About this file
This is an Amendment of Solicitation (Amendment 0002) issued by DLA Weapons Support (Warren), Michigan, modifying solicitation SPRDL1-25-R-0176. The amendment is effective January 29, 2026, and was issued by Richard Campbell (ZGBC/(385)591-2845; richard.j.campbell@dla.mil). The solicitation is for a Firm Fixed Price supply contract.
The primary purpose of Amendment 0002 is to update the Technical Data Package (TDP) link in narrative section CS6334 and extend the deadline for offer submission. The original submission deadline of March 2, 2026, at 3:00 PM local time (Warren, Michigan) has been extended to April 1, 2026, at 3:00 PM local time (Warren, Michigan). The TDP is accessible via SAM.gov at the URL https://sam.gov/workspace/contract/opp/821db1e4b6b64a709e15eed4e931fe8d/view, and vendors must have a current DD Form 2345 (Militarily Critical Technical Data Agreement) on file with the Defense Logistics Information Service (DLIS) to access export-controlled technical data. All other terms and conditions of the original solicitation remain unchanged. The document includes standard specifications regarding drawing limitations, configuration control engineering changes, manufacturer's part number acquisitions, ozone-depleting substance restrictions, and supply chain traceability documentation requirements.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Contract ID Code Page Of
2. Amendment/Modification No.
3. Effective Date
4. Requisition/Purchase Req No.
5. Project No. (If applicable)
6. Issued By Code 7. Administered By (If other than Item 6) Code
8. Name And Address Of Contractor (No., Street, City, County, State and Zip Code)
9A. Amendment Of Solicitation No.
9B. Dated (See Item 11)
10A. Modification Of Contract/Order No.
10B. Dated (See Item 13) Code Facility Code
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing items 8 and 15, and returning ____________ copies of the amendments: (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. Accounting And Appropriation Data (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATIONS OF CONTRACTS/ORDERS
It Modifies The Contract/Order No. As Described In Item 14.
A. This Change Order is Issued Pursuant To: The Changes Set Forth In Item 14 Are Made In
The Contract/Order No. In Item 10A.
B. The Above Numbered Contract/Order Is Modified To Reflect The Administrative Changes (such as changes in paying office, appropriation data, etc.) Set
Forth In Item 14, Pursuant To The Authority of FAR 43.103(b).
C. This Supplemental Agreement Is Entered Into Pursuant To Authority Of:
D. Other (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return _______________ copies to the Issuing Office.
14. Description Of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. Name And Title Of Signer (Type or print)
16A. Name And Title Of Contracting Officer (Type or print)
15B. Contractor/Offeror 15C. Date Signed 16B. United States Of America 16C. Date Signed
By (Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITIONS UNUSABLE
30-105-02 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
SEE SCHEDULE
X
Firm Fixed Price
0002 2026FEB25
SPRDL1
DLA WEAPONS SUPPORT (WARREN)
WARREN, MI 48397-5000
RICHARD CAMPBELL
EMAIL: RICHARD.J.CAMPBELL@DLA.MIL
SPRDL1-25-R-0176
2026JAN29
X
X 2026APR01 03:00pm
/SIGNED/
2 signed
SEE SECOND PAGE FOR DESCRIPTION
1 6
CONTINUATION SHEET
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION A - SUPPLEMENTAL INFORMATION
Buyer Name: RICHARD CAMPBELL
Buyer Office Symbol/Telephone Number: ZGBC/(385)591-2845
Type of Contract 1: Firm Fixed Price
Kind of Contract: Supply Contracts and Priced Orders
*** End of Narrative A0000 ***
The purpose of this amendment 0002 to solicitation SPRDL1-25-R-0176 is to update the TDP link in narrative CS6334 with the link to the revised TDP and to extend the deadline for submission of offers.
1. The TDP link in narrative CS6334 is hereby updated with the link to the revised TDP.
. The deadline for submission of offers to solicitation SPRDL1-25-R-0176 is hereby extended from March 02, 2026, at 3:00pm local time
(Warren, MI) to April 1, 2026, at 3:00pm local time (Warren, MI).
. All other terms and conditions of solicitation SPRDL1-25-R-0176 remain in full force and effect.
