This federal contract opportunity solicitation seeks installation services for new lightning protection and grounding systems at the James H. Quillen VA Medical Center in Mountain Home, Tennessee. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 9 is the contracting agency. The scope of work involves installing new lightning protection and ground systems on the defined medical center buildings. Interested parties should respond with pricing and availability by the specified response date to be considered for the award date.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEPTEMBER 2022
LOCATION MAP
SCALE: N.T.S.
PERFORM LIGHTNING PROTECTION & GROUND STUDY
BUILDINGS 3, 5, 8, 35, 36, 37, 108, 115, 116, 160, 161,
162, 200 COMPLEX (69, 77, 200, 204, 205) 201, 208
JAMES H. QUILLEN VA MEDICAL CENTER
MOUNTAIN HOME, TN
Department of Veterans Affairs
PROJECT # 621-22-117
N
COVER PAGE
G-001
KEY MAP
SCALE: N.T.S.
N
1 33CAS
Raymond-Pond SDVOSB JV, LLC 1035 Green St. SE Suite A Conyers, GA 30012 770-483-9592 Art Warner U.S. Department of Veterans Affairs
621-22-117
JUNE 2022
LIGHTNING PROTECTION &
GROUNDING STUDY
BUILDINGS 3, 5, 8, 35, 36, 37, 108, 115, 116, 160, 161, 162,
200 COMPLEX (69, 77, 200, 204, 205) 201, 208
JAMES H. QUILLEN VA MEDICAL CENTER
MOUNTAIN HOME, TN
Office of Construction and Facilities Management
SEPT. 2022 RL
VHAMOULapoiL Text Box Bid Documents
VHAMOULapoiL Text Box
(DESIGN)
VHAMOULapoiL Text Box
PROJECT # 621-23-109 (CONSTRUCTION)
BLDG 5
BLDG 3
BLDG 8
BLDG 37
BLDG 116
BLDG 36
BLDG 115
BLDG 35
BLDG 108
BLDG 160
BLDG 200
BLDG 204
BLDG 205
BLDG 77
BLDG 201
BLDG 69
BLDG 208
BLDG 161
BLDG 162
BLDG 241
(NIC)
SCALE:
SITE PLAN
NOT TO SCALE G-002
N
BLDG 206
(NIC)
SITE PLAN
G-002
CAS
Raymond-Pond SDVOSB JV, LLC 1035 Green St. SE Suite A Conyers, GA 30012 770-483-9592 Art Warner U.S. Department of Veterans Affairs
621-22-117
JUNE 2022
LIGHTNING PROTECTION &
GROUNDING STUDY
BUILDINGS 3, 5, 8, 35, 36, 37, 108, 115, 116, 160, 161, 162,
200 COMPLEX (69, 77, 200, 204, 205) 201, 208
JAMES H. QUILLEN VA MEDICAL CENTER
MOUNTAIN HOME, TN
Office of Construction and Facilities Management
INDEX TO DRAWINGS
Sheet Sheet Title
GENERAL
1 G-001 COVER PAGE
2 G-002 SITE PLAN
3 G-003 GENERAL NOTES
4 G-004 GENERAL NOTES
ELECTRICAL
5 E-101 BUILDING 3 - LIGHTNING PROTECTION ROOF PLAN
6 E-102 BUILDING 5 - LIGHTNING PROTECTION ROOF PLAN
7 E-103 BUILDING 8 - LIGHTNING PROTECTION ROOF PLAN
8 E-104 BUILDING 35 - LIGHTNING PROTECTION ROOF PLAN
9 E-105 BUILDING 36 - LIGHTNING PROTECTION ROOF PLAN
10 E-106 BUILDING 37 - LIGHTNING PROTECTION ROOF PLAN
11 E-107 BUILDING 108 - LIGHTNING PROTECTION ROOF PLAN
12 E-108 BUILDING 115 - LIGHTNING PROTECTION ROOF PLAN
13 E-109 BUILDING 116 - LIGHTNING PROTECTION ROOF PLAN
14 E-110 BUILDING 160 - LIGHTNING PROTECTION ROOF PLAN
15 E-111 BUILDING 161 - LIGHTNING PROTECTION ROOF PLAN
16 E-112 BUILDING 162 - LIGHTNING PROTECTION ROOF PLAN
17 E-113 COMPLEX 200 - LIGHTNING PROTECTION ROOF PLAN
18 E-114 BUILDING 69 & 77 - B200 COMPLEX - LIGHTING PROTECTION ROOF PLAN
19 E-115 BUILDING 200 - B200 COMPLEX - LIGHTING PROTECTION ROOF PLAN
20 E-116 BUILDING 204 - B200 COMPLEX - LIGHTING PROTECTION ROOF PLAN
21 E-117 BUILDING 205 - B200 COMPLEX- LIGHTING PROTECTION ROOF PLAN
22 E-118 BUILDING 201 - LIGHTNING PROTECTION ROOF PLAN
23 E-119 BUILDING 208 - LIGHTNING PROTECTION ROOF PLAN
24 E-201 IMAGES
25 E-301 MAIN ELECTRICAL PANEL MAPS (3, 5, & 8)
26 E-302 MAIN ELECTRICAL PANEL MAPS (35, 36, & 37)
27 E-303 MAIN ELECTRICAL PANEL MAPS (108, 115, & 160)
28 E-304 MAIN ELECTRICAL PANEL MAPS (161, 162, & 201)
29 E-305 MAIN ELECTRICAL PANEL MAPS (200 Complex – 69, 77 & 200)
30 E-306 MAIN ELECTRICAL PANEL MAPS (200 Complex – 204 & 205, 208)
31 E-307 MAIN ELETRICAL PANEL MAPS (Interconnection of Buss Bars)
32 E-501 TYPICAL DETAILS
33 E-502 TYPICAL DETAILS
2 33RLSEPT. 2022
VHAMOULapoiL Rectangle
VHAMOULapoiL Rectangle
VHAMOULapoiL Rectangle
VHAMOULapoiL Rectangle
VHAMOULapoiL Rectangle
VHAMOULapoiL
Not in Contract
Raymond-Pond SDVOSB JV, LLC 1035 Green St. SE Suite A Conyers, GA 30012 770-483-9592 Art Warner U.S. Department of Veterans Affairs
621-22-117
JUNE 2022
LIGHTNING PROTECTION &
GROUNDING STUDY
BUILDINGS 3, 5, 8, 35, 36, 37, 108, 115, 116, 160, 161, 162,
200 COMPLEX (69, 77, 200, 204, 205) 201, 208
JAMES H. QUILLEN VA MEDICAL CENTER
MOUNTAIN HOME, TN
Office of Construction and Facilities Management
GENERAL NOTES
G-003
CAS 3 33
DCS - DOWNCONDUCTORS
* B108 HAS EXISTING LPS ONLY ON 'SECT A' TO BE REMOVED
*2 B37 SERVICE IS OUTSIDE AND REQUIRES A NEMA 3R BOX TO MOUNT THE GROUND BUS BAR IN. MOUNT
THE BOX ON THE SIDE OF THE ELECTRICAL SWITCHGEAR
*3 B116 WILL HAVE A SPD INSTALLED IN A SEPARATE PROJECT.*
*4 SAME PROJECT THAT WILL INSTALL SPD IN B116 WILL ALSO INSTALL A NEW GROUND BUS BAR. NOT KNOWING WHICH PROJECT MAY BE COMPLETED FIRST, CONTRACTOR SHALL PROVIDE A BUS BAR. IF
THERE IS ONE EXISTING, TURN YOURS OVER TO THE COR.
*5 SEVERAL SHORT DONWCONDUCTORS AND GROUND RODS ARE TO BE INSTALLED.
*6 UTILIZE EXISTING DOWNCONDUCTOR CONNECTIONS WHERE AVAILABLE. SOME NEW DOWNCONDUCTOR
CONNECTIONS SHALL BE CREATED PER DRAWINGS.
GENERAL NOTES (ALL SHEETS)
1. SEE “SUMMARY OF WORK” TABLE ABOVE. PROVIDE NEW ALL COPPER LIGHTNING PROTECTION SYSTEM (LPS) FOR EACH BUILDING.
FOR THOSE BUILDINGS WITH EXISTING LPS, ONLY REMOVE THE EXISTING AS THE NEW SYSTEM IS INSTALLED. USE ALL NEW ROOF
ITEMS. NO NEW ROOF PENETRATIONS SHALL BE REQUIRED BY THIS PROJECT.
2. ROUTING OF GROUND GRID SHOWN IS APPROXIMATE WHEN INDICATED AROUND BUILDINGS. FOLLOW THE 3 TO 8 FOOT STANDARD
FROM THE BUILDING WALL AS STATED IN NFPA 780.
a. FOR THOSE BUILDINGS RECEIVING A NEW GROUND GRID WITH EXISTING EXTERNAL DOWN CONDUCTORS, HAND DIG TO A POINT AT LEAST 1 FOOT UNDERGROUND, EXOTHERMAL WELD A CONNECTION TO THE NEW GROUND GRID AND LEAVE EXPOSED (WITH BARRIER) UNTIL THE EXISTING DOWNCONDUCTOR CAN BE REMOVED. WHEN EXISTING DOWNCONDUCTOR IS NO LONGER BEING USED, CUT THE DOWNCONDUCTOR ABOVE THE EXOTHERMAL WELD AND REMOVE. FILL THE HOLE WITH SOIL.
b. FOR THOSE BUILDING RECEIVING A NEW GROUND GRID, THE GROUND GRID SHALL BE INSTALLED BEFORE INSTALLING THE ROOF ITEMS. ROUTE THE DOWN CONDUCTORS TO ROOF AND LEAVE SEVERAL FEET FOR PROPER CONNECTION WHEN THE NEW ROOF CONDUCTORS ARE INSTALLED. AS NEW ROOF CONDUCTORS ARE INSTALLED, CONNECT TO THE NEW DOWN
CONDUCTORS.
3. FOR THOSE BUILDING WITH EXISTING INTERNAL DOWNCONDUCTORS (I.E. TIED TO STRUCTURAL STEEL), REUSE THE EXISTING
DOWNCONDUCTORS (SEE DETAIL 14 AND/OR 15).
4. ROUTING OF CONDUCTOR FROM ONE LEVEL TO ANOTHER AND DOWNCONDUCTORS SHALL BE COURSED IN A DOWNWARD DIRECTION WITHOUT ANY VEERING TO LEFT OR RIGHT WITH SPECIAL ATTENTION TO CORRECT BENDING OF CONDUCTORS FROM
THE ROOF CONDUCTOR TO THE DOWNWARD DIRECTION.
a. FOR THOSE BUILDINGS WITH A PARAPET WITH A SMALL SLOPED ROOF, ROUTE THE DOWNCONDUCTOR THROUGH THE PARAPET.
