Specifications.pdf
PDF 19 MB Posted
- Solicitation number
- 36C24224R0080
About this file
This document appears to be a set of Specifications for the federal contract opportunity titled "Z1DA--MINOR-CONST 528-811 CONSOLIDATE PRIMARY CARE 1st FLOOR PHASE 1". The opportunity is a Solicitation issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 2.
The Specifications document likely outlines the detailed technical requirements, standards, and expectations for the construction and consolidation work to be performed on the 1st floor of the 528-811 facility. Key details may include the scope of work, schedule, materials, labor, quality control, safety, and other contractual terms. However, as this document is a technical specification rather than the full solicitation, it does not appear to contain information about the overall procurement, such as response deadlines, award criteria, pricing, or set-asides.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 528-811_ASPC_Addendum_1_20240530.pdf | ||
| 36C24224R0080 0004.docx | DOCX document | |
| 528-811_TripleC-CA-SubmittalLOG and Cutsheet Index.xlsx | XLSX spreadsheet | |
| 00 41 13.10 - Construction Estimate Breakdown Template.xlsx | XLSX spreadsheet | |
| Past Performace Questionaire_PPQ.pdf | ||
| PROCEDURES FOR SUBMITTAL OF OFFERS AND PROPOSAL EVALUATION CRITERIA.docx | DOCX document | |
| 36C24224R0080 0003.docx | DOCX document | |
| 36C24224R0080 0002.docx | DOCX document | |
| 36C24224R0080 0001.docx | DOCX document | |
| 36C24222R0080 Project RFI Questions with Responses 6-07-2024.pdf | ||
| Wage Determination.txt | TXT text file | |
| Past Performace Questionaire.pdf | ||
| Drawings I.pdf | ||
| Drawings II.pdf | ||
| FAR 52.225-2 Buy American Certification.pdf | ||
| 852.219-77 VA Notice of Limitations on Subcontracting.docx | DOCX document | |
| 36C24224R0080_1.docx | DOCX document | |
| Contractor Projects Form.docx | DOCX document |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Samuel S. Stratton VA Medical Center
Project Number: 528-811
Consolidate Primary Care 1st Floor – Building 1
ISSUED FOR BIDDING
PROJECT MANUAL
Prepared For:
Samuel S. Stratton VA Medical Center 113 Holland Avenue Albany, NY 12208
Prepared By:
Triple C - The A/E Group 201 E. Jefferson Street, Suite 200 Syracuse, NY 13202
Project Team:
C&S Companies MES Group, Inc
This page intentionally left blank.
Consolidate Primary Care 1st Floor Project #: 528-811
05-01-21
00 01 10 - 1
SAMUEL S. STRATTON VA MEDICAL CENTER
CONSOLIDATE PRIMARY CARE 1ST FLOOR
TABLE OF CONTENTS
SECTION 00 01 10
SECTIONS DIVISION AND SECTION TITLES DATE
PROJECT FILES
NOT USED
COVER PAGE
00 01 01 Project Title
DIVISION 00 — SPECIAL SECTIONS
00 01 10 Table of Contents 05-2021 00 01 15 List of Drawing Sheets 06-2020 00 41 13 Bid Form 00 41 13.10 Construction Estimate Breakdown - ASPC 00 41 13.10 Construction Estimate Breakdown Template
DIVISION 01 — GENERAL REQUIREMENTS
01 00 00 General Requirements 11-2021 01 32 16.15 Project Schedules (Small Projects - Design-Bid-Build) 11-2021 01 33 23 Shop Drawings, Product Data, and Samples 02-2023 01 33 24 Electronic Submittal Procedures - 01 35 26 Safety Requirements 10-2022 01 35 26.1 Infection Prevention-Infection Control Risk Assessment Procedure for Construction 01 42 19 Reference Standards 11-2020 01 45 00 Quality Control 02-2021 01 45 00.01 Quality Control Sample Forms 01 45 29 Testing Laboratory Services 11-2018 01 45 35 Special Inspections 06-2021 01 45 35.01 Schedule of Special Inspections Template 04-2018 01 45 35.02 Schedule of Special Inspections Template 04-2018 01 57 19 Temporary Environmental Controls 01-2021 01 58 16 Temporary Interior Signage 07-2015 01 74 19 Construction Waste Management 04-2022 01 81 13 Sustainable Construction Requirements 10-2017 01 91 00 General Commissioning Requirements 01 91 00.01 Commissioning Report
DIVISION 02 — EXISTING CONDITIONS
02 41 00 Demolition 08-2017 02 82 11 Traditional Asbestos Abatement 01-2021 02 82 11.1 Asbestos Report for Reference 02 82 13.13 Glovebag Asbestos Abatement 01-2021 02 82 13.19 Asbestos Floor Title and Mastic Abatement 01-2021 02 83 33.13 Lead-Based Paint Removal and Disposal 01-2021
DIVISION 03 — CONCRETE
03 01 30 Maintenance of Cast-In-Place Concrete 03 30 53 (Short-Form) Cast-in-Place Concrete 01-2021
05-01-21
00 01 10 - 2
DIVISION 04 — MASONRY
04 01 00 Maintenance of Masonry 01-2021 04 05 13 Masonry Mortaring 10-2017 04 05 16 Masonry Grouting 01-2021
DIVISION 05 — METALS
05 12 00 Structural Steel Framing 11-2018 05 31 00 Steel Decking 01-2021 05 36 00 Composite Metal Decking 01-2021 05 40 00 Cold-Formed Metal Framing 01-2021 05 50 00 Metal Fabrications 08-2018
DIVISION 06 — WOOD, PLASTICS, AND COMPOSITES
06 06 60 Plastic Fabrications Resin Panels 06 10 00 Rough Carpentry 10-2017
DIVISION 07 — THERMAL AND MOISTURE PROTECTION
07 01 50.19 Preparation for Re-Roofing 01-2021 07 08 00 Facility Exterior Closure Commissioning 01-2021 07 13 00 Sheet Waterproofing 01-2021 07 21 13 Thermal Insulation 01-2021 07 22 00 Roof and Deck Insulation 01-2021 07 24 00 Exterior Insulation and Finish Systems 01-2021 07 27 26 Fluid-Applied Membrane Air Barrier, Vapor Permeable 01-2021 07 51 13.13 Cold-Applied Built-Up Asphalt Roofing 01-2021 07 53 23 Ethylene-Propylene-Diene-Monomer Roofing 01-2021 07 60 00 Flashing and Sheet Metal 01-2021 07 81 00 Applied Fireproofing 10-2017 07 84 00 Firestopping 01-2021 07 92 00 Joint Sealants