*** END OF NARRATIVE A0003 ***
2 6
SPRDL1-25-R-0176
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
CS6334 Technical Data Package Information (Contract Opportunities in SAM.gov) Version
The following "X"d item applies to this solicitation:
[ ] 1. There is no Technical Data Package (TDP) included with this solicitation.
[ ] 2. This solicitation contains one or more web-located TDPs. If multiple Contract Line-Item Numbers (CLINS) are listed below, each one will have its own URL just under the CLIN listing. The URL will take you to that CLIN's Web-located TDP. To access the TDP, you will have to copy or type the link's URL to your web browser address bar at the top of the screen.
Note: To copy a link from a .pdf file, click on the "Text Select Tool," then highlight the URL, copy and paste it into your browser, and hit the Enter key.
CLIN: N/A
TDP Link (URL): N/A
[X] 3. The TDP for this solicitation resides within sam.gov under the Contract Opportunities search function https://sam.gov, and is associated with this solicitation number and can be accessed via this URL:
https://sam.gov/workspace/contract/opp/821db1e4b6b64a709e15eed4e931fe8d/view
a. Log on to the SAM.gov website.
b. Select Contract Opportunities in the search bar and search by solicitation number.
(1) TDPs that have an Export Control Warning Notice are subject to the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et.seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C, App. 2401 et. seq..
(2) Further dissemination must be in accordance with provisions of DoD Directive 5230.25. This also applies to distribution of the TDP to all SUBCONTRACTORS at every level.
(3) To obtain these TDPs, vendors and Contractors must have a current DD 2345, Militarily Critical Technical Data Agreement on file with Defense Logistics Information Service (DLIS). If you are currently certified, your MPIN will be verified and you may proceed to the next step. To obtain certification, login to the Joint Certification Program (JCP) https://www.dla.mil/Logistics-
Operations/Services/JCP/. Click on documents and follow instructions provided. Processing time is estimated at six (6) to ten (10) weeks after receipt. Contract Opportunities will allow you to access export controlled TDPs once certification is confirmed.
(4) Upon completion of the purposes for which Government Technical Data has been provided, the Contractor is required to destroy all documents, including all reproductions, duplications, or copies thereof as may have been further distributed by the
Contractor. Destruction of this technical data shall be accomplished by: shredding, pulping, burning, or melting any physical copies of the TDP and/or deletion or removal of downloaded TDP files from computer drives and electronic devices, and any copies of those files.
c. If technical data is otherwise restricted, click the document title to request access. A window will pop-up, select "Request
Access" to controlled documents and enter the Reason for Access. This will generate an email to the Contract Opportunities system administrator at DLA Warren with all the information needed for them to grant you access. Contract Opportunities will subsequently automatically generate an email stating when you have permission to view or download TDP items. Allow 2 3 working days to complete this
Contract Opportunities-TDP access/approval process through sam.gov.
d. Only one individual in your company can request access to the Technical Data Package (TDP) for a solicitation. That individual must be registered as the Data Custodian, as identified in the JCP, and be granted approval to view the Technical Data Package (TDP) for a solicitation. The Data Custodian MUST be registered for a sam.gov account through https://login.gov. Any individual(s) no longer with the company should be deleted. Questions related to registration in https://login.gov should be directed to https://login.gov/help/. Questions related to accounts in sam.gov should be directed to https://sam.gov/content/help. Vendors are responsible for placing correct information in login.gov and sam.gov accounts.
e. It is strongly suggested that you submit an access request and provide the Contract Specialist with the completed "Use and Non-
Disclosure Agreement" at the same time if the solicitation requires both to gain access to view the TDP.
[ ] 4. The Government requires a "Use and Non-Disclosure Agreement" (NDA) to be signed by the Data Custodian of your firm, as
3 6
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
identified in the JCP, before access is granted to the technical data. The appropriate Agreement is titled N/A, and is:
[ ] available by emailing the Contract Specialist listed on page 1 of this solicitation.
[ ] available as an attachment to this solicitation.
Follow the instructions on the Agreement and email it to the Contract Specialist at N/A. The Contract Specialist will notify the
Contract Opportunities administrator upon receiving the NDA. The Administrator will grant approval to view/download the TDP. An email stating approval has been granted will be sent to the vendor. It can take up to 24 hours after approval before you are able to view the
TDP. If you have any questions/problems viewing the TDP contact the Contract Specialist.
