This federal contract opportunity solicitation seeks installation services for new lightning protection and grounding systems at the James H. Quillen VA Medical Center in Mountain Home, Tennessee. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 9 is the contracting agency. The scope of work involves installing new lightning protection and ground systems on the defined medical center buildings. Interested contractors should respond with pricing by the specified deadline to be considered for award of contract 36C24923B0002 for this project.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
D A T A
D R A W I N G S
I N S T R U C T I O N S
S C H E D U L E S
R E P O R T S
C E R T F I C A T E S
S A M P L E S
R E C O R D S
O M
M A N U A L S
I N F O R M A T I O N
G O V A P P R O V E D
SUBMIT
APPROVAL
NEEDED BY
MATERIAL
NEEDED BY
C O D E
DATE
SUBMIT TO
GOVERN-
MENT
C O D E
DATE REMARKS
011011-2.B.(1) Contractor’s Environmental Safety and Health Program Plan X
End of Pre-construction meeting
011011-2.B.(1) Contractor’s AHA (Activity Hazard Analysis) plan X
End of Pre-construction meeting
011011-2.B.(2) Request for Contractor Identification (I.D.) Badges X
End of Pre-construction meeting
011011-2.B.(3) Phasing Schedule X End of Pre-construction meeting
011011-2.B.(4) Contractor's Superintendent and Contractor's Competent Person(s) X
End of Pre-construction meeting
011011-2.B.(5) request to schedule a date and time for all contactor and Sub-contractor's employees to view the VA's mandatory Video
X End of Pre-construction meeting
011011-2.B.(6 OSHA Training Records for all such employees X
End of Pre-construction meeting
011011-3.D.
Submit details and reasons for departure from contract drawings X ASAP
011011-3.G.
After Working Hours Activity Security Request, Attachment 00 10 11-C
X 48 hours in advance
011011-4.D.(1) Contractor Key Request", Attachment 00 10 11-D, X When keys are required
011011-20.B.
Request to Disarm Fire Alarm / Sprinkler System, Attachment 00 10 11-H, to the
COR
X 24 hours prior to requirement
011011-28.A.
List of materials and Material Data Safety Sheets (MSDS) When used
011011-30.
Cost proposal for Lead Based Paint disturbed X When found
011011-33.B.(1) Hot Work Permit to the COR, Attachment 00 10 11-J X before hot work
011011-34.C.(1) Confined Space Policy X When confined spaces are incountered
011011-34.C.(2) Confined Space Entry Permit, Attachment 00 10 11-K X
When confined spaces are incountered
011011-Attach A, 3.a.
Schedule of Work and any specified Phasing Schedules X 5 days before work
011011-Attach A, 26.b.
Notification of Asbestos (See Section 00 10 11, Attachment I). X before commencing work
CONTRACT NO.SUBMITTAL REGISTER
TITLE AND LOCATION: CONTRACTOR
CLASSI-
FICATION CONTRACTOR SCHEDULE DATES
CONTRACTOR
ACTION
GOVERNMENT
ACTIONA C
T I V I T Y N O
TRANS-
MITTAL
NO.
I T E M N O
SPECIFICATION
PARAGRAPH NUMBER
DESCRIPTION OF ITEM BUBMITTED
R E V I E W
E R
T A
D R A W I N G S
I N S T R U C T I O N S
S C H E D U L E S
R E P O R T S
C E R T F I C A T E S
S A M P L E S
R E C O R D S
O M
M A N U A L S
I N F O R M A T I O N
G O V A P P R O V E D
SUBMIT
APPROVAL
NEEDED BY
MATERIAL
NEEDED BY
C O D E
DATE
SUBMIT TO
GOVERN-
MENT
C O D E
DATE REMARKS
CONTRACT NO.SUBMITTAL REGISTER
TITLE AND LOCATION: CONTRACTOR
CLASSI-
FICATION CONTRACTOR SCHEDULE DATES
CONTRACTOR
ACTION
GOVERNMENT
ACTIONA C
T I V I T Y N O
TRANS-
MITTAL
NO.
I T E M N O
SPECIFICATION
PARAGRAPH NUMBER
DESCRIPTION OF ITEM BUBMITTED
R E V I E W
E R
011011-Attach A, 35.a.
Schedule of Costs and a Progress Schedule X NTP + 3
011011-Attach A, 38.a.
Subcontractors to be engaged on the work site, indicating name, address, and nature of work involved
X
NTP + 10
011011-Attach A, 36.b. certificate of apprenticeship X with payroll 011011-Attach A, 51.a. applicable specified O & M manuals X Prior to training 011011-Attach A-1,
1. Contractor's weekly payroll X Weekly 010000-1.5.E.1. Electrtonic control memorandum X before starting work 010000-1.5.F.1. Motor Vehicle Restrictions X 24 hours before access 010000-1.6.L.2. Utilities services interruptions X 7 days before
010000-1.15.A. Warranty Management Plan X 30 days before pre-warranty conference
010000-1.15.E. Warranty report X after work performed 010000-1.15.F. Warranty Tag layouts NTP + 10
010000-1.25.C System training/instructions course outline X prior to scheduling training
013216.15-1.3.A. Contractor's Scheduling Consultant X Award + 10
013216.15-1.4.A.
