Specifications.pdf

PDF 580 KB Posted

Attached to
Missoula Fire Sciences Laboratory Roof Replacement
Solicitation number
1240LT25R0017
Issued by

About this file

The file is a comprehensive set of technical specifications for a roofing replacement project at the Missoula Fire Sciences Laboratory. The specifications detail requirements for replacing existing roofing on Wings A, B, C, and D, including increasing roof insulation thickness on A, B, and C wings. The technical sections cover multiple aspects of the project, including mobilization, submittal procedures, quality requirements, execution and closeout requirements, cutting and patching, selective structure demolition, rooftop fall protection, rough carpentry, EPDM roofing, sheet metal flashing and trim, joint sealants, aluminum-framed entrances and storefronts, door hardware, glazing, and building accessories.

Key technical requirements include using Ethylene-Propylene-Diene-Monomer (EPDM) roofing with specific performance characteristics, such as a minimum 60-mil composite thickness, thermal resistance, and wind uplift resistance. The project also includes optional window replacements on the north elevation of B-Wing. Specific installation standards mandate compliance with manufacturer guidelines, ASTM standards, and quality control procedures. Warranty provisions include a 20-year manufacturer's warranty for the roofing system and a minimum 5-year workmanship warranty, with an optional extension to 20 years. The specifications provide detailed guidance on materials, installation methods, testing, and performance expectations for each component of the roofing and associated systems.

View the file

Other files

File Type Posted
AsbestosLeadHazMaterial- A Wing.pdf PDF
AsbestosLeadHazMaterial- C Wing.pdf PDF
Amendment 1240LT25R0017.pdf PDF
Addendum 1_Fire Lab Roof Replacement.docx DOCX document
AsbestosLeadHazMaterial- B Wing.pdf PDF
SOW FiSL Roof Windows.docx DOCX document
Drawings.pdf PDF
Record Drawings - B-Wing Windows.pdf PDF
Wage Determination Missoula County MT MT20250063.pdf PDF
Record Drawings - D-Wing.pdf PDF
1240LT25R0017.docx DOCX document
Experience questionnaire.pdf PDF
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MOBILIZATION SECTION 011900-1

USDA FOREST SERVICE

SECTION 011900 - MOBILIZATION

PART 1 - GENERAL

1.1 SUMMARY

A. This item is intended to compensate the Contractor for operations including, but not limited to, those necessary for the movement of personnel, equipment, supplies, and incidentals to the project site; for payment of premiums for bonds and insurance for the project; and for any other work and operations which must be performed or costs that must be incurred incident to the initiation of meaningful work at the site and for which payment is not otherwise provided for under the contract.

1.2 MEASUREMENT AND PAYMENT

A. The measurement shall be lump sum for mobilization. Payment shall be as follows:

1. Bond premiums will be reimbursed after receipt of the evidence of payment.

2. 50% of the lump sum, not to exceed 5% of the original contract amount, will be paid following completion of 5% of the original contract amount not including mobilization and bond premiums.

3. Payment of the remaining portion of the lump sum, up to 10% of the original contract amount, will be paid following completion of 10% of the original contract amount not including mobilization and bond premiums.

4. Any portion of the lump sum in excess of 10% of the original contract amount will be paid after final acceptance.

5. Progress payments for mobilization and preparatory work shall be subject to retainage.

PART 2 - PRODUCTS (NOT USED)

PART 3 - EXECUTION (NOT USED)

END OF SECTION 011900

SUBMITTAL PROCEDURES 013300-1

SECTION 013300 - SUBMITTAL PROCEDURES

PART 1 - GENERAL

1.1 SUMMARY

A. This Section includes administrative and procedural requirements for submitting Shop Drawings, Product Data, Samples, and other miscellaneous submittals. See Table 013300-1 for a summary of required submittals.

B. See other specification section within this package for additional requirements on submittal.

1.2 SUBMITTAL PROCEDURES

A. Coordination: Coordinate preparation and processing of submittals with performance of construction activities.

1. Coordinate transmittal of different types of submittals for related parts of the Work so processing will not be delayed because of need to review submittals concurrently for coordination.

a. The Contracting Officer (CO) reserves the right to withhold action on a submittal requiring coordination with other submittals until related submittals are received.

B. Processing Time: Allow enough time for submittal review, including time for re-submittals, as follows. Time for review shall commence on CO's receipt of submittal.

1. Initial Review: Allow 14 days for initial review of each submittal. Allow additional time if processing must be delayed to permit coordination with subsequent submittals. CO will advise Contractor when a submittal being processed must be delayed for coordination.

2. If intermediate submittal is necessary, process it in same manner as initial submittal.

3. Allow 14 days for processing each re-submittal.

4. No extension of the Contract Time will be authorized because of failure to transmit submittals enough in advance of the Work to permit processing.

C. Identification: Place a permanent label or title block on each submittal for identification.

1. Indicate name of firm or entity that prepared each submittal on label or title block.

2. Provide a space on label or beside title block to record Contractor's review and approval markings and action taken by CO.

3. Include the following information on label for processing and recording action taken:

a. Project name.

SUBMITTAL PROCEDURES 013300-2

b. Date.

c. Name and address of Contractor.

d. Name of manufacturer.

e. Unique identifier, including revision number.

f. Number and title of appropriate Specification Section.

g. Drawing number and detail references, as appropriate.

h. If more than one item is shown on submittal sheet, identify item.

D. Deviations: Highlight, encircle, or otherwise identify deviations from the Contract Documents on submittals.

E. Additional Copies: Unless additional copies are required for final submittal, and unless CO observes noncompliance with provisions of the Contract Documents, initial submittal may serve as final submittal.

F. Use for Construction: Use only final submittals with mark indicating action taken by CO in connection with construction.