CS7002 Drawing Limitations
(a) The drawings supplied with this contract are not shop or process drawings. They are engineering design drawings. They are adequate to permit manufacture, and:
(1) depict the completed (item(s), and
(2) serve as the basis for inspection of the completed item(s).
(b) These drawings DON'T cover intermediate drawings/specifications or steps in the manufacturing process. As a result, even if you meet all the dimensions and tolerances specified in the engineering design drawing for each individual part, a cumulative unacceptable fit for the contract item could result.
(c) The Contractor is responsible for producing the shop or process drawings needed to cover intermediate steps in the manufacturing process.
(d) The Contractor is responsible for obtaining all specifications and drawings necessary to manufacture the items being solicited in accordance with the TDP including all incorporated specifications and drawings. Delivery delays are not excusable where the
Contractor asserts that it did not have a specification or drawing and has failed to request, in writing, the specification from either the Procuring Contracting Officer or Contract Specialist prior to the solicitation closing date.
(e) If you fail to produce an end item with a cumulative fit that conforms to Government drawings, specifications or other supplemental manufacturing documentation, you'll be responsible for correcting this condition at no additional cost to the Government and no delivery schedule extension.
CS7004 Configuration Control Engineering Changes
(a) The Contractor may submit Engineering Change Proposal(s) (ECPs) and Request for Variance(s) (RFVs) for the requirements in the
Government provided Technical Data Package (TDP). If a Value Engineering Change Proposal(s) (VECPs) clause is included on this contract, VECPs shall be submitted in the same manner as ECPs.
(1) ECPs - The Contractor may request a permanent change to the requirements specified in the TDP or any other baseline documentation by submitting an ECP. ECPs shall be submitted to include all Notice of Revisions (NORs) necessary to completely define the requested change. Each ECP shall be accompanied with at least one NOR per affected document. The Contractor shall not present any production items for acceptance that incorporate any change to the TDP or other baseline documentation until notified by the Government the ECP has been approved and incorporated in the contract.
(i) Page 1 of DD Form 1692 (or equivalent) shall be submitted for all ECPs. Pages 2-7 of DD Form 1692 shall be submitted when required to properly explain all the potential logistics and technical impacts of the proposed change. DD Form 1695 NOR or DD Form 1695-
1 Tabulated NOR (or equivalents) shall be submitted to completely describe the desired change on each affected document.
(ii) All ECPs submitted by the Contractor will be routine priority unless otherwise justified. If the Contractor considers the ECP to be emergency or urgent, they shall include justification within 48 hours of submittal of the ECP.
(2) RFVs - The Contractor may request to temporarily depart from a requirement specified in the TDP or any other baseline documentation, by submitting an RFV. RFVs may be submitted either pre-production (formerly known as Request for Deviation (RFD)) or post-production and prior to acceptance by the Government (formerly known as Request for Waiver (RFW)). DD Form 1694 (or equivalent) shall be submitted for all RFVs. The Contractor shall not present any production items for acceptance with any nonconformance to the requirements in the TDP or other baseline documentation until notified by the Government the RFV has been approved and incorporated in the contract.
(b) Submission of requested changes - The submission of an ECP or RFV by the Contractor does not affect the required delivery dates
4 6
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
specified within the contract, shall not constitute excusable delay in the performance of this Contract by the Contractor or in any way relieve the Contractor from compliance with the contract delivery schedule. If a delivery date change is needed, it must be negotiated with the Procuring Contracting Officer and documented via modification to the contract. The submission of an ECP and/or RFV by the
Contractor shall not preclude the Government from exercising its rights under any clause of the Contract.
(c) Specifications - Permanent proposed changes to specifications which are part of the TDP or baseline documentation shall be requested with an ECP and NOR (i.e. Specification Change Notices (SCNs) are not required).
(d) Forms If any of the above listed forms are not included with the solicitation or contract, the Contractor may locate forms on the
DOD Forms Website https://www.esd.whs.mil/Directives/forms/dd1500_1999/ or contact the Contract Specialist listed on page 1 of the solicitation or contract for copies of the forms.