CUT A SLOT IN THE PARAPET WALL AT LEAST 6 INCHES ABOUT THE ROOF TO ROUTE THE DOWNCONDUCTOR THROUGH THE WALL INTO THE INNER SPACE OF THE PARAPET. USE FIRESTOPPING OR OTHER COMPOUND TO CLOSE THE HOLE AFTER THE DOWNCONDUCTOR IS INSTALLED. ALSO PATCH THE EXIT OF THE DOWNCONDUCTOR FROM THE PARAPET'S BOTTOM
STRUCTURE.
b. ROUTING OF THE ROOF CONDUCTOR DOWN THE WALL FOR DOWNCONDUCTORS SHALL TRANSITION TO 1/0 BARE COPPER WIRE
WITHIN 1 FOOT OF THE TOP OF THE 6 FEET PVC PER DETAIL 3.
c. SOME PENTHOUSES HAVE EXISTING DOWNCONDUCTORS. THESE MAY OR MAY NOT BE INDICATED. CONTRACTOR HAS THE CHOICE TO REUSING THESE EXISTING DOWNCONDUCTORS OR INSTALL NEW EXTERNAL DOWNCONDUCTORS. IF THESE EXISTING DOWNCONDUCTORS ARE NOT USED, DO NOT REMOVE ANY PARAPET OR ROOF CONNECTION (DUE TO PRODUCING A LEAK). BOND THE NON-USED EXISTING ROOF DOWNCONDUCTOR CONNECTION TO THE ROOF CONDUCTORS. CUT THE WIRE UNDER THE ROOF AND REMOVE. PROVIDE AT LEAST TWO ROOF CONDUCTORS FROM THE TOP OF EACH PENTHOUSE AND TIE
INTO ROOF CONDUCTORS AT THE ROOF LEVEL.
d. WHEN ROUTING FROM ONE FLOOR LEVEL TO ANOTHER CONTRACTOR MAY MOVE THE LOCATION INDICATED TO MISS WINDOWS/DOORS. FOR CONDUCTORS ROUTED WITHIN 3 FEET OF A WINDOW/DOOR, ENCLOSE CONDUCTOR IN PVC FROM A
POINT 3 FOOT ABOVE TO 3 FEET BELOW THE WINDOW/DOOR.
e. EXCEPTION: FOR ARCHITECTURAL WINDOWS ON THE SLOPED PARAPET WALLS, ROUTE ROOF CONDUCTOR OVER WALL AND DOWN TO AIR TERMINAL ON THE WINDOW FROM A 30- TO 45-DEGREE ANGLE. BE CAREFUL WITH BEND OVER THE WALL TO MAKE
SURE THAT AN 8 DEGREE BEND IS MAINTAINED.
f. SOME ROUTING OF ROOF CONDUCTORS FROM TOP OF PARAPET TO ROOF TO ROUTE TO MECHANICAL EQUIPMENT OR OTHER PURPOSES MAY NOT BE SPECIFICALLY IDENTIFIED BY NOTE. IT IS TO BE UNDERSTOOD THAT IT IS REQUIRED.
5. LOCATION, PLACEMENT, SIZE AND HEIGHT OF ITEMS ON ROOF SUCH AS, RTU, VENTILATORS, ETC., ARE APPROXIMATE. ASSUME 3% OVER THE NUMBER OF AIR TERMINALS, ROOF CONDUCTOR AND ROOF ATTACHMENT FOR ROOF CONDUCTORS OF THE ITEMS IDENTIFIED (DO NOT INCLUDE AIR TERMINALS AND ROOF CONDUCTORS MOUNTED ON PARAPETS AND ROOF.) THOSE NOT USED IN
CONSTRUCTION WILL BE TURNED OVER TO COR.
a. VENTILATORS ARE SHOWN ALL WITH THE SAME SYMBOL; HOWEVER, VENTILATORS WERE NOTED IN FIELD INVESTIGATION FROM 1-FOOT DIAMETER TO 4-FEET DIAMETER AND FROM 1-FOOT HIGH TO 3-FOOT HIGH. TWO VENTILATORS WITH ROTATING TOPS
WERE IDENTIFIED EVEN HIGHER.
b. TWO TYPES OF VENTILATORS ARE DETAILED. SEE DETAIL 21 & 22.
c. ASSUME 6-FEET OF ROOF CONDUCTOR TO ROUTE AROUND EACH VENTILATOR FOR BIDDING PURPOSES.
d. OTHER VENTILATORS WERE SQUARE IN SHAPE, SOME WITH STACKS AND SOME WITHOUT.
e. VARIOUS ROOF TOP UNITS WERE ALSO IDENTIFIED. SOME BARELY 2 X 2 FOOT, OTHERS OVER 8 FEET HIGH AND 15-FEET LONG.
ONE WAS IDENTIFIED OVER 25-FEET HIGH.
f. CONTRACTOR SHALL TAKE THESE VARIATIONS INTO ACCOUNT IN HIS BID. SITE VISIT TO IDENTIFY SOME OF THESE
DIFFERENCES IS HIGHLY ENCOURAGED.
6. LOCATION OF VARIOUS BONDING OBJECTS ARE APPROXIMATE. ASSUME 3% OVER THE NUMBER OF BONDING ITEMS (INCLUDING ROOF CONDUCTOR, CONNECTORS, STRAPS AND MOUNTING DEVICES) INDICATED TO COVER ANY THAT MAY HAVE BEEN MISSED.
ONLY METAL OBJECTS REQUIRE BONDING (THERE WERE SOME PVC PIPES SEEN.) ANY ITEMS NOT USED FOR ONE BUILDING MAY BE
USED FOR ANOTHER. THOSE NOT USED IN CONSTRUCTION WILL BE TURNED OVER TO COR.
a. PARAPET/VENTILATOR/RTU/STACK HEIGHTS ARE CONSERVATIVE FOR ROLLING BALL TEST. CONTRACTOR SHALL MEASURE FOR
HIS BIDDING/INSTALLATION PURPOSES.
b. AS A RULE, ANY METAL OBJECT ON THE ROOF WITH A THICKNESS GREATER THAN 3/16 INCH AND HIGHER THAN 10-INCHES IN
HEIGHT SHALL BE BONDED.
c. ROUTING OF BONDING CONDUCTORS ARE NOT SHOWN. CONTRACTOR SHALL DETERMINE THE BEST ROUTING. FOR EACH BONDING ITEM (EXCEPT FOR THE LAST ONE ON A LINE) PROVIDE A “TEE” CONNECTOR ON THE ROOF CONDUCTOR USED TO ROUTE TO THE OBJECTS, A SHORT RUN OF ROOF CONDUCTOR AND THE APPROPRIATE CONNECTOR TO EACH OBJECT.
d. CONTRACTOR MAY PLACE A TEE ON VARIOUS ROOF CONDUCTORS AND PROVIDE AN EXTENSION TO PROVIDE BONDING TO
ITEMS.
e. SOME ALUMINUM ITEMS WERE SEEN (IF DETERMINED TO BE ALUMINUM, CONTRACTOR MUST PROVIDE A BIMETALLIC CONNECTOR, A VERY SHORT PIECE OF ALUMINUM ROOF CONDUCTOR AND APPROPRIATE ALUMINUM CONNECTOR TO CONNECT
TO OBJECT.)
f. IDENTIFY THE DIFFERENT TYPES/SIZES OF ROOF DRAINS. PURCHASE AT LEAST 2 OF EACH DIFFERENT TYPE. PREDRILL AND THREAD BEFORE DELIVERY TO PROJECT SITE. USE THESE TO REPLACE THOSE IN THE FIELD AND BRING THEM TO SHOP TO
PREDRILL AND THREAD.
g. FOR B77 (A PART OF THE B200 COMPLEX) ABOUT 5 PLASTIC DRAIN COVERS WERE IDENTIFIED. PURCHASE 5 METAL DRAIN COVERS OF THE SAME SIZE AND CONFIGURATION TO REPLACE THE PLASTIC ONES. PREDRILL AND THREAD FOR BONDING CONNECTION BEFORE PLACING THEM ON ROOF. THEY CAN BE USED AS ROTATING STOCK UNTIL THE BUILDING IS COMPLETE.
7. CONNECTIONS TO DOWNCONDUCTOR AND/OR EXISTING DOWNCONDUCTOR CONNECTIONS AS WELL AS ALL CONNECTIONS TO GROUND RODS AND SPICING/CONNECTING OF GROUND GRID SHALL BE BY EXOTHERMIC WELDS. DUE TO “HOT WORK” REQUIREMENTS, MECHANICAL MEANS OF CONNECTION CAN BE USED TEMPORARY UNTIL THE HOT WORK PERMIT IS ACQUIRED AND THE MECHANICAL MEANS OF CONNECTION IS REPLACED WITH EXOTHERMIC WELD(S). DO NOT COVER UP THE MECHANICAL
CONNECTION DURING WAIT PERIOD.
8. THE NOMINAL NFPA 50-FT STANDARD INTEGRAL SPACING IS NOT USED FOR THIS PROJECT. USE THE ROLLING BALL TABLE
SPACINGS INSTEAD.
9. ROUTE ROOF CONDUCTORS ACROSS ROOF TO CONNECT DOWNCONDUCTORS TOGETHER AT 100-FOOT INTERVALS AS SHOWN ON DRAWINGS. DUE TO ODD SHAPES, ETC. SOME OF THESE ROUTINGS MAY NOT BE APPARENT, BUT THIS ASSISTS IN SPLITTING UP ANY STRIKE TO MORE THAN ONE DOWN CONDUCTOR; ALLOWING THE STRESS OF THE STRIKE TO BE SHARED AMONG MORE DOWNCONDUCTORS. MAKE SURE TO TIE DIRECTLY TO THE NEW OR EXISTING DOWN CONDUCTOR CONNECTIONS ON THE ROOF.
10. CONTRACTOR SHALL PROVIDE SPD'S (SEE “SUMMARY OF WORK” TABLE) AND MOUNT THE SPD AS CLOSE TO THE MAIN
BREAKER/MAIN LUGS AS POSSIBLE (MAY BE ON TOP OF PANEL).
11. PROVIDE A NEW GROUND BUS BAR IN BUILDINGS (SEE “SUMMARY OF WORK” TABLE). CONTRACTOR SHALL DETERMINE THE BEST LOCATION AND SUBMIT A PICTURE/DRAWING TO COR OF THAT LOCATION FOR APPROVAL. LOCATION SHOULD BE WITHIN 3-FEET OF
THE MAIN PANEL/SWITCHBOARD.
a. BUILDINGS RECEIVING A NEW EXTERNAL GROUND GRID (SEE “SUMMARY OF WORK” TABLE.)
(1) AFTER NEW GROUND GRID IS INSTALLED, CONTRACTOR SHALL DISCONNECT THE EXISTING GROUNDING ELECTRODES (ASSUME TWO) FROM THE MAIN PANEL, EXOTHERMIC WELD A COPPER 1/0 COPPER WIRE TO EXTEND EACH TO THE NEW GROUND BUS. PROVIDE A 1/0 COPPER WIRE FROM THE NEW GROUND BUS TO THE MAIN PANEL AND CONNECT TO THE
POINT THAT THE EXISTING GROUNDING ELECTRODE(S) WAS REMOVED.
(2) CONTRACTOR SHALL DETERMINE ROUTE OF NEW 1/0 WIRE FROM GROUND GRID TO NEW GROUND BUS (ABOVE CEILING)
WITH COR'S APPROVAL.
(3) WITHIN ONE FOOT OF 1/0 WIRE ENTRANCE INTO BUILDING DISCONTINUE PVC CONDUIT AND TRANSITION TO RIGID CONDUIT.
A SHOT SECTION (LESS THAN 6 INCHES MAY BE WIRE ONLY TO ALLOW FOR REQUIRED TERMINATIONS (SEE DETAIL 20).
(4) IF RUN OF CABLE IS OVER 250 FEET AND/OR MORE THAN 4(90-DEGREE) BENDS, INSTALL A METAL JUNCTION BOX.
CONTRACTOR MUST ENSURE CONTINUITY OF THE CONDUIT FROM ONE END TO THE OTHER. PROVIDE GROUNDING TYPE TERMINATIONS FOR BOTH END AND OUT CONDUITS. PROVIDE A CONNECTION PER DETAIL 20 FOR EACH LOCKNUT TO BOND CABLE TO CONDUIT. INSTALL COVER WITHOUT CASKETS FOR A GOOD METAL-TO-METAL CONNECTION.
