Calculation of Self Performed Work.docx
DOCX document 53 KB Posted
- Attached to
- Z1DA--621-23-2-5620-0001 - 621-23-109 - Install Lightning Protection & Grounding Systems
- Solicitation number
- 36C24923B0002
About this file
This document provides guidance for calculating the percentage of self-performed work on a federal construction contract. The solicitation is for installing new lightning protection and grounding systems at the James H. Quillen VA Medical Center in Mountain Home, Tennessee. Offerors must perform at least 25% of the total contract labor costs using their own employees or those of verified Service Disabled Veteran Owned Small Business (SDVOSB) subcontractors. Offerors are required to submit a breakdown of personnel and material costs by specification division, and clearly identify which costs will be self-performed and which will be performed by eligible SDVOSB subcontractors. Home office overhead, profit, and bond costs should be added after subtotals for personnel and material.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CALCULATION OF SELF-PERFORMED/SUBCONTRACTED WORK (621-23-109)
Offerors for General Construction (NAICS code 238210) must provide at least 25% of the cost of the contract performance incurred for personnel must be performed by the Service Disabled Veteran Owned Small Business (SDVOSB) awardee or those of a verified SDVOSB subcontractor. Provide a breakdown of material and personnel costs, by specification division listed for the project. Home Office overhead, profit/fee and bond costs shall be added after a subtotal of personnel and material/Equipment costs has been calculated. Clearly identify the personnel costs you will be performing, and the personnel costs of other eligible service disabled veteran-owned small business concerns. Below is a suggested format.
| Specification Division |
| SDVOB Vendor (Y or N) |
| Personnel Cost |
| Material/Equipment Costs |
Division 01
| $ |
| $ |
Division 02
| $ |
| $ |
Division 03
| $ |
| $ |
(Add additional lines as necessary for each Division applicable to this project)
| $ |
| $ |
| $ |
| $ |
Sub Total (Personnel Costs, Material/Equipment Costs)
| Profit |
| $ |
| Home Office Overhead |
| $ |
| Bond |
| $ |
| Grand Total |
| $ |
Calculation of self-performed personnel costs:
1. Total personnel costs * both prime and all subcontractors: $
2. Subtract all subcontractor personnel costs* that are not SDVOSB companies that will perform work on this contract: $
3. Remainder is ‘Total amount of work to be self-performed under the
| Contract’: | $ | |
| 4. Self-performed work = Line 3/Line 1 x 100 = | % |
*personnel costs include labors, mechanics, other tradesmen, and office personnel directly charged to the project (includes project manager, job superintendent, administrative, estimators, etc.)