CS7016 Acquisition of Manufacturer's Part Number: Components
One or more of the drawings for part of the contract item set forth in the Schedule and in the Technical Data Package specify manufacturer's part numbers. Since complete Government technical data for such part or parts are not available, it is understood that the Contractor, by accepting this contract, agrees to furnish only the listed manufacturer's part number(s) for those components of the contract item, except as provided in the narrative entitled NOTICE REGARDING REQUIRED MANUFACTURER'S PART NUMBER. It is further understood and agreed that references to manufacturer's part numbers herein shall be deemed to include all changes or revisions thereto which the approved manufacturer has made effective as of the first date of delivery of any of the items under this contract; provided, that no change or revision that affects the interchangeability (ability to be interchanged with previous parts and to match with all mating parts when assembled) of the listed manufacturer's part shall be incorporated into the contract item without the prior written approval of the Procuring Contracting Officer.
CS7151 Use of Class 1 Ozone Depleting Substances (CIODS)
(a) Definitions.
(1) Class I and Class II Ozone-Depleting Substances (CIODS) refers to the class of substances identified in Section 602(a) of the Clean Air Act, (42 U.S.C. 7671a(a)), complete list provided at: https://www.epa.gov/clean-air-act-overview/clean-air-act-title-vi-stratospheric-ozone-protection
(2) Directly requires the use of CIODS means that the Government's specification or technical data package, at any tier, explicitly requires the use of any Class I Ozone-Depleting Substance (CIODS) in performance of the contract.
(3) Indirectly requires the use of CIODS means that the Government's specification or technical data package, while not explicitly requiring the use of any CIODS, does require a feature that you can meet or produce only by the use of CIODS.
(b) No CIODS shall be used in meeting the requirements of this contract. If the use of CIODS is required in the performance of this contract, please notify the Procuring Contracting Officer immediately in writing.
(c) No Class II Ozone Depleting Substances shall be required in the performance of this contract without Government approval. If the use of Class II ODS is required in the performance of this contract, please notify the Procuring Contracting Officer immediately in writing.
CS8001 Contractor Retention of Supply Chain Traceability Documentation
1) By submitting a quotation or offer, the Contractor, is confirming it currently has, or will obtain before delivery, and shall retain supply chain traceability documentation, as described in paragraph (2) below, demonstrating the item conforms to the technical requirements, and for part numbered items, is from an approved manufacturer.
2) Supply Chain Traceability Documentation
Supply chain traceability documentation shall include: basic item description, part number; drawing or specification; national stock number, manufacturing source, manufacturing source's Commercial and Government Entity (CAGE) code, and clear identification of the name and location of all supply chain intermediaries between the manufacturer to the contractor to Government acceptance. The documentation should also include, if available, the manufacturer's batch identification for the item(s), such as date codes, lot codes, or serial numbers.
5 6
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
Supply chain traceability documentation shall also include, if available, the manufacturer's batch identification for the item(s), such as date codes, lot codes, or serial numbers. For part numbered items, contractors can find examples of acceptable supply chain traceability documentation at the Counterfeit Detection and Avoidance Program (CDAP) website http://www.dla.mil/LandandMaritime/Business/Selling/Counterfeit-Detection-Avoidance-Program/.
In addition, the contractor will obtain, retain, and provide to the contracting officer written documentation of all inspections and tests necessary to substantiate that the supplies furnished under this contract conform to contract requirements, including any applicable technical requirements for specified manufacturers' parts. Such records shall include, without limitation, test reports, test data, material certification, and manufacturing process sheets, in addition to any other information identified in the technical specifications applicable to the item.
3) The contractor shall make supply chain traceability documentation available to the contracting officer within three business days upon the contracting officer's request. The contracting officer determines the acceptability and sufficiency of documentation. The contractor shall retain supply chain traceability documentation for ten years after final payment under this contract for audit and other valid government purposes. If the contractor fails to retain or provide the documentation, or the contracting officer finds the documentation to be unacceptable, the contracting officer may take corrective action, including, but not limited to, cancellation of undelivered orders or rejection of delivered supplies.
*** END OF NARRATIVE C0001 ***