(5) AT THE GROUND BUS BAR, STOP RIGID CONDUIT WITHIN 1-FOOT OF THE BUS BAR. EXTEND CABLE WITH 2-HOLE
CONNECTOR TO BUS BAR.
(6) AT BOTH ENDS OF RIGID CONDUIT, INSTALL DEVICE THAT WILL BOND THE CABLE TO THE END OF THE RIGID CONDUIT PER
DETAIL 20.
b. BUILDINGS RECEIVING NEW GROUND BUS BAR UTILIZING EXISTING DOWNCONDUCTOR CONNECTIONS (SEE “WORK SUMMARY” TABLE): CONTRACTOR SHALL DISCONNECT THE EXISTING GROUNDING ELECTRODES (ASSUME TWO) FROM THE MAIN PANEL, EXOTHERMIC WELD A 1/0 COPPER WIRE TO EACH AND EXTEND TO THE NEW GROUND BUS. PROVIDE FROM THE NEW GROUND BUS A 1/0 COPPER WIRE TO THE MAIN PANEL AND CONNECT TO THE POINT THAT THE EXISTING GROUNDING ELECTRODE(S) WAS
REMOVED.
c. SINCE THERE IS NO NEW EXTERNAL GROUND GRID, THE GROUNDING ELECTRODE WHICH IS CONNECTED TO BUILDING STEEL
AND OTHER ITEMS, IS USED AS THIS CONNECTION.
12. CONTRACTOR SHALL WORK THE INSTALLATION OF THE SPD AND GROUND BUS BAR SIMULTANEOUSLY.
a. NEW EXTERNAL GROUND GRID (SEE “SUMMARY OF WORK” TABLE) AND GROUND BUS BAR MUST BE INSTALLED AND CONNECTED
TO NEW EXTERNAL GROUND GRID BEFORE PROCEEDING WITH INSTALLATION OF ROOF SYSTEM.
b. GROUND BUS BARS FOR BUILDINGS UTILIZING EXISTING DOWNCONDUCTOR CONNECTIONS (SEE “SUMMARY OF WORK” TABLE)
MAY BE INSTALLED AT ANY TIME, EXCEPT FOR CONNECTION TO PANEL.
c. INSTALL SPD IN LOCATION APPROVED, EXCEPT FOR WIRING TO PANEL.
d. ONCE OUTAGE IS APPROVED, WIRE BOTH. OUTAGE WILL PROBABLY BE ON WEEKEND AND FOR A VERY SHORT DURATION (2
HOURS.)
RLSEPT. 2022
VHAMOULapoiL Rectangle
VHAMOULapoiL Rectangle
VHAMOULapoiL Rectangle
VHAMOULapoiL Rectangle
VHAMOULapoiL Rectangle
VHAMOULapoiL
Conyers, GA 30012 770-483-9592 Art Warner U.S. Department of Veterans Affairs
621-22-117
JUNE 2022
LIGHTNING PROTECTION &
GROUNDING STUDY
BUILDINGS 3, 5, 8, 35, 36, 37, 108, 115, 116, 160, 161, 162,
200 COMPLEX (69, 77, 200, 204, 205) 201, 208
JAMES H. QUILLEN VA MEDICAL CENTER
MOUNTAIN HOME, TN
Office of Construction and Facilities Management
GENERAL NOTES
G-004
CAS 4 33
BLDG 3 NOTES (SHEET E-101)
1. ROUTE ROOF CONDUCTORS FROM ONE LEVEL TO THE NEXT, SEE GENERAL NOTE 4.
2. SAWCUT 10-INCH WIDTH PATH THRU 4 SIDEWALKS, TRENCH FOR GROUND GRID. FILL AND PATCH.
3. DIRECTIONAL BORE UNDER DRIVEWAY ON SOUTH SIDE OF BUILDING TO INSTALL 1/0 BARE COPPER WIRE FOR GROUND GRID.
4. SEE SHEET E-301 FOR ROUTING OF GROUND GRID TO THE GROUND BUS BAR.
5. ROUTE GROUND GRID OUT TO STEEL POLE AND GROUND POLE ABOUT GROUND (FOR INSPECTION PURPOSES). POLE IS ~60 FEET
FROM BUILDING.
BLDG 5 NOTES (SHEET E-102)
1. ROUTE ROOF CONDUCTORS FROM ONE LEVEL TO THE NEXT, SEE GENERAL NOTE 4.
2. SAWCUT 10-INCH WIDTH PATH THRU SIDEWALK, TRENCH FOR GROUND GRID. FILL AND PATCH.
3. DIRECTIONAL BORE UNDER 3 DRIVEWAYS ON SOUTH SIDE OF BUILDING TO LAY 1/0 BARE COPPER WIRE FOR GROUND GRID.
4. SEE SHEET E-301 FOR ROUTING OF GROUND GRID TO THE GROUND BUS BAR.
5. SEE DETAIL 16 & 17 FOR ARRANGEMENT OF HIGH AIR TERMINAL (>10 FEET) NEXT TO ROTATING FAN.
BLDG 8 NOTES (SHEET E-103)
1. ROUTE ROOF CONDUCTORS FROM ONE LEVEL TO THE NEXT, SEE GENERAL NOTE 4.
2. STOP GROUND GRID ON EACH SIDE OF TUNNEL THAT LEAVES B8 ROUTED TO B77.
3. DIRECTIONAL BORE UNDER DRIVEWAY ON SOUTH SIDE OF BUILDING TO LAY 1/0 BARE COPPER WIRE FOR GROUND GRID.
4. DIRECTIONAL BORE UNDER CONCRETE ON NORTH OF BUILDING. PLACE GROUND RODS IN THE CONCRETE AREA NORTH AND EAST
OF BUILDING AS SHOWN. PATCH CONCRETE AS REQUIRED.
5. SEE SHEET E-301 FOR ROUTING OF GROUND GRID TO THE GROUND BUS BAR.
6. ROUTE ROOF CONDUCTOR FOR PERIMETER OF BUILDING AROUND BACKSIDE OF PENTHOUSE.
BLDG 35 NOTES (SHEET E-104)
1. ROUTE ROOF CONDUCTORS FROM ONE LEVEL TO THE NEXT, SEE GENERAL NOTE 4.
2. DIRECTIONAL BORE UNDER CONCRETE ON SOUTH SIDE OF BUILDING TO LAY 1/0 BARE COPPER WIRE FOR GROUND GRID. IT MAY BE NECESSARY TO DIRECTIONAL BORE UNDER PAVEMENT AND CONCRETE ON THE SOUTH SIDE OF BUILDING TO PROVIDE THE LEAST
PATCHING OF PAVEMENT.
3. SAWCUT EDGE OF PAVEMENT FOR LAYING THE 1/0 GROUND GRID. FILL TRENCH. IF SAW CUT IS LESS THAN 1 FOOT INTO EXISTING
PAYMENT, LEAVE AS IS. IF SAW CUT IS GREATER THAN 1 FOOT IN WIDTH, PATCH.
4. MOUNT AIR TERMINALS FOR SLANTED ROOF AT PEAK ON THE TWO ORNAMENTAL ELEMENTS. AIR TERMINAL SHALL BE MOUNTED
WITH AT LEAST 18 INCHES ABOVE HIGHEST POINT.
5. SEE SHEET E302 FOR ROUTING OF GROUND GRID TO THE GROUND BUS BAR.
BLDG 36 NOTES (SHEET E105)
1. ROUTE ROOF CONDUCTORS FROM ONE LEVEL TO THE NEXT, SEE GENERAL NOTE 4.
2. DIRECTIONAL BORE UNDER CONCRETE ON EAST AND WEST SIDE OF BUILDING TO LAY 1/0 BARE COPPER WIRE FOR GROUND GRID.
3. ROUTE GROUND GRID A DISTANCE FROM BUILDING TO AVOID CONCRETE ON NORTH SIDE OF BUILDING.
4. MOUNT AIR TERMINAL ON ORNAMENTAL ELEMENT AT WEST SIDE OF BUILDING. AIR TERMINAL SHALL BE MOUNTED WITH AT LEAST 18
INCHES ABOVE HIGHEST POINT.
5. SEE SHEET E-302 FOR ROUTING OF GROUND GRID TO THE GROUND BUS BAR.
6. SEE DETAIL 13 FOR ROUTING ROOF CONDUCTOR IN FREE AIR.
7. ROUTE GROUND GRID AWAY FROM BUILDING TO AVOID BUSHES IN THIS AREA.
8. SAWCUT 10-INCH WIDTH PATH THROUGH CONCRETE TO LAY 1/0 BARE COPPER WIRE. FILL AND PATCH.
BLDG 37 NOTES (SHEET E-106)
1. ROUTE ROOF CONDUCTORS FROM ONE LEVEL TO THE NEXT, SEE GENERAL NOTE 4.
2. DIRECTIONAL BORE UNDER CONCRETE ON WEST, EAST, NORTH & SOUTH SIDE OF BUILDING TO LAY 1/0 BARE COPPER WIRE FOR
GROUND GRID.
3. ADD AIR TERMINALS ON PORCH ON WEST SIDE OF BUILDING.
4. ROUTE DOWNCONDUCTOR FOR PORCH HORIZONTALLY ALONG WALL TO DOWNCONDUCTOR ON EACH SIDE OF BUILDING.
5. SEE DETAIL 13 FOR ROUTING ROOF CONDUCTOR IN FREE AIR.
6. SEE SHEET E-302 FOR ROUTING OF GROUND GRID TO THE GROUND BUS BAR.
7. ROUTE DOWNCONDUCTOR FOR THE ARCHITECTURAL WINDOWS OVER, DOWN AND UNDER THE SLOPED PARAPET WALL AND ATTACH
TO THE OTHER DOWNCONDUCTOR. DO NOT CREATE NEW ROOF PENETRATIONS.
8. SEE DETAIL 16 & 17 FOR ARRANGEMENT OF HIGH AIR TERMINAL (>4 FEET) NEXT TO ROTATING FAN.
BLDG 108 NOTES (SHEET E-107)
1. ROUTE ROOF CONDUCTORS FROM ONE LEVEL TO THE NEXT, SEE GENERAL NOTE 4.
2. DIRECTIONAL BORE UNDER CONCRETE ON SOUTH SIDE OF BUILDING TO LAY 1/0 BARE COPPER WIRE FOR GROUND GRID.
3. SAWCUT 10-INCH WIDTH PATH THRU 4 SIDEWALKS, TRENCH FOR GROUND GRID. FILL AND PATCH.
4. SEE SHEET E-303 FOR ROUTING OF GROUND GRID TO THE GROUND BUS BAR.
5. FOR 'SECT C' OF THE ROOF, LAY DOWN ½ INCH PLYWOOD TO PROVIDE WALKING SURFACE. ROOF IS WEAK, AND NO STEP SHOULD
BE TAKEN ON THE ROOF WITHOUT PLYWOOD SUPPORT.
6. ROUTE DOWNCONDUCTOR DC8 FROM AIR TERMINAL L7 TO L9 TO GROUND GRID.
7. PROVIDE STRAP TO BOND TO EXHAUST PIPES. DO NOT DRILL OR EXOTHERMIC WELD TO THESE PIPES. DUE TO RUST, SAND PIPE
FOR A GOOD CONNECTION.