DIVISION 08 — OPENINGS
08 11 13 Hollow Metal Doors and Frames 01-2021 08 14 00 Interior Wood Doors 01-2021 08 31 13 Access Doors and Frames 04-2022 08 36 16.13 High Performance Barn (Sliding) Door 08 41 13 Aluminum-Framed Entrances and Storefronts 01-2021 08 56 53 Blast Resistant Windows 01-2021 08 62 50 Insulated Translucent Wall Skylight System - 08 71 00 Door Hardware 02-2022 08 80 00 Glazing 01-2021 08 90 00 Louvers and Vents 01-2021
DIVISION 09 — FINISHES
09 05 16 Subsurface Preparation for Floor Finishes 01-2021 09 22 16 Non-Structural Metal Framing 06-2018 09 29 00 Gypsum Board 04-2020 09 30 13 Ceramic Porcelain Tiling 01-2021 09 51 00 Acoustical Ceilings 12-2018 09 65 13 Resilient Base and Accessories 01-2021 09 65 16 Resilient Sheet Flooring 05-2018 09 65 19 Resilient Tile Flooring 05-2018 09 67 23.40 Resinous Poured In Place Resilient Flooring (RES-4) 01-2021 09 91 00 Painting 01-2021
DIVISION 10 — SPECIALTIES
10 14 00 Signage 01-2021 10 21 23 Cubicle Curtain Tracks 01-2021 10 26 00 Wall and Door Protection 01-2021
05-01-21
00 01 10 - 3
10 28 00 Toilet, Bath, and Laundry Accessories 01-2021 10 44 13 Fire Extinguisher Cabinets 08-2018 10 51 00 Metal Lockers 10 81 13 Bird Control Devices
DIVISION 11 — EQUIPMENT
11 17 36 Package Transfer Units 01-2021 11 73 00 Ceiling Mounted Patient Lift System 08-2020
DIVISION 12 — FURNISHINGS
12 32 00 Manufactured Wood Casework 01-2021
12 36 00 COUNTERTOPS
DIVISION 13 — SPECIAL CONSTRUCTION
13 05 41 Seismic Restraint Requirements for Non-Structural Components 01-2021
DIVISION 14 — CONVEYING EQUIPMENT
14 92 00 Pneumatic Tube
DIVISION 21 — FIRE SUPPRESSION
21 08 00 Commissioning of Fire Suppression System 11-2016 21 13 13 Wet-Pipe Sprinkler Systems
DIVISION 22 — PLUMBING
22 00 00 sDetail-Div22-Schedules 22 05 11 Common Work Results for Plumbing 09-2020 22 05 12 General Motor Requirements for Plumbing Equipment 09-2020 22 05 19 Meters and Gauges for Plumbing Piping 09-2020 22 05 23 General-Duty Valves for Plumbing Piping 11-2022 22 07 11 Plumbing Insulation 09-2019 22 08 00 Commissioning of Plumbing Systems 11-2016 22 11 00 Facility Water Distribution 05-2021 22 13 00 Facility Sanitary and Vent Piping 09-2020 22 14 00 Facility Storm Drainage 09-2015 22 40 00 Plumbing Fixtures 12-2022
DIVISION 23 — HEATING VENTILATING AND AIR CONDITIONING
23 sDetail-Div23-Schedules (1) 23 05 11 Common Work Results for HVAC 01-2023 23 05 12 General Motor Requirements for HVAC and Steam Generation Equipment 02-2020 23 05 41 Noise and Vibration Control for HVAC Piping and Equipment 02-2020 23 05 93 Testing, Adjusting, and Balancing for HVAC 02-2020 23 07 11 HVAC, Plumbing, and Boiler Plant Insulation 02-2020 23 08 00 Commissioning of HVAC Systems 02-2020 23 09 23 Direct-Digital Control System for HVAC 23 21 13 Hydronic Piping 03-2023 23 21 23 Hydronic Pumps 02-2020 23 22 13 Steam and Condensate Heating Piping 10-2022 23 22 23 Steam Condensate Pumps 04-2020 23 23 00 Refrigeration Piping 02-2020 23 25 00 HVAC Water Treatment 02-2020 23 31 00 HVAC Ducts and Casings 02-2020 23 34 00 HVAC Fans 02-2020 23 36 00 Air Terminal Units 02-2020 23 37 00 Air Outlets and Inlets 02-2020 23 40 00 HVAC Air Cleaning Devices 03-2020 23 73 00 Indoor Central-Station Air-Handling Units 03-2020 23 81 00 Decentralized Unitary HVAC Equipment 03-2020 23 82 00 Convection Heating and Cooling Units 03-2020
05-01-21
00 01 10 - 4
23 82 16 Air Coils 03-2020
DIVISION 25 — INTEGRATED AUTOMATION
NOT USED
DIVISION 26 — ELECTRICAL
26 05 11 Requirements for Electrical Installations 01-2016 26 05 19 Low-Voltage Electrical Power Conductors and Cables 11-2022 26 05 26 Grounding and Bonding for Electrical Systems 11-2022 26 05 33 Raceway and Boxes for Electrical Systems 11-2022 26 05 73 Overcurrent Protective Device Coordination Study 11-2022 26 08 00 Commissioning of Electrical Systems 11-2016 26 09 23 Lighting Controls 01-2018 26 24 16 Panelboards 11-2022 26 25 11 Busways 11-2022 26 27 26 Wiring Devices 11-2022 26 29 11 Motor Controllers 26 29 21 Enclosed Switches and Circuit Breakers 11-2022 26 43 13 Surge Protective Devices 11-2022 26 51 00 Interior Lighting 26 56 00 Exterior Lighting
DIVISION 27 — COMMUNICATIONS
27 05 11 Requirements for Communications Installations 06-2015 27 05 26 Grounding and Bonding for Communications Systems 06-2015 27 05 33 Raceways and Boxes for Communications Systems 10-2018 27 08 00 Commissioning of Communications Systems 11-2016 27 10 00 Control, Communication and Signal Wiring 06-2015 27 11 00 Communications Equipment Room Fittings 27 15 00 Communications Structured Cabling 01-2016 27 51 16 Public Address and Mass Notification Systems 10-2018 27 51 23 Intercommunications and Program Systems 06-2015 27 52 23 Nurse Call and Code Blue Systems 12-2020
DIVISION 28 — ELECTRONIC SAFETY AND SECURITY
28 05 00 Common Work Results for Electronic Safety and Security 04-2018 28 05 13 Conductors and Cables for Electronic Safety and Security 10-2018 28 05 26 Grounding and Bonding for Electronic Safety and Security 09-2011 28 05 28.33 Conduits and Backboxes for Electronic Safety and Security 09-2011 28 08 00 Commissioning of Electronic Safety and Security Systems 11-2016 28 13 00 Physical Access Control System 10-2011 28 23 00 Video Surveillance 09-2011 28 26 00 Electronic Personal Protection System 09-2011 28 31 00 Fire Detection and Alarm
