SR2S_Concept_Plans_-_Faith_Ringgold_Elementary.pdf
PDF 303 KB Posted
- Attached to
- D Street Traffic Calming Project PS&E
- Solicitation number
- 26-027
- Issued by
- Alameda County, California
About this file
This is a Safe Routes to School (SR2S) concept plan document prepared for the City of Hayward, California, detailing traffic calming and pedestrian safety improvements for Faith Ringgold Academy and multiple other schools in the district. The document presents a concept plan for the D Street and 5th Street area, featuring proposed improvements including curb extensions at the 5th and D intersection and a rectangular rapid flashing beacon (RRFB) at the same location. The plan is part of a comprehensive SR2S program that includes concept plans for nine additional schools: Burbank, Impact Academy, Longwood, MLK Middle, Palma Ceia, Park, Schaefer Park, Southgate, Tennyson, Tyrrell, and Winton. The related contract opportunity, referenced as 26-027 D Street Traffic Calming Project PS&E, requires sealed proposals for professional services and engineering (PS&E) work. Proposals must be submitted through the City's eProcurement Portal by 4:00 pm on Friday, February 20, 2026, with submissions directed to the Transportation Department at 777 B Street, Hayward, CA 94541-5114.
The project scope encompasses preliminary design and engineering services for traffic calming improvements on D Street. This initiative is part of the City of Hayward's broader commitment to enhancing student safety and promoting safe routes to schools throughout the district. The contract opportunity does not specify pricing terms, set-asides, funding sources, or contract duration in the available documentation; however, the submission of this concept plan indicates that the City has secured preliminary planning resources and is advancing toward detailed design and construction documents phase.
View the file
Other files
Show all 39
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N
Faith Ringgold Academy
D ST
5TH ST
CURB EXTENSIONS AT
5TH AND D
00 60' 120'
SAFE ROUTES TO SCHOOL CONCEPT PLAN
RRFB AT 5TH AND D
5TH ST
C ST
| SR2S CAD Base-BURBANK |
| Sheets and Views |
| BURBANK |
| SR2S CAD Base-FAITH RINGGOLD |
| Sheets and Views |
| FAITH RINGGOLD |
| SR2S CAD Base-IMPACT ACADEMY |
| Sheets and Views |
| IMPACT ACADEMY |
| SR2S CAD Base-LONGWOOD |
| Sheets and Views |
| LONGWOOD |
| SR2S CAD Base-MLK MIDDLE |
| Sheets and Views |
| MLK MIDDLE |
| SR2S CAD Base-PALMA CEIA |
| Sheets and Views |
| PALMA CEIA |
| SR2S CAD Base-PARK |
| Sheets and Views |
| PARK |
| SR2S CAD Base-SCHAFER PARK |
| Sheets and Views |
| SCHAFER PARK |
| SR2S CAD Base-SOUTHGATE |
| Sheets and Views |
| SOUTHGATE |
| SR2S CAD Base-TENNYSON |
| Sheets and Views |
| TENNYSON |
| SR2S CAD Base-TYRRELL |
| Sheets and Views |
| TYRRELL |
| SR2S CAD Base-WINTON |
| Sheets and Views |
| WINTON |
File details come from the government source that posted it. Updated .