BLDG 115 NOTES (SHEET E-108)
1. SEE GENERAL NOTES.
BLDG 116 NOTES (SHEET E-109)
1. SEE GENERAL NOTES.
BLDG 160 NOTES (SHEET E-110)
1. ROUTE ROOF CONDUCTOR UP/DOWN FROM ONE LEVEL TO THE NEXT. SEE GENERAL NOTE 4.
2. COVERED BRIDGE IS BEING ADDED AS THIS DESIGN WAS OCCURRING. ROUTE ROOF CONDUCTOR FROM NEAREST AIR TERMINAL UP AND OVER COVERED BRIDGE. USE CROSS CONNECTOR TO TIE THE EXISTING TWO RUNS OF AIR TERMINALS ON COVERED BRIDGE TO ROOF CONDUCTOR. ROUTE ROOF CONDUCTOR DOWN ON THE OTHER SIDE TO NEAREST AIR TERMINAL.
BLDG 161 NOTES (SHEET E-111)
1. ROUTE ROOF CONDUCTORS FROM ONE LEVEL TO THE NEXT, SEE GENERAL NOTE 4.
2. FROM 1 FOOT FROM WALL, ROUTE GROUND GRID IN PVC TO WALL AND UP TO A POINT 2 FEET BELOW GRADE ON EAST SIDE. CORE DRILL THRU WALL AND ROUTE PVC WITH GROUND GRID THROUGH WALL. PATCH AROUND HOLE. CORE DRILL THRU WALL ON NORTH
SIDE OF WALL AT THE WEST AND EAST END OF THE BUILDING.
3. CORE DRILL THRU WALL AT A POINT 2 FEET BELOW GRADE ON THE WEST SIDE OF THE WALL, ROUTE GROUND GRID IN PVC
THROUGH WALL. PATCH AROUND HOLE.
4. DIRECTIONAL BORE UNDER CONCRETE SIDEWALK/PAVEMENT ON WEST SIDE OF BUILDING TO LAY 1/0 BARE COPPER WIRE FOR
GROUND GRID.
5. SEE SHEET E-304 FOR ROUTING OF GROUND GRID TO THE GROUND BUS BAR.
BLDG 162 NOTES (SHEET E-112)
1. ROUTE ROOF CONDUCTORS FROM ONE LEVEL TO THE NEXT, SEE GENERAL NOTE 4.
2. SAWCUT 10-INCH WIDTH PATH IN CONCRETE TO LAY 1/0 GROUND GRID ON SOUTH SIDE OF BUILDING AS REQUIRED. FILL AND PATCH.
3. DIRECTIONAL BORE UNDER DRIVEWAY ON WEST SIDE OF BUILDING TO LAY 1/0 BARE COPPER WIRE FOR GROUND GRID.
4. SEE DETAIL 16 & 17 FOR MOUNTING OF HIGH AIR TERMINAL.
--------------------------------------B200 COMPLEX--------------------------------------
BLDG 69 & BLDG 77 NOTES (SHEET E-114)
1. ROUTE ROOF CONDUCTORS FROM ONE LEVEL TO THE NEXT, SEE GENERAL NOTE 4.
2. SEE DETAIL 16 & 17 FOR MOUNTING OF HIGH AIR TERMINAL TO PROTECT VENTILATOR WITH ROTATING TOP.
3. SEE GENERAL NOTE 6 CONCERNING BONDING OF ITEMS, SPECIFICALLY STATEMENT CONCERNING REPLACEMENT OF PLASTIC ROOF
DRAIN COVERS.
4. SEE DETAIL 9 FOR MOUNTING OF LIGHTNING PROTECTION ITEMS ON STEEL ROOF.
5. SEE DETAIL 13 FOR ROUTING ROOF CONDUCTOR IN FREE AIR.
6. SEE SHEET 307 FOR BONDING OF GROUND BUSSES TOGETHER.
7. PROVIDE NEW DOWNCONDUTOR CONNECTIONS AS INDICATED ON DRAWINGS. THESE NEW DOWNCONDUCTOR CONNECTIONS WILL
BE NUMBERED TO INDICATE THAT THEY ARE NEW (I.E. NUMBER WILL BE LIKE DC22N).
a. USE STUD FINDER TO LOCATE STRUCTURAL STEEL. CUT INTO SIDE OF PARAPET. DO NOT DISRUPT THE EXISTING ROOF
MEMBRANE.
b. EXPOSE THE STEEL. SELECT THE POINT YOU WILL EXOTHERMICALLY WELD TO.
c. PLACE SHEET METAL UNDER THE POINT OF WELDING. MAKE SURE THAT ALL OPENING DOWN INTO THE WALL ARE PROTECTED AGAINST ANY SPARKS. EXOTHERMIC WELD A 1/0 BARE COPPER WIRE TO ONE OF THE STEEL MEMBERS.
d. PROVIDE A PLATE TO COVER OPENING WITH A ¾ INCH PVC THROUGH IT FOR THE BARE COPPER WIRE. CHAULK AROUND
THE PLATE TO PREVENT WATER FROM BEING INTRODUCED INTO THE WALL.
BLDG 200 NOTES (SHEET E-115)
1. ROUTE ROOF CONDUCTORS FROM ONE LEVEL TO THE NEXT, SEE GENERAL NOTE 4.
2. LOCATE DOWNCONDUCTOR AND GROUND ROD AT POINT AROUND LOWER ROOF TO LESSEN THE NEED TO SAWCUT CONCRETE.
SAWCUT 10-INCH WIDTH PATH THROUGH CONCRETE TO LAY 1/0 BARE COPPER WIRE TO NEW GROUND ROD. FILL AND PATCH.
3. PROVIDE NEW DOWNCONDUTOR CONNECTIONS AS INDICATED ON DRAWINGS. THESE NEW DOWNCONDUCTOR CONNECTIONS WILL
BE NUMBERED TO INDICATE THAT THEY ARE NEW (I.E. NUMBER WILL BE LIKE DC22N).
a. USE STUD FINDER TO LOCATE STRUCTURAL STEEL. CUT INTO SIDE OF PARAPET. DO NOT DISRUPT THE EXISTING ROOF
MEMBRANE.
b. EXPOSE THE STEEL. SELECT THE POINT YOU WILL EXOTHERMICALLY WELD TO.
c. PLACE SHEET METAL UNDER THE POINT OF WELDING. MAKE SURE THAT ALL OPENING DOWN INTO THE WALL ARE PROTECTED AGAINST ANY SPARKS. EXOTHERMIC WELD A 1/0 BARE COPPER WIRE TO ONE OF THE STEEL MEMBERS.
d. PROVIDE A PLATE TO COVER OPENING WITH A ¾ INCH PVC THROUGH IT FOR THE BARE COPPER WIRE. CHAULK AROUND
THE PLATE TO PREVENT WATER FROM BEING INTRODUCED INTO THE WALL.
4. SEE DETAIL 16 FOR MOUNTING OF HIGH AIR TERMINAL IN MIST OF EQUIPMENT.
5. SEE DETAIL 13 FOR ROUTING ROOF CONDUCTOR IN FREE AIR.
6. SEE B204 (E-118) FOR DETAIL ON DOWNCONDUCTOR RUN.
7. SEE SHEET 307 FOR BONDING OF GROUND BUSSES TOGETHER.
BLDG 204 NOTES (SHEET E-116)
1. ROUTE ROOF CONDUCTORS FROM ONE LEVEL TO THE NEXT, SEE GENERAL NOTE 4.
2. FOLLOW DIRECTIONS ON SIGN FOR HAZARDOUS AREA.
3. SEE SHEET 307 FOR BONDING OF SERVICES TOGETHER.
4. ROUTE DOWNCONDUCTOR FROM B200 LOW ROOF HORIZONTALLY TO DC10B AND BOND TO DOWNCONDUCTOR AT THE SAME
HORIZONTAL LEVEL AS THE LOWER ROOF.
5. PROVIDE NEW DOWNCONDUTOR CONNECTIONS AS INDICATED ON DRAWINGS. THESE NEW DOWNCONDUCTOR CONNECTIONS WILL
BE NUMBERED TO INDICATE THAT THEY ARE NEW (I.E. NUMBER WILL BE LIKE DC22N).
a. USE STUD FINDER TO LOCATE STRUCTURAL STEEL. CUT INTO SIDE OF PARAPET. DO NOT DISRUPT THE EXISTING ROOF
MEMBRANE.
b. EXPOSE THE STEEL. SELECT THE POINT YOU WILL EXOTHERMICALLY WELD TO.
c. PLACE SHEET METAL UNDER THE POINT OF WELDING. MAKE SURE THAT ALL OPENING DOWN INTO THE WALL ARE PROTECTED AGAINST ANY SPARKS. EXOTHERMIC WELD A 1/0 BARE COPPER WIRE TO ONE OF THE STEEL MEMBERS.
d. PROVIDE A PLATE TO COVER OPENING WITH A ¾ INCH PVC THROUGH IT FOR THE BARE COPPER WIRE. CHAULK AROUND
THE PLATE TO PREVENT WATER FROM BEING INTRODUCED INTO THE WALL.
BLDG 205 NOTES (SHEET E-117)
1. ROUTE ROOF CONDUCTOR UP/DOWN WALL. SEE GENERAL NOTE 4.
2. SEE SHEET 307 FOR BONDING OF SERVICES TOGETHER.
3. PROVIDE NEW DOWNCONDUTOR CONNECTIONS AS INDICATED ON DRAWINGS. THESE NEW DOWNCONDUCTOR CONNECTIONS WILL
BE NUMBERED TO INDICATE THAT THEY ARE NEW (I.E. NUMBER WILL BE LIKE DC22N).
a. USE STUD FINDER TO LOCATE STRUCTURAL STEEL. CUT INTO SIDE OF PARAPET. DO NOT DISRUPT THE EXISTING ROOF
MEMBRANE.
b. EXPOSE THE STEEL. SELECT THE POINT YOU WILL EXOTHERMICALLY WELD TO.
c. PLACE SHEET METAL UNDER THE POINT OF WELDING. MAKE SURE THAT ALL OPENING DOWN INTO THE WALL ARE PROTECTED AGAINST ANY SPARKS. EXOTHERMIC WELD A 1/0 BARE COPPER WIRE TO ONE OF THE STEEL MEMBERS.
d. PROVIDE A PLATE TO COVER OPENING WITH A ¾ INCH PVC THROUGH IT FOR THE BARE COPPER WIRE. CHAULK AROUND
THE PLATE TO PREVENT WATER FROM BEING INTRODUCED INTO THE WALL.
-------------------------------------- END OF B200 COMPLEX--------------------------------------
BLDG 201 NOTES (SHEET E-118)
1. ROUTE ROOF CONDUCTORS FROM ONE LEVEL TO THE NEXT, SEE GENERAL NOTE 4.
2. DIRECTIONAL BORE UNDER CONCRETE ON SOUTH SIDE OF BUILDING TO LAY 1/0 BARE COPPER WIRE FOR GROUND GRID..
3. SAWCUT CONCRETE FOR PLACEMENT OF GROUND ROD AND PATCH.
4. SEE SHEET E-304 FOR ROUTING OF GROUND GRID TO THE GROUND BUS BAR.
5. PLACE AIR TERMINALS ON CONDENSING UNIT. ALSO ROUTE A BONDING CONDUCTOR FROM GROUND GRID TO THE BASE OF THE A/C
UNIT AND BOND.
6. ROUTE GROUND GRID UNDER PIPES AT THIS POINT. ROUTE A CONDUCTOR TO A POINT ABOVE GROUND AND BOND TO PIPES (USE
STRAPS).