DIVISION 31 — EARTHWORK
NOT USED
DIVISION 32 — EXTERIOR IMPROVEMENTS
32 31 13 Chain Link Fences and Gates 06-2016
DIVISION 33 — UTILITIES
NOT USED
DIVISION 34 — TRANSPORTATION
NOT USED
DIVISION 35 — WATERWAY AND MARINE
NOT USED
DIVISION 40 — PROCESS INTERCONNECTIONS
05-01-21
00 01 10 - 5
NOT USED
DIVISION 41 — MATERIAL PROCESSING AND HANDLING EQUIPMENT
NOT USED
DIVISION 42 — PROCESS HEATING, COOLING, AND DRYING EQUIPMENT
NOT USED
DIVISION 43 — PROCESS GAS AND LIQUID HANDLING, PURIFICATION AND
STORAGE EQUIPMENT
NOT USED
DIVISION 44 — POLLUTION AND WASTE CONTROL EQUIPMENT
NOT USED
DIVISION 45 — INDUSTRY-SPECIFIC MANUFACTURING EQUIPMENT
NOT USED
DIVISION 46 — WATER AND WASTEWATER EQUIPMENT
NOT USED
DIVISION 48 — ELECTRICAL POWER GENERATION
NOT USED
List of Drawing Sheets
00 01 15 - 1
SECTION 00 01 15
LIST OF DRAWING SHEETS
A. The drawings listed below accompanying this specification form a part of the contract.
Drawing No. Title
GENERAL
GI000 COVER SHEET
GI001 DRAWING INDEX
GI050 GENERAL NOTES
GI100 LIFE SAFETY PLAN - BASEMENT
GI101 LIFE SAFETY PLAN - FIRST FLOOR
GI201 SMOKE COMPARTMENT AND AREA OCCUPANCY DIAGRAMS
GC101 DEDUCTIVE ALTERNATE PLAN
GC200 CONTRACTOR ACCESS PLANS
GC300 OVERALL PHASING PLANS
GC301 ICRA AND INTERIM LIFE SAFETY PLANS BY PHASE
GC302 ICRA AND INTERIM LIFE SAFETY PLANS BY PHASE
GC303 ICRA AND INTERIM LIFE SAFETY PLANS BY PHASE
GC304 ICRA AND INTERIM LIFE SAFETY PLANS BY PHASE
GC305 INFECTION CONTROL AND INTERIM LIFE SAFETY DETAIL
HAZARDOUS
H-100 HAZARDOUS MATERIALS PLAN - BASEMENT
H-101 HAZARDOUS MATERIALS PLAN - GROUND FLOOR - C WING
H-102 HAZARDOUS MATERIALS PLAN - GROUND FLOOR - D WING
HP001 HAZARDOUS MATERIALS PHOTO REFERENCE
STRUCTURAL
S-001 GENERAL STRUCTURAL NOTES
S-002 GENERAL STRUCTURAL NOTES CONTINUED
S-003 SPECIAL INSPECTIONS
SD101C STRUCTURAL DEMOLITION PLAN - FIRST FLOOR - C WING
SD101D STRUCTURAL DEMOLITION PLAN - FIRST FLOOR - D WING
S-100 STRUCTURAL FLOOR PLAN - BASEMENT - OVERALL
S-101 STRUCTURAL FLOOR PLAN - FIRST FLOOR - OVERALL
S-101C STRUCTURAL ENLARGED FLOOR PLAN - FIRST FLOOR - C WING
S-101D STRUCTURAL ENLARGED FLOOR PLAN - FIRST FLOOR - D WING
S-102 STRUCTURAL FLOOR PLAN - SECOND FLOOR - OVERALL
S-102C STRUCTURAL ENLARGED ROOF PLAN - SECOND FLOOR - C WING
S-103C STRUCTURAL ENLARGED ROOF PLAN - THIRD FLOOR - C WING
S-201 STRUCTURAL ELEVATIONS
S-301 STRUCTURAL SECTIONS
S-401 ENLARGED FRAMING PLANS
S-402 ENLARGED FRAMING PLANS
S-501 TYPICAL CONCRETE DETAILS
S-502 TYPICAL DECK DETAILS
S-503 TYPICAL BRACING AND ANCHORAGE DETAILS
S-520 FRAMING DETAILS
S-521 FRAMING DETAILS
S-522 FRAMING DETAILS
S-530 FRAMING DETAILS
00 01 15 - 2
ARCHITECTURAL
A-001 SYMBOLS, & GENERAL NOTES
AD101 ARCHITECTURAL DEMOLITION PLAN - BASEMENT, FIRST FLOOR & THIRD FLOOR
AD101C ARCHITECTURAL DEMOLITION PLAN - FIRST FLOOR - C WING
AD101D ARCHITECTURAL DEMOLITION PLAN - FIRST FLOOR - D WING
AD120 ARCHITECTURAL DEMOLITION REFLECTED CEILING PLAN - BASEMENT
AD120C ARCHITECTURAL DEMOLITION REFLECTED CEILING PLAN - BASEMENT - C WING
AD120D ARCHITECTURAL DEMOLITION REFLECTED CEILING PLAN - BASEMENT - D WING
AD121 ARCHITECTURAL DEMOLITION REFLECTED CEILING PLAN - FIRST FLOOR
AD121C ARCHITECTURAL DEMOLITION REFLECTED CEILING PLAN - FIRST FLOOR - C WING
AD121D ARCHITECTURAL DEMOLITION REFLECTED CEILING PLAN - FIRST FLOOR - D WING
A-101 ARCHITECTURAL FLOOR PLAN - BASEMENT ENLARGED VIEW KITCHEN
A-101C ARCHITECTURAL FLOOR PLAN - FIRST FLOOR - C WING
A-101CC ARCHITECTURAL DIMENSION PLAN - FIRST FLOOR - C WING
A-101D ARCHITECTURAL FLOOR PLAN - FIRST FLOOR - D WING
A-101DD ARCHITECTURAL DIMENSION PLAN - FIRST FLOOR - D WING
A-102 ARCHITECTURAL SECOND FLOOR & ROOF PLAN
A-103C THIRD FLOOR AND ROOF PLAN
A-104 PNEUMATIC TUBE SYSTEM
AC101 ARCHITECTURAL REFLECTED CEILING PLAN - FIRST FLOOR - OVERALL
AC101C ARCHITECTURAL REFLECTED CEILING PLAN - FIRST FLOOR - C WING
AC101D ARCHITECTURAL REFLECTED CEILING PLAN - FIRST FLOOR - D WING
A-201 ARCHITECTURAL EXTERIOR ELEVATIONS
A-301 ARCHITECTURAL SECTIONS - BUILDING
A-351 SECTIONS - EXTERIOR WALL
A-352 SECTIONS - EXTERIOR WALL
A-353 SECTIONS - EXTERIOR WALL
A-401 ARCHITECTURAL ENLARGED PLANS & INTERIOR ELEVATIONS
A-402 ARCHITECTURAL ENLARGED PLANS & INTERIOR ELEVATIONS
A-501 PLAN DETAILS & ROOF DETAILS
A-502 PLAN DETAILS & SECTIONS
A-503 PLAN DETAILS & ROOF DETAILS
A-551 DETAILS - INTERIOR
A-571 ARCHITECTURAL CEILING DETAILS
A-601 DOOR AND WINDOW SCHEDULE AND ELEVATIONS
A-603 DOOR AND WINDOW DETAILS
A-720 STANDARD PARTITION TYPES
A-721 PARTITION HEAD DETAILS
A-722 PARTITION FRAMING DETAILS
A-730 TYPICAL MOUNTING HEIGHTS
SIGNAGE
AW100 ARCHITECTURAL SIGNAGE ABBREVIATIONS, SYMBOLS, GENERAL NOTES AND
SCHEDULE
AW101C ARCHITECTURAL SIGNAGE PLAN - FIRST FLOOR - C WING
AW101D ARCHITECTURAL SIGNAGE PLAN - FIRST FLOOR - D WING
INTERIORS
IN001 INTERIOR FINISH ABBREVIATIONS, SYMBOLS, GENERAL NOTES AND
FINISH BOARDS
IN100 INTERIOR FLOOR FINISH PLAN - BASEMENT
IN101C INTERIOR FLOOR FINISH PLAN - FIRST FLOOR - C WING
IN101D INTERIOR FLOOR FINISH PLAN - FIRST FLOOR - D WING
IN102C INTERIOR WALL FINISH PLAN - FIRST FLOOR - C WING
IN102D INTERIOR WALL FINISH PLAN - FIRST FLOOR - D WING
00 01 15 - 3
IN501 DETAILS - INTERIOR FINISH
IN502 DETAILS - INTERIOR FINISH
IN601 INTERIOR FINISH LEGEND AND SCHEDULES
IN901 INTERIOR 3D CONCEPT IMAGES
FURNITURE
IF101 INTERIOR FUNRITURE PLAN - FIRST FLOOR – OVERALL
IF101C INTERIOR FURNITURE PLAN - FIRST FLOOR - C WING
IF101D INTERIOR FURNITURE PLAN - FIRST FLOOR - D WING
EQUIPMENT
Q-101 EQUIPMENT PLAN - FIRST FLOOR – OVERALL
Q-101C EQUIPMENT PLAN - FIRST FLOOR - C WING
Q-101D EQUIPMENT PLAN - FIRST FLOOR - D WING
Q-601 EQUIPMENT SCHEDULE
FIRE PROTECTION
F-001 FIRE PROTECTION NOTES AND LEGEND
FD100 FIRE PROTECTION DEMOLITION PLAN - BASEMENT FLOOR
FD101C FIRE PROTECTION DEMOLITION PLAN - FIRST FLOOR - C WING
FD101D FIRE PROTECTION DEMOLITION PLAN - FIRST FLOOR - D WING
FP100 FIRE PROTECTION RENOVATION PLAN - BASEMENT FLOOR
FP101C FIRE PROTECTION RENOVATION PLAN - FIRST FLOOR - C WING
FP101D FIRE PROTECTION RENOVATION PLAN - FIRST FLOOR - D WING
FP111C FIRE PROTECTION ZONING PLAN - FIRST FLOOR - C WING
FP111D FIRE PROTECTION ZONING PLAN - FIRST FLOOR - D WING
FP121C FIRE PROTECTION CEILING PLAN - FIRST FLOOR - C WING
FP121D FIRE PROTECTION CEILING PLAN - FIRST FLOOR - D WING
PLUMBING
P-001 PLUMBING NOTES AND LEGEND
PD100 PLUMBING DEMOLITION PLAN - SUB-BASEMENT FLOOR
PD101C PLUMBING DEMOLITION PLAN - FIRST FLOOR - C WING
PD101D PLUMBING DEMOLITION PLAN - FIRST FLOOR - D WING
PK100 PLUMBING COORDINATION PLAN - BASEMENT FLOOR - CD CORE
PL100 PLUMBING RENOVATION PLAN - BASEMENT FLOOR - CD CORE
PL101C PLUMBING RENOVATION PLAN - FIRST FLOOR - C WING
PL101D PLUMBING RENOVATION PLAN - FIRST FLOOR - D WING
PL110 PLUMBING DOMESTIC WATER RENOVATION PLAN - SUB-BASEMENT FLOOR
PL111C PLUMBING DOMESTIC WATER RENOVATION PLAN - FIRST FLOOR - C WING
PL111D PLUMBING DOMESTIC WATER RENOVATION PLAN - FIRST FLOOR - D WING
PL401 PLUMBING ENLARGED FLOOR PLANS
PW301 PLUMBING ISOMETRIC - WASTE AND VENT
