SR2S_Concept_Plans_-_Faith_Ringgold_Elementary.pdf

PDF 303 KB Posted

Attached to
D Street Traffic Calming Project PS&E
Solicitation number
26-027
Issued by
Alameda County, California

About this file

This is a Safe Routes to School (SR2S) Concept Plan document prepared for the City of Hayward in Alameda County, California, depicting preliminary design concepts for traffic calming and pedestrian safety improvements. The document presents a concept plan for Faith Ringgold Academy, one of multiple schools included in a comprehensive SR2S initiative covering nine additional schools including Burbank, Impact Academy, Longwood, MLK Middle, Palma Ceia, Park, Schafer Park, Southgate, Tennyson, Tyrrell, and Winton. The specific improvements shown for Faith Ringgold Academy include curb extensions at the intersection of 5th and D Streets and a Rectangular Rapid Flashing Beacon (RRFB) at the same location, designed to enhance pedestrian safety and traffic calming. The concept plan provides a foundation for the more detailed design work being solicited through RFP 26-027, with proposals due to the City by 4:00 p.m. on February 20, 2026, and an optional pre-proposal conference and site walkthrough scheduled for January 29, 2026, at 10:00 a.m.

The D Street Traffic Calming Project PS&E procurement seeks professional design and engineering services to advance the concept designs through five progressive phases (30%, 60%, 90%, and 100% completion) and produce Plans, Specifications, and Estimates for construction. The project is funded through Alameda CTC VRF, Measure B, and Measure BB funds, and is subject to the City of Hayward's Local Business Contract Equity Program with mandatory participation goals of 70% for Local Business Enterprises and 30% for Small Local Business Enterprises. All proposing firms must be certified by Alameda CTC at the time of proposal submission. The selected consultant must provide a Professional Civil Engineer to stamp final construction documents and coordinate with existing SR2S and Highway Safety Improvement Program initiatives. Evaluation criteria include project management experience (15%), project understanding and approach (25%), firm qualifications (20%), project staffing (15%), cost (15%), and LBCE participation (10%), with City Council recommendation and contractor selection anticipated for March 3, 2026. Standard insurance requirements include workers' compensation ($1,000,000 minimum), commercial general and automobile liability ($1,000,000 per occurrence), and professional liability insurance ($1,000,000 for errors and omissions).

View the file

Other files

File Type Posted
D_Street_Traffic_Calming_Project_PS&E_(Addendum_#2_Revision).pdf PDF
D_Street_Traffic_Calming_Project_PS&E_(Addendum_#2_Revision).pdf PDF
D_Street_Traffic_Calming_Project_PS&E_(Addendum_#2_Revision).pdf PDF
D_Street_Traffic_Calming_Project_PS&E.pdf PDF
Cost_Proposal_FormB(B4_LBCE_Participation).csv CSV file
Cost_Proposal_FormB(B4_LBCE_Participation).csv CSV file
Cost_Proposal_FormB(B4_LBCE_Participation).csv CSV file
Cost_Proposal_FormB(B4_LBCE_Participation).csv CSV file
D_Street_Traffic_Calming_Concept_Plan.pdf PDF
D_Street_Traffic_Calming_Concept_Plan.pdf PDF
D_Street_Traffic_Calming_Concept_Plan.pdf PDF
D_Street_Traffic_Calming_Concept_Plan.pdf PDF
HSIP_-_Pedestrian_Crossing_Upgrades_Concept_Plans_-_D_St_&_5th_St.pdf PDF
HSIP_-_Pedestrian_Crossing_Upgrades_Concept_Plans_-_D_St_&_5th_St.pdf PDF
SR2S_Concept_Plans_-_Faith_Ringgold_Elementary.pdf PDF
HSIP_-_Pedestrian_Crossing_Upgrades_Concept_Plans_-_D_St_&_5th_St.pdf PDF
SR2S_Concept_Plans_-_Faith_Ringgold_Elementary.pdf PDF
HSIP_-_Pedestrian_Crossing_Upgrades_Concept_Plans_-_D_St_&_5th_St.pdf PDF
SR2S_Concept_Plans_-_Faith_Ringgold_Elementary.pdf PDF
Nondiscriminatory_Affirmative_Action_Cert_Statement.pdf PDF
General_Provisions.pdf PDF
Non-Collusion_Affidavit.pdf PDF
Transportation_Professional_Services_Agreement_-_EXAMPLE.pdf PDF
Non-nuclear.pdf PDF
Nondiscriminatory_Affirmative_Action_Cert_Statement.pdf PDF
Transportation_Professional_Services_Agreement_-_EXAMPLE.pdf PDF
Non-Collusion_Affidavit.pdf PDF
Transportation_Professional_Services_Agreement_-_EXAMPLE.pdf PDF
Non-nuclear.pdf PDF
Nondiscriminatory_Affirmative_Action_Cert_Statement.pdf PDF
General_Provisions.pdf PDF
Non-Collusion_Affidavit.pdf PDF
Non-nuclear.pdf PDF
General_Provisions.pdf PDF
Non-Collusion_Affidavit.pdf PDF
General_Provisions.pdf PDF
Transportation_Professional_Services_Agreement_-_EXAMPLE.pdf PDF
Non-nuclear.pdf PDF
Nondiscriminatory_Affirmative_Action_Cert_Statement.pdf PDF
Show all 39

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N

Faith Ringgold Academy

D ST

5TH ST

CURB EXTENSIONS AT

5TH AND D

00 60' 120'

SAFE ROUTES TO SCHOOL CONCEPT PLAN

RRFB AT 5TH AND D

5TH ST

C ST

SR2S CAD Base-BURBANK
Sheets and Views
BURBANK
SR2S CAD Base-FAITH RINGGOLD
Sheets and Views
FAITH RINGGOLD
SR2S CAD Base-IMPACT ACADEMY
Sheets and Views
IMPACT ACADEMY
SR2S CAD Base-LONGWOOD
Sheets and Views
LONGWOOD
SR2S CAD Base-MLK MIDDLE
Sheets and Views
MLK MIDDLE
SR2S CAD Base-PALMA CEIA
Sheets and Views
PALMA CEIA
SR2S CAD Base-PARK
Sheets and Views
PARK
SR2S CAD Base-SCHAFER PARK
Sheets and Views
SCHAFER PARK
SR2S CAD Base-SOUTHGATE
Sheets and Views
SOUTHGATE
SR2S CAD Base-TENNYSON
Sheets and Views
TENNYSON
SR2S CAD Base-TYRRELL
Sheets and Views
TYRRELL
SR2S CAD Base-WINTON
Sheets and Views
WINTON

File details come from the government source that posted it. Updated .