BLDG 208 NOTES (SHEET E-119)
1. ROUTE ROOF CONDUCTORS FROM ONE LEVEL TO THE NEXT, SEE GENERAL NOTE 4.
2. SAWCUT 10-INCH WIDTH PATH THRU SIDEWALK ON WEST AND SOUTH SIDE OF BUILDING, TRENCH FOR GROUND GRID, FILL AND PATCH WITH CONCRETE. CUT ONLY ONE SIDEWALK, PATCH AND OPEN FOR TRAFFIC BEFORE CUTTING THE OTHERS. DIRECTIONAL
BORING CAN BE USED AS AN OPTION.
3. DIRECTIONAL BORE UNDER CONCRETE ON EAST SIDE OF BUILDING TO INSTALL 1/0 BARE COPPER WIRE FOR GROUND GRID.
4. SEE SHEET E-306 FOR ROUTING OF GROUND GRID TO THE GROUND BUS BAR.
5. ROUTE GROUND GRID OUT TO WATER TANK (~40 FEET). CUT AND PATCH PAYMENT AS REQUIRED. BOND ABOVE GROUND (FOR
INSPECTION PURPOSES.)
6. ROUTE GROUND GRID TO GREEN TANK (~50 FEET). CUT AND PATCH PAVEMENT AS REQUIRED. BOND ABOVE GROUND (FOR
INSPECTION PURPOSES)
7. PROVIDE STRAP TO BOND TO EXHAUST PIPES. DO NOT DRILL OR EXOTHERMIC WELD TO THESE PIPES. DUE TO RUST, SAND PIPE
FOR A GOOD CONNECTION.
RLSEPT. 2022
VHAMOULapoiL Rectangle
VHAMOULapoiL Rectangle
VHAMOULapoiL Rectangle
VHAMOULapoiL Rectangle
VHAMOULapoiL Rectangle
VHAMOULapoiL
T
L27
L28
L33 L35
L40
L41
L48
L49
TR
R
SIDE
WALK
VENTILATOR
EL. = 3'-6"
VENTILATOR
EL. = 3'-6"
SKYLIGHT
EL. = < 1'-0"
R
R
R
R
B4
EL. = 2'-0"
B2
B1
B3
B6
DC2
DC
L
L
L
L
L
L
L8
L7
L9
L10
L11
L12
L13
L1
L1
L1
L1 7L18
L19L20
L21 L22
L23
L24
L25
L26
DC3
DC8
DC5
DC6
L29 L30 L31 L32
L34
L36 L37 L38 L39
L42L43L44L45
L46
L47
L50L51L52L53
D C
D
C
L56
L54 L55
PLAN LEGEND
ROOF DRAIN (RD)
ROOF HATCH - OPERABLE MISC. MECHANICAL
EQUIPMENT
SKYLIGHT
VENT THROUGH ROOF
S
Raymond-Pond SDVOSB JV, LLC 1035 Green St. SE Suite A Conyers, GA 30012 770-483-9592 Art Warner
621-22-117
U.S. Department of Veterans AffairsJUNE 2022
LIGHTNING PROTECTION &
GROUNDING STUDY
BUILDINGS 3, 5, 8, 35, 36, 37, 108, 115, 116, 160, 161, 162,
200 COMPLEX (69, 77, 200, 204, 205) 201, 208
JAMES H. QUILLEN VA MEDICAL CENTER
MOUNTAIN HOME, TN
Office of Construction and Facilities Management
EXHAUST FAN
DOOR STRAP BOND
(DSLx / DSRx)
T
R
GROUND GRID
DOWN CONDUCTOR
(DC#)
AIR TERMINAL (L#)
GROUND ROD & TEST
WELL
GROUND ROD
BONDING POINT (B#)
LADDER BONDING POINT
TOP/BOTTOM (LT# / LB#)
DOOR FACING BONDING
POINT (D#)
N
SCA
LE:
BUILDING 3 - LIGHTNING PROTECTION ROOF PLAN
1/8" : 1'-0" E-101
N
BUILDING 3 - LIGHTNING PROTECTION ROOF
PLAN
E-101
CAS
T/PARAPET
±3'-0"
SCA
LE:
BUILDING 3 - LIGHTNING PROTECTION ROOF PLAN
1/8" : 1'-0" E-101
GENERA L NOTES
1. SEE SHEETS G-002 & G-003 FOR GENERAL AND SPECIAL NOTES
RELEVANT TO THIS SHEET. ALL NOTES REFERENCED ON THIS SHEET
ARE SPECIFIC NOTES TO THIS SHEET.
NEW GROUND GRID
(SEE GENERA L NOTE 2)
TYP.
5 33
SECT A
SECT B
RLSEPT. 2022
DC2
DC
L
L
L 3 L4 L5
L
L8
L7
L9
L10
L11
L12
L13
L1
L1 5L1
L1 7L18
L1
L20
L21 L22
L23
L24
L25
L26
DC3
DC8
DC5
DC6
L27
L28
L29 L30 L31 L32
L33
L34
L35
L36 L37 L38 L39
L40
L41
L42 L43 L44 L45
L46
L47L48
L49
L50 L51L52 L53
T
T
D C
D C
R
R
R
R
RTU
EL. = 3'-6"
RTU
EL. = 3'-6"
SKYLIGHT
EL. = < 1'-0"
VENTILATOR
EL. = 2'-0"
B7
R
R
B4
L54 L60 L59
L58 B6
B5
B2
B1 B3
L56
L55
ROTATING
VENTILATOR
EL. = 8'-0"
L57
PLAN LEGEND
ROOF DRAIN (RD)
ROOF HATCH - OPERABLE MISC. MECHANICAL
EQUIPMENT
SKYLIGHT
VENT THROUGH ROOF
S
Raymond-Pond SDVOSB JV, LLC 1035 Green St. SE Suite A Conyers, GA 30012 770-483-9592 Art Warner
621-22-117
U.S. Department of Veterans AffairsJUNE 2022
LIGHTNING PROTECTION &
GROUNDING STUDY
BUILDINGS 3, 5, 8, 35, 36, 37, 108, 115, 116, 160, 161, 162,
200 COMPLEX (69, 77, 200, 204, 205) 201, 208
JAMES H. QUILLEN VA MEDICAL CENTER
MOUNTAIN HOME, TN
Office of Construction and Facilities Management
EXHAUST FAN
DOOR STRAP BOND
(DSLx / DSRx)
T
R
GROUND GRID
DOWN CONDUCTOR
(DC#)
AIR TERMINAL (L#)
GROUND ROD & TEST
WELL
GROUND ROD
BONDING POINT (B#)
LADDER BONDING POINT
TOP/BOTTOM (LT# / LB#)
DOOR FACING BONDING
POINT (D#)
SCALE:
BUILDING 5 - LIGHTNING PROTECTION ROOF PLAN
1/8" : 1'-0" E-102
N
SCALE:
BUILDING 5 - LIGHTNING PROTECTION ROOF PLAN
NO SCALE E-102
BUILDING 5 - LIGHTNING PROTECTION ROOF
PLAN
E-102
CAS
T/PARAPET
3'-0"
N
NEW GROUND GRID
(SEE GENERAL NOTE 2)
GENERAL NOTES
1. SEE SHEETS G-002 & G-003 FOR GENERAL AND SPECIAL NOTES
RELEVANT TO THIS SHEET. ALL NOTES REFERENCED ON THIS SHEET
ARE SPECIFIC NOTES TO THIS SHEET.
1 TYP.
6 33
SECT A
L2 9L30
L28
L2
L2
L2
L2
L2
L2
L2
L19
L20
L18
L16 L15
L11
L10L9
L8L4
L3L1
L39
L38
L37
L35
L34 L3
L3
L3
L5 L6 L7
L2
L3
L12
L13
L14
L17 L113
L1
L1
L111
DC
DC2
DC4
DC7
DC
L5
L5 6 L57 L5
8 L59 L61L6
L62
L63
L6
L6 5 L6
L67
L68 L69 L7
0 L71 L73L7
L7
L7
L76
L77
L78
L7
L8 0L81L82
L84 L83L85 L8
L87
L8 8L90 L89
L91
L92 L93L95L97 L94
L96
L98
L99
L100
L101
L102
T
T
D C
D
C
DC9
D C
D
C
R
R
R
B1
R
VENTILATOR
EL. = 2'-6"
VENTILATOR
EL. = 2'-6"
VENTILATOR
EL. = 2'-6"
VENTILATOR
EL. = 2'-6"
VENTILATOR
EL. = 2'-6"
R
R
R
R
R
B2
B3
L41 L40
RTU
EL. = 4'-0"
B4 B5 B6 B7 B10 B9
B12 B11
B13
B8
VENTILATOR
EL. = 2'-6"
L42
L4
L4
L45 L46
L47
L51
L52
L53
L54
VENTILATOR
EL. = 2'-6"
L49
L50
D C
2B
DC2A
L48 DOOR,
D1, DSL1,
DSR1,
STEPS
B14
PLAN LEGEND
ROOF DRAIN (RD)
ROOF HATCH - OPERABLE MISC. MECHANICAL
EQUIPMENT
SKYLIGHT
VENT THROUGH ROOF
S
Raymond-Pond SDVOSB JV, LLC 1035 Green St. SE Suite A Conyers, GA 30012 770-483-9592 Art Warner
621-22-117
U.S. Department of Veterans AffairsJUNE 2022
LIGHTNING PROTECTION &
GROUNDING STUDY
BUILDINGS 3, 5, 8, 35, 36, 37, 108, 115, 116, 160, 161, 162,
200 COMPLEX (69, 77, 200, 204, 205) 201, 208
JAMES H. QUILLEN VA MEDICAL CENTER
MOUNTAIN HOME, TN
Office of Construction and Facilities Management
EXHAUST FAN
DOOR STRAP BOND
(DSLx / DSRx)
T
R
GROUND GRID
DOWN CONDUCTOR
(DC#)
AIR TERMINAL (L#)
GROUND ROD & TEST
WELL
GROUND ROD
BONDING POINT (B#)
LADDER BONDING POINT
TOP/BOTTOM (LT# / LB#)
DOOR FACING BONDING
POINT (D#)
N
SCALE:
BUILDING 8 - LIGHTNING PROTECTION ROOF PLAN
3/32" : 1'-0" E-103
N
SCALE:
BUILDING 8 - LIGHTNING PROTECTION ROOF PLAN
NO SCALE E-103
BUILDING 8 - LIGHTNING PROTECTION
ROOF PLAN
E-103
CAS
T/PARAPET
±3'-0"
T/PENTHOUSE
±10'-0"
NEW GROUND GRID
(SEE GENERAL NOTE 2)
GENERAL NOTES
1. SEE SHEETS G-002 & G-003 FOR GENERAL AND SPECIAL NOTES
RELEVANT TO THIS SHEET. ALL NOTES REFERENCED ON THIS SHEET
ARE SPECIFIC NOTES TO THIS SHEET.
