SPPD_Lobby_Ballistic_Door_Plans_(4).pdf

PDF 346 KB Posted

Attached to
Police Department Ballistic Door Installation
Solicitation number
Quote- 26 - 176
Issued by
Pinellas County, Florida

About this file

This is a set of architectural and technical plans for the City of St. Petersburg Police Department's ballistic door installation project (Work Order 10940) at the Police Department Headquarters located at 1301 1st Avenue North in St. Petersburg, Florida. The plans provide detailed specifications for a double automatic ballistic door system to be installed in the main lobby, including wall details, frame installation requirements, and technical specifications. The ballistic door and glass components must meet UL 752 Level 4 certification standards, providing protection against .30 caliber rifle lead core soft point ammunition (.30-06 caliber) with no spall or penetration. The project includes double automatic door openers, battery-powered ADA remote buttons, and ADA automatic door signage. The solicitation was released on April 3, 2026, with a deadline for submitting questions on April 8, 2026, and a response deadline of April 13, 2026, at 3:00 p.m., with all submissions required through the OpenGov Procurement portal. Work must be completed within the timeframe specified in the Notice to Proceed during regular business hours (8:00 a.m. to 4:00 p.m., Monday through Friday, excluding city holidays).

Qualified vendors must demonstrate a minimum of five years of experience in ballistic door installation services and possess required insurance coverage including Commercial General Liability of $1,000,000 per occurrence/$2,000,000 aggregate, Commercial Automobile Liability of $1,000,000, and Workers' Compensation as required by Florida law. All vendor and subcontractor employees must successfully pass a Level 2 background investigation. Contractors may subcontract up to 80 percent of contract work with all subcontractors submitted on a Subcontractor Summary Spreadsheet at bid time. Total Security Solutions has been identified as a qualified vendor. The City encourages participation from Small Business Enterprises, Women Business Enterprises, Veteran Owned Businesses, and Minority Business Enterprises located in the Tampa Bay Region with no minimum participation requirements. Contractors must provide operational testing, user manuals, and operational training as part of a lump-sum cost proposal, with payment made within twenty business days of invoice receipt subject to a five percent retainage until Substantial Completion and an additional 150 percent retainage of estimated Punch List costs until Final Completion. Liquidated damages of $150 per calendar day apply for failure to achieve Substantial Completion on schedule, and contractors must provide a one-year warranty on all materials and labor following Substantial Completion. No specific budget amount is disclosed in the solicitation documents.

View the file

Other files

File Type Posted
Police_Department_Ballistic_Door_Installation.pdf PDF
Agreement.pdf PDF
Proposed_door_area.jpg JPG image
SPPD_Lobby_Ballistic_Door_Plans_(4).pdf PDF
SPPD_Lobby_Ballistic_Door_Plans.pdf PDF
2026_Ballistic_Door_Contractors_to_be_included_in_Bid.docx DOCX document
Subcontractor_Summary_-_Sheltered_.xlsx XLSX spreadsheet
Quote_Addendum.docx DOCX document
Performance_&_Payment_Bond_.DOCX DOCX document
Subcontractor_Summary_Spreadsheet.xlsx XLSX spreadsheet
2026_Ballistic_Door_Scope_of_Services.docx DOCX document
Subcontractor_Utilization_Plan.docx DOCX document
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Police Ballistic Door Project

WO 10940

1301 1st Ave N St

Petersburg FL 33705

Work

Area

NTS

Wall Detail

Ballistic Door

Frame Material

Ballistic Door and Glass

UL 752 – Level 4 – UL Listed – File

BP844

.30 Caliber Rifle Lead Core Soft Point

(.30-06 Caliber) No Spall, No

Penetration

Police Ballistic Door Project

WO 10940

Frame Detail

SPPD Lobby Ballistic Door Plans.vsdx
Project Location
WORK AREA
Wall Details
Frame Installation