SOW FiSL Roof Windows.docx
DOCX document 54 KB Posted
- Solicitation number
- 1240LT25R0017
- Issued by
-
Department of Agriculture Forest Service
About this file
This Statement of Work (SOW) details a roof replacement and optional window replacement project for the Missoula Fire Sciences Laboratory, located at 5775 US Highway 10 W, Missoula, MT. The base scope includes replacing ballasted membrane roofing on A, B, and C wings, removing and replacing damaged insulation, installing a new 60-mil EPDM membrane with metal flashing, and improving roof insulation to a minimum of R-38. The project also involves replacing the D-Wing TPO membrane with a mechanically-adhered white EPDM membrane and installing new paver pathways and guardrails.
Optional additions include replacing all windows on the first and second floors of the north elevation of B-Wing. The project will be conducted during normal business hours (0800-1630, M-F), with government providing site access, 120V power, potable water, and restrooms. The contractor is responsible for all travel costs, equipment mobilization, and must verify window dimensions before ordering materials. The solicitation is issued by the Department of Agriculture Forest Service under solicitation number 1240LT25R0017, with the Contracting Officer's Representative (COR) being Nathaniel Coffman.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AsbestosLeadHazMaterial- A Wing.pdf | ||
| AsbestosLeadHazMaterial- C Wing.pdf | ||
| Amendment 1240LT25R0017.pdf | ||
| Addendum 1_Fire Lab Roof Replacement.docx | DOCX document | |
| AsbestosLeadHazMaterial- B Wing.pdf | ||
| Specifications.pdf | ||
| Drawings.pdf | ||
| Record Drawings - B-Wing Windows.pdf | ||
| Wage Determination Missoula County MT MT20250063.pdf | ||
| Record Drawings - D-Wing.pdf | ||
| 1240LT25R0017.docx | DOCX document | |
| Experience questionnaire.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US Department of Agriculture (USDA)
Statement of Work
Contents
| Project | 3 |
| General Information | 3 |
| 1.0 Scope of Work | 3 |
| 2.0 Background | 3 |
| Contractor Requirements | 3 |
| 3.0 Technical Requirements / Tasks | 3 |
| 4.0 Government Furnished | 3 |
| 5.0 Deliverables / Schedule | 3 |
| 6.0 Travel | 4 |
| 7.0 Contractor’s Key Personnel | 4 |
| 8.0 Security Requirements | 4 |
| 9.0 Data Rights | 4 |
| 10.0 Section 508 – Electronic and Information Technology Standards | 4 |
| Attachment | 4 |
Project Missoula Fire Sciences Laboratory Roof Replacement
General Information
1.0 Scope of Work
Contractor shall provide all equipment, materials, and labor necessary to replace the existing roofing on all wings (A, B, C, and D) of the Missoula Fire Sciences Laboratory and increase the thickness of roof insulation on A, B, and C wings. Optional additions are included to replace windows on the north elevation of B-Wing. The project is located at 5775 US Highway 10 W, Missoula, MT 59808-9361.
2.0 Background
The ballasted membrane roofs on A, B, and C-wing of the Fire Lab range in age from approximately 25-35 years. The membrane was installed on 1” mineral board over the original 1-1/2” rigid insulation and ballasted at 15 pounds per square foot. Construction of D-wing was completed in 2009. D-wing has a mechanically fastened TPO membrane roof over R-38 EPS II insulation.
The roof deck of A and B wings consist of lightweight concrete deck slabs. C-Wing has 4”x6” tongue-and-groove decking. D-Wing primarily has metal decking, with some sections of 2x6 wood deck or concrete slab.
Contractor Requirements
3.0 Technical Requirements / Tasks
The base scope consists of the following:
· Tear-off of existing ballasted membrane roofing on A, B, and C wings, including all flashing. Remove and replace any damaged insulation and/or damaged mineral board.
· Installation of a new, ballasted 60-mil EPDM membrane with new metal flashing, counterflashing, and coping; existing stone ballast may be reused.
· Installation of new paver pathways, approximately 966 SF, as shown on the Drawings.
· Miscellaneous repairs to existing insulation, cant strips, blocking, curbs, sleepers, seismic joint covers, and other roof accessories required to complete the roof project.
· Installation of curbs under any HVAC equipment (roof-top units, condensing units, fans, etc.) currently supported by sleepers resting directly on the roof membrane. Roof curb heights shall maintain 8-inch minimum base flashing heights.
· Installation of approximately 237 LF of parapet guardrails and one hatch guardrail, as shown on the Drawings.
· Replacement of D-Wing TPO membrane with mechanically-adhered white EPDM membrane. Includes any miscellaneous repairs to existing insulation, cant strips, blocking, curbs, sleepers, and other roof accessories required to complete the replacement. Does not include replacement of metal roofing on front awning. See “Record Drawings – D-Wing.”
· Improvement of insulation of A, B, and C-wing roofs up to a minimum of R-38, plus tapered insulation. Includes replacement or modification of other roofing elements (e.g. flashing, roof drains) necessary to accommodate increased thickness of insulation.
Optional additions include:
· Replace all windows on the first floor of the north (front) elevation of B-Wing, including original storefront entrance. Existing access control equipment in good condition may be reused. See attached “Record Drawings – B-Wing Windows” for original window dimensions. Contractor shall field verify window and entrance dimensions prior to ordering materials. See Specification Section 084113 for details.
· Replace all windows on the second floor of the north (front) elevation of B-Wing. See attached “Record Drawings – B-Wing Windows” for original window dimensions. Contractor shall field verify window dimensions prior to ordering materials. See Specification Section 084113 for details.
4.0 Government Furnished
· Government will provide access to the site during normal business hours (0800-1630, M-F). Work outside of this period may be permissible with prior approval from the COR (Nathaniel Coffman, nathaniel.coffman@usda.gov)
· Note that site is scheduled to be closed during all Federally recognized holidays. https://www.opm.gov/policy-dataoversight/pay-leave/federal-holidays/
· Government will provide onsite access to 120V power and potable water. Contractor will be responsible for any extension cords, hoses, and other supplies necessary to connect to the service.
· Onsite Restrooms will be available for use.
5.0 Deliverables / Schedule
N/A
6.0 Travel
All costs associated with travel to and from the job site, including mobilization of all equipment and materials shall be included in the Contractor’s cost proposal.
7.0 Contractor’s Key Personnel
N/A
Attachment
Drawings Record Drawings – D-Wing Record Drawings – B-Wing Windows image1.png