SR2S_Concept_Plans_-_Faith_Ringgold_Elementary.pdf
PDF 303 KB Posted
- Attached to
- D Street Traffic Calming Project PS&E
- Solicitation number
- 26-027
- Issued by
- Alameda County, California
About this file
This document is a concept plan drawing for the Safe Routes to School (SR2S) program at Faith Ringgold Academy in Hayward, California, prepared in conjunction with the City of Hayward's D Street Traffic Calming Project. The drawing depicts the proposed improvements at the intersection of 5th Street and D Street, specifically showing curb extensions and a Rectangular Rapid Flashing Beacon (RRFB) installation designed to enhance pedestrian safety and traffic calming measures. The concept plan references multiple other school sites within the SR2S program scope, including Burbank, Impact Academy, Longwood, MLK Middle, Palma Ceia, Park, Schafer Park, Southgate, Tennyson, Tyrrell, and Winton schools, indicating a comprehensive multi-school transportation safety initiative. The professional design services for the overall D Street Traffic Calming Project are being solicited under RFP 26-027, with sealed proposals due by 4:00 p.m. on February 20, 2026, through the City's eProcurement Portal. An optional pre-proposal conference and site walkthrough are scheduled for January 29, 2026, at 10:00 a.m., with a question submission deadline of January 30, 2026, at 4:00 p.m. City Council contractor selection and recommendation is anticipated for March 3, 2026.
The project is funded through Alameda CTC VRF, Measure B, and/or Measure BB funds and is subject to the City of Hayward's Local Business Contract Equity Program, which mandates 70 percent Local Business Enterprise (LBE) and 30 percent Small Local Business Enterprise (SLBE) participation. All proposing firms must be certified by Alameda CTC at the time of proposal submission. Evaluation criteria include project management experience (15 percent), project understanding and approach (25 percent), firm qualifications (20 percent), project staffing (15 percent), cost (15 percent), and LBCE participation (10 percent). Contractors must comply with prevailing wage standards, maintain workers' compensation insurance with minimum limits of $1,000,000, and carry commercial general and automobile liability insurance of $1,000,000 per occurrence, as well as professional liability insurance of $1,000,000 for errors and omissions. The City reserves the right to reject all proposals, cancel the RFP in part or whole, split awards among multiple vendors, and negotiate separately with proposers.
View the file
Other files
Show all 39
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N
Faith Ringgold Academy
D ST
5TH ST
CURB EXTENSIONS AT
5TH AND D
00 60' 120'
SAFE ROUTES TO SCHOOL CONCEPT PLAN
RRFB AT 5TH AND D
5TH ST
C ST
| SR2S CAD Base-BURBANK |
| Sheets and Views |
| BURBANK |
| SR2S CAD Base-FAITH RINGGOLD |
| Sheets and Views |
| FAITH RINGGOLD |
| SR2S CAD Base-IMPACT ACADEMY |
| Sheets and Views |
| IMPACT ACADEMY |
| SR2S CAD Base-LONGWOOD |
| Sheets and Views |
| LONGWOOD |
| SR2S CAD Base-MLK MIDDLE |
| Sheets and Views |
| MLK MIDDLE |
| SR2S CAD Base-PALMA CEIA |
| Sheets and Views |
| PALMA CEIA |
| SR2S CAD Base-PARK |
| Sheets and Views |
| PARK |
| SR2S CAD Base-SCHAFER PARK |
| Sheets and Views |
| SCHAFER PARK |
| SR2S CAD Base-SOUTHGATE |
| Sheets and Views |
| SOUTHGATE |
| SR2S CAD Base-TENNYSON |
| Sheets and Views |
| TENNYSON |
| SR2S CAD Base-TYRRELL |
| Sheets and Views |
| TYRRELL |
| SR2S CAD Base-WINTON |
| Sheets and Views |
| WINTON |
File details come from the government source that posted it. Updated .