1.3 MEASUREMENT AND PAYMENT

A. No separate measurement and/or payment will be made for this section. Payment shall be included with work shown in the schedule of items.

PART 2 - PRODUCTS

2.1 ACTION SUBMITTALS – (Submittals requiring CO approval)

A. General: Prepare and submit Action Submittals required by individual Specification Sections.

1. Number of Copies: Submit each submittal electronically, unless otherwise indicated. CO will return submittal with comments or approval. Mark up and retain returned copy as a Project Record Document.

B. Product Data: Collect information into a single submittal for each element of construction and type of product or equipment.

1. If information must be specially prepared for submittal because standard printed data are not suitable for use, submit as Shop Drawings, not as Product Data.

2. Mark each copy of each submittal to show which products and options are applicable.

3. Include the following information, as applicable:

a. Manufacturer's written recommendations.

b. Manufacturer's product specifications.

c. Manufacturer's installation instructions.

d. Manufacturer's catalog cuts.

e. Wiring diagrams showing factory-installed wiring.

f. Compliance with recognized trade association standards.

g. Compliance with recognized testing agency standards.

SUBMITTAL PROCEDURES 013300-3

C. Shop Drawings: Prepare Project-specific information, drawn accurately to scale. Do not base Shop Drawings on reproductions of the Contract Documents or standard printed data.

1. Preparation: Include the following information, as applicable:

a. Dimensions.

b. Identification of products.

c. Fabrication and installation drawings.

d. Roughing-in and setting diagrams.

e. Wiring diagrams showing field-installed wiring, including power, signal, and control wiring.

f. Notation of dimensions established by field measurement.

2. Wiring Diagrams: Differentiate between manufacturer-installed and field-installed wiring.

D. Contractor's Construction Schedule: The contractor shall submit a Construction Schedule, for approval by CO, in accordance with the contract provisions within 5 day of commencement of work.

2.2 INFORMATIONAL SUBMITTALS – (Submittals NOT requiring CO approval)

A. General: Prepare and submit Informational Submittals required by other Specification Sections.

1. Number of Copies: Submit each submittal electronically, unless otherwise indicated.

2. Certificates and Certifications: Certificates and certifications shall be signed by an officer or other individual authorized to sign documents on behalf of that entity.

3. Test and Inspection Reports: Comply with requirements in Section 014100 "Quality Control."

B. Material Test Reports: Prepare reports written by a qualified testing agency, on testing agency's standard form, indicating and interpreting test results of material for compliance with requirements.

C. Field Test Reports: Prepare reports written by a qualified testing agency, on testing agency's standard form, indicating and interpreting results of field tests performed either during installation of product or after product is installed in its final location, for compliance with requirements.

D. Maintenance Data: Prepare written and graphic instructions and procedures for operation and normal maintenance of products and equipment.

E. Manufacturer's Instructions: Prepare written or published information that documents manufacturer's recommendations, guidelines, and procedures for installing or operating a product or equipment. Include name of product and name, address, and telephone number of manufacturer.

SUBMITTAL PROCEDURES 013300-4

PART 3 - EXECUTION

3.1 GENERAL

A. Review each submittal and check for compliance with the Contract Documents. Note corrections and field dimensions. Mark with approval stamp before submitting to CO.

B. Approval Stamp: Stamp each submittal with a uniform, approval stamp. Include Project name and location, submittal number, Specification Section title and number, name of reviewer, date of Contractor's approval, and statement certifying that submittal has been reviewed, checked, and approved for compliance with the Contract Documents.

C. CO will not review submittals that do not bear Contractor's approval stamp and will return them without action.

D. Submittals not required by the Contract Documents will not be reviewed and may be discarded.

E. Substitutions – Whenever materials, products, and equipment are listed by name or brand in the specifications and/or on the drawings, it is used as a measure of quality, utility, or standard. If the Contractor prefers to use any other brand or manufacturer of same quality, appearance and utility to that specified, he shall request substitution as provided below, not less than 30 days before the planned installation of the item. The Contracting Officer will approve or disapprove the request for substitution.

F. Requests for substitutions will only be considered if contractor submits the following:

1. Complete technical data including drawings, complete performance specifications, test data, samples and performance tests of the article proposed for substitution. Submit additional information if required by Contracting Officer.

All items in the above information shall be circled, tagged, or marked in some way to indicate all deviations or differences which the proposed item differs from the originally specified item.

2. Similar data as above for item originally specified. All items shall be marked to identify where/how the proposed substitution will differ.

3. A statement by the Contractor that the proposed substitution is in full compliance with the contract documents, applicable codes, and laws.

4. The Contractor shall be responsible for any effect upon related work in the project for any substitution and shall pay any additional costs generated by any substitutions.

3.2 SUBMITTAL SCHEDULE – Submittals shall be made as required by and called for in the drawings and specifications. The following table is a summary of the required submittals for the project - the table is to assist the Contractor and may not be all inclusive – additional submittals may be required by specific specifications:

SUBMITTAL PROCEDURES 013300-5

TABLE 013000-1

Spec.