PW302 PLUMBING ISOMETRIC - DOMESTIC WATER
P-501 PLUMBING DETAILS
MECHANICAL
M-001 HVAC NOTES AND LEGEND
M-002 HVAC SCHEDULES
M-003 HVAC PHASING SCHEMATIC
M-004 HVAC PHASING SCHEMATIC - WALK-IN COOLERS
MD100 HVAC DEMOLITION PLAN - BASEMENT FLOOR
MD101C HVAC DEMOLITION PLAN - FIRST FLOOR - C WING
MD101D HVAC DEMOLITION PLAN - FIRST FLOOR - D WING
MD101M HVAC DEMOLITION PLAN - FIRST FLOOR - MECHANICAL ROOM
00 01 15 - 4
MH100 HVAC RENOVATION PLAN - BASEMENT FLOOR
MH101C HVAC RENOVATION PLAN - FIRST FLOOR - C WING
MH101D HVAC RENOVATION PLAN - FIRST FLOOR - D WING
MH101M HVAC RENOVATION PLAN - FIRST FLOOR - MECHANICAL ROOM
MH102M HVAC RENOVATION PLAN - PART PLANS - MECHANICAL ROOM
MH111C HVAC AIRFLOW PLAN - FIRST FLOOR - C WING
MH111D HVAC AIRFLOW PLAN - FIRST FLOOR - D WING
MP101C HVAC PIPING RENOVATION PLAN - FIRST FLOOR - C WING
MP101D HVAC PIPING RENOVATION PLAN - FIRST FLOOR - D WING
MP101M HVAC PIPING RENOVATION PLAN - FIRST FLOOR - MECHANICAL ROOM
M-501 HVAC DETAILS
M-502 HVAC DETAILS
M-503 HVAC DETAILS
M-601 MECHANICAL CONTROLS
M-602 MECHANICAL CONTROLS
ELECTRICAL
E-001 NOTES AND LEGEND – ELECTRICAL
ED100 ELECTRICAL LIGHTING AND POWER DEMOLITION PLAN - BASEMENT - C & D WING
ED101C ELECTRICAL POWER DEMOLITION PLAN - FIRST FLOOR - C WING
ED101D ELECTRICAL POWER DEMOLITION PLAN - FIRST FLOOR - D WING
ED201C ELECTRICAL LIGHTING DEMOLITION PLAN - FIRST FLOOR - C WING
ED201D ELECTRICAL LIGHTING DEMOLITION PLAN - FIRST FLOOR - D WING
EL101C ELECTRICAL LIGHTING PLAN - FIRST FLOOR - C WING
EL101D ELECTRICAL LIGHTING PLAN - FIRST FLOOR - D WING
EM101C ELECTRICAL MECHANICAL POWER PLAN - FIRST FLOOR - C WING
EM101D ELECTRICAL MECHANICAL POWER PLAN - FIRST FLOOR - D WING
EP100 ELECTRICAL POWER PLAN - BASEMENT FLOOR - C & D WING
EP101C ELECTRICAL POWER PLAN - FIRST FLOOR - C WING
EP101D ELECTRICAL POWER PLAN - FIRST FLOOR - D WING
ET101C ELECTRICAL TELECOMMUNICATIONS PLAN - FIRST FLOOR - C WING
ET101D ELECTRICAL TELECOMMUNICATIONS PLAN - FIRST FLOOR - D WING
EY101C ELECTRICAL AUXILIARY SYSTEMS - FIRST FLOOR - C WING
EY101D ELECTRICAL AUXILIARY SYSTEMS - FIRST FLOOR - D WING
EF101C ELECTRICAL FIRE ALARM PLAN - FIRST FLOOR - C WING
EF101D ELECTRICAL FIRE ALARM PLAN - FIRST FLOOR - D WING
E-501 ELECTRICAL DETAILS
E-502 ELECTRICAL DETAILS
E-601 ELECTRICAL ONE-LINE DIAGRAM
E-602 ELECTRICAL SCHEDULES
E-603 ELECTRICAL SCHEDULES
E-604 ELECTRICAL SCHEDULES
Grand total: 174
- - - E N D - - -
Bid Form
00 41 13 - 1
SECTION 00 41 13
BID FORM
DATE: ____________________________
Bidder, __________________________, a * _________________________ organized and existing under the laws of the State of __________________________, does business as **
* Insert corporation, partnership, or individual, as applicable.
** Insert trade or business name.
TO: Samuel S. Stratton VA Medical Center, Albany, New York
Hereinafter referred to as Owner
Technical Evaluation Board:
The Bidder, in compliance with your invitation for bids for construction of: 528-811 Consolidate Primary
Care 1st Floor – Building 1, having examined the Bidding Documents prepared by Triple C - The A/E
Group, and other related documents and being familiar with site of proposed Work, and with all conditions surrounding construction of proposed Project including availability of materials and labor, hereby propose to furnish all labor, materials, tools, equipment, machinery, equipment rental, transportation, superintendence, perform all Work, provide all services, and to construct all Work in accordance with
Bidding Documents, within time and amounts stated herein. These amounts are to cover all expenses incurred in performing Work required under Bidding Documents, of which this Bid is a part.
Bidder, if awarded contract, hereby agrees to commence Work under this contract on or before a date to be specified in Contract Agreement or written “Notice to Proceed” from Owner and to obtain Substantial
Completion of Project within ____________________________ (Bidder to fill in) consecutive calendar days thereafter.
Bid amount shall be expressed in words and in figures. In case of discrepancy, amount shown in words will govern.
BASE BID - FOR CONTRACT: Bidder agrees to perform all Work as described in Bidding Documents, for Lump Sum of ________________________________________ dollars (Bidder to fill in)
Following Alternates shall be expressed in words and figures as add/deduct to Base Bid as indicated.
Cross out terms, “Add” or “Deduct” as applicable. In case of discrepancy, amount shown in words will govern. See Division 01 for description.
00 41 13 - 2
ALTERNATE 1: Add/Deduct the sum of _____________________________ ($ ________________ )
Dollars
ALTERNATE 2: Add/Deduct the sum of _____________________________ ($ ________________ )
ALTERNATE 3: Add/Deduct the sum of ______________________________ ($ ________________ )
ALTERNATE 4: Add/Deduct the sum of ______________________________ ($ ________________ )
ALTERNATE 5: Add/Deduct the sum of ______________________________ ($ ________________ )
ALTERNATE 6: Add/Deduct the sum of ______________________________ ($ ________________ )
ALTERNATE 7: Add/Deduct the sum of ______________________________ ($ ________________ )
ALTERNATE 8: Add/Deduct the sum of ______________________________ ($ ________________ )
ALTERNATE 9: Add/Deduct the sum of ______________________________ ($ ________________ )
ALTERNATE 10: Add/Deduct the sum of _____________________________ ($ ________________ )
Following Unit Prices shall be expressed in words and figures. In case of discrepancy, amount shown in words will govern. See Division 01 for descriptions.
UNIT PRICE 1, additive:
The sum of __________________________ ($__________ ) Dollars Per ________________________.
00 41 13 - 3
UNIT PRICE 1, deductive:
UNIT PRICE 2, additive:
UNIT PRICE 2, deductive:
UNIT PRICE 3, additive:
UNIT PRICE 3, deductive:
Bidder agrees that this Bid shall be good and will not be withdrawn for period of 90 calendar days after date for opening of bid.
Bidder understands that Owner reserves right to reject any or all bids and to waive any informalities or irregularities therein.
Bid Security attached in sum of _____________________________ ($_________________), as required by Instructions to Bidders, becomes property of Owner in event contract agreement is not executed and
Performance Bond, and Labor and Material Payment Bonds are not delivered within time set forth.
Upon notice of award of this Bid, bidder and Owner will execute Contract Agreement prior to start of
Work, but not later than 15 days after Notice to Proceed.
If awarded a contract, Contractor shall furnish Performance Bond, and Labor and Material Payment Bond within three days following date agreement is entered into, and prior to commencement of Work. The bidder’s Surety for Performance and Payment Bonds will be: __________________________________
00 41 13 - 4
Bidder acknowledges receipt of following addenda: _________________________________________.
