Specs 621-23-109 Install Lightning Protection and Grounding Systems _Part2.pdf

PDF 15 MB Posted

Attached to
Z1DA--621-23-2-5620-0001 - 621-23-109 - Install Lightning Protection & Grounding Systems
Solicitation number
36C24923B0002
Issued by

About this file

This federal contract opportunity solicitation seeks installation services for new lightning protection and grounding systems at the James H. Quillen VA Medical Center in Mountain Home, Tennessee. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 9 is the contracting agency. The scope of work involves installing new lightning protection and ground systems on the defined medical center buildings. Interested contractors should respond with pricing by the specified deadline to be considered for award of contract 36C24923B0002 for this project.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

D A T A

D R A W I N G S

I N S T R U C T I O N S

S C H E D U L E S

R E P O R T S

C E R T F I C A T E S

S A M P L E S

R E C O R D S

O M

M A N U A L S

I N F O R M A T I O N

G O V A P P R O V E D

SUBMIT

APPROVAL

NEEDED BY

MATERIAL

NEEDED BY

C O D E

DATE

SUBMIT TO

GOVERN-

MENT

C O D E

DATE REMARKS

011011-2.B.(1) Contractor’s Environmental Safety and Health Program Plan X

End of Pre-construction meeting

011011-2.B.(1) Contractor’s AHA (Activity Hazard Analysis) plan X

End of Pre-construction meeting

011011-2.B.(2) Request for Contractor Identification (I.D.) Badges X

End of Pre-construction meeting

011011-2.B.(3) Phasing Schedule X End of Pre-construction meeting

011011-2.B.(4) Contractor's Superintendent and Contractor's Competent Person(s) X

End of Pre-construction meeting

011011-2.B.(5) request to schedule a date and time for all contactor and Sub-contractor's employees to view the VA's mandatory Video

X End of Pre-construction meeting

011011-2.B.(6 OSHA Training Records for all such employees X

End of Pre-construction meeting

011011-3.D.

Submit details and reasons for departure from contract drawings X ASAP

011011-3.G.

After Working Hours Activity Security Request, Attachment 00 10 11-C

X 48 hours in advance

011011-4.D.(1) Contractor Key Request", Attachment 00 10 11-D, X When keys are required

011011-20.B.

Request to Disarm Fire Alarm / Sprinkler System, Attachment 00 10 11-H, to the

COR

X 24 hours prior to requirement

011011-28.A.

List of materials and Material Data Safety Sheets (MSDS) When used

011011-30.

Cost proposal for Lead Based Paint disturbed X When found

011011-33.B.(1) Hot Work Permit to the COR, Attachment 00 10 11-J X before hot work

011011-34.C.(1) Confined Space Policy X When confined spaces are incountered

011011-34.C.(2) Confined Space Entry Permit, Attachment 00 10 11-K X

When confined spaces are incountered

011011-Attach A, 3.a.

Schedule of Work and any specified Phasing Schedules X 5 days before work

011011-Attach A, 26.b.

Notification of Asbestos (See Section 00 10 11, Attachment I). X before commencing work

CONTRACT NO.SUBMITTAL REGISTER

TITLE AND LOCATION: CONTRACTOR

CLASSI-

FICATION CONTRACTOR SCHEDULE DATES

CONTRACTOR

ACTION

GOVERNMENT

ACTIONA C

T I V I T Y N O

TRANS-

MITTAL

NO.

I T E M N O

SPECIFICATION

PARAGRAPH NUMBER

DESCRIPTION OF ITEM BUBMITTED

R E V I E W

E R

T A

D R A W I N G S

I N S T R U C T I O N S

S C H E D U L E S

R E P O R T S

C E R T F I C A T E S

S A M P L E S

R E C O R D S

O M

M A N U A L S

I N F O R M A T I O N

G O V A P P R O V E D

SUBMIT

APPROVAL

NEEDED BY

MATERIAL

NEEDED BY

C O D E

DATE

SUBMIT TO

GOVERN-

MENT

C O D E

DATE REMARKS

CONTRACT NO.SUBMITTAL REGISTER

TITLE AND LOCATION: CONTRACTOR

CLASSI-

FICATION CONTRACTOR SCHEDULE DATES

CONTRACTOR

ACTION

GOVERNMENT

ACTIONA C

T I V I T Y N O

TRANS-

MITTAL

NO.