Section Section Title Subsec-tion Required Submittal

013300 Submittal Procedures 2.1D Construction Schedule 014000 Quality Requirements 1.4 A Qualification Data 014100 Quality Control 1.3 A Contractor quality control plan 014100 Quality Control 1.3 B Permits, Licenses, and Certifi-cates 014100 Quality Control 1.3 C Test and inspection reports 014100 Quality Control 1.3 D As-Built drawings 017329 Cutting and Patching 1.2 A Cutting and Patching Proposal 055217 Rooftop Edge Protection 1.4A Product Data 055217 Rooftop Edge Protection 1.4B Shop Drawings 061000 Rough Carpentry 1.2 A Product Data 075323 Ethylene-Propylene-Diene-Monomer

(EPDM) Roofing

1.3 A Product Data

075323 Ethylene-Propylene-Diene-Monomer (EPDM) Roofing

1.3 B Shop Drawings

075323 Ethylene-Propylene-Diene-Monomer (EPDM) Roofing

1.3 C Wind Uplift Resistance Submit-

tal

075323 Ethylene-Propylene-Diene-Monomer (EPDM) Roofing

1.4 A Manufacturer’s Certificates

075323 Ethylene-Propylene-Diene-Monomer (EPDM) Roofing

1.4 B Product Test Reports

075323 Ethylene-Propylene-Diene-Monomer (EPDM) Roofing

1.4 C Research Reports

075323 Ethylene-Propylene-Diene-Monomer (EPDM) Roofing

1.4 D Field Test Reports

075323 Ethylene-Propylene-Diene-Monomer (EPDM) Roofing

1.4 E Field Quality Control Reports

075323 Ethylene-Propylene-Diene-Monomer (EPDM) Roofing

1.4 F Warranties

075323 Ethylene-Propylene-Diene-Monomer (EPDM) Roofing

1.5 A Maintenance Data

076200 Sheet Metal Flashing and Trim 1.3 A Product Data 079200 Joint Sealants 1.3 A,B Product Data 079200 Joint Sealants 1.3 B Laboratory Test Results 079200 Joint Sealants 1.3 C Joint Sealant Schedule 079200 Joint Sealants 1.4 A Product Test Reports 079200 Joint Sealants 1.4 B Preconstruction Laboratory Test

Results 079200 Joint Sealants 1.4 C Preconstruction Field Adhesion

Test Reports 079200 Joint Sealants 1.4 D Field Adhesion Test Results 079200 Joint Sealants 1.4 E Warranties

SUBMITTAL PROCEDURES 013300-6

Spec.

Section Section Title Subsec-tion Required Submittal

084113 Aluminum-Framed Entrances and Storefronts

1.2 A Product Data

084113 Aluminum-Framed Entrances and Storefronts

1.2 B Shop Drawings

084113 Aluminum-Framed Entrances and Storefronts

1.2 C Samples

084113 Aluminum-Framed Entrances and Storefronts

1.2 D Entrance Door Hardware

Schedule

084113 Aluminum-Framed Entrances and Storefronts

1.2 E Delegated-Design

084113 Aluminum-Framed Entrances and Storefronts

1.3 A Energy Performance Certificates

084113 Aluminum-Framed Entrances and Storefronts

1.3 B Product Test Reports

084113 Aluminum-Framed Entrances and Storefronts

1.3 C Source Quality Control Reports

084113 Aluminum-Framed Entrances and Storefronts

1.3 D Sample Warranties

084113 Aluminum-Framed Entrances and Storefronts

1.4 A Maintenance Data

087100 Door Hardware 1.3 A Product Data 087100 Door Hardware 1.3 B Shop Drawings 087100 Door Hardware 1.3 C Maintenance Data 087100 Door Hardware 1.3 D Warranties 088000 Glazing 1.3 A, B Product Data 088000 Glazing 1.3 B Laboratory Test Results 088000 Glazing 1.3 C Samples 088000 Glazing 1.3 D Glazing Schedule 088000 Glazing 1.3 E Delegated-Design 088000 Glazing 1.4 A Preconstruction Adhesion and

Compatibility Test Report 129000 Building Accessories 1.3 A Product Data

END OF SECTION 013300

QUALITY REQUIREMENTS 014000-1

SECTION 014000 - QUALITY REQUIREMENTS

PART 1 - GENERAL

1.1 SUMMARY

A. This Section includes administrative and procedural requirements for quality assurance and quality control.

B. Testing and inspecting services are required to verify compliance with requirements specified or indicated. These services do not relieve Contractor of responsibility for compliance with the Contract Document requirements.

1. Specified tests, inspections, and related actions do not limit Contractor's other quality assurance and control procedures that facilitate compliance with the Contract Document requirements.

2. Requirements for Contractor to provide quality assurance and control services required by Contracting Officer or authorities having jurisdiction are not limited by provisions of this Section.

C. See Divisions 02 through 12 Sections for specific test and inspection requirements.

1.2 DEFINITIONS

A. Quality Assurance Services: Activities, actions, and procedures performed before and during execution of the Work to guard against defects and deficiencies and substantiate that proposed construction will comply with requirements.

B. Quality Control Services: Tests, inspections, procedures, and related actions during and after execution of the Work to evaluate that actual products incorporated into the Work and completed construction comply with requirements. Services do not include contract enforcement activities performed by Contracting Officer.

C. Preconstruction Testing: Tests and inspections that are performed specifically for the Project before products and materials are incorporated into the Work to verify performance or compliance with specified criteria.

D. Product Testing: Tests and inspections that are performed by an NRTL, an NVLAP, or a testing agency qualified to conduct product testing and acceptable to authorities having jurisdiction, to establish product performance and compliance with industry standards.

E. Source Quality-Control Testing: Tests and inspections that are performed at the source, i.e., plant, mill, factory, or shop.

F. Field Quality-Control Testing: Tests and inspections that are performed on-site for installation of the Work and for completed Work.

QUALITY REQUIREMENTS 014000-2

G. Testing Agency An entity engaged to perform specific tests, inspections, or both. Testing laboratory shall mean the same as testing agency.

H. Installer/Applicator/Erector: Contractor or another entity engaged by Contractor as an employee, Subcontractor, or Sub-subcontractor, to perform a particular construction operation, including installation, erection, application, and similar operations.

I. Experienced: When used with an entity, "experienced" means having successfully completed a minimum of five previous projects similar in size and scope to this Project;

being familiar with special requirements indicated; and having complied with requirements of authorities having jurisdiction.

