SPPD_Lobby_Ballistic_Door_Plans.pdf

PDF 346 KB Posted

Attached to
Police Department Ballistic Door Installation
Solicitation number
Quote- 26 - 176
Issued by
Pinellas County, Florida

About this file

This is a ballistic door installation project plan document for the City of St. Petersburg Police Department, specifically detailing the technical specifications and installation requirements for the main lobby entrance at 1301 1st Avenue North, St. Petersburg, Florida. The project (Work Order 10940) calls for the installation of one double automatic ballistic door system that must meet UL 752 Level 4 certification standards, capable of withstanding .30 caliber rifle ammunition with no spall or penetration. The system must include double automatic door openers, battery-powered ADA-compliant remote buttons, and appropriate signage. The solicitation was released on April 3, 2026, with a deadline for vendor questions on April 8, 2026, and proposals due by April 13, 2026, at 3:00 p.m. through the OpenGov Procurement portal. Work must be completed during regular business hours (8:00 a.m. to 4:00 p.m., Monday through Friday, excluding city holidays) with completion required within the timeframe specified in the Notice to Proceed.

Qualified vendors must demonstrate a minimum of five years' experience in ballistic door installation and provide all labor, materials, tools, equipment, user manuals, operational testing, and staff training as part of a lump-sum cost proposal. Required insurance includes Commercial General Liability of $1,000,000 per occurrence/$2,000,000 aggregate and Commercial Automobile Liability of $1,000,000. All vendor and subcontractor employees must pass a Level 2 background investigation by the St. Petersburg Police Department before commencing work. Contractors may subcontract up to 80 percent of the work, with subcontractors identified at bid and not subject to substitution after award without justification. Payment terms include monthly invoices paid within twenty business days with five percent retainage until Substantial Completion and 150 percent retainage of estimated Punch List costs until Final Completion. A one-year warranty on all materials and labor is required following Substantial Completion. Liquidated damages of $150 per calendar day apply for failure to meet the project schedule. The City encourages participation from Small Business Enterprises, Women Business Enterprises, Veteran-Owned Businesses, and Minority Business Enterprises in the Tampa Bay Region through a voluntary Subcontractor Utilization Plan with no mandatory minimums.

View the file

Other files

File Type Posted
Police_Department_Ballistic_Door_Installation.pdf PDF
Agreement.pdf PDF
Proposed_door_area.jpg JPG image
SPPD_Lobby_Ballistic_Door_Plans_(4).pdf PDF
SPPD_Lobby_Ballistic_Door_Plans.pdf PDF
2026_Ballistic_Door_Contractors_to_be_included_in_Bid.docx DOCX document
Subcontractor_Summary_-_Sheltered_.xlsx XLSX spreadsheet
Quote_Addendum.docx DOCX document
Performance_&_Payment_Bond_.DOCX DOCX document
Subcontractor_Summary_Spreadsheet.xlsx XLSX spreadsheet
2026_Ballistic_Door_Scope_of_Services.docx DOCX document
Subcontractor_Utilization_Plan.docx DOCX document
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Police Ballistic Door Project

WO 10940

1301 1st Ave N St

Petersburg FL 33705

Work

Area

NTS

Wall Detail

Ballistic Door

Frame Material

Ballistic Door and Glass

UL 752 – Level 4 – UL Listed – File

BP844

.30 Caliber Rifle Lead Core Soft Point

(.30-06 Caliber) No Spall, No

Penetration

Police Ballistic Door Project

WO 10940

Frame Detail

SPPD Lobby Ballistic Door Plans.vsdx
Project Location
WORK AREA
Wall Details
Frame Installation

File details come from the government source that posted it. Updated .