I T E M N O

SPECIFICATION

PARAGRAPH NUMBER

DESCRIPTION OF ITEM BUBMITTED

R E V I E W

E R

011011-Attach A, 35.a.

Schedule of Costs and a Progress Schedule X NTP + 3

011011-Attach A, 38.a.

Subcontractors to be engaged on the work site, indicating name, address, and nature of work involved

X

NTP + 10

011011-Attach A, 36.b. certificate of apprenticeship X with payroll 011011-Attach A, 51.a. applicable specified O & M manuals X Prior to training 011011-Attach A-1,

1. Contractor's weekly payroll X Weekly 010000-1.5.E.1. Electrtonic control memorandum X before starting work 010000-1.5.F.1. Motor Vehicle Restrictions X 24 hours before access 010000-1.6.L.2. Utilities services interruptions X 7 days before

010000-1.15.A. Warranty Management Plan X 30 days before pre-warranty conference

010000-1.15.E. Warranty report X after work performed 010000-1.15.F. Warranty Tag layouts NTP + 10

010000-1.25.C System training/instructions course outline X prior to scheduling training

013216.15-1.3.A. Contractor's Scheduling Consultant X Award + 10

013216.15-1.4.A.

all computer-produced time/cost schedules and reports generated from monthly project updates

X Monthly

013216.15-1.5.A. Complete Project Schedule X NTP+30 013216.15-1.6.C. Work Activity/evant Cost Data X NTP+10 013216.15-1.8.A. Payment to the Contractor X Monthly

013216.15-1.9.A Progress Reporting Updates X 3 days prior to monthly meeting

013216.15-1.9.C Electronic Progress Schedule Updates X 14 days after monthly update 013216.15-1.11.A. Changes to schedule (electronic) X when schedule changes 013216.15-1.12.C. Adjustment of Contract Completion X When identified

013323-1.8.A. Operation and Maintenance Data X 30 days after item delivered

013526-1.3.A. Matter of Interpretation of Regulations X When found

013526-1.4.C. Accident Prevention Plan (APP) X 15 days prior to pre-construction conference

013526-1.5.C.1. Compentent Persons X Prior to start of work activity

T A

D R A W I N G S

I N S T R U C T I O N S

S C H E D U L E S

R E P O R T S

C E R T F I C A T E S

S A M P L E S

R E C O R D S

O M

M A N U A L S

I N F O R M A T I O N

G O V A P P R O V E D

SUBMIT

APPROVAL

NEEDED BY

MATERIAL

NEEDED BY

C O D E

DATE

SUBMIT TO

GOVERN-

MENT

C O D E

DATE REMARKS

CONTRACT NO.SUBMITTAL REGISTER

TITLE AND LOCATION: CONTRACTOR

CLASSI-

FICATION CONTRACTOR SCHEDULE DATES

CONTRACTOR

ACTION

GOVERNMENT

ACTIONA C

T I V I T Y N O

TRANS-

MITTAL

NO.

I T E M N O

SPECIFICATION

PARAGRAPH NUMBER

DESCRIPTION OF ITEM BUBMITTED

R E V I E W

E R

013526-1.5.C.2. Activity Hazard Analyses (AHAs): X 15 days prior to start of each phase

013526-1.5.D.