TYP.1
7 33
SECT A
SECT C
L
L
L11
L10
L9
L3
L5
L
L
L22
L27
L25 L2
L42 L4 0L41
R
R
DC3
DC2
DC1
DC6
DC4
DC5
SLOPE SLOPE
L26
L24
L
L
EL. ±2'-0"
EL. ±2'-0"
EL. ±3'-0"STEEL
COLUMN,
B10
STEEL
COLUMN,
B11
STEEL
COLUMN,
B12
STEEL
COLUMN,
B13
STEEL DOOR,
D1, DSL1, DSR1
GROUND
VENTS
GROUND
VENTS
GROUND VENTS
GROUND VENTS
T
TR
EL. ±2'-0"
EL. ±2'-0"
EL. ±2'-0"
B9
EL. ±2'-0"EL. ±2'-0"
L46
L48 L44
L43
L45
L47
B8
B7B6
B4 B2
B5
B1
EL. ±2'-6"
L16
L15
L17
L14
L13 B3
L21 L20
L19
L18
EL. ±2'-0"
Bx
B14
R
L4
L6
L12
PLAN LEGEND
ROOF DRAIN (RD)
ROOF HATCH - OPERABLE MISC. MECHANICAL
EQUIPMENT
SKYLIGHT
VENT THROUGH ROOF
S
Raymond-Pond SDVOSB JV, LLC 1035 Green St. SE Suite A Conyers, GA 30012 770-483-9592 Art Warner
621-22-117
U.S. Department of Veterans AffairsJUNE 2022
LIGHTNING PROTECTION &
GROUNDING STUDY
BUILDINGS 3, 5, 8, 35, 36, 37, 108, 115, 116, 160, 161, 162,
200 COMPLEX (69, 77, 200, 204, 205) 201, 208
JAMES H. QUILLEN VA MEDICAL CENTER
MOUNTAIN HOME, TN
Office of Construction and Facilities Management
EXHAUST FAN
DOOR STRAP BOND
(DSLx / DSRx)
T
R
GROUND GRID
DOWN CONDUCTOR
(DC#)
AIR TERMINAL (L#)
GROUND ROD & TEST
WELL
GROUND ROD
BONDING POINT (B#)
LADDER BONDING POINT
TOP/BOTTOM (LT# / LB#)
DOOR FACING BONDING
POINT (D#)
N
BUILDING 35 - LIGHTNING PROTECTION ROOF PLAN
E-104
SCALE:SCALE:
BUILDING 35 - LIGHTNING PROTECTION ROOF PLAN
1/8" : 1'-0" E-104
N
SCALE:SCALE:
BUILDING 35 - LIGHTNING PROTECTION ROOF PLAN
NO SCALE E-104
CAS
T/PARAPET
2'-0"
T/HIP
25'-0"
T/PARAPET
3'-0"
1'-0"
NEW GROUND GRID
(SEE GENERAL NOTE 2)
GENERAL NOTES
1. SEE SHEETS G-002 & G-003 FOR GENERAL AND SPECIAL NOTES
RELEVANT TO THIS SHEET. ALL NOTES REFERENCED ON THIS SHEET
ARE SPECIFIC NOTES TO THIS SHEET.
T/PARAPET
TYP.1
8 33
SECT C
SECT B
SECT A SECT D
RLSEPT. 2022
VHAMOULapoiL Rectangle
VHAMOULapoiL
NOT IN CONTRACT
GENERATOR
L1 4L13
L5L4
L1
L1
DC3
L1
L2
L3
L9
L8
L7
L10
L6
D C
DC2
DC5
DC
DC6
RAIL,
B3
PLAN LEGEND
ROOF DRAIN (RD)
ROOF HATCH - OPERABLE MISC. MECHANICAL
EQUIPMENT
SKYLIGHT
VENT THROUGH ROOF
S
Raymond-Pond SDVOSB JV, LLC 1035 Green St. SE Suite A Conyers, GA 30012 770-483-9592 Art Warner
621-22-117
U.S. Department of Veterans AffairsJUNE 2022
LIGHTNING PROTECTION &
GROUNDING STUDY
BUILDINGS 3, 5, 8, 35, 36, 37, 108, 115, 116, 160, 161, 162,
200 COMPLEX (69, 77, 200, 204, 205) 201, 208
JAMES H. QUILLEN VA MEDICAL CENTER
MOUNTAIN HOME, TN
Office of Construction and Facilities Management
EXHAUST FAN
DOOR STRAP BOND
(DSLx / DSRx)
T
R
GROUND GRID
DOWN CONDUCTOR
(DC#)
AIR TERMINAL (L#)
GROUND ROD & TEST
WELL
GROUND ROD
BONDING POINT (B#)
LADDER BONDING POINT
TOP/BOTTOM (LT# / LB#)
DOOR FACING BONDING
POINT (D#)
BUILDING 36 - LIGHTNING PROTECTION ROOF
PLAN
E-105
SCALE:SCALE:
BUILDING 36 - LIGHTNING PROTECTION ROOF PLAN
3/8" : 1'-0" E-105
N
SCALE:SCALE:
BUILDING 36 - LIGHTNING PROTECTION ROOF PLAN
NO SCALE E-105
N
CAS
T/PARAPET
2'-0"
R
R
R
T
T
R
EL. ±8'-0"
EL. ±5'-0"
GENERAL NOTES
1. SEE SHEETS G-002 & G-003 FOR GENERAL AND SPECIAL NOTES
RELEVANT TO THIS SHEET. ALL NOTES REFERENCED ON THIS SHEET
ARE SPECIFIC NOTES TO THIS SHEET.
R
NEW GROUND GRID
(SEE GENERAL NOTE 2)
REMOVED BY OTHERS
SHORT CONCRETE WALL
CONCRETE SLAB
6 6
ELECTRIC
SWITCHGEAR
B1
B2
TYP.1
9 33
SECT B
SECT A
L7
L11
L12
L6
L5
L4
L3
L8
L9
L10
L2
L4
L4
L5
L4
L4
L5
L4
L48
L30
L3
L32
L3
L5
L5
L5
L5
L44
EL. ±3'-2"
L45
L46
L47
DC2
DC1
DC3
DC4
DC9
D C
DC6
DC7
D C
DC10
STEEL COVERING,
B11 STEEL COVERING,
B10
D C
2A D
C 1A
L15
L14
L16
L17
L18
ELECTRICAL
SWITCHGEAR
DC9B
DC9B
L61 L62 L63 L64
L68 L67 L66
B23
L65
DC9A
DC7A
DC4A
DC6A
L59L56
L58
B3
L57 B24 B25
B26
B22B21
L19
L60
B1
B4
B2
L34 L35
L20
L1
PLAN LEGEND
ROOF DRAIN (RD)
ROOF HATCH - OPERABLE MISC. MECHANICAL
EQUIPMENT
SKYLIGHT
VENT THROUGH ROOF
S
Raymond-Pond SDVOSB JV, LLC 1035 Green St. SE Suite A Conyers, GA 30012 770-483-9592 Art Warner
621-22-117
U.S. Department of Veterans AffairsJUNE 2022
LIGHTNING PROTECTION &
GROUNDING STUDY
BUILDINGS 3, 5, 8, 35, 36, 37, 108, 115, 116, 160, 161, 162,
200 COMPLEX (69, 77, 200, 204, 205) 201, 208
JAMES H. QUILLEN VA MEDICAL CENTER
MOUNTAIN HOME, TN
Office of Construction and Facilities Management
EXHAUST FAN
DOOR STRAP BOND
(DSLx / DSRx)
T
R
GROUND GRID
DOWN CONDUCTOR
(DC#)
AIR TERMINAL (L#)
GROUND ROD & TEST
WELL
GROUND ROD
BONDING POINT (B#)
LADDER BONDING POINT
TOP/BOTTOM (LT# / LB#)
DOOR FACING BONDING
POINT (D#)
N
BUILDING 37 - LIGHTNING PROTECTION ROOF PLAN
E-106
SCALE:
BUILDING 37 - LIGHTNING PROTECTION ROOF PLAN
1/8" : 1'-0" E-106
N
SCALE:
BUILDING 37 - LIGHTNING PROTECTION ROOF PLAN
NO SCALE E-106
CAS
T
R
R
R R
R R
T/PARAPET
3'-0"
T/PARAPET
3'-0"
HANDRAIL
HANDRAIL
GENERAL NOTES
1. SEE SHEETS G-002 & G-003 FOR GENERAL AND SPECIAL NOTES
RELEVANT TO THIS SHEET. ALL NOTES REFERENCED ON THIS SHEET
ARE SPECIFIC NOTES TO THIS SHEET.
NEW GROUND GRID (SEE
GENERAL NOTE 2)
PENTHOUSE
±3'-0"
T
EL. ±2'-0"
TYP.1
10 33
SECT A SECT B
SECT C
SECT D
SECT E
L2
L2
L2
L23
L24
L4
L7
L2
L3
L5 L6
L9 0 L91
L10
L11
L12 L14L13
L17L16L15
L2
L2
L2
L19
L18
SECT. A
SECT. B
SECT. C
DC1 DC2
DC9
DC
DC7
DC3
DC4
DC6
DC5
HANDRAIL
EL. = 3'-0"
EL. = 2'-0"
EL. = 3'-7"
EL. = 4'-0"
STACK, B1
EL. = 7'-2"
EL. = 4'-0"
EL. = 2'-0"
EL. = 4'-3"
B9
B14
EL. = 6'-1"
EL. = 6'-1"
EL. = 6'-1"
EL. = 2'-5"L69
L64
L44
L45 L43
L42
L68
B37
B12B10
B13B11
B4
L65
L66 L67
L40
L41
B35
B36
B34
B33
B38 B39
B41 B40B32
B16
B15
B18
B17
B19
B20 B6B7
B21
B22
B8
B29
B28
B31
B30 B23
B5
B50
L4
B2 B3
L60 L61
L63 L62
EXHAUST FAN
ROOF OPENING
B27
B25
B26
B24
SECT. D
B51
B52
PLAN LEGEND
ROOF DRAIN (RD)
ROOF HATCH - OPERABLE MISC. MECHANICAL
EQUIPMENT
SKYLIGHT
VENT THROUGH ROOF
S
Raymond-Pond SDVOSB JV, LLC 1035 Green St. SE Suite A Conyers, GA 30012 770-483-9592 Art Warner
621-22-117
U.S. Department of Veterans AffairsJUNE 2022
LIGHTNING PROTECTION &
GROUNDING STUDY
BUILDINGS 3, 5, 8, 35, 36, 37, 108, 115, 116, 160, 161, 162,
200 COMPLEX (69, 77, 200, 204, 205) 201, 208
JAMES H. QUILLEN VA MEDICAL CENTER
MOUNTAIN HOME, TN
Office of Construction and Facilities Management
EXHAUST FAN
DOOR STRAP BOND
(DSLx / DSRx)
T
R
GROUND GRID
DOWN CONDUCTOR
(DC#)
AIR TERMINAL (L#)
GROUND ROD & TEST
WELL
GROUND ROD
BONDING POINT (B#)
LADDER BONDING POINT
TOP/BOTTOM (LT# / LB#)
DOOR FACING BONDING
POINT (D#)
N
BUILDING 108 - LIGHTNING PROTECTION ROOF
PLAN
E-107
SCALE:
BUILDING 108 - LIGHTNING PROTECTION ROOF PLAN
1/8" : 1'-0" E-107
SCALE:
BUILDING 108 - LIGHTNING PROTECTION ROOF PLAN
NO SCALE E-107
CAS
T
T
R R
R
R
RR
R
N
GENERAL NOTES
1. SEE SHEETS G-002 & G-003 FOR GENERAL AND SPECIAL NOTES
RELEVANT TO THIS SHEET. ALL NOTES REFERENCED ON THIS SHEET
ARE SPECIFIC NOTES TO THIS SHEET.