all computer-produced time/cost schedules and reports generated from monthly project updates
X Monthly
013216.15-1.5.A. Complete Project Schedule X NTP+30 013216.15-1.6.C. Work Activity/evant Cost Data X NTP+10 013216.15-1.8.A. Payment to the Contractor X Monthly
013216.15-1.9.A Progress Reporting Updates X 3 days prior to monthly meeting
013216.15-1.9.C Electronic Progress Schedule Updates X 14 days after monthly update 013216.15-1.11.A. Changes to schedule (electronic) X when schedule changes 013216.15-1.12.C. Adjustment of Contract Completion X When identified
013323-1.8.A. Operation and Maintenance Data X 30 days after item delivered
013526-1.3.A. Matter of Interpretation of Regulations X When found
013526-1.4.C. Accident Prevention Plan (APP) X 15 days prior to pre-construction conference
013526-1.5.C.1. Compentent Persons X Prior to start of work activity
T A
D R A W I N G S
I N S T R U C T I O N S
S C H E D U L E S
R E P O R T S
C E R T F I C A T E S
S A M P L E S
R E C O R D S
O M
M A N U A L S
I N F O R M A T I O N
G O V A P P R O V E D
SUBMIT
APPROVAL
NEEDED BY
MATERIAL
NEEDED BY
C O D E
DATE
SUBMIT TO
GOVERN-
MENT
C O D E
DATE REMARKS
CONTRACT NO.SUBMITTAL REGISTER
TITLE AND LOCATION: CONTRACTOR
CLASSI-
FICATION CONTRACTOR SCHEDULE DATES
CONTRACTOR
ACTION
GOVERNMENT
ACTIONA C
T I V I T Y N O
TRANS-
MITTAL
NO.
I T E M N O
SPECIFICATION
PARAGRAPH NUMBER
DESCRIPTION OF ITEM BUBMITTED
R E V I E W
E R
013526-1.5.C.2. Activity Hazard Analyses (AHAs): X 15 days prior to start of each phase
013526-1.5.D.
Known Compentent Persons w/training records X Prior to start of work activity
013526-1.8.E. Training Records X 15 days before pre-construction conference
013526-1.12.D Dust control plan X NTP+10 013526-1.14.A. Fire Safety Program X NTP+10 013526-1.19.C Lift Plan X 14 days prior
014500-3.2.A. CQC Plan X 3 days prior to Coordination meeting
014500-3.2.C.1 DQC Plan X 3 days prior to Coordination meeting
'014500-3.2.C.2 DQC Plan changes X 7 days of change 014500-3.4.E CQC orginazational changes X with changes 014500-3.7.A.5 Test Reports X After test
015719-1.4.A.1. Environmental Protection Plan meeting X after award 015719-1.4.A.1. Environmental Protection Plan X 20 days after meeting 017419-1.5.B. demolition debris management plan X NTP+10
017419-3.3.A.
summary of construction and demolition debris diversion and disposal
X with payement requests
033053-1.4.A. Manufacturer's Literature and Data X NTP+10 033053-1.4.C. Sustainable Construction Submittals: X NTP+10 033053-1.4.D. Certificates X each delivery
033053-2.3.C.
mix design and results of compression tests X as taken
033053-2.4.A.4. Mix deviations X when occur 033053-3.6.D.1.a Curing deviations when occur 033053-3.9.A.1. Surface treatment deviations when occur 260511-1.4.B.2. List of Installation X When requested 260511-1.9.C.3. Work Plan for Engerized work 2 weeks before 260511-1.12.F.1. O&M Manuals check 260511-1.17.C. Training Schedule X 30 days prior 260526-1.4.A.1. shop drawings X before construction
260526-1.4.A.2. Ground test reports X 2 weeks prior to final inspection
260526-1.4.A.3. Certifications X 2 weeks prior to final inspection
260541-1.4.A.1. Shop Drawings X Before construction
T A
D R A W I N G S
I N S T R U C T I O N S
S C H E D U L E S
R E P O R T S
C E R T F I C A T E S
S A M P L E S
R E C O R D S
O M
M A N U A L S
I N F O R M A T I O N
G O V A P P R O V E D
SUBMIT
APPROVAL
NEEDED BY
MATERIAL
NEEDED BY
C O D E
DATE
SUBMIT TO
GOVERN-
MENT
C O D E
DATE REMARKS
CONTRACT NO.SUBMITTAL REGISTER
TITLE AND LOCATION: CONTRACTOR
CLASSI-
FICATION CONTRACTOR SCHEDULE DATES
CONTRACTOR
ACTION
GOVERNMENT
ACTIONA C
T I V I T Y N O
TRANS-
MITTAL
NO.
I T E M N O
SPECIFICATION
PARAGRAPH NUMBER
DESCRIPTION OF ITEM BUBMITTED
R E V I E W
E R
260541-1.4.A.1.c. Deviations from Drawings X When determined
260541-1.4.A.2 Certifications X 2 weeks prior to final inspection
264100-1.4.A.1. Shop Drawings X Before construction
264100-1.4.A.2. Certifications X 2 weeks prior to final inspection
264100-3.2.B. LPS Test sheets X 2 weeks prior to final inspection
264313-1.4.A.1. Shop Drawings X Before construction 264313-1.4.A.2.a. Manuals X with shop drawings 264313-1.4.A.2.b. Correction to manuals X 2 weeks before final 264313-1.4.A.3. Certifications X 2 weeks before final 321216-1.5.B. Data and Test Reports X after test 321216-1.5.C. Certifications X at delivery 321216-1.5.D. State Highway Department Specifications X NTP+10
321216-1.5.E.
MSDS (Material Safety Data Sheets) for all chemicals used on ground X Before use
321723-1.4.B. pavement marking drawings before work 321723-1.4.C. Manufacturer's Literature and Data X before work 321723-1.4.D. Samples X before work 321723-1.4.E Certificates: X before work 321723-1.4.F. Qualifications X before work 321723-3.3.A.1. Deviations X before work 329000-1.6.B. Manufacturer's Literature and Data X before work 329000-1.6.C. Certificates X before work 329000-1.7.b.1. plant material source information X 7 days prior to delivery 329000-3.1.A.5. Variance in Platings X when known