Known Compentent Persons w/training records X Prior to start of work activity

013526-1.8.E. Training Records X 15 days before pre-construction conference

013526-1.12.D Dust control plan X NTP+10 013526-1.14.A. Fire Safety Program X NTP+10 013526-1.19.C Lift Plan X 14 days prior

014500-3.2.A. CQC Plan X 3 days prior to Coordination meeting

014500-3.2.C.1 DQC Plan X 3 days prior to Coordination meeting

'014500-3.2.C.2 DQC Plan changes X 7 days of change 014500-3.4.E CQC orginazational changes X with changes 014500-3.7.A.5 Test Reports X After test

015719-1.4.A.1. Environmental Protection Plan meeting X after award 015719-1.4.A.1. Environmental Protection Plan X 20 days after meeting 017419-1.5.B. demolition debris management plan X NTP+10

017419-3.3.A.

summary of construction and demolition debris diversion and disposal

X with payement requests

033053-1.4.A. Manufacturer's Literature and Data X NTP+10 033053-1.4.C. Sustainable Construction Submittals: X NTP+10 033053-1.4.D. Certificates X each delivery

033053-2.3.C.

mix design and results of compression tests X as taken

033053-2.4.A.4. Mix deviations X when occur 033053-3.6.D.1.a Curing deviations when occur 033053-3.9.A.1. Surface treatment deviations when occur 260511-1.4.B.2. List of Installation X When requested 260511-1.9.C.3. Work Plan for Engerized work 2 weeks before 260511-1.12.F.1. O&M Manuals check 260511-1.17.C. Training Schedule X 30 days prior 260526-1.4.A.1. shop drawings X before construction

260526-1.4.A.2. Ground test reports X 2 weeks prior to final inspection

260526-1.4.A.3. Certifications X 2 weeks prior to final inspection

260541-1.4.A.1. Shop Drawings X Before construction

T A

D R A W I N G S

I N S T R U C T I O N S

S C H E D U L E S

R E P O R T S

C E R T F I C A T E S

S A M P L E S

R E C O R D S

O M

M A N U A L S

I N F O R M A T I O N

G O V A P P R O V E D

SUBMIT

APPROVAL

NEEDED BY

MATERIAL

NEEDED BY

C O D E

DATE

SUBMIT TO

GOVERN-

MENT

C O D E

DATE REMARKS

CONTRACT NO.SUBMITTAL REGISTER

TITLE AND LOCATION: CONTRACTOR

CLASSI-

FICATION CONTRACTOR SCHEDULE DATES

CONTRACTOR

ACTION

GOVERNMENT

ACTIONA C

T I V I T Y N O

TRANS-

MITTAL

NO.

I T E M N O

SPECIFICATION

PARAGRAPH NUMBER

DESCRIPTION OF ITEM BUBMITTED

R E V I E W

E R

260541-1.4.A.1.c. Deviations from Drawings X When determined

260541-1.4.A.2 Certifications X 2 weeks prior to final inspection

264100-1.4.A.1. Shop Drawings X Before construction

264100-1.4.A.2. Certifications X 2 weeks prior to final inspection

264100-3.2.B. LPS Test sheets X 2 weeks prior to final inspection

264313-1.4.A.1. Shop Drawings X Before construction 264313-1.4.A.2.a. Manuals X with shop drawings 264313-1.4.A.2.b. Correction to manuals X 2 weeks before final 264313-1.4.A.3. Certifications X 2 weeks before final 321216-1.5.B. Data and Test Reports X after test 321216-1.5.C. Certifications X at delivery 321216-1.5.D. State Highway Department Specifications X NTP+10

321216-1.5.E.

MSDS (Material Safety Data Sheets) for all chemicals used on ground X Before use

321723-1.4.B. pavement marking drawings before work 321723-1.4.C. Manufacturer's Literature and Data X before work 321723-1.4.D. Samples X before work 321723-1.4.E Certificates: X before work 321723-1.4.F. Qualifications X before work 321723-3.3.A.1. Deviations X before work 329000-1.6.B. Manufacturer's Literature and Data X before work 329000-1.6.C. Certificates X before work 329000-1.7.b.1. plant material source information X 7 days prior to delivery 329000-3.1.A.5. Variance in Platings X when known