NEW GROUND GRID (SEE
GENERAL NOTE 2)
TYP.1
11 33
R
RLSEPT. 2022
VHAMOULapoiL Rectangle
VHAMOULapoiL
L3
L6 L7
L8
L4
L5
L10
L9
D C1
DC2
L11
L14
L12
L13
L2
PLAN LEGEND
ROOF DRAIN (RD)
ROOF HATCH - OPERABLE MISC. MECHANICAL
EQUIPMENT
SKYLIGHT
VENT THROUGH ROOF
S
Raymond-Pond SDVOSB JV, LLC 1035 Green St. SE Suite A Conyers, GA 30012 770-483-9592 Art Warner
621-22-117
U.S. Department of Veterans AffairsJUNE 2022
LIGHTNING PROTECTION &
GROUNDING STUDY
BUILDINGS 3, 5, 8, 35, 36, 37, 108, 115, 116, 160, 161, 162,
200 COMPLEX (69, 77, 200, 204, 205) 201, 208
JAMES H. QUILLEN VA MEDICAL CENTER
MOUNTAIN HOME, TN
Office of Construction and Facilities Management
EXHAUST FAN
DOOR STRAP BOND
(DSLx / DSRx)
T
R
GROUND GRID
DOWN CONDUCTOR
(DC#)
AIR TERMINAL (L#)
GROUND ROD & TEST
WELL
GROUND ROD
BONDING POINT (B#)
LADDER BONDING POINT
TOP/BOTTOM (LT# / LB#)
DOOR FACING BONDING
POINT (D#)
BUILDING 115 - LIGHTNING PROTECTION ROOF PLAN
E-108
SCALE:SCALE:
BUILDING 115 - LIGHTNING PROTECTION ROOF PLAN
1/4" : 1'-0" E-108
N
SCALE:SCALE:
BUILDING 115 - LIGHTNING PROTECTION ROOF PLAN
NO SCALE E-108
12 33CAS
T/PARAPET
2'-3"
EL. = 4'-6"
UTILIZE EXIST. DOWN
CONDUCTOR CONNECTIONS
(SEE GENERAL NOTE 3)
B115
GENERAL NOTES
1. SEE SHEETS G-002 & G-003 FOR GENERAL AND SPECIAL NOTES
RELEVANT TO THIS SHEET. ALL NOTES REFERENCED ON THIS SHEET
ARE SPECIFIC NOTES TO THIS SHEET.
B115
N
DC3
DC4
L5
L7L8
L1
DC1 L3
ANTENNA,
B9
PULL BOX,
B5
LIGHT, B13
LIGHT,
B12
FUEL TANK VENT,
B14, B15, B16
EXHAUST PIPE
FUEL TANK VENT,
B17, B18
DC2 L6
L4 L2
CONDUITS,
B19, B20
BRACKET,
B10
B11
PULL BOX,
B6
PULL BOX,
B7
PULL BOX,
B8
B3
B2
B1
B4
PLAN LEGEND
ROOF DRAIN (RD)
ROOF HATCH - OPERABLE MISC. MECHANICAL
EQUIPMENT
SKYLIGHT
VENT THROUGH ROOF
S
Raymond-Pond SDVOSB JV, LLC 1035 Green St. SE Suite A Conyers, GA 30012 770-483-9592 Art Warner
621-22-117
U.S. Department of Veterans AffairsJUNE 2022
LIGHTNING PROTECTION &
GROUNDING STUDY
BUILDINGS 3, 5, 8, 35, 36, 37, 108, 115, 116, 160, 161, 162,
200 COMPLEX (69, 77, 200, 204, 205) 201, 208
JAMES H. QUILLEN VA MEDICAL CENTER
MOUNTAIN HOME, TN
Office of Construction and Facilities Management
EXHAUST FAN
DOOR STRAP BOND
(DSLx / DSRx)
T
R
GROUND GRID
DOWN CONDUCTOR
(DC#)
AIR TERMINAL (L#)
GROUND ROD & TEST
WELL
GROUND ROD
BONDING POINT (B#)
LADDER BONDING POINT
TOP/BOTTOM (LT# / LB#)
DOOR FACING BONDING
POINT (D#)
N
BUILDING 116 - LIGHTNING PROTECTION ROOF
PLAN
E-109
SCALE:SCALE:
BUILDING 116 - LIGHTNING PROTECTION ROOF PLAN
1/4" : 1'-0" E-109
CAS
SCALE:SCALE:
BUILDING 116 - LIGHTNING PROTECTION ROOF PLAN
NO SCALE E-109
N
GENERAL NOTES
1. SEE SHEETS G-003 FOR GENERAL AND SPECIAL NOTES RELEVANT TO
THIS SHEET. ALL NOTES REFERENCED ON THIS SHEET ARE SPECIFIC
NOTES TO THIS SHEET.
UTILIZE EXIST. DOWN CONDUCTOR
CONNECTIONS (SEE GENERAL NOTE 3)
B116
13 33
SECT A
RLSEPT. 2022
VHAMOULapoiL Rectangle
VHAMOULapoiL
L3
L1
L3
L24
L31
L116
L44
L43
L60
L45 L4
L4
L59
L58 L57 L5
L5 4 L53
L93
L7
L162
L163
L164
L91L48
L61
L5
L28
L27
L26
L25
L3
L5
L8
L9
L10
L11
L15 L95
L1
L14
L4
L6
L52
L50
L9
D C
DC2
DC3
D C
D C
D C
D C
D C
D C
D C
D
C
D C
D C
D
C
D C
D C
DC21
D C
D C
D C
L9
D C
D C24
D C
D C
DC
D C
D C
D C
DC34
D C
D C
D C
D C
L56
B55
L194 L195
L34
L35
L36
L147
L148
L144 L145
L146
L152
L151
L150
L149
L120 L121
L122
L49 L42
L178
L180
L181
L179
L38 L37
L88
L89
L80 L78
L68 L67
L64
L72
L82 L84
L76
L86
L70 L71
L75 L73
L77
L79 L81
L87 L85 L83
L65
L62
L74
L69
L66
L63
L190
L193
L192
L191
D C
A
DC31A
L176 L177
L175L174
L53
L53
L78 L78
L2
L7
L1
L1
L1
L1
L1
L20
D C
L23 D
C
L29
L30
L41 L50
L52
L92
L94
L98
L99
L100
L101
L102
L104
L103
L103A
L102
L103
L104
L105
L106
L112
L113L114
L111
L110
L109
L108
L107
L115
L117
L131 L132 L133 L134 L135 L136 L137 L138
L139
L140
L141
L142 L143
L160
L161
L165L166L167L168L169L170L171L172
EL. = 12'-0"
OVERHANG OF
PARAPET
COVERED BRIDGE
SECOND FLOOR
PLAN LEGEND
ROOF DRAIN (RD)
ROOF HATCH - OPERABLE MISC. MECHANICAL
EQUIPMENT
SKYLIGHT
VENT THROUGH ROOF
S
Raymond-Pond SDVOSB JV, LLC 1035 Green St. SE Suite A Conyers, GA 30012 770-483-9592 Art Warner
621-22-117
U.S. Department of Veterans AffairsJUNE 2022
LIGHTNING PROTECTION &
GROUNDING STUDY
BUILDINGS 3, 5, 8, 35, 36, 37, 108, 115, 116, 160, 161, 162,
200 COMPLEX (69, 77, 200, 204, 205) 201, 208
JAMES H. QUILLEN VA MEDICAL CENTER
MOUNTAIN HOME, TN
Office of Construction and Facilities Management
EXHAUST FAN
DOOR STRAP BOND
(DSLx / DSRx)
T
R
GROUND GRID
DOWN CONDUCTOR
(DC#)
AIR TERMINAL (L#)
GROUND ROD & TEST
WELL
GROUND ROD
BONDING POINT (B#)
LADDER BONDING POINT
TOP/BOTTOM (LT# / LB#)
DOOR FACING BONDING
POINT (D#)
N
BUILDING 160 - LIGHTNING PROTECTION ROOF PLAN
E-110
SCALE:SCALE:
BUILDING 160 - LIGHTNING PROTECTION ROOF PLAN
1/16" : 1'-0" E-110
CAS
T/PARAPET
3'-0"
T/PARAPET
3'-0"
PENTHOUSE
14'-0"
DC28
PARAPET @ PENTHOUSE
3'-0"
ROOF HEIGHT
-12'-0" FROM MAIN ROOF
T/PARAPET
1'-5"
N
SCALE:SCALE:
COVERED BRIDGE DETAIL
NTS E-110
N
SCALE:SCALE:
BUILDING 160
NTS E-110
COVERED
BRIDGE,
SEE 1/E-110
GENERAL NOTES
1. SEE SHEETS G-002 & G-003 FOR GENERAL AND SPECIAL NOTES
RELEVANT TO THIS SHEET. ALL NOTES REFERENCED ON THIS SHEET
ARE SPECIFIC NOTES TO THIS SHEET.
UTILIZE EXISTING DOWN CONDUCTOR
CONNECTIONS (SEE GENERAL NOTE 3)
SECT A SECT C
LADDER,
LT1, LB1
METAL DOOR, D3,
DSL3, DSR3,
STEPS, B81
CONDUIT
CONDUITS
VENTILATOR
EL. = 4'-2"
EL. = 2'-0"
EL. = 1'-0"
EL. = 3'-10"
FENCE
EL. = 4'-0"
EL. = 6'-0"
EL. = 4'-2"
EL. = 4'-0"
EL. = 4'-0"
SECT B
SECT F
SECT E
EL. = 4'-0"
EL. = 4'-0"
EL. = 4'-0"
EL. = 1'-0"
B36
EL. = 2'-5"
EL. = 4'-0"
EL. = 3'-2"
EL. = 3'-3"
EL. = 2'-5"
EL. = 3'-10"
EL. = 2'-10"
EL. = 3'-0"
EL. = 3'-4" EL. = 4'-10"
EL. = 3'-5"
EL. = 15'-8"
EL. = 4'-0"
B60
B37 B38
B39 B40
B41
B42 B43
B44
B45
B46
B47 B48
B49
B50
B51 B52 B53
B54
B58
B59
B56
CONDUIT
B35 B32
B33 B34
B31B30
B21
B23 B20
B22 B19
B16
B18
B13
B15B14
B12
EL. = 4'-2"
B11
B10B9
B7
B6 B8
CONDUIT
B5
B3 B4
B2
B1 B75
B74
B73 B64
EL. = 3'-3"
B57
EL. = 4'-0"
STEEL DOOR,
D2, DSL2, DSR2,
STEEL STEPS,
B80
B17
EL. = 4'-0"
EL. = 3'-10"
EL. = 2'-5" EL. = 2'-5"
B68 B69 B70
B71 B72
B67
14 33
B66 B65
B79 B77 B76B78
EL. = 3'-3"
EL. = 3'-3"
B62 B61 B60 B59
SECT D
B63
STEEL DOOR,
D1, DSL1, DSR1
DC1 DC2
DC4 DC3
L4 L8
L6
L2
L1
L
L3 L5
L10
L9
PLAN LEGEND
ROOF DRAIN (RD)
ROOF HATCH - OPERABLE MISC. MECHANICAL
EQUIPMENT
SKYLIGHT
VENT THROUGH ROOF
S
Raymond-Pond SDVOSB JV, LLC 1035 Green St. SE Suite A Conyers, GA 30012 770-483-9592 Art Warner
621-22-117
U.S. Department of Veterans AffairsJUNE 2022
LIGHTNING PROTECTION &
GROUNDING STUDY
BUILDINGS 3, 5, 8, 35, 36, 37, 108, 115, 116, 160, 161, 162,
200 COMPLEX (69, 77, 200, 204, 205) 201, 208
JAMES H. QUILLEN VA MEDICAL CENTER
MOUNTAIN HOME, TN
Office of Construction and Facilities Management
EXHAUST FAN
DOOR STRAP BOND
(DSLx / DSRx)
T
R
GROUND GRID
DOWN CONDUCTOR
(DC#)
AIR TERMINAL (L#)
GROUND ROD & TEST
WELL
GROUND ROD
BONDING POINT (B#)
LADDER BONDING POINT
TOP/BOTTOM (LT# / LB#)
DOOR FACING BONDING
POINT (D#)
N
BUILDING 161 - LIGHTNING PROTECTION ROOF
PLAN
E-111
SCALE:SCALE:
BUILDING 161 - LIGHTNING PROTECTION ROOF PLAN
3/8" : 1'-0" E-111
CAS
R
R
T
T
N
SCALE:SCALE:
BUILDING 161 - LIGHTNING PROTECTION ROOF PLAN
NO SCALE E-111
NEW GROUND GRID
(SEE GENERAL NOTE 2)
GENERAL NOTES
1. SEE SHEETS G-002 & G-003 FOR GENERAL AND SPECIAL NOTES
RELEVANT TO THIS SHEET. ALL NOTES REFERENCED ON THIS SHEET
ARE SPECIFIC NOTES TO THIS SHEET.