1.3 CONFLICTING REQUIREMENTS

A. General: If compliance with two or more standards is specified and the standards establish different or conflicting requirements for minimum quantities or quality levels, comply with the most stringent requirement. Refer uncertainties and requirements that are different, but apparently equal, to Contracting Officer for a decision before proceeding.

B. Minimum Quantity or Quality Levels The quantity or quality level shown or specified shall be the minimum provided or performed. The actual installation may comply exactly with the minimum quantity or quality specified, or it may exceed the minimum within reasonable limits. To comply with these requirements, indicated numeric values are minimum or maximum, as appropriate, for the context of requirements. Refer uncertainties to Contracting Officer for a decision before proceeding.

1.4 SUBMITTALS

A. Qualification Data: For testing agencies specified in "Quality Assurance" Article to demonstrate their capabilities and experience. Include proof of qualifications in the form of a recent report on the inspection of the testing agency by a recognized authority.

B. Reports: Prepare and submit certified written reports that include the following:

1. Date of issue.

2. Project title and number.

3. Name, address, and telephone number of testing agency.

4. Dates and locations of samples and tests or inspections.

5. Names of individuals making tests and inspections.

6. Description of the Work and test and inspection method.

7. Identification of product and Specification Section.

8. Complete test or inspection data.

9. Test and inspection results and an interpretation of test results.

10. Record of temperature and weather conditions at time of sample taking and testing and inspecting.

11. Comments or professional opinion on whether tested or inspected Work complies with the Contract Document requirements.

12. Name and signature of laboratory inspector.

13. Recommendations on retesting and re-inspecting.

QUALITY REQUIREMENTS 014000-3

C. Permits, Licenses, and Certificates: For Owner's records, submit copies of permits, licenses, certifications, inspection reports, releases, jurisdictional settlements, notices, receipts for fee payments, judgments, correspondence, records, and similar documents, established for compliance with standards and regulations bearing on performance of the Work.

1.5 QUALITY ASSURANCE

A. General: Qualifications paragraphs in this Article establish the minimum qualification levels required; individual Specification Sections specify additional requirements.

B. Installer Qualifications: A firm or individual experienced in installing, erecting, or assembling work similar in material, design, and extent to that indicated for this Project, whose work has resulted in construction with a record of successful in-service performance.

C. Manufacturer Qualifications A firm experienced in manufacturing products or systems similar to those indicated for this Project and with a record of successful in-service performance, as well as sufficient production capacity to produce required units.

D. Fabricator Qualifications A firm experienced in producing products similar to those indicated for this Project and with a record of successful in-service performance, as well as sufficient production capacity to produce required units.

E. Professional Engineer Qualifications: A professional engineer who is legally qualified to practice in jurisdiction where Project is located and who is experienced in providing engineering services of the kind indicated. Engineering services are defined as those performed for installations of the system, assembly, or product that are similar to those indicated for this Project in material, design, and extent.

F. Specialists: Certain sections of the Specifications require that specific construction activities shall be performed by entities who are recognized experts in those operations.

Specialists shall satisfy qualification requirements indicated and shall be engaged for the activities indicated.

1. Requirement for specialists shall not supersede building codes and regulations governing the Work.

G. Testing Agency Qualifications: An NRTL, an NVLAP, or an independent agency with the experience and capability to conduct testing and inspecting indicated, as documented according to ASTM E 548; and with additional qualifications specified in individual Sections; and where required by authorities having jurisdiction, that is acceptable to authorities.

1. NRTL A nationally recognized testing laboratory according to 29 CFR 1910.7.

2. NVLAP: A testing agency accredited according to NIST's National Voluntary

Laboratory Accreditation Program

H. Factory-Authorized Service Representative Qualifications: An authorized representative of manufacturer who is trained and approved by manufacturer to inspect installation of

QUALITY REQUIREMENTS 014000-4

manufacturer's products that are similar in material, design, and extent to those indicated for this Project

1.6 QUALITY CONTROL

A. Tests and inspections, as well as special tests and inspections, not explicitly assigned to Contracting Officer are Contractor's responsibility. Unless otherwise indicated, provide quality control services specified and those required by authorities having jurisdiction.

Perform quality control services required of Contractor by authorities having jurisdiction, whether specified or not.

1. Where services are indicated as Contractor's responsibility, engage a qualified testing agency to perform these quality-control services.

a. Contractor shall not employ same entity engaged by Contracting Officer, unless agreed to in writing by Contracting Officer.

2. Notify testing agencies at least 24 hours in advance of time when Work that requires testing or inspecting will be performed.

3. Where quality control services are indicated as Contractor's responsibility, submit a certified written report, in duplicate, of each quality control service.

4. Testing and inspecting requested by Contractor and not required by the Contract Documents are Contractor's responsibility.

5. Submit additional copies of each written report directly to authorities having jurisdiction, when they so direct.

B. Manufacturer's Field Services: Where indicated, engage a factory-authorized service representative to inspect field-assembled components and equipment installation, including service connections. Report results in writing as specified in Division 01 Section "Submittal Procedures.”

C. Retesting/Re-inspecting: Regardless of whether original tests or inspections were Contractor's responsibility, provide quality-control services, including retesting and re-inspecting, for construction that replaced Work that failed to comply with the Contract Documents.

D. Testing Agency Responsibilities: Cooperate with Contracting Officer and Contractor in performance of duties. Provide qualified personnel to perform required tests and inspections.

1. Notify Contracting Officer and Contractor promptly of irregularities or deficiencies observed in the Work during performance of its services.

2. Determine the location from which test samples will be taken and in which in-situ tests are conducted.

3. Conduct and interpret tests and inspections and state in each report whether tested and inspected work complies with or deviates from requirements.

4. Submit a certified written report, in duplicate, of each test, inspection, and similar quality control service through Contractor.

5. Do not release, revoke, alter, or increase the Contract Document requirements or approve or accept any portion of the Work.

QUALITY REQUIREMENTS 014000-5

6. Do not perform any duties of Contractor.

E. Associated Services: Cooperate with agencies performing required tests, inspections, and similar quality-control services, and provide reasonable auxiliary services as requested.

Notify agency sufficiently in advance of operations to permit assignment of personnel.

Provide the following:

1. Access to the Work.

2. Incidental labor and facilities necessary to facilitate tests and inspections.

3. Adequate quantities of representative samples of materials that require testing and inspecting. Assist agency in obtaining samples.

4. Facilities for storage and field curing of test samples.

5. Delivery of samples to testing agencies.

6. Preliminary design mix proposed for use for material mixes that require control by testing agency.

7. Security and protection for samples and for testing and inspecting equipment at

Project site.

F. Coordination: Coordinate sequence of activities to accommodate required quality assurance and control services with a minimum of delay and to avoid necessity of removing and replacing construction to accommodate testing and inspecting.

1. Schedule times for tests, inspections, obtaining samples, and similar activities.

PART 2 - PRODUCTS (NOT USED)

PART 3 - EXECUTION

3.1 REPAIR AND PROTECTION

A. General: On completion of testing, inspecting, sample taking, and similar services, repair damaged construction and restore substrates and finishes.

1. Provide materials and comply with installation requirements specified in other Specification Sections. Restore patched areas and extend restoration into adjoining areas with durable seams that are as invisible as possible.

2. Comply with the Contract Document requirements for Division 01 Section "Cutting and Patching.”

B. Protect construction exposed by or for quality control service activities.

C. Repair and protection are Contractor's responsibility, regardless of the assignment of responsibility for quality control services.

END OF SECTION 014000

QUALITY CONTROL SECTION 014100-1

SECTION 014100 – QUALITY CONTROL

PART 1 - GENERAL

1.1 This work shall consist of providing quality control in conformance with the inspection, testing, and product certification requirements of this contract to ensure compliance with the drawings and specifications. The Contractor shall provide all personnel, equipment, tests, and reports necessary to meet the requirements of the contract.

1.2 QUALITY CONTROL

A. The Contractor shall provide and maintain a quality control system that will ensure all services, supplies, and construction work required under this contract conforms to the contract requirements. The Contractor shall perform, or cause to be performed, the sampling, inspection, and testing required to substantiate that all services, supplies, and construction conform to the contract requirements.

B. Retesting/Reinspecting: Contractor shall provide quality-control services for retesting and reinspection for replaced construction work or for work that failed to comply with the requirements under the contract.

1.3 SUBMITTALS

A. Contractor Quality Control Plan

B. Permits, Licenses, and Certificates

C. Test and Inspection Reports

D. As-Built Drawings

1.4 MEASUREMENT AND PAYMENT

A. No separate payment will be made for the work included under this section; rather payment shall be considered to be included in the items of work listed in the Schedule of Items.

PART 2 - PRODUCTS (Not Applicable)

PART 3 - EXECUTION

3.1 QUALITY CONTROL SYSTEM

A. General: Perform required testing, inspections, sampling, and similar services per direction specified in the contract drawings and specifications and in accordance with established industry standards.

QUALITY CONTROL SECTION 014100-2

3.2 CONTRACTOR QUALITY CONTROL PLAN

A. At the time of the preconstruction conference, the Contractor shall submit for approval a written Contractor Quality Control Plan.

1. If the plan requires any revisions or corrections, the Contractor shall resubmit the plan within 10 days.

2. The Government reserves the right to require changes in the plan during the contract period as necessary.

3. No change in the approved plan may be made without written concurrence by the Contracting Officer.

4. At a minimum, the plan shall include the following:

a. A list of personnel responsible for quality control and assigned duties.

Include each person's qualifications.

b. A copy of a letter of direction to the Contractor's Quality Control Supervisor outlining assigned duties.

c. Names, qualifications, and descriptions of laboratories to perform sampling and testing, and samples of proposed report forms.

d. Methods of performing, documenting, and enforcing quality control of all work.

e. Methods of monitoring and controlling environmental pollution and contamination as required by all applicable regulations and laws.

3.3 TEST AND INSPECTION REPORTS

A. All inspections and test results shall be recorded daily.

1. Inspection Reports: The inspection reports shall be reproduced and fully executed to show all inspections and tests. The inspection reports shall be submitted to the Contracting Officer no less than once every two weeks.

3.4 PERMITS, LICENSES, AND CERTIFICATES

A. For Contracting Officer’s records, submit copies of permits, licenses, certifications, inspection reports, releases, jurisdictional settlements, notices, receipts for fee payments, judgments, correspondence, records, and similar documents, established for compliance with standards and regulations relevant to the on performance of the work.

3.5 AS-BUILT DRAWINGS

A. The Contractor shall maintain a set of the contract drawings depicting as-built conditions. These drawings shall be maintained in a current condition and shall be available for review. All variations from the original contract drawings shall be indicated in red on the drawings. Upon completion of the contract work, as-built drawings shall be submitted to the Contracting Officer.

END OF SECTION 014100

EXECUTION AND CLOSEOUT REQUIREMENTS 017000 - 1

SECTION 017000 - EXECUTION AND CLOSEOUT REQUIREMENTS

PART 1 - GENERAL

1.1 CLOSEOUT SUBMITTALS

A. Operation and Maintenance Data: Submit PDFs of O&M data to the CO and COR via email.

PART 2 - PRODUCTS (Not Applicable)

PART 3 - EXECUTION

3.1 EXAMINATION AND PREPARATION

A. Examine substrates and conditions for compliance with manufacturer's written requirements including, but not limited to, surfaces that are sound, level, plumb, smooth, clean, and free of deleterious substances; substrates within installation tolerances; and application conditions within environmental limits. Proceed with installation only after unsatisfactory conditions have been corrected.

B. Before proceeding to lay out the Work, verify layout information shown on Drawings, in relation to property survey and existing benchmarks.

C. Take field measurements as required to fit the Work properly. Where fabricated products are to be fitted to other construction, verify dimensions by field measurement before fabrication and, when possible, allow for fitting and trimming during installation.

3.2 CUTTING AND PATCHING

A. Do not cut structural members or operational elements without prior written approval of Contracting Officer.

B. Patch with durable seams that are as invisible as possible. Provide materials and comply with installation requirements specified in other Sections.

3.3 INSTALLATION

A. Comply with manufacturer's written instructions for installation. Anchor each product securely in place, accurately located and aligned with other portions of the Work. Clean exposed surfaces and protect from damage.

B. Clean Project site and work areas daily, including common areas.

3.4 FINAL CLEANING

A. Complete the following cleaning operations before requesting inspection for certification of Substantial Completion:

1. Remove labels that are not permanent.

2. Wipe surfaces of mechanical and electrical equipment.

3. Clean Project site, yard, and grounds, in areas disturbed by construction activities. Sweep paved areas; remove stains, spills, and foreign deposits.

EXECUTION AND CLOSEOUT REQUIREMENTS 017000 - 2

3.5 CLOSEOUT PROCEDURES

A. Substantial Completion: Before requesting Substantial Completion, complete the following:

1. Prepare a list of items to be completed and corrected (punch list), the value of items on the list, and reasons why the Work is not complete.

2. Submit specific warranties, maintenance service agreements, and similar documents.

3. Submit As-Built Drawings and Specifications, operation and maintenance manuals, and similar final record information.

4. Remove temporary facilities and controls.

5. Complete final cleaning requirements, including touchup painting.

6. Touch up and otherwise repair and restore marred exposed finishes to eliminate visual defects.

B. Submit a written request for inspection for Substantial Completion. On receipt of request, Contracting Officer will proceed with inspection or advise Contractor of unfulfilled requirements.

C. Request re-inspection when the Work identified in previous inspections as incomplete is completed or corrected.

D. Submit a written request for final inspection for acceptance. On receipt of request, Contracting Officer will proceed with inspection or advise Contractor of unfulfilled requirements.

END OF SECTION 017000

CUTTING AND PATCHING 017329-1

SECTION 017329 - CUTTING AND PATCHING

PART 1 - GENERAL

1.1 SUMMARY

A. This Section includes procedural requirements for cutting and patching.

B. See Divisions 2 through 33 Sections for specific requirements and limitations applicable to cutting and patching individual parts of the Work.

C. Patching of fire-rated construction to follow all applicable Codes and requirements.

1.2 SUBMITTALS

A. Cutting and Patching Proposal: Submit a proposal describing procedures at least 5 days before the time cutting and patching will be performed, requesting approval to proceed.

Include the following information:

1. Extent: Describe cutting and patching, show how they will be performed, and indicate why they cannot be avoided.

2. Changes to In-Place Construction: Describe anticipated results. Include changes to structural elements and operating components as well as changes in building's appearance and other significant visual elements.

3. Products: List products to be used and firms or entities that will perform the Work.

4. Dates: Indicate when cutting and patching will be performed.

5. Utility Services and Mechanical/Electrical Systems: List services/systems that cutting and patching procedures will disturb or affect. List services/systems that will be relocated and those that will be temporarily out of service. Indicate how long services/systems will be disrupted.

6. Structural Elements: Where cutting and patching involve adding reinforcement to structural elements, submit details and engineering calculations showing integration of reinforcement with original structure.

7. Contracting Officer's Approval: Obtain approval of cutting and patching proposal before cutting and patching. Approval does not waive right to later require removal and replacement of unsatisfactory work.

1.3 QUALITY ASSURANCE

A. Structural Elements: Do not cut and patch structural elements in a manner that could change their load-carrying capacity or load-deflection ratio.

B. Operational Elements: Do not cut and patch operating elements and related components in a manner that results in reducing their capacity to perform as intended or that results in increased maintenance or decreased operational life or safety.

CUTTING AND PATCHING 017329-2

C. Miscellaneous Elements: Do not cut and patch miscellaneous elements or related components in a manner that could change their load-carrying capacity, that results in reducing their capacity to perform as intended, or that results in increased maintenance or decreased operational life or safety.

D. Visual Requirements: Do not cut and patch construction in a manner that results in visual evidence of cutting and patching. Do not cut and patch construction exposed on the exterior or in occupied spaces in a manner that would, in Contracting Officer's opinion, reduce the building's aesthetic qualities. Remove and replace construction that has been cut and patched in a visually unsatisfactory manner.

PART 2 - PRODUCTS

2.1 MATERIALS

A. General: Comply with requirements specified in other Sections.

B. In-Place Materials: Use materials identical to in-place materials. For exposed surfaces, use materials that visually match in-place adjacent surfaces to the fullest extent possible.

1. If identical materials are unavailable or cannot be used, use materials that, when installed, will match the visual and functional performance of in-place materials.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Examine surfaces to be cut and patched and conditions under which cutting and patching are to be performed.

1. Compatibility: Before patching, verify compatibility with and suitability of substrates, including compatibility with in-place finishes or primers.

2. Proceed with installation only after unsafe or unsatisfactory conditions have been corrected.

3.2 PREPARATION

A. Temporary Support: Provide temporary support of Work to be cut.

B. Protection: Protect in-place construction during cutting and patching to prevent damage.

Provide protection from adverse weather conditions for portions of Project that might be exposed during cutting and patching operations.

C. Adjoining Areas: Avoid interference with use of adjoining areas or interruption of free passage to adjoining areas.

D. Existing Utility Services and Mechanical/Electrical Systems: Where existing services/systems are required to be removed, relocated, or abandoned, bypass such services/systems before cutting to prevent interruption to occupied areas.

CUTTING AND PATCHING 017329-3

3.3 PERFORMANCE

A. General: Employ skilled workers to perform cutting and patching. Proceed with cutting and patching at the earliest feasible time, and complete without delay.

1. Cut in-place construction to provide for installation of other components or performance of other construction, and subsequently patch as required to restore surfaces to their original condition.

B. Cutting: Cut in-place construction by sawing, drilling, breaking, chipping, grinding, and similar operations, including excavation, using methods least likely to damage elements retained or adjoining construction. If possible, review proposed procedures with original Installer; comply with original Installer's written recommendations.

1. In general, use hand or small power tools designed for sawing and grinding, not hammering and chopping. Cut holes and slots as small as possible, neatly to size required, and with minimum disturbance of adjacent surfaces. Temporarily cover openings when not in use.

2. Finished Surfaces: Cut or drill from the exposed or finished side into concealed surfaces.

3. Concrete or Masonry: Cut using a cutting machine, such as an abrasive saw or a diamond-core drill.

4. Mechanical and Electrical Services: Cut off pipe or conduit in walls or partitions to be removed. Cap, valve, or plug and seal remaining portion of pipe or conduit to prevent entrance of moisture or other foreign matter after cutting.

5. Proceed with patching after construction operations requiring cutting are complete.

C. Patching: Patch construction by filling, repairing, refinishing, closing up, and similar operations following performance of other Work. Patch with durable seams that are as invisible as possible. Provide materials and comply with installation requirements specified in other Sections.

1. Inspection: Where feasible, test and inspect patched areas after completion to demonstrate integrity of installation.

2. Exposed Finishes: Restore exposed finishes of patched areas and extend finish restoration into retained adjoining construction in a manner that will eliminate evidence of patching and refinishing.

3. Exterior Building Enclosure: Patch components in a manner that restores enclosure to a weathertight condition.

D. Cleaning: Clean areas and spaces where cutting and patching are performed. Completely remove paint, mortar, oils, putty, and similar materials.

END OF SECTION 017329

SELECTIVE STRUCTURE DEMOLITION 024119 - 1

SECTION 024119 - SELECTIVE STRUCTURE DEMOLITION

PART 1 - GENERAL

1.1 SUMMARY

A. This section includes the demolition of the existing roofing, flashing, and associated materials with the roof. It includes the proper disposal of the waste materials at an approved disposal location.

1.2 SECTION REQUIREMENTS

A. Comply with EPA regulations and hauling and disposal regulations of authorities having jurisdiction.

B. Owner will occupy portions of building immediately adjacent to selective demolition area.

Conduct selective demolition so Government's operations will not be disrupted.

C. It is not expected that hazardous materials will be encountered in the Work. If materials suspected of containing hazardous materials are encountered, do not disturb; immediately notify Contracting Officer. Government will remove hazardous materials under a separate contract.

PART 2 - PRODUCTS (Not Applicable)

PART 3 - EXECUTION

3.1 DEMOLITION

A. Maintain services/systems indicated to remain and protect them against damage during selective demolition operations. Before proceeding with demolition, provide temporary services/systems that bypass area of selective demolition and that maintain continuity of services/systems to other parts of the building.

B. Locate, identify, shut off, disconnect, and cap off utility services and mechanical/electrical systems serving areas to be selectively demolished.

C. Provide temporary barricades and other protection required to prevent injury to people and damage to adjacent buildings and facilities to remain.

D. Provide temporary weather protection to prevent water leakage and damage to structure and interior areas.

E. Protect walls, ceilings, floors, and other existing finish work that are to remain. Cover and protect furniture, furnishings, and equipment that have not been removed.

F. Neatly cut openings and holes plumb, square, and true to dimensions required. Use cutting methods least likely to damage construction to remain or adjoining construction.

G. Promptly remove demolished materials from Government’s property and legally dispose of them.

1. The contractor is responsible for all costs and permits associated with the disposal.

2. Do not burn demolished materials.

END OF SECTION 024119

ROOFTOP FALL PROTECTION 055217 - 1

SECTION 055217 – Rooftop Fall Protection

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 specifications sections, apply to this section.

1.2 SUMMARY

A. This Section includes the following:

1. Permanent guard rails.

1.3 REFERENCES

A. American Welding Society: AWS D1.1 - Structural Welding Code - Steel.

B. American Welding Society: AWS D1.3 - Structural Welding Code - Sheet Steel.

C. Occupational Safety and Health Administration (OSHA): 29 CFR 1926.502 - Fall Protection Systems Criteria and Practices.

1.4 SUBMITTALS

A. Product Data: Manufacturer's data sheets on each product to be used, including:

1. Preparation instructions and recommendations.

2. Storage and handling requirements and recommendations.

3. Installation methods.

B. Shop Drawings: Drawings showing plans, elevations, sections and details of components. Show member sizes and part identification, fasteners, anchors, fittings and evidence of compliance with structural performance requirements.

1.5 DELIVERY, STORAGE, AND HANDLING

A. Deliver materials to the job site in good condition and adequately protected against damage.

B. Inspect rail sections for damage before signing the receipt from the trucking company. Truck driver must note damaged goods on the bill of lading if damaged product is found.

C. Store products in manufacturer's unopened packaging until ready for installation.

D. Products to be palletized and labeled by roof level or designated drop zone.

1.6 PROJECT CONDITIONS

A. Field Measurements: Where handrails and railings are indicated to fit to other construction, check actual dimensions of other construction by accurate field measurements before fabrication.

PART 2 - PRODUCTS

2.1 PERMANENT GUARD RAILS

A. Roof Edge Protection: Provide permanently attached pedestrian egress barrier system on roof, including pipe railings, bases, accessories and fittings.

ROOFTOP FALL PROTECTION 055217 - 2

1. Product: Floor Mount Guardrail System, Permanent.

2. System top and mid rail provided in accordance with OSHA Standards - 29 CFR.29 (b)(1-

14).

3. Structural Load: 200 lb (90.7 kg), minimum, in any direction to all components in accordance with OSHA Regulation 29 CFR 1926.502.

4. Tested and independently certified to be in accordance with OSHA fall protection for guardrail regulations, sections 29 CFR 1910.29, 29 CFR 1926.500, 29 CFR 1926.502 and

29 CFR 1926.503.

5. Railings: 1-5/8 inch (41 mm) minimum O.D. tubing, free of sharp edges and snag points.

a. Railing to be permanently attached to bases and building structure.

6. Height: 42 inches (1067 mm), from walking/working surface.

7. Single Post Receivers: The first and last piece of a safety railing installation.

8. Double Post Receiver: The intermediate receiver for in-line railing runs.

9. Finish: Steel surfaces.

a. Hot Dip Zinc Galvanized.

b. Factory finished powder coat paint.

c. Dip Zinc Galvanized and factory finished powder coat paint.

10. Fasteners: Type 304 or 305 stainless steel or galvanized.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Do not begin installation until substrates have been properly prepared.

B. If substrate preparation is the responsibility of another installer, notify Contracting Officer of unsatisfactory preparation before proceeding.

3.2 PREPARATION

A. Clean surfaces thoroughly prior to installation.

B. Prepare surfaces using the methods recommended by the manufacturer for achieving the best result for the substrate under the project conditions.

3.3 INSTALLATION

A. Install in accordance with manufacturer's instructions, approved submittals and in proper relationship with adjacent construction.

3.4 PROTECTION

A. Protect installed products until completion of project.

B. Touch-up, repair or replace damaged products before Substantial Completion.

END OF SECTION 055217

ROUGH CARPENTRY 061000 - 1

SECTION 061000 - ROUGH CARPENTRY

1.1 SECTION REQUIREMENTS

A. This section includes the installation of wood blocking, curbs, cants, and nailers as required for the roofing installation

1.2 SUBMITTALS

A. Product Data: For each type of process and factory fabricated product.

1. Include data for wood-preservative treatment from chemical treatment manufacturer and certification by treating plant that treated materials comply with requirements.

PART 2 - PRODUCTS

2.1 WOOD PRODUCTS, GENERAL

A. Lumber: Provide dressed lumber, S4S, marked with grade stamp of inspection agency.

2.2 TREATED MATERIALS

A. Preservative-Treated Materials: AWPA C2, except that lumber not in ground contact and not exposed to the weather may be treated according to AWPA C31 with inorganic boron

(SBX).

1. Use treatment containing no arsenic or chromium.

2. Kiln-dry lumber after treatment to a maximum moisture content of 19 percent.

3. Mark lumber with treatment quality mark of an inspection agency approved by the ALSC

Board of Review.

B. Provide preservative-treated materials for the following:

1. Wood members in connection with roofing, flashing, vapor barriers, and waterproofing.

2. Concealed members in contact with masonry or concrete.

3. Wood framing members that are less than 18 inches (460 mm) above the ground.

2.3 LUMBER

A. Dimension Lumber:

1. Maximum Moisture Content: 19 percent.

2. Framing Other Than Non-Load-Bearing Partitions: Construction or No. 2.

3. Exposed Framing: Provide material hand-selected for uniformity of appearance and freedom from characteristics, on exposed surfaces and edges, that would impair finish appearance, including decay, honeycomb, knot-holes, shake, splits, torn grain, and wane.

a. Species: As specified for framing other than non-load bearing partitions.

b. Grade: No. 2

ROUGH CARPENTRY 061000 - 2

B. Exposed Boards: Hem-fir, Select Merchantable or No. 1 Common: WCLIB, or WWPA; with 19 percent maximum moisture content.

C. Concealed Boards: Northern species, No. 3 Common: NLGA; or Western woods, Standard:

WCLIB; or No. 3 Common: WWPA; with 19 percent maximum moisture content.

D. Miscellaneous Lumber: Construction, or No. 2 grade with 19 percent maximum moisture content of any species. Provide for nailers, blocking, and similar members.

2.4 MISCELLANEOUS PRODUCTS

A. Fasteners: Size and type indicated. Where rough carpentry is exposed to weather, in ground contact, or in area of high relative humidity, provide fasteners with hot-dip zinc coating complying with ASTM A 153/A 153M.

1. Power-Driven Fasteners: CABO NER-272.

2. Bolts: Steel bolts complying with ASTM A 307, Grade A; with ASTM A 563 hex nuts and, where indicated, flat washers.

PART 3 - EXECUTION

3.1 INSTALLATION

A. Set rough carpentry to required levels and lines, with members plumb, true to line, cut, and fitted.

Locate nailers, blocking, and similar supports to comply with requirements for attaching other construction.

B. Securely attach rough carpentry to substrates, complying with the following:

1. Table 2304.9.1, "Fastening Schedule," ICC's International Building Code.

END OF SECTION 061000

ETHYLENE-PROPYLENE-DIENE-MONOMER (EPDM) ROOFING 075323 - 1

SECTION 075323 - ETHYLENE-PROPYLENE-DIENE-MONOMER (EPDM) ROOFING

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Ballasted ethylene-propylene-diene-terpolymer (EPDM) roofing system.

2. Mechanically adhered ethylene-propylene-diene-terpolymer (EPDM) roofing system.

3. Roof insulation.

4. Cover board.

1.2 PREINSTALLATION MEETINGS

A. Preliminary Conference: Conduct conference at Project site.

1.3 ACTION SUBMITTALS

A. Product Data: For each type of product.

1. For insulation and roof system…

This is the start of the file's text. The full file is on GovTribe.