Bidder shall fill out the Construction Cost Estimate Breakdown tables included with this Bid Form and attached
00 41 13 - 5
Respectfully submitted, Contractor License Number: ____________________________
Expiration Date: ____________________________
Signature if an Individual: ____________________________
Doing Business as: ____________________________
Business Address: ____________________________
If a Partnership: ____________________________
By: ____________________________ Member of Firm
________________________ Member of Firm
If a Corporation ____________________________
By: _________________________ Title: ______________________
Telephone Number: ____________________________
END OF BID FORM
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
PROJECT NUMBER $
WORK LOCATION
LINE
NO. SPEC (#)
ITEM
(1)
UNIT OF
MEASURE
(2)
QUANTITY
(3)
UNIT
(4)
TOTAL
(5)
MANHOURS
MANDAYS
(6)
AVERAGE
RATE
(7)
TOTAL
(8)
OTHER
DIRECT
COSTS
(9)
UNIT
(10)
TOTAL
(11)
LINE TOTAL
(12)
1 01 00 00 General Requirements -$ -$ -$ -$ -$ -$ -$
2 Mulitple Coordination Drawings LS -$ -$ -$ -$ -$ -$ -$
3 01 32 16 Project Schedules (Small Projects -
Design-Bid-Build
4 01 33 23 Shop Drawings, Product Data, and
Samples
5 01 33 24 Electronic Submittal Procedures -$ -$ -$ -$ -$ -$ -$
6 01 35 26 Safety/ICRA -$ -$ -$ -$ -$ -$ -$
7 01 45 00 Quality Control -$ -$ -$ -$ -$ -$ -$
8 01 45 29 Testing Laboaratory Services -$ -$ -$ -$ -$ -$ -$
9 01 45 35 Special Inspections -$ -$ -$ -$ -$ -$ -$
10 01 57 19 Temporary Environmental Controls -$ -$ -$ -$ -$ -$ -$
11 01 58 16 Temporary Interior Signage -$ -$ -$ -$ -$ -$ -$
12 01 74 19 Construction Waste Management -$ -$ -$ -$ -$ -$ -$
13 01 81 13 Sustainable Construction
Requirements
14 01 91 00 General Commissioning Requirements -$ -$ -$ -$ -$ -$ -$
16 02 41 00 Demolition -$ -$ -$ -$ -$ -$ -$
18 02 82 11 Traditional Asbestos Abatement -$ -$ -$ -$ -$ -$ -$
19 02 82 13.13 Glovebag Asbestos Abatement -$ -$ -$ -$ -$ -$ -$
20 02 82 13.19 Asbestos Floor Title and Mastic
Abatement
24 02 83 33.13 Lead-Based Paint Removal and
Disposal
27 03 30 53 (Short-Form) Cast-in-Place Concrete
DIVISION 04 - MASONRY -$
36 04 01 00 Maintenance of Masonry -$ -$ -$ -$ -$ -$ -$
37 04 05 13 Masonry Mortaring -$ -$ -$ -$ -$ -$ -$
38 04 05 16 Masonry Grouting -$ -$ -$ -$ -$ -$ -$
MATERIAL COST
CLIN 00 (BASE BID) - CONSTRUCTION COST ESTIMATE BREAKDOWN
528-811 Albany Stratton VA Medical Center - Consolidate
Primary Care 1st Floor
Albany Stratton VA Medical Center
PURCHASE REQUEST NUMBER
LABOR COSTS EQUIPMENT COST
DIVISION 01 - GENERAL REQUIREMENTS
DIVISION 03 - CONCRETE
DIVISION 02 - EXISTING CONDITIONS
CONTRACTOR ADDRESS
PROJECT NUMBER $
WORK LOCATION
LINE
NO. SPEC (#)
ITEM
(1)
UNIT OF
MEASURE
(2)
QUANTITY
(3)
UNIT
(4)
TOTAL
(5)
MANHOURS
MANDAYS
(6)
AVERAGE
RATE
(7)
TOTAL
(8)
OTHER
DIRECT
COSTS
(9)
UNIT
(10)
TOTAL
(11)
LINE TOTAL
(12)
MATERIAL COST
CLIN 00 (BASE BID) - CONSTRUCTION COST ESTIMATE BREAKDOWN
528-811 Albany Stratton VA Medical Center - Consolidate
Primary Care 1st Floor
Albany Stratton VA Medical Center
PURCHASE REQUEST NUMBER
LABOR COSTS EQUIPMENT COST
41 05 12 00 Structural Steel Framing -$ -$ -$ -$ -$ -$ -$
44 05 36 00 Composite Metal Decking -$ -$ -$ -$ -$ -$ -$
45 05 40 00 Cold-Formed Metal Framing -$ -$ -$ -$ -$ -$ -$
46 05 50 00 Metal Fabrications -$ -$ -$ -$ -$ -$ -$
48 06 06 60 Plastic Fabrications Resin Panels -$ -$ -$ -$ -$ -$ -$
49 06 10 00 Rough Carpentry -$ -$ -$ -$ -$ -$ -$
52 07 01 50.19 Preparation for Re-Roofing -$ -$ -$ -$ -$ -$ -$
53 07 08 00 Facility Exterior Closure
Commissioning
57 07 13 00 Sheet Waterproofing -$ -$ -$ -$ -$ -$ -$
61 07 21 13 Thermal Insulation -$ -$ -$ -$ -$ -$ -$
63 07 22 00 Roof and Deck Insulation -$ -$ -$ -$ -$ -$ -$
64 07 24 00 Exterior Insulation and Finish Systems
65 07 27 26 Fluid-Applied Membrane Air Barrier, Vapor Permeable
74 07 51 13.13 Cold-Applied Built-Up Asphalt
Roofing
77 07 53 23 Ethylene-Propylene-Diene-Monomer
Roofing
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
DIVISION 06 - WOODS, PLASTICS AND COMPOSITES
DIVISION 05 - METALS
CONTRACTOR ADDRESS
PROJECT NUMBER $
WORK LOCATION
LINE
NO. SPEC (#)
ITEM
(1)
UNIT OF
MEASURE
(2)
QUANTITY
(3)
UNIT
(4)
TOTAL
(5)
MANHOURS
MANDAYS
(6)
AVERAGE
RATE
(7)
TOTAL
(8)
OTHER
DIRECT
COSTS
(9)
UNIT
(10)
TOTAL
(11)
LINE TOTAL
(12)
MATERIAL COST
CLIN 00 (BASE BID) - CONSTRUCTION COST ESTIMATE BREAKDOWN
528-811 Albany Stratton VA Medical Center - Consolidate
Primary Care 1st Floor
Albany Stratton VA Medical Center
PURCHASE REQUEST NUMBER
LABOR COSTS EQUIPMENT COST
83 07 60 00 Flashing and Sheet Metal -$ -$ -$ -$ -$ -$ -$
87 07 81 00 Applied Fireproofing -$ -$ -$ -$ -$ -$ -$
88 07 84 00 Firestopping -$ -$ -$ -$ -$ -$ -$
89 07 92 00 Joint Sealants -$ -$ -$ -$ -$ -$ -$
91 08 11 13 Hollow Metal Doors and Frames
93 08 14 00 Interior Wood Doors -$ -$ -$ -$ -$ -$ -$
95 08 31 13 Access Doors and Frames -$ -$ -$ -$ -$ -$ -$
102 08 36 13 Sectional Doors -$ -$ -$ -$ -$ -$ -$
103 08 36 16.13 High Performance Barn (Sliding) Door
105 08 41 13 Aluminum-Framed Entrances and
Storefronts
113 08 56 53 Blast Resistant Windows -$ -$ -$ -$ -$ -$ -$
117 08 71 00 Door Hardware -$ -$ -$ -$ -$ -$ -$
120 08 80 00 Glazing -$ -$ -$ -$ -$ -$ -$
121 08 90 00 Louvers and Vents -$ -$ -$ -$ -$ -$ -$
DIVISION 08 - OPENINGS
CONTRACTOR ADDRESS
PROJECT NUMBER $
WORK LOCATION
LINE
NO. SPEC (#)
ITEM
(1)
UNIT OF
MEASURE
(2)
QUANTITY
(3)
UNIT
(4)
TOTAL
(5)
MANHOURS
MANDAYS
(6)
AVERAGE
RATE
(7)
TOTAL
(8)
OTHER
DIRECT
COSTS
(9)
UNIT
(10)
TOTAL
(11)
LINE TOTAL
(12)
MATERIAL COST
CLIN 00 (BASE BID) - CONSTRUCTION COST ESTIMATE BREAKDOWN
528-811 Albany Stratton VA Medical Center - Consolidate
Primary Care 1st Floor
Albany Stratton VA Medical Center
PURCHASE REQUEST NUMBER
LABOR COSTS EQUIPMENT COST
122 09 05 16 Subsurface Preparation for Floor
Finishes
124 09 22 16 Non-Structural Metal Framing -$ -$ -$ -$ -$ -$ -$
128 09 29 00 Gypsum Board -$ -$ -$ -$ -$ -$ -$
129 09 30 13 Ceramic Porcelain Tiling -$ -$ -$ -$ -$ -$ -$
130 09 51 00 Acoustical Ceilings -$ -$ -$ -$ -$ -$ -$