R
VENTILATOR
EL. = 3'-0"
VENTILATOR
EL. = 3'-0"
TYP.1
15 33RLSEPT. 2022
L23
L24
L27
L28
L30
L31
L32
L34
L35
L36
L37
L3
L41
L42
L45
L46
L49 L50
L51
L52
L53
L54
L5
L5
L58
L5
L6
L62
L6 3L65
L146
L147
L1
L1
L155 L154 L124
L121 L122
L1
L101
L104 L130 L131 L133 L134
L152
L151
L150
L149
L6
L6
L69
L7
L73
L7
L77
L78L79
L80
L81 L82
L1 L3
L4
L5 L7
L8
L9
L10
L12
L13
L14
L15
L17
L18
L19
L21
L22
L102
L103
DC1
DC2
DC3
DC4
DC5
DC6
DC7
DC8
DC9
DC10
DC11 DC12
D C
D
C
D C
D
C
DC17 D
C
DC19
D C
D C
D C
23A
DC20
L140
L141
L26
L2
L40
L44
L48
L135
L95L94
L93 L96 EL. = 5'-1"
T
DC31
DC32
T DC29
DC28
DC26
DC25
DC24
EL. = 6'-9"
EL. = 2'-5"
EL. = 4'-3"
EL. = 1'-2"
EL. = 1'-9"
L192
B15
B11
B13
B7
B6
B5
L191
L193
EL. = 2'-0"
EL. = 4'-0"
L106
L108
L107
L1
L125 L126
B12
L168
L169
L1
L186
L183
L185
L145
EL. = 5'-0"
L123
L127 L129
L196 L197
EL. = 3'-5"
EL. = 4'-9"
L161 L162
L188 L187
L181
L1
L180 L179
L159 L160
L199 L198
B1
B2
L105
B10
B16
B4
B3
B8
L190 B9
EL. = 4'-3"
EL. = 5'-0"
L157
L99
L100 L97
L98
EL. = ±5'-0"
DC26
A
L156
L1
L128
B26
B25
B24
B29
B28
B27
B33
B32
B31
B36
B35
B34
B39
B38
B37 B40
B30
B21
B22
B23
B20
B43B41 B42
B46B44 B45
B49B47 B48
B52B50 B51
B7A
EL. = 4'-0"
R
R
R
R
R R
R
D C
D
C
L86L83 L84 L85 L87 L88 L89
L7
L9
L9
L148
L66
L2 L6
L11
L16
L20
L33
L29
L3 9 L43
L47
L5
L6
L6
L7
L7
L7
L7
L136
L1
L163
L164
L1
L1
L175 L172
L1
L1
L1
L176
L177
L178
B14
L142
L194
L1
L111 L110
L132
L155A L155B
L1
A
PLAN LEGEND
ROOF DRAIN (RD)
ROOF HATCH - OPERABLE MISC. MECHANICAL
EQUIPMENT
SKYLIGHT
VENT THROUGH ROOF
S
Raymond-Pond SDVOSB JV, LLC 1035 Green St. SE Suite A Conyers, GA 30012 770-483-9592 Art Warner
621-22-117
U.S. Department of Veterans AffairsJUNE 2022
LIGHTNING PROTECTION &
GROUNDING STUDY
BUILDINGS 3, 5, 8, 35, 36, 37, 108, 115, 116, 160, 161, 162,
200 COMPLEX (69, 77, 200, 204, 205) 201, 208
JAMES H. QUILLEN VA MEDICAL CENTER
MOUNTAIN HOME, TN
Office of Construction and Facilities Management
EXHAUST FAN
DOOR STRAP BOND
(DSLx / DSRx)
T
R
GROUND GRID
DOWN CONDUCTOR
(DC#)
AIR TERMINAL (L#)
GROUND ROD & TEST
WELL
GROUND ROD
BONDING POINT (B#)
LADDER BONDING POINT
TOP/BOTTOM (LT# / LB#)
DOOR FACING BONDING
POINT (D#)
N
BUILDING 162 - LIGHTNING PROTECTION ROOF PLAN
SCALE:SCALE:
BUILDING 162 - LIGHTNING PROTECTION ROOF PLAN
1/16" : 1'-0" E-112
E-112
CAS
PENTHOUSE
6'-0" ABOVE MAIN ROOF
ROOF
-16'-0" BELOW MAIN ROOF
N
SCALE:SCALE:
BUILDING 162 - LIGHTNING PROTECTION ROOF PLAN
NO SCALE E-112
T/ROOF
±14'-4"
UTILIZE EXIST. DOWN CONDUCTOR
CONNECTIONS (SEE GENERAL NOTE 3)
NEW GROUND GRID
(SEE GENERAL NOTE 2)
GENERAL NOTES
1. SEE SHEETS G-003 & G-004 FOR GENERAL AND SPECIAL NOTES
RELEVANT TO THIS SHEET. ALL NOTES REFERENCED ON THIS SHEET
ARE SPECIFIC NOTES TO THIS SHEET.
ROOF
-12'-0" BELOW MAIN ROOF
SECT
D
SECT
H
SECT
G
SECT
F
SECT
A
SECT
C
SECT
B
SECT
E
TYP.1
16 33
T
B69
B200
MATCH LINE MATCH LINE
DC20
DC21 DC22
DC28
DC30
DC42
DC23
DC29
DC26N
DC54
DC27
DC18
L5
DC35B
DC12A
DC35A
DC13A DC13B
DC35D
DC25N
DC19
DC17N
DC16N
DC14N
DC15N
DC24
DC34N
DC33N
DC32N
DC31N
DC13N
DC12B
DC53
DC49DC47
DC50
D C
D C
DC1DC2
ROOF EL. -8'-0"
BELOW BUILDING 77
DC51A
DC49A
DC3A
DC47A
DC50A
DC5
DC46
DC36N
DC51N
RTU
DC6
DC51
DC13
DC14
DC8
RTU
DC7
DC9N
DC10ADC11N
DC43
DC41
DC40
DC38
DC44
DC45
DC37
DC38A
DC39A
DC35C
DC39N
DC2A
T
DC3B
DC12AN
RR
RR
R
R DC52N
DC35N
R
R
DC12N
DC30AN
D C
DC22AN
DC18AN
DC34AN
DC10N
DC23AN
DC23BN
D C
51AN
DC54N
PLAN LEGEND
ROOF DRAIN (RD)
ROOF HATCH - OPERABLE MISC. MECHANICAL
EQUIPMENT
SKYLIGHT
VENT THROUGH ROOF
S
Raymond-Pond SDVOSB JV, LLC 1035 Green St. SE Suite A Conyers, GA 30012 770-483-9592 Art Warner
621-22-117
U.S. Department of Veterans AffairsJUNE 2022
LIGHTNING PROTECTION &
GROUNDING STUDY
BUILDINGS 3, 5, 8, 35, 36, 37, 108, 115, 116, 160, 161, 162,
200 COMPLEX (69, 77, 200, 204, 205) 201, 208
JAMES H. QUILLEN VA MEDICAL CENTER
MOUNTAIN HOME, TN
Office of Construction and Facilities Management
EXHAUST FAN
DOOR STRAP BOND
(DSLx / DSRx)
T
R
GROUND GRID
DOWN CONDUCTOR
(DC#)
AIR TERMINAL (L#)
GROUND ROD & TEST
WELL
GROUND ROD
BONDING POINT (B#)
LADDER BONDING POINT
TOP/BOTTOM (LT# / LB#)
DOOR FACING BONDING
POINT (D#)
200 COMPLEX
N
COMPLEX 200 - LIGHTNING PROTECTION ROOF
PLAN
E-113
SCALE:SCALE:
COMPLEX 200 - LIGHTNING PROTECTION ROOF PLAN
3/32" : 1'-0" E-113
N
SCALE:SCALE:
COMPLEX 200 - AERIAL
NO SCALE E-113
CAS
NEW GROUND GRID (SEE
GENERAL NOTE 2)
GENERAL NOTES
1. SEE SHEETS G-003 & G-004 FOR GENERAL AND SPECIAL NOTES
RELEVANT TO THIS SHEET. ALL NOTES REFERENCED ON THIS SHEET
ARE SPECIFIC NOTES TO THIS SHEET.
2. DUE THE LARGE SIZE OF THIS COMPLEX, IT HAS BEEN BROKEN INTO
PARTS ON THE FOLLOWING SHEETS.
3. THE INTENT ON THIS SHEET IS TO SHOW THE MAIN ROOF
CONDUCTORS THAT INDICATE THE OVERALL CONNECTIONS OF ALL
LPS COMPONENTS AS ONE SYSTEM FOR THESE BUILDINGS.
PENTHOUSE
B200
B204
SCALE:SCALE:
NORTH ELEVATION
NO SCALE E-113
17 33
SCALE:SCALE:
B200/214 ROLLING BALL
NO SCALE E-113
E-113
E-113
NOTE:
WHILE THE ROLLING BALL COVERAGE FOR B200 GOES OUT 100 FT, IT WILL NOT PROTECT
B207 OR B214. DUE TO CURVE OF ROLLING BALL, THE HEIGHT OF 20 FT IS ONLY
PROTECTED OUT 20 FT FROM B200.
B214B207
MATCH LINE
DC53
DC49
L3
L298
L297
L
L295
L
L144
L175
L2
L260
L273
L272
L270
L277
L276
L322
L170
L1
L1
L161
L150
L149
L1
L1
L166
L165
L164
L163
L162
L1
L1
L148
L147
L146
L145
L266
L2
DC47
L
L292
L291 L290
L303 L3
L1
L1
L163
L264
L265
L
L
L3
L300
L299
L269
L268
L227
T R
L229
L228
L230
D C
D C
DC1DC2
EL. ±10'-0"
LADDER, LB1
HANDRAIL
EL. = 5'-0"
B171
HANDRAIL
EL. = 3'-0"
B134
L248
L247
EL. = ±7'-10"
EL. = ±1'-0"
T/PARAPET
±3'-0"
T/PARAPET
1'-5"
EL. = ±1'-0"
EL. = ±1'-0"
EL. = ±3'-2"
RT
VENTILATOR
EL. = ±5'-4"
VENTILATOR
EL. = ±6'-4"
EL. = ±4'-2"
EL. = ±4'-0"
EL. = ±2'-3"
EL. = ±3'-2"
EL. = ±2'-9"
EL. = ±2'-8"
EL. = ±3'-5" EL. = ±2'-4"
STEEL BEAM
EL. = ±3'-2"
B70
STEEL BEAM,
B90
EL. = ±3'-2"
EL. = ±1'-4"
ROTATING
VENT
EL. = ±2'-0"
EL.…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .