. Failure to Provide Services. As with any time-and-materials contract, the Contractor may only bill for hours worked. For an unmanned post, not only is the contractor prohibited from billing for such services, but also the Government may assess a further deduction, as shown in the first category of the matrix displayed below, due to the serious breach of security created by the unmanned post.
Exhibit C.1.2. Deduction for Unacceptable Performance. The deductions described in the matrix below are for billed services not performed in accordance with acceptable quality standards, resulting in:
(1) the degradation in value of those services, and
(2) the anticipated loss of administrative time and cost in dealing with performance deficiencies.
This contract may also contain line items for communications equipment. These line items are paid at a fixed monthly rate. The matrix reflects the deductions for unacceptable services under these line items. These deductions reflect a pro rata deduction from the monthly rate.
Exhibit C.2. Computation of Government Deduct Rate
The deduct value is based on the estimated cost for the Government to provide that service in the absence of a contract employee or the additional administrative time for the Government. For certain deficiencies, the specified deduct value is the loaded labor rate paid to the Embassy COR/Post Security Officer. This rate may be assessed in as little as quarter hour increments. The Government cost for this purpose is:
For Base Period $52.76 per hour
For Option Year 1:
$54.34 per hour
For Option Year 2:
$55.97 per hour
For Option Year 3:
$57.65 per hour
For Option Year 4:
$59.38 per hour
The Government reserves the unilateral right to modify the contract for the purpose of changing this rate. Changes will occur only to reflect changes in the cost on which the hourly rate is based.
Exhibit C.3. Policy
The acceptable quality and deduct guidelines do not imply that the Contractor may knowingly perform in a defective manner. Defective performance may cause the Government to incur additional expenses with regard to the services, or cause the Government to withhold payment for services not properly or satisfactorily performed. When the Contracting Officer or COR observes deficient performance, as identified in the following items, the Government shall invoke the deduct value for that deficiency.
CONTRACT GOALS AND PERFORMANCE STANDARDS
PRIVATE
Desired Outcomes
| Contract Requirement |
| Maximum |
Allowable
Deviation from Performance Standard
| Negative Incentive for Not Meeting Performance Standards |
| Monitoring Method/Frequency |
| No manned Post |
| C.1.2., Exhibit A, Section B |
| 0 |
| COR/PSO deduct hourly rate not to exceed length of guard shift. |
| Time period is determined from beginning of shift or point of last Supervisor Inspection until time post is manned, not to exceed the end of the shift. |
| Thereafter, at COR/PSO hourly rate. |
| As long as post remains unmanned. |
| No Sleeping on Duty |
| H.4.5. |
| 0 |
| Hourly rate from Section B for position required by the post where infraction occurred. |
| Time period is determined from point in time of last Supervisor Inspection to time of infraction. |
| Local Guard Commander Inspection; no failure to make complete inspection of all posts |
| C.3.2. |
| 1 per month |
| COR’s hourly rate times the hours per shift |
| Deduction is determined as the ratio of the number of unsatisfactory round(s) to the required number of rounds per shift times the deduct value. |
(See Note #1)
| No failure to follow General and/or Post Orders |
| C.1.3.2, Exhibit B |
| 2 |
| COR’s hourly rate. Deduction per incident at the hourly rate. |
| Deduction is determined by COR inspection, observation, or reports. |
| No failure to maintain Administrative Records |
| C.1.5.9.2 |
| 2 per month |
| COR deduct hourly rate |
| Deduction per deviation for actual time expended for review. |
| No lack of Key Personnel |
| H.11 |
| 2 days per month |
| COR Deduct hourly rate times 8. |
| Deduction is per hour of deficiency. |
| No lack of Radio Network Equipment (including individual functioning radios) |
| C.1.5.8 |
| 2 radios per month |
| Monthly rate in Section B divided by 30, times number of hours without equipment per post |
| Deduction is per hour of deficiency. |
| No lack of Equipment – items not priced by line in Section B |
| Exhibit D |
| 2 per month |
| Hourly rate from Section, times number of hours without equipment |
| Deduction is per hour of deficiency. |
Note (1):
Desired Outcome: Contractor’s Local Guard Commander; no failure to make complete inspection of all posts.
Negative incentive for not meeting performance standard: Deduction is determined as the ratio of the number of unsatisfactory rounds(s) to the required number of rounds per shift times the deduct value. The deduct determination expressed in formula format:
(Number of Unsatisfactory Rounds/Number of Required Rounds per Shift) x (Hourly Rate) x (Hours per shift)