134 09 65 13 Resilient Base and Accessories -$ -$ -$ -$ -$ -$ -$
135 09 65 16 Resilient Sheet Flooring -$ -$ -$ -$ -$ -$ -$
136 09 65 19 Resilient Tile Flooring -$ -$ -$ -$ -$ -$ -$
151 09 91 00 Painting -$ -$ -$ -$ -$ -$ -$
DIVISION 09 - FINISHES
CONTRACTOR ADDRESS
PROJECT NUMBER $
WORK LOCATION
LINE
NO. SPEC (#)
ITEM
(1)
UNIT OF
MEASURE
(2)
QUANTITY
(3)
UNIT
(4)
TOTAL
(5)
MANHOURS
MANDAYS
(6)
AVERAGE
RATE
(7)
TOTAL
(8)
OTHER
DIRECT
COSTS
(9)
UNIT
(10)
TOTAL
(11)
LINE TOTAL
(12)
MATERIAL COST
CLIN 00 (BASE BID) - CONSTRUCTION COST ESTIMATE BREAKDOWN
528-811 Albany Stratton VA Medical Center - Consolidate
Primary Care 1st Floor
Albany Stratton VA Medical Center
PURCHASE REQUEST NUMBER
LABOR COSTS EQUIPMENT COST
154 10 11 13 Chalkboards and Markerboards -$ -$ -$ -$ -$ -$ -$
158 10 14 00 Signage -$ -$ -$ -$ -$ -$ -$
161 10 21 23 Cubicle Curtain Tracks -$ -$ -$ -$ -$ -$ -$
164 10 22 26.13 Accordion Folding Partitions -$ -$ -$ -$ -$ -$ -$
166 10 26 00 Wall and Door Protection -$ -$ -$ -$ -$ -$ -$
167 10 28 00 Toilet, Bath, and Laundry Accessories
168 10 44 13 Fire Extinguisher Cabinets -$ -$ -$ -$ -$ -$ -$
170 10 81 13 Bird Control Devices -$ -$ -$ -$ -$ -$ -$
188 11 73 00 Ceiling Mounted Patient Lift System
DIVISION 11 – EQUIPMENT
DIVISION 10 - SPECIALTIES
CONTRACTOR ADDRESS
PROJECT NUMBER $
WORK LOCATION
LINE
NO. SPEC (#)
ITEM
(1)
UNIT OF
MEASURE
(2)
QUANTITY
(3)
UNIT
(4)
TOTAL
(5)
MANHOURS
MANDAYS
(6)
AVERAGE
RATE
(7)
TOTAL
(8)
OTHER
DIRECT
COSTS
(9)
UNIT
(10)
TOTAL
(11)
LINE TOTAL
(12)
MATERIAL COST
CLIN 00 (BASE BID) - CONSTRUCTION COST ESTIMATE BREAKDOWN
528-811 Albany Stratton VA Medical Center - Consolidate
Primary Care 1st Floor
Albany Stratton VA Medical Center
PURCHASE REQUEST NUMBER
LABOR COSTS EQUIPMENT COST
194 12 24 00 Window Shades -$ -$ -$ -$ -$ -$ -$
197 12 32 00 Manufactured Wood Casework -$ -$ -$ -$ -$ -$ -$
200 12 36 00 Countertops -$ -$ -$ -$ -$ -$ -$
202 13 05 41 Seismic Restraint Requirements for
Non-Structural Components
219 14 92 00 Pneumatic Tube -$ -$ -$ -$ -$ -$ -$
220 21 08 00 Commissioning of Fire Suppression
System
223 21 13 13 Wet-Pipe Sprinkler Systems -$ -$ -$ -$ -$ -$ -$
DIVISION 14 – CONVEYING EQUIPMENT
DIVISION 13 – SPECIAL CONSTRUCTION
DIVISION 12 – FURNISHINGS
DIVISION 21 - FIRE SUPPRESSION
CONTRACTOR ADDRESS
PROJECT NUMBER $
WORK LOCATION
LINE
NO. SPEC (#)
ITEM
(1)
UNIT OF
MEASURE
(2)
QUANTITY
(3)
UNIT
(4)
TOTAL
(5)
MANHOURS
MANDAYS
(6)
AVERAGE
RATE
(7)
TOTAL
(8)
OTHER
DIRECT
COSTS
(9)
UNIT
(10)
TOTAL
(11)
LINE TOTAL
(12)
MATERIAL COST
CLIN 00 (BASE BID) - CONSTRUCTION COST ESTIMATE BREAKDOWN
528-811 Albany Stratton VA Medical Center - Consolidate
Primary Care 1st Floor
Albany Stratton VA Medical Center
PURCHASE REQUEST NUMBER
LABOR COSTS EQUIPMENT COST
228 22 05 11 Common Work Results for Plumbing
229 22 05 12 General Motor Requirements for
Plumbing Equipment
230 22 05 19 Meters and Gauges for Plumbing
Piping
231 22 05 23 General-Duty Valves for Plumbing
Piping
233 22 07 11 Plumbing Insulation -$ -$ -$ -$ -$ -$ -$
234 22 08 00 Commissioning of Plumbing Systems
236 22 11 00 Facility Water Distribution -$ -$ -$ -$ -$ -$ -$
237 22 11 23 Domestic Water Pumps -$ -$ -$ -$ -$ -$ -$
239 22 13 00 Facility Sanitary and Vent Piping
244 22 14 00 Facility Storm Drainage -$ -$ -$ -$ -$ -$ -$
250 22 33 00 Electric Domestic Water Heaters
251 22 34 00 Fuel-Fired Domestic Water Heaters
252 22 35 00 Domestic Water Heat Exchangers
253 22 40 00 Plumbing Fixtures -$ -$ -$ -$ -$ -$ -$
264 23 05 11 Common Work Results for HVAC
266 23 05 41 Noise and Vibration Control for
HVAC Piping and Equipment
268 23 05 93 Testing, Adjusting, and Balancing for
HVAC
270 23 07 11 HVAC, Plumbing, and Boiler Plant
Insulation
271 23 08 00 Commissioning of HVAC Systems
275 23 09 23 Direct-Digital Control System for
HVAC
279 23 21 13 Hydronic Piping -$ -$ -$ -$ -$ -$ -$
280 23 21 23 Hydronic Pumps -$ -$ -$ -$ -$ -$ -$
281 23 22 13 Steam and Condensate Heating Piping
282 23 22 23 Steam Condensate Pumps -$ -$ -$ -$ -$ -$ -$
283 23 23 00 Refrigeration Piping -$ -$ -$ -$ -$ -$ -$
284 23 25 00 HVAC Water Treatment -$ -$ -$ -$ -$ -$ -$
285 23 31 00 HVAC Ducts and Casings -$ -$ -$ -$ -$ -$ -$
286 23 34 00 HVAC Fans -$ -$ -$ -$ -$ -$ -$
287 23 36 00 Air Terminal Units -$ -$ -$ -$ -$ -$ -$
288 23 37 00 Air Outlets and Inlets -$ -$ -$ -$ -$ -$ -$
290 23 40 00 HVAC Air Cleaning Devices -$ -$ -$ -$ -$ -$ -$
302 23 73 00 Indoor Central-Station Air-Handling
Units
304 23 81 00 Decentralized Unitary HVAC
Equipment
306 23 81 43 Air-Source Unitary Heat Pumps -$ -$ -$ -$ -$ -$ -$
309 23 82 00 Convection Heating and Cooling Units
310 23 82 16 Air Coils -$ -$ -$ -$ -$ -$ -$
311 23 84 00 Humidity Control Equipment -$ -$ -$ -$ -$ -$ -$
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
DIVISION 22 - PLUMBING
DIVISION 25 - INTEGEGRATED AUTOMATION
CONTRACTOR ADDRESS
PROJECT NUMBER $
WORK LOCATION
LINE
NO. SPEC (#)
ITEM
(1)
UNIT OF
MEASURE
(2)
QUANTITY
(3)
UNIT
(4)
TOTAL
(5)
MANHOURS
MANDAYS
(6)
AVERAGE
RATE
(7)
TOTAL
(8)
OTHER
DIRECT
COSTS
(9)
UNIT
(10)
TOTAL
(11)
LINE TOTAL
(12)
MATERIAL COST
CLIN 00 (BASE BID) - CONSTRUCTION COST ESTIMATE BREAKDOWN
528-811 Albany Stratton VA Medical Center - Consolidate
Primary Care 1st Floor
Albany Stratton VA Medical Center
PURCHASE REQUEST NUMBER
LABOR COSTS EQUIPMENT COST
312 25 10 10 Advanced Utility Metering System -$ -$ -$ -$ -$ -$ -$
CONTRACTOR ADDRESS
PROJECT NUMBER $
WORK LOCATION
LINE
NO. SPEC (#)
ITEM
(1)
UNIT OF
MEASURE
(2)
QUANTITY
(3)
UNIT
(4)
TOTAL
(5)
MANHOURS
MANDAYS
(6)
AVERAGE
RATE
(7)
TOTAL
(8)
OTHER
DIRECT
COSTS
(9)
UNIT
(10)
TOTAL
(11)
LINE TOTAL
(12)
MATERIAL COST
CLIN 00 (BASE BID) - CONSTRUCTION COST ESTIMATE BREAKDOWN
528-811 Albany Stratton VA Medical Center - Consolidate
Primary Care 1st Floor
Albany Stratton VA Medical Center
PURCHASE REQUEST NUMBER
LABOR COSTS EQUIPMENT COST
313 26 05 11 Requirements for Electrical
Installations
315 26 05 19 Low-Voltage Electrical Power
Conductors and Cables
316 26 05 26 Grounding and Bonding for Electrical
Systems
317 26 05 33 Raceway and Boxes for Electrical
Systems
