This is a specification document for tennis court resurfacing and equipment installation prepared by the City of Palo Alto's Community Services Department for Invitation for Bids (IFB) #197312. The project encompasses comprehensive resurfacing work at two municipal tennis court locations: Hopkins (three courts requiring 2-inch asphalt overlay with crack repair, acrylic resurfacing, and striping) and Hoover (two courts requiring crack repair, acrylic resurfacing, asphalt apron replacement, and striping). The scope includes site preparation, traffic control, sediment and erosion management, removal and disposal of existing equipment, replacement of asphalt pathways totaling approximately 260 linear feet at Hopkins and 4-foot by 2-foot apron replacement at Hoover, installation of new tennis posts (Har-Tru Advantage Round External Wind Posts), nets (Edwards 40LS Tennis Net), benches (HAR-TRU Multi-purpose Bench), and fence and irrigation repairs as needed. All surfacing materials must be supplied by California Products Corporation using the Plexipave System with ITF Category 2 pace classification. Bids are due electronically through the City's OpenGov portal by 3:00 p.m. on May 13, 2026, with project commencement anticipated May 18, 2026, and completion required by December 31, 2026. Questions regarding specifications must be submitted by 3:00 p.m. on April 22, 2026.

Bidders must be California-licensed Class A contractors in good standing with the California Department of Industrial Relations and authorized applicators of the California Products Corporation Plexipave System with American Sports Builders Association (ASBA) builder membership. A one-year warranty covering materials and workmanship is required, with bid bonds equal to 10 percent of the aggregate bid required for bids exceeding $25,000 and performance and payment surety bonds equal to 100 percent of the contract sum due within ten business days of award. The project is subject to California prevailing wage requirements under Labor Code Sections 1720 et seq., and liquidated damages are assessed at $1,050 per day for failure to meet the completion deadline. Bidders must submit completed questionnaires with company information, business history, relevant project references from the past three years, management staff details, California Contractor's License information, DIR registration number, and certifications of non-collusion. No specific budget range is disclosed; however, the substantial scope of work at two multi-court locations indicates a project value likely exceeding the $25,000 bid security threshold.

View the file

Other files

File Type Posted
Tennis_Court_Resurfacing_(Addendum_#1_Revision).pdf PDF
Tennis_Court_Resurfacing.pdf PDF
Bid_Form_Tennis_Ct_Resurfacing.docx DOCX document
Bid_Form_Tennis_Ct_Resurfacing.docx DOCX document
Performance_Bond_(1).docx DOCX document
SPECS_-_TENNIS_COURT_RESURFACING.docx DOCX document
Payment_Bond_(1).docx DOCX document
SCOPE_OF_WORK.docx DOCX document
SCOPE_OF_WORK.docx DOCX document
Bid_Bond_Form_.docx DOCX document
Bidders_Questionaire.docx DOCX document
Performance_Bond_(1).docx DOCX document
Bidders_Questionaire.docx DOCX document
Payment_Bond_(1).docx DOCX document
Bid_Bond_Form_.docx DOCX document
Construction_Contract,_General_Conditions,_and_Change_Orders.pdf PDF
Construction_Contract,_General_Conditions,_and_Change_Orders.pdf PDF
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TENNIS COURT RESURFACING & EQUIPMENT SPECIFICATION

Hoover and Hopkins Athletic Court Resurfacing

1. QUALITY ASSURANCE

A. Surfacing shall conform to American Sports Builders Association (ASBA) guidelines for planarity.

B. All surface coating products shall be supplied by a single manufacturer.

C. Contractor shall record batch numbers and maintain records through warranty period.

D. Installer shall be an authorized applicator of the specified system.

E. Manufacturer’s representative shall be available for consultation.

2. SUBMITTALS

A. Manufacturer specifications, color charts, and installation instructions.

B. Authorized Applicator certification.

C. ITF classification certificate (Category 2 pace).

D. MSDS documentation.

E. Substitutions require 7-day prior approval with QUV ≥1000-hour testing.

3. MATERIAL HANDLING & STORAGE

A. Store per manufacturer requirements.

B. Deliver in unopened labeled containers.

C. All surfacing materials shall be non-flammable.

4. GUARANTEE

Provide one-year warranty covering materials and workmanship.

5. QUALIFICATIONS

Installer

· Experienced in acrylic court construction

· ASBA builder member

· Authorized applicator Manufacturer

· ITF medium pace classification

· U.S.-owned company

· ASBA member

6. PRODUCTS

6.1 Manufacturer

· California Products Corporation – Plexipave System

6.2 COURT SURFACING MATERIALS (Integrated List)

Surface Preparation

· Plexipave Crack Filler

· 100% acrylic resin, sand-filled

· Min. solids: 85%

· Weight: ~15 lbs/gal

· Court Patch Binder

· 100% acrylic resin + Portland cement + silica sand

· Min. solids: 46%

· Weight: 8.7–8.9 lbs/gal

Resurfacing Layer

· California Acrylic Resurfacer

· 100% acrylic resin (no vinyl)

· ≥3.5% attapulgite

· Min. solids: 26.7%

Color System (Combined System Requirement)

· Plexipave Color Base

· 100% acrylic resin

· ≤63% rounded silica sand

· Min. solids: 74%

· Plexichrome

· 100% acrylic resin

· Light-fast pigments

· Green contains ≥8% chrome oxide

· Min. solids: 36.5%

· System Note:

Plexichrome and Plexipave Color Base shall be mechanically blended on-site to create the Fortified Plexipave system.

Line Striping

· California Line Paint

· 100% acrylic resin

· No alkyds or vinyl

· Rounded silica sand texture

· Min. solids: 60.5%

General Material Requirements

· VOC: ≥100 g/L (EPA Method 24)

· No local sand allowed in color system

· All sand factory-controlled

6.3 COURT EQUIPMENT (Integrated)

Tennis Posts

· Har-Tru Advantage Round External Wind Posts

· 2 7/8" diameter

· Schedule 80 aluminum

· External reel with safety guard

· Powder-coated finish Tennis Net

· Edwards 40LS Tennis Net

· 3.5 mm braided polyethylene

· Double mesh top (6 rows)

· Heavy-duty UV-treated headband

· 42 ft regulation length

· 5/8" fiberglass dowels

· Weather-resistant

· 5-year warranty Court Furnishings

· HAR-TRU Multi-purpose Bench – White

7. EXECUTION

7.1 Weather Limitations

· Do not install in rain or high humidity

· Minimum temp: 50°F rising

· Max surface temp: 140°F

7.2 Surface Preparation

· Clean surface (pressure wash required)

· Treat algae with approved solution

· Crack sterilization required 14 days prior

7.3 Patching

· Fill depressions using Court Patch Binder mix

· Flood test to identify birdbaths

· Apply tack coat prior to patching

7.4 Acrylic Resurfacer Application

· Apply 0.06 gal/sy minimum

· Mix ratio:

· 55 gal resurfacer

· 20–40 gal water

· 600–800 lbs silica sand

· Apply via rubber squeegee

· Allow full cure between coats

7.5 Color System Application

· Mix:

· 30 gal Color Base

· 20 gal Plexichrome

· 20 gal water

· Apply 3 coats minimum

· Total: ≥0.15 gal/sy

· Use 50 durometer squeegee

7.6 Line Striping

· 2-inch width (unless noted)

· Apply 150–200 sf/gal

· Layout per USTA standards

8. PROTECTION & CLEANUP

· Protect surface during curing

· Restrict access until acceptance

· Remove debris and dispose per regulations

9. PROJECT SCOPE (SUMMARY INTEGRATED)

Hopkins Courts (3 Courts – Overlay)

· 2" asphalt overlay

· Crack repair (~200 LF)

· Fabric system installation

· New pathways (6–6.5 ft width)

· Full acrylic system + striping

· New posts, nets, benches

Hoover Courts (2 Courts – Resurfacing)

· Crack repair + fabric (~150 LF)

· Acrylic resurfacing system

· Asphalt apron replacement

· Striping and coatings

· Equipment installation

10. PERFORMANCE REQUIREMENTS

· Flatness: ≤1/8" over 10 ft

· No ponding permitted

· Surface must meet ITF Category 2 pace