318 26 05 36 Wireways for Radiology Equipment
321 26 05 73 Overcurrent Protective Device
Coordination Study
322 26 08 00 Commissioning of Electrical Systems
324 26 09 23 Lighting Controls -$ -$ -$ -$ -$ -$ -$
334 26 24 16 Panelboards -$ -$ -$ -$ -$ -$ -$
336 26 25 11 Busways -$ -$ -$ -$ -$ -$ -$
338 26 27 26 Wiring Devices -$ -$ -$ -$ -$ -$ -$
339 26 29 11 Motor Controllers -$ -$ -$ -$ -$ -$ -$
340 26 29 21 Enclosed Switches and Circuit
Breakers
348 26 51 00 Interior Lighting -$ -$ -$ -$ -$ -$ -$
350 26 56 00 Exterior Lighting -$ -$ -$ -$ -$ -$ -$
DIVISION 26 - ELECTRICAL
CONTRACTOR ADDRESS
PROJECT NUMBER $
WORK LOCATION
LINE
NO. SPEC (#)
ITEM
(1)
UNIT OF
MEASURE
(2)
QUANTITY
(3)
UNIT
(4)
TOTAL
(5)
MANHOURS
MANDAYS
(6)
AVERAGE
RATE
(7)
TOTAL
(8)
OTHER
DIRECT
COSTS
(9)
UNIT
(10)
TOTAL
(11)
LINE TOTAL
(12)
MATERIAL COST
CLIN 00 (BASE BID) - CONSTRUCTION COST ESTIMATE BREAKDOWN
528-811 Albany Stratton VA Medical Center - Consolidate
Primary Care 1st Floor
Albany Stratton VA Medical Center
PURCHASE REQUEST NUMBER
LABOR COSTS EQUIPMENT COST
351 27 05 11 Requirements for Communications
Installations
352 27 05 26 Grounding and Bonding for
Communications Systems
353 27 05 33 Raceways and Boxes for
Communications Systems
355 27 08 00 Commissioning of Communications
Systems
357 27 10 00 Control, Communication and Signal
Wiring
358 27 11 00 Communications Equipment Room
Fittings
359 27 15 00 Communications Structured Cabling
364 27 51 16 Public Address and Mass Notification
Systems
366 27 52 23 Nurse Call and Code Blue Systems
DIVISION 27 -COMMUNICATIONS
CONTRACTOR ADDRESS
PROJECT NUMBER $
WORK LOCATION
LINE
NO. SPEC (#)
ITEM
(1)
UNIT OF
MEASURE
(2)
QUANTITY
(3)
UNIT
(4)
TOTAL
(5)
MANHOURS
MANDAYS
(6)
AVERAGE
RATE
(7)
TOTAL
(8)
OTHER
DIRECT
COSTS
(9)
UNIT
(10)
TOTAL
(11)
LINE TOTAL
(12)
MATERIAL COST
CLIN 00 (BASE BID) - CONSTRUCTION COST ESTIMATE BREAKDOWN
528-811 Albany Stratton VA Medical Center - Consolidate
Primary Care 1st Floor
Albany Stratton VA Medical Center
PURCHASE REQUEST NUMBER
LABOR COSTS EQUIPMENT COST
369 28 05 00 Common Work Results for Electronic
Safety and Security
370 28 05 13 Conductors and Cables for Electronic
Safety and Security
371 28 05 26 Grounding and Bonding for Electronic
Safety and Security
372 28 05 28.33 Conduits and Backboxes for
Electronic Safety and Security
373 28 08 00 Commissioning of Electronic Safety and Security Systems
375 28 13 00 Physical Access Control System
378 28 16 00 Intrusion Detection System -$ -$ -$ -$ -$ -$ -$
379 28 23 00 Video Surveillance -$ -$ -$ -$ -$ -$ -$
380 28 26 00 Electronic Personal Protection System
381 28 31 00 Fire Detection and Alarm -$ -$ -$ -$ -$ -$ -$
DIVISION 33 - UTILITIES
DIVISION 32 - EXTERIOR IMPROVEMENTS
DIVISION 31 - EARTHWORK
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
CONTRACTOR ADDRESS
PROJECT NUMBER $
WORK LOCATION
LINE
NO. SPEC (#)
ITEM
(1)
UNIT OF
MEASURE
(2)
QUANTITY
(3)
UNIT
(4)
TOTAL
(5)
MANHOURS
MANDAYS
(6)
AVERAGE
RATE
(7)
TOTAL
(8)
OTHER
DIRECT
COSTS
(9)
UNIT
(10)
TOTAL
(11)
LINE TOTAL
(12)
MATERIAL COST
CLIN 00 (BASE BID) - CONSTRUCTION COST ESTIMATE BREAKDOWN
528-811 Albany Stratton VA Medical Center - Consolidate
Primary Care 1st Floor
Albany Stratton VA Medical Center
PURCHASE REQUEST NUMBER
LABOR COSTS EQUIPMENT COST
412 Mulitple As-Builts/O&M Manuals LS -$ -$ -$ -$ -$ -$ -$
-$ Total
CLOSE-OUT DOCUMENTS
DIVISION 34 - TRANSPORTATION
DIVISION 48 — ELECTRICAL POWER GENERATION
General Requirements
01 00 00 - 1
SECTION 01 00 00
GENERAL REQUIREMENTS
PART 1 - GENERAL
1.1 SAFETY REQUIREMENTS
A. Refer to section 01 35 26, SAFETY REQUIREMENTS for safety and infection control requirements.
1.2 GENERAL INTENTION
A. Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform work for Additions and Renovations to Consolidate Primary Care on the First Floor (phase 1) of the Samuel S Stratton VA Medical Center, .as required by drawings and specifications.
B. Visits to the site by Bidders may be made only by appointment with the Contracting Officer’s Representative (COR).
C. Offices of Triple C, as Architect-Engineers, will render certain technical services during construction. Such services shall be considered as advisory to the Government and shall not be construed as expressing or implying a contractual act of the Government without affirmations by Contracting Officer or his duly authorized representative. All file transfers, including meeting notes, shop submittals, RFIs, and CORs, will be transferred through an Document Management Site such as A360, Submittal Exchange or Procore, provided by the Contractor
D. Before placement and installation of work subject to tests, the Contractor shall notify the COR in sufficient time to enable key personnel to be present at the site in time for proper taking and testing of specimens and field inspection. Such prior notice shall be not less than three workdays unless otherwise designated by the COR.
E. Contractor is responsible for Asbestos Containing Materials (ACM) removal and mitigation where it occurs inside the area of work. There will be no cost to the Government for any removal, testing, oversight, or clearance of ACM. Traditional and Glovebag Abatement methods as stipulated in Specification Sections 02 82 11 and 02 82 13.13, are the only allowable methods of abatement. No alternate abatement methods will be considered.
F. Contractor to provide Submittal Exchange®, or approved equal (substitutions must be submitted with Contractor Bid), for the duration of the contract. Contractor will provide VA access to the site. Contractor will keep this site current and will use it for all submittals, RFIs, change documents, Record Drawing, electronic file management, and communication logs for the duration of the contract.
G. Contractor to provide Infection Control Plan as required by Memorandum 111-40, Subj:
Guidelines for Infection Control during Renovation and Construction, and Maintenance Activities in Healthcare Facilities dated July 30, 2015. Submit to COR for approval prior to the start of work.
H. Pricing Proposal transparency requirements: this project requires pricing proposals to include breakdown pricing for the General Contractor and all subcontractors. All price proposals, including subcontractor pricing must include a breakdown of pricing per the format included with tis specification. Third party inspections must be included as a line item in the price proposal.
I. The Key Personnel assigned by the contractor for the performance of work on this contract shall be acceptable to VA in terms of personal and professional conduct and technical knowledge.
Should the assignment to this contract of any person by the contractor be deemed to conflict with the interests of VA, or in the event performance is deemed to be unsatisfactory at any time during the life of the contract, the Contracting Officer may notify the contractor and request the person be removed from the assignment. The reason for removal will be documented and a
01 00 00 - 2 request to receive key personnel replacement within three (3) business days of the notification will be made. Replacement of key personnel qualifications shall be equal to or greater than those of the key personnel being replaced. Employment and staffing difficulties will not be justification for failure to meet established schedules. The contractor is required to submit a resume with qualifications for the proposed replacement which shall be approved by the COR and CO prior to the replacement starting work.
J. All employees of general contractor and subcontractors shall comply with VA security management program and obtain permission of the VA police, be identified by project and employer, and restricted from unauthorized access.
1.3 STATEMENT OF BID ITEM(S)
A. Project Scope of Work (Base Bid):
1. Contractor shall completely prepare project area for operations, including demolition and removal of existing elements, and furnish labor and materials and perform work for the Additions and Renovations to Consolidate Primary Care on the First Floor (phase 1) of the Samuel S Stratton VA Medical Center, as required by the drawings and specifications. The work will require construction of two additions at the first-floor level. An 1,807 SF addition on the West side of the old file room (room #108) on the roof of the basement level, and a second mirror image addition (1,807 SF) on the East side of room #108. The remainder of the 1st floor core area (approximately 6,140 SF) shall be renovated.
These three areas combine to form a continuous Patient Aligned Care Team Primary Care Unit.
2. Electrical, Telecommunications, and Security Work: Work includes all labor, material, equipment and supervision to perform new electrical, communications and security systems to the renovated spaces as detailed by the construction drawings and specifications. Provide access control for all the required doors, coordinate with the door hardware schedule for additional requirements. Provide new cameras, associated devices, and equipment.
3. Mechanical, Plumbing, and Fire Protection Work: Work includes all labor, material, equipment and supervision required to perform the work on this project as detailed by the construction drawings and specifications. All new mechanical systems shall be addressable and controllable via the existing Engineering Control Center (ECC) and HVAC Shop. The ECC System shall monitor space conditions and unit status and shall alarm the Facility Operations Staff as detailed by the mechanical Control Drawings and Specifications. Existing building HVAC Systems (Ducts, diffusers, grilles, bracing / supports, etc.) shall also be reconfigured as noted in the drawings and specifications, to maintain existing heating and cooling systems. Contractor is required to Test and Balance (TAB) new and existing HVAC systems. This work required pre-construction TAB readings to establish baseline performance for all existing HVAC systems to remain serving the project Area and adjacent areas. Existing systems shall be re-balanced to pre-construction readings.
4. Contractor shall reconfigure fire protection, piping, and provide additional sprinkler heads to the existing building automatic sprinkler system as required. New Fire Protection systems shall be provided, and existing systems modified per the construction drawings and specifications.
5. Contractor shall reconfigure plumbing and medical gas piping, and provide new piping, fixtures, valves, fittings, and devises as required by the Construction drawings and specifications.
6. All New and affected Existing Systems within the Scope of Work shall be commissioned (or recommissioned) per Specification 01 91 00. Contractor shall appoint an individual under their direct employee to act as their Commissioning Manager (CxM), to coordinate required commissioning activities with the Contractor and Sub-Contractors with the Commissioning Agent (CxA).
1)
01 00 00 - 3
7. Site Work: Site work includes all labor, material, equipment and supervision to repair any damage to hardscape and landscape due to construction work on this project, including materials and construction equipment access to the additions and renovation detailed by the construction drawings and specifications.
a) Protection for existing plantings, trees and hardscape to remain shall be installed, maintained and enforced by contractor
8. The VA has arranged with a third-party individual, company, or firm to act as the Commissioning Agent. The Commissioning Agent is the designated person, company, or entity that plans, schedules, and coordinates the commissioning team to implement the commissioning process. The Contractor shall employ or appoint staff to act as a Commissioning Manager (see 01 91 00) to carry out all commissioning tasks including managing submittal requirements and resolution of the issues log, and coordination with the third party Commissioning Agent.
a. All new and existing systems within the Scope of Work shall be commissioned (or recommissioned) per Specification 01 91 00
B. CLIN ITEM I, GENERAL CONSTRUCTION (BASE BID): Work includes general construction, alterations, necessary removal of existing structures and construction and certain other items as required to perform the Scope of Work.
C. CLIN ITEM 2: ALTERNATE NO.1: BASE BID except delete Refinishing of Existing Roof areas CLIN ITEM 3: ALTERNATE NO.2: ALTERNATE 1 except also delete Pneumatic Tube system.
D. ALTERNATE NO.3: ALTERNATE 2 except also delete Renovation at Offices North of Main Corridor.
E. ALTERNATE NO.4: ALTERNATE 3 except also delete Renovation at Offices South Side of Corridor.
F. ALTERNATE NO.5: ALTERNATE 4 except also delete Renovation at Beneficiary Travel.
G. The expected construction period duration of 550 calendar days includes all pre-construction activity, construction, and post-construction testing, third-party inspections, Owner inspections, and commissioning. Contractor shall submit a comprehensive schedule of work in compliance with 01 32 16.15 PROJECT SCHEDULES (SMALL PROJECTS
DESIGN/BID/BUILD).
1. Contractor shall submit and obtain approval for all project submittals, including coordination drawings, prior to beginning physical construction.
2. Contractor shall perform required commissioning work and noted corrections for commissioning required and performed by the Commissioning Agent, as impacted by the project according to requirements in sections:
a. 01 91 00 – GENERAL COMMISSIONING REQUIREMENTS
b. 21 08 00 – COMMISSIONING OF FIRE SUPPRESSION SYSTEMS.
c. 22 08 00 – COMMISSIONING OF PLUMBING SYSTEMS.
d. 23 08 00 – COMMISSIONING OF HVAC SYSTEMS.
e. 26 08 00 – COMMISSIONING OF ELECTRICAL SYSTEMS.
f. 27 08 00 – COMMISSIONING OF COMMUNICATION SYSTEMS.
g. 28 08 00 – COMMISSIONING OF SECURITY SYSTEMS.
3. A detailed commissioning coordination plan is required to ensure that all systems are calibrated, programmed, and all graphic displays are accurate and approved by applicable VA staff.
1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR
A. Drawings and contract documents may be obtained from the website where the solicitation is posted. Additional copies will be at Contractor's expense.
1.5 CONTRACTOR REQUIREMENTS
A. Prime Contractor Personal Minimum Requirements:
01 00 00 - 4
1. As Required in other parts of the Project Manual and Contract Requirements the following are minimum requirements:
a. The Superintendent shall be an employee of the Prime Contractor with authority to act as the contractor, responsible for the day-to-day operations at the construction site, planning, quality control, verification of delivery of approved material and equipment, subcontractor coordination responsibilities and execution of the complete project as per the contract documents.
1) Superintendent shall have no hands-on construction interaction. In addition, the superintendent shall provide proof to the COR regarding completion of 30 hour OSHA.
2) Superintendent assigned to this project shall not be assigned to any other project and shall only have duties on one project at a time.
3) The Superintendent shall sign-in at the beginning of each day of work and Sign-out at the end of the work day at the Office of Engineering Service. No work shall be performed by any contractors or subcontractors without the presence of the superintendent at the actual work site.
a) Superintendent shall keep a daily sign-in sheet of all personnel entering the construction area. This list shall be available to the COR and VA Police at all times.
4) The Superintendent shall be responsible for submitting daily work logs to the COR at the end of every work day.
b. Site Safety and Health Officer (SSHO) shall be a separate qualified individual from the Prime Contractor’s Superintendent or CQC System Manager with duties only as the SSHO. See 01 35 26 SAFETY REQUIREMENTS for more information on roles and responsibilities for General Contractor’s staff.
c. CQC System Manager shall be a separate qualified individual from the Prime Contractor’s Superintendent or Site Safety and Health Officer (SSHO) with duties only as the CQC System Manager. See Section 01 45 00 Quality Control for more information on roles and responsibilities for CQC Personnel.
d.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .