Drawings I.pdf
PDF 47 MB Posted
- Solicitation number
- 36C24224R0080
About this file
This document appears to be a set of drawings related to a federal construction contract opportunity with the Department of Veterans Affairs (VA) for the consolidation of primary care facilities on the 1st floor of a building. The solicitation number is 36C24224R0080 and the opportunity is a minor construction project titled "Z1DA--MINOR-CONST 528-811 CONSOLIDATE PRIMARY CARE 1st FLOOR PHASE 1." The drawings do not directly address the required products or services, pricing terms, set asides, or other key details of the contract opportunity. This appears to be a supplementary document providing technical drawings or specifications related to the construction project.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 528-811_ASPC_Addendum_1_20240530.pdf | ||
| 36C24224R0080 0004.docx | DOCX document | |
| 528-811_TripleC-CA-SubmittalLOG and Cutsheet Index.xlsx | XLSX spreadsheet | |
| 00 41 13.10 - Construction Estimate Breakdown Template.xlsx | XLSX spreadsheet | |
| Past Performace Questionaire_PPQ.pdf | ||
| PROCEDURES FOR SUBMITTAL OF OFFERS AND PROPOSAL EVALUATION CRITERIA.docx | DOCX document | |
| 36C24224R0080 0003.docx | DOCX document | |
| 36C24224R0080 0002.docx | DOCX document | |
| 36C24224R0080 0001.docx | DOCX document | |
| 36C24222R0080 Project RFI Questions with Responses 6-07-2024.pdf | ||
| Wage Determination.txt | TXT text file | |
| Past Performace Questionaire.pdf | ||
| Drawings II.pdf | ||
| FAR 52.225-2 Buy American Certification.pdf | ||
| Specifications.pdf | ||
| 852.219-77 VA Notice of Limitations on Subcontracting.docx | DOCX document | |
| 36C24224R0080_1.docx | DOCX document | |
| Contractor Projects Form.docx | DOCX document |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Approved By VAMC Director
Engineering Manager
VA Safety Manager
VA Police
Energy Manager
GEMS Coordinator
IT Manager
Approved By Signatures, date(s)
Using Activity Program Manager:
Using Activity Program Manager:
Interior Design
Infection Control
Operations Foreman
Information Security Officer
Sterile Processing Services
Logistics
Food Services
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
C&S Companies 2575 E Camelback Rd, Suite 740 Phoenix, AZ 85016
(602) 997-7536
MES Group 550 North Reo Street Tampa, FL 33609
(813) 289-4700
TRIPLE C THE A&E GROUP
201 E. Jefferson St, Suite 200
Syracuse, NY 13202
(315) 484-5958
Mat Perkins
A u to d e s k D o c s /5
-8
C o n s o lid a te
P ri m a ry
C a re s t
F lo o r
S tr a tt o n V
A M
C /5
-8
.1
-A .r v t
/2
/2
:5
:5
A
M
GI000
COVER SHEET 528-811
BLDG 1
08/10/2023 M .PERKINS K.MACAULAY
ISSUED FOR BIDDING CONSOLIDATE PRIMARY CARE ON
FIRST FLOOR
113 Holland Ave, Albany, NY 12208
ISSUED FOR BIDDING
08/10/2023
528-811 CONSOLIDATE PRIMARY CARE
ON FIRST FLOOR - BLDG 1
SAMUEL S. STRATTON VA MEDICAL CENTER
CO: Tony Clemente Contracting Officer
Construction Team 2 Department of Veterans Affairs Network Contracting Office - NCO2 VHA Regional Procurement Office East
20 Madison Ave Extension Albany, NY 12203 518-626-6979 office 518-258-5483 cell 518-626-6144 fax
COR: Joseph Whitney, PE VA Samuel S. Stratton VAMC 113 Holland Ave Albany, NY 12203 518-626-7267 office
C&S TEAM:
Name: Juan Lozoya Email: jlozoya@cscos.com Discipline/Role: Structural Engineer Telephone: (602) 422-8634
Name: Benhang Shi Email: BShi@cscos.com Discipline/role: Structural Engineer Telephone: (713) 416-8094
Name: Charles Vonnahme Email: CVonnahme@cscos.com Discipline/role: BIM- Structural Telephone: (602) 422-8630 Ext: 3902
Name: Margarita Oreshkova Email: MOreshkova@cscos.com Discipline/role: BIM- Structural Telephone: (602) 422-8630 Ext: 6246
MES TEAM:
Name: Nick Stephenson Email: nick.stephenson@mesgroupinc.com Discipline: Mechanical Telephone: 813.331.5093 direct
813.310.7465
Name: Dion Motl Email: dion.motl@mesgroupinc.com Discipline: MPFP Phone: 813-331-5094
Name: Susan Yongue Email: susan.yongue@mesgroupinc.com Discipline: Electrical Phone: 813-331-5083
Name: David Keith Email: david.keith@mesgroupinc.com Discipline: Electrical
THERE IS NO LEAD OR ASBESTOS MATERIAL DESIGNED INTO THIS PROJECT.
_____________________________________________________________SIGNATURE __________________________DATE
AUTHOR: MAT PERKINS, AIA, NCARB, PMP, LEED AP BD+C
TRIPLE C - THE A&E GROUP
THIRD-PARTY INSPECTIONS: COMPREHENSIVE THIRD-PARTY INSPECTIONS, TESTING AND WRITTEN REPORTS FOR ALL DIVISIONS. THE VA SHALL EMPLOY THIRD PARTY INSPECTION CONSULTANTS TO PERFORM ALL INSPECTIONS REQUIRED BY THIS CONTRACT. ANY REFERENCE TO VA INSPECTIONS SHALL BE BY A THIRD-PARTY INSPECTOR QUALIFIED TO PERFORM THE WORK. ALL INSPECTIONS, TESTING, CERTIFICATIONS, AND PERMITS ARE TO BE SCHEDULED BY THE GENERAL
CONTRACTOR IN COORDINATION WITH THE COR.
AS A MINOR PROJECT, THIS PROJECT MUST BE “STAND ALONE”. THAT IS, THE PROJECT CANNOT DEPEND ON ANOTHER
PROJECT OR OTHER FUNDING SOURCE TO MAKE THE FINAL RESULT COMPLETE AND USABLE.
AUGUST 10TH, 2023
Construction Scope of Work
528-811, Consolidate Primary Care 1st Floor
Stratton VA Medical Center, Albany, NY
CONSTRUCTION SCOPE OF WORK
Contractor shall completely prepare project site for operations, including demolition and removal of existing site elements, and furnish labor and materials and perform work at the Samuel S Stratton VA Medical Center, Project 528-811, Consolidate Primary Care 1st Floor as required by drawings and specifications. Period of performance is projected to be Five hundred and Fifty (550) calendar days.
The work will require construction of two additions at the first-floor level. An 1,807 SF addition on the West side of the old file room (room #108) on the roof of the basement level, and a second mirror image addition (1,807 SF) on the East side of room #108. The remainder of the 1st floor core area (approximately 6,140 SF) shall be renovated. These three areas combine to form a continuous Patient Aligned Care Team Primary Care Unit. See phasing on sheets GC-300 - GC305.
Work includes general construction, alterations, and certain other items. Contractor shall provide services including but not limited to: furnish all supervision, labor, equipment, materials, and transportation necessary to accomplish work for the demolition, addition, and replacement as required by specifications and drawings.
Contractor is responsible for Asbestos Containing Materials (ACM) and Lead Based Paint (LBP) removal and mitigation, including Floor tile, Mastic and Lead Paint removal, where it occurs inside the project area of work. Please also see the 2011 ACM survey (included in 02 82 11.1) for estimated quantities and locations. There will be no cost to the Government for any removal, testing, oversight or clearance of ACM. Abatement methods as stipulated in Specification Sections 02 82 11, 02 82 13.13, 02 82 13.19 and 02 83 33.13, are the only allowable methods of abatement. No alternate abatement methods will be considered. See sheets H-100, H-101 and H-102 for more information.
Electrical, Telecommunications, and Security Work: Work includes all labor, material, equipment and supervision to perform new electrical, communications and security systems to the spaces renovated and the new additions detailed by the construction drawings and specifications. Provide access control for all the required doors, coordinate with the door hardware schedule for additional requirements. Provide new cameras, associated devices and equipment.
Mechanical, Plumbing and Fire Protection Work: Work includes all labor, material, equipment and supervision to perform the required Mechanical, Plumbing and Fire Protection construction work on this project. This includes providing materials and construction equipment as detailed by the construction drawings and specifications.
All new mechanical systems shall be addressable and controllable via the existing Engineering Control Center (ECC) and HVAC Shop. The ECC system shall monitor space conditions and unit status and shall alarm the Facility Operations staff as detailed by the mechanical control drawings and specifications.
In addition to providing new mechanical systems to serve the new addition and renovated spaces, this project also requires reconfiguration of the existing building HVAC systems (duct, diffusers, grilles, bracing and supports) to maintain existing heating and cooling systems. Contractor is required to Test and Balance (TAB) new and existing HVAC systems per 23 05 93. This work requires preconstruction TAB readings to establish baseline performance for all existing HVAC systems (in Summer and Winter) to remain serving the Primary Care space and adjacent corridor. Existing systems shall be rebalanced to preconstruction readings.
Contractor shall reconfigure fire protection piping and provide additional sprinkler heads to the existing building automatic sprinkler system as required. New Fire Protection systems shall be provided, and existing systems modified per the construction drawings and specifications.
Contractor shall reconfigure plumbing and medical gas piping and provide new piping, fixtures, valves, fittings, and devices as required by the construction drawings and specifications.
All new and existing systems within the Scope of Work shall be commissioned (or recommissioned) for per Specification 01 91 00.
Inspections: Comprehensive 3rd party inspections, testing and written reports for all Divisions are required and paid by the VA.
Commissioning: The VA has arranged with a third-party individual, company or firm to act as the Commissioning Agent. The Commissioning Agent is the designated person, company or entity that plans, schedules, and coordinates the commissioning team to implement the commissioning process. The Contractor shall employ or appoint staff to act as a Commissioning Manager (see 01 91 00) to carry out all commissioning tasks including managing submittal requirements and resolution of the issues log, and coordination with the third party Commissioning Agent. All new and existing systems within the Scope of Work shall be commissioned (or recommissioned) per Specification 01 91 00.
Duration: The expected construction period duration for each phase includes all pre-construction activity and post-construction testing, third-party inspections and commissioning. Contractor shall submit a comprehensive schedule of work in compliance with 01 32 16.15 PROJECT SCHEDULES (SMALL PROJECTS DESIGN/BID/BUILD). Contractor to perform Commissioning of all new systems and existing systems impacted by the project according to requirements in sections: 01 91 00 – GENERAL COMMISSIONING REQUIREMENTS; 21 08 00 – COMMISSIONING OF FIRE SUPPRESSION SYSTEMS, 22 08 00 – COMMISSIONING OF PLUMBING SYSTEMS, 23 08 00 – COMMISSIONING OF HVAC SYSTEMS; 26 08 00 – COMMISSIONING OF ELECTRICAL SYSTEMS; 27 08 00 – COMMISSIONING OF COMMUNICATIONS SYSTEMS, and 28 08 00 – COMMISSIONING OF ELECTRONIC SAFETY AND SECURITY SYSTEMS. A detailed commissioning plan is required to ensure that all devices are calibrated, programmed, and all graphic displays are accurate and approved by applicable VA staff.
Infection Control: The construction shall clearly define and meet “Infection Control Barrier” criteria. The construction shall be in accordance with the AIA Guidelines for Design and Construction of Hospital and Health Care Facilities, VA Guidelines (or whichever is most stringent) and address; the impact of demolition, renovation including walls and ceiling, electrical, mechanical, equipment and equipment support installation, and new construction.
HIPAA: The design shall accommodate compliance with current HIPAA requirements.
Complete and Functional: The Additions and Renovation shall be in 4 phases and address coordination between all phases to provide a complete, watertight, and functional project for the intended use. Maintain free and unobstructed egress during all phases and all utilities to occupied spaces at each stage.
VA TEAM:
LOCATION MAP
SITE MAP
AREA OF WORK
ALBANY/STRATTON VAMC
113 HOLLAND AVENUE
ALBANY, NEW YORK 12208
N
DEDUCTIVE ALTERNATES:
(DEDUCTIVE ALTERNATES ARE NOT CASCADING. THE OWNER WILL EXERCISE DEDUCTS AS NEEDED. EACH DEDUCT SHALL BE PRICED UNDER SEPARATE CLINS (CONTRACT LINE ITEM NUMBER) SO DETERMINATIONS CAN BE MADE AND PRIORITIES ESTABLISHED BASED ON BIDS RECEIVED.)
FULL CONSTRUCTION AREA INCLUDING ALL ALTERNATES = (2 ADDITIONS @ 1,807 = 3,614 SF + 6,140 SF OF RENOVATION = 9,754 SF GROSS
DEDUCT ALTERNATE #1 - DO NOT REFINISH EXISTING ROOF AREAS. (1,442 SF OF ROOFING)
DEDUCT ALTERNATE #2 - DO NOT EXTEND PNEUMATIC TUBE SYSTEM. (50LF OF PNEUMATIC TUBE)
DEDUCT ALTERNATE #3 - REDUCE 392 SF - NO RENOVATION OFFICES NORTH SIDE OF CORRIDOR -- TAKES OUT 1/2 OF BLOOD DRAW AREA
DEDUCT ALTERNATE #4 - REDUCE 340 SF - NO RENOVATION OFFICES SOUTH SIDE OF CORRIDOR -- TAKES OUT OVERFLOW WAITING
DEDUCT ALTERNATE #5 - REDUCE 500 SF - NO RENOVATION AT BENEFICIARY TRAVEL -- TAKES OUT 1 PROCEDURE ROOM, 1 EXAM ROOM
NOTE: IT IS RECOMMENDED TO PRINT THE PHASING DRAWINGS AT FULL OR HALF SIZE AND IN COLOR FOR
CLARITY (SHEETS GC300 - GC305).
# Revisions: Date:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
C&S Companies 2575 E Camelback Rd, Suite 740 Phoenix, AZ 85016
(602) 997-7536
MES Group 550 North Reo Street Tampa, FL 33609
(813) 289-4700
TRIPLE C THE A&E GROUP
201 E. Jefferson St, Suite 200
Syracuse, NY 13202
(315) 484-5958
Mat Perkins
A u to d e s k D o c s /5
-8
C o n s o lid a te
P ri m a ry
C a re s t
F lo o r
S tr a tt o n V
A M
C /5
-8
.1
-A .r v t
/1
/2
:4
:5
A
M
GI001
DRAWING INDEX 528-811
BLDG 1
08/10/2023 M .PERKINS K.MACAULAY
ISSUED FOR BIDDING CONSOLIDATE PRIMARY CARE ON
FIRST FLOOR
113 Holland Ave, Albany, NY 12208
- DRAWING INDEX -
SHEET NUMBER SHEET NAME
GENERAL
GI000 COVER SHEET
GI001 DRAWING INDEX
GI050 GENERAL NOTES
GI100 LIFE SAFETY PLAN - BASEMENT
GI101 LIFE SAFETY PLAN - FIRST FLOOR
GI201 SMOKE COMPARTMENT AND AREA OCCUPANCY DIAGRAMS
GC101 DEDUCTIVE ALTERNATE PLAN
GC200 CONTRACTOR ACCESS PLANS
GC300 OVERALL PHASING PLANS
GC301 ICRA AND INTERIM LIFE SAFETY PLANS BY PHASE
GC302 ICRA AND INTERIM LIFE SAFETY PLANS BY PHASE
GC303 ICRA AND INTERIM LIFE SAFETY PLANS BY PHASE
GC304 ICRA AND INTERIM LIFE SAFETY PLANS BY PHASE
GC305 INFECTION CONTROL AND INTERIM LIFE SAFETY DETAIL
HAZARDOUS
H-100 HAZARDOUS MATERIALS PLAN - BASEMENT
H-101 HAZARDOUS MATERIALS PLAN - FIRST FLOOR - C WING
H-102 HAZARDOUS MATERIALS PLAN - FIRST FLOOR - D WING
HP001 HAZARDOUS MATERIALS PHOTO REFERENCE
STRUCTURAL
S-001 GENERAL STRUCTURAL NOTES
S-002 GENERAL STRUCTURAL NOTES CONTINUED
S-003 SPECIAL INSPECTIONS
SD101C STRUCTURAL DEMOLITION PLAN - FIRST FLOOR - C WING
SD101D STRUCTURAL DEMOLITION PLAN - FIRST FLOOR - D WING
S-100 STRUCTURAL FLOOR PLAN - BASEMENT - OVERALL
S-101 STRUCTURAL FLOOR PLAN - FIRST FLOOR - OVERALL
S-101C STRUCTURAL ENLARGED FLOOR PLAN - FIRST FLOOR - C WING
S-101D STRUCTURAL ENLARGED FLOOR PLAN - FIRST FLOOR - D WING
S-102 STRUCTURAL FLOOR PLAN - SECOND FLOOR - OVERALL
S-102C STRUCTURAL ENLARGED ROOF PLAN - SECOND FLOOR - C WING
S-103C STRUCTURAL ENLARGED ROOF PLAN - THIRD FLOOR - C WING
S-201 STRUCTURAL ELEVATIONS
S-301 STRUCTURAL SECTIONS
S-401 ENLARGED FRAMING PLANS
S-402 ENLARGED FRAMING PLANS
S-501 TYPICAL CONCRETE DETAILS
S-502 TYPICAL DECK DETAILS
S-503 TYPICAL BRACING AND ANCHORAGE DETAILS
S-520 FRAMING DETAILS
S-521 FRAMING DETAILS
S-522 FRAMING DETAILS
S-530 FRAMING DETAILS
ARCHITECTURAL
A-001 SYMBOLS, & GENERAL NOTES
AD101 ARCHITECTURAL DEMOLITION PLAN - BASEMENT, FIRST FLOOR & THIRD FLOOR
AD101C ARCHITECTURAL DEMOLITION PLAN - FIRST FLOOR - C WING
AD101D ARCHITECTURAL DEMOLITION PLAN - FIRST FLOOR - D WING
AD120 ARCHITECTURAL DEMOLITION REFLECTED CEILING PLAN - BASEMENT
AD120C ARCHITECTURAL DEMOLITION REFLECTED CEILING PLAN - BASEMENT - C WING
AD120D ARCHITECTURAL DEMOLITION REFLECTED CEILING PLAN - BASEMENT - D WING
AD121 ARCHITECTURAL DEMOLITION REFLECTED CEILING PLAN - FIRST FLOOR
AD121C ARCHITECTURAL DEMOLITION REFLECTED CEILING PLAN - FIRST FLOOR - C WING
AD121D ARCHITECTURAL DEMOLITION REFLECTED CEILING PLAN - FIRST FLOOR - D WING
A-101 ARCHITECTURAL FLOOR PLAN - BASEMENT ENLARGED VIEW KITCHEN
A-101C ARCHITECTURAL FLOOR PLAN - FIRST FLOOR - C WING
A-101CC ARCHITECTURAL DIMENSION PLAN - FIRST FLOOR - C WING
A-101D ARCHITECTURAL FLOOR PLAN - FIRST FLOOR - D WING
A-101DD ARCHITECTURAL DIMENSION PLAN - FIRST FLOOR - D WING
A-102 ARCHITECTURAL SECOND FLOOR & ROOF PLAN
A-103C THIRD FLOOR AND ROOF PLAN
A-104 PNEUMATIC TUBE SYSTEM
AC101 ARCHITECTURAL REFLECTED CEILING PLAN - FIRST FLOOR - OVERALL
AC101C ARCHITECTURAL REFLECTED CEILING PLAN - FIRST FLOOR - C WING
AC101D ARCHITECTURAL REFLECTED CEILING PLAN - FIRST FLOOR - D WING
A-201 ARCHITECTURAL EXTERIOR ELEVATIONS
A-301 ARCHITECTURAL SECTIONS - BUILDING
A-351 SECTIONS - EXTERIOR WALL
A-352 SECTIONS - EXTERIOR WALL
A-353 SECTIONS - EXTERIOR WALL
A-401 ARCHITECTURAL ENLARGED PLANS & INTERIOR ELEVATIONS
A-402 ARCHITECTURAL ENLARGED PLANS & INTERIOR ELEVATIONS
A-501 PLAN DETAILS & ROOF DETAILS
A-502 PLAN DETAILS & SECTIONS
A-503 PLAN DETAILS & ROOF DETAILS
A-551 DETAILS - INTERIOR
A-571 ARCHITECTURAL CEILING DETAILS
A-601 DOOR AND WINDOW SCHEDULE AND ELEVATIONS
A-603 DOOR AND WINDOW DETAILS
A-720 STANDARD PARTITION TYPES
A-721 PARTITION HEAD DETAILS
A-722 PARTITION FRAMING DETAILS
A-730 TYPICAL MOUNTING HEIGHTS
SIGNAGE
AW100 ARCHITECTURAL SIGNAGE ABBREVIATIONS, SYMBOLS, GENERAL NOTES AND SCHEDULE
AW101C ARCHITECTURAL SIGNAGE PLAN - FIRST FLOOR - C WING
AW101D ARCHITECTURAL SIGNAGE PLAN - FIRST FLOOR - D WING
- DRAWING INDEX -
SHEET NUMBER SHEET NAME
INTERIORS
IN001 INTERIOR FINISH ABBREVIATIONS, SYMBOLS, GENERAL NOTES AND FINISH BOARDS
IN100 INTERIOR FLOOR FINISH PLAN - BASEMENT
IN101C INTERIOR FLOOR FINISH PLAN - FIRST FLOOR - C WING
IN101D INTERIOR FLOOR FINISH PLAN - FIRST FLOOR - D WING
IN102C INTERIOR WALL FINISH PLAN - FIRST FLOOR - C WING
IN102D INTERIOR WALL FINISH PLAN - FIRST FLOOR - D WING
IN501 DETAILS - INTERIOR FINISH
IN502 DETAILS - INTERIOR FINISH
IN601 INTERIOR FINISH LEGEND AND SCHEDULES
IN901 INTERIOR 3D CONCEPT IMAGES
FURNITURE
IF101 INTERIOR FURNITURE PLAN - FIRST FLOOR - OVERALL
IF101C INTERIOR FURNITURE PLAN - FIRST FLOOR - C WING
IF101D INTERIOR FURNITURE PLAN - FIRST FLOOR - D WING
EQUIPMENT
Q-101 EQUIPMENT PLAN - FIRST FLOOR - OVERALL
Q-101C EQUIPMENT PLAN - FIRST FLOOR - C WING
Q-101D EQUIPMENT PLAN - FIRST FLOOR - D WING
Q-601 EQUIPMENT SCHEDULE
FIRE PROTECTION
F-001 FIRE PROTECTION NOTES AND LEGEND
FD100 FIRE PROTECTION DEMOLITION PLAN - BASEMENT FLOOR
FD101C FIRE PROTECTION DEMOLITION PLAN - FIRST FLOOR - C WING
FD101D FIRE PROTECTION DEMOLITION PLAN - FIRST FLOOR - D WING
FP100 FIRE PROTECTION RENOVATION PLAN - BASEMENT FLOOR
FP101C FIRE PROTECTION RENOVATION PLAN - FIRST FLOOR - C WING
FP101D FIRE PROTECTION RENOVATION PLAN - FIRST FLOOR - D WING
FP111C FIRE PROTECTION ZONING PLAN - FIRST FLOOR - C WING
FP111D FIRE PROTECTION ZONING PLAN - FIRST FLOOR - D WING
FP121C FIRE PROTECTION CEILING PLAN - FIRST FLOOR - C WING
FP121D FIRE PROTECTION CEILING PLAN - FIRST FLOOR - D WING
PLUMBING
P-001 PLUMBING NOTES AND LEGEND
PD100 PLUMBING DEMOLITION PLAN - SUB-BASEMENT FLOOR
PD101C PLUMBING DEMOLITION PLAN - FIRST FLOOR - C WING
PD101D PLUMBING DEMOLITION PLAN - FIRST FLOOR - D WING
PK100 PLUMBING COORDINATION PLAN - BASEMENT FLOOR - CD CORE
PL100 PLUMBING RENOVATION PLAN - BASEMENT FLOOR - CD CORE
PL101C PLUMBING RENOVATION PLAN - FIRST FLOOR - C WING
PL101D PLUMBING RENOVATION PLAN - FIRST FLOOR - D WING
PL110 PLUMBING DOMESTIC WATER RENOVATION PLAN - SUB-BASEMENT FLOOR
PL111C PLUMBING DOMESTIC WATER RENOVATION PLAN - FIRST FLOOR - C WING
PL111D PLUMBING DOMESTIC WATER RENOVATION PLAN - FIRST FLOOR - D WING
PL401 PLUMBING ENLARGED FLOOR PLANS
PW301 PLUMBING ISOMETRIC - WASTE AND VENT
PW302 PLUMBING ISOMETRIC - DOMESTIC WATER
P-501 PLUMBING DETAILS
MECHANICAL
M-001 HVAC NOTES AND LEGEND
M-002 HVAC SCHEDULES
M-003 HVAC PHASING SCHEMATIC
M-004 HVAC PHASING SCHEMATIC - WALK-IN COOLERS
MD100 HVAC DEMOLITION PLAN - BASEMENT FLOOR
MD101C HVAC DEMOLITION PLAN - FIRST FLOOR - C WING
MD101D HVAC DEMOLITION PLAN - FIRST FLOOR - D WING
MD101M HVAC DEMOLITION PLAN - FIRST FLOOR - MECHANICAL ROOM
MH100 HVAC RENOVATION PLAN - BASEMENT FLOOR
MH101C HVAC RENOVATION PLAN - FIRST FLOOR - C WING
MH101D HVAC RENOVATION PLAN - FIRST FLOOR - D WING
MH101M HVAC RENOVATION PLAN - FIRST FLOOR - MECHANICAL ROOM
MH102M HVAC RENOVATION PLAN - PART PLANS - MECHANICAL ROOM
MH111C HVAC AIRFLOW PLAN - FIRST FLOOR - C WING
MH111D HVAC AIRFLOW PLAN - FIRST FLOOR - D WING
MP101C HVAC PIPING RENOVATION PLAN - FIRST FLOOR - C WING
MP101D HVAC PIPING RENOVATION PLAN - FIRST FLOOR - D WING
MP101M HVAC PIPING RENOVATION PLAN - FIRST FLOOR - MECHANICAL ROOM
M-501 HVAC DETAILS
M-502 HVAC DETAILS
M-503 HVAC DETAILS
M-601 MECHANICAL CONTROLS
M-602 MECHANICAL CONTROLS
ELECTRICAL
E-001 NOTES AND LEGEND - ELECTRICAL
ED100 ELECTRICAL LIGHTING AND POWER DEMOLITION PLAN - BASEMENT - C & D WING
ED101C ELECTRICAL POWER DEMOLITION PLAN - FIRST FLOOR - C WING
ED101D ELECTRICAL POWER DEMOLITION PLAN - FIRST FLOOR - D WING
ED201C ELECTRICAL LIGHTING DEMOLITION PLAN - FIRST FLOOR - C WING
ED201D ELECTRICAL LIGHTING DEMOLITION PLAN - FIRST FLOOR - D WING
EL101C ELECTRICAL LIGHTING PLAN - FIRST FLOOR - C WING
EL101D ELECTRICAL LIGHTING PLAN - FIRST FLOOR - D WING
EM101C ELECTRICAL MECHANICAL POWER PLAN - FIRST FLOOR - C WING
EM101D ELECTRICAL MECHANICAL POWER PLAN - FIRST FLOOR - D WING
EP100 ELECTRICAL POWER PLAN - BASEMENT FLOOR - C & D WING
EP101C ELECTRICAL POWER PLAN - FIRST FLOOR - C WING
EP101D ELECTRICAL POWER PLAN - FIRST FLOOR - D WING
ET101C ELECTRICAL TELECOMMUNICATIONS PLAN - FIRST FLOOR - C WING
ET101D ELECTRICAL TELECOMMUNICATIONS PLAN - FIRST FLOOR - D WING
EY101C ELECTRICAL AUXILIARY SYSTEMS - FIRST FLOOR - C WING
EY101D ELECTRICAL AUXILIARY SYSTEMS - FIRST FLOOR - D WING
EF101C ELECTRICAL FIRE ALARM PLAN - FIRST FLOOR - C WING
EF101D ELECTRICAL FIRE ALARM PLAN - FIRST FLOOR - D WING
E-501 ELECTRICAL DETAILS
E-502 ELECTRICAL DETAILS
E-601 ELECTRICAL ONE-LINE DIAGRAM
E-602 ELECTRICAL SCHEDULES
E-603 ELECTRICAL SCHEDULES
E-604 ELECTRICAL SCHEDULES
Grand total: 174
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
C&S Companies 2575 E Camelback Rd, Suite 740 Phoenix, AZ 85016
(602) 997-7536
MES Group 550 North Reo Street Tampa, FL 33609
(813) 289-4700
TRIPLE C THE A&E GROUP
201 E. Jefferson St, Suite 200
Syracuse, NY 13202
(315) 484-5958
Mat Perkins
A u to d e s k D o c s /5
-8
C o n s o lid a te
P ri m a ry
C a re s t
F lo o r
S tr a tt o n V
A M
C /5
-8
.1
-A .r v t
/1
/2
:4
:5
A
M
GI050
GENERAL NOTES 528-811
BLDG 1
08/10/2023 M .PERKINS S. MADEN
ISSUED FOR BIDDING CONSOLIDATE PRIMARY CARE ON
FIRST FLOOR
113 Holland Ave, Albany, NY 12208
1. STANDARDS: GENERAL PAINTING SPECIFICATIONS FOR
THIS PROJECT ARE DEFINED BY THE PROJECT MANUAL
AND ARE BASED ON THE MPI ARCHITECTURAL PAINTING
SPECIFICATION MANUAL FOR NEW WORK AND THE MPI
MAINTENANCE REPAINTING MANUAL FOR RENOVATION OR
REPAINTING WORK.
2. PAINTING WORK: INCLUDES TAPING, SURFACE
PREPARATION, CLEANING, DE-RUSTING, PRIMING, FIELD
PAINTING AND FINISHING AS REQUIRED BY STANDARD
PRACTICE, MANUFACTURER OR SPECIFICATION. REQUIRED
COATS OF PAINT OR STAIN ARE IN ADDITION TO SHOP
PRIMING, SURFACE TREATMENT AND FINISHING. THE WORK
ALSO INCLUDES PAINTING CLEANUP AND REMOVAL OF
OVERSPRAY, DRIPS AND SPLATTERS. THE SPECIFICATIONS
MAY REQUIRE OTHER TYPES OF PAINTING, INCLUDING, BUT
NOT LIMITED TO, FIELD APPLIED SPECIAL COATINGS AND
FACTORY PRIMING.
3. PROJECT PAINTING SCOPE: EXCEPT AS NOTED
OTHERWISE, CONTRACTOR IS TO FIELD PAINT INTERIOR
AND EXTERIOR EXPOSED ITEMS AND BUILDING SURFACES,
WHETHER OR NOT PREVIOUSLY PAINTED, AND ALL NEW
ITEMS AND SURFACES. THIS INCLUDES, BUT IS NOT LIMITED
TO, FACTORY-PRIMED ITEMS, GALVANIZED SHEET METAL
AND EXPOSED PIPING AND FITTINGS (INCLUDING IRON AND
PVC). EXTERIOR EXPOSED MASONRY AND CONCRETE
SHALL BE SEALED, UNLESS NOTED OTHERWISE OR NOT
RECOMMENDED BY MANUFACTURER. PAINTING SCOPE
ITEMS MAY BE FOUND IN FINISH SCHEDULES, DRAWINGS,
SPECIFICATIONS AND PAINTING GENERAL NOTES. THESE
SOURCES ARE COMPLEMENTARY, NOT MUTUALLY
EXCLUSIVE.
4. MECHANICAL AND ELECTRICAL PAINTING: INCLUDES FIELD
PAINTING OF INTERIOR AND EXTERIOR EXPOSED PIPES,
DUCTS, HANGERS, EXPOSED STEEL AND IRON WORK AND
PRIMED METAL SURFACES OF EQUIPMENT IN EXPOSED
AREAS INSTALLED UNDER MECHANICAL AND ELECTRICAL
WORK, EXCEPT AS OTHERWISE INDICATED. PAINTING OF
ELECTRICAL AND MECHANICAL WORK IN ELECTRICAL AND
MECHANICAL ROOMS IS NOT REQUIRED UNLESS NOTED
OTHERWISE IN THE PROJECT MANUAL. COLOR-CODING OF
PIPING FOR MECHANICAL AND PLUMBING WORK IS
COVERED IN THE MECHANICAL OR PLUMBING
SPECIFICATIONS.
5. APPLICATION: EACH COAT OF PAINT SHALL TERMINATE AT
AN EDGE, CORNER, CHANGE OF MATERIALS OR CHANGE
OF PAINT COLOR. COMPLETED PAINTING SHALL NOT
IMPEDE THE INTENDED OPERATION OF ANY ITEM, SUCH AS
WINDOWS, DRAWERS, HINGES, DOORS, ETC.
6. TOUCH-UP: SURFACES REQUIRING TOUCH-UP SHALL BE
REPAIRED AS REQUIRED. PAINT TEXTURE, GLOSS AND
COLOR SHALL MATCH EXISTING. IF TOTAL TOUCH-UP AREA
ON ONE SURFACE IS LARGER THAN 1 SQUARE FOOT, OF IF
TEXTURE, GLOSS AND COLOR CANNOT BE MATCHED, THE
ENTIRE SURFACE SHALL BE REPAINTED TO ENCLOSING
EDGES OR CORNERS.
7. DO NOT PAINT: UNLESS OTHERWISE INDICATED, DO NOT
PAINT ITEMS THAT ARE SPECIFIED FACTORY-FINISHED OR
INSTALLER-FINISHED. ALSO, UNLESS OTHERWISE
INDICATED, DO NOT PAINT SUCH ITEMS AS ACOUSTIC
MATERIALS, HARDWARE, PRE-FINISHED FIXTURES AND
EQUIPMENT, PRE-FINISHED MECHANICAL AND ELECTRICAL
EQUIPMENT, SWITCH AND OUTLET PLATES, THERMOSTATS,
LIGHTING FIXTURES, SWITCHGEAR, MOTORS,
DISTRIBUTION PANELS AND INTERIOR AND EXTERIOR
SIGNAGE. IF THERE IS A QUESTION WHETHER OR NOT TO
PAINT AN ITEM OR SURFACE, FOLLOW PROCEDURES
LISTED IN SECTION 01 00 00 1.8 REQUESTS FOR
INFORMATION (RFI).
8. EXPOSED FINISH METAL SURFACES: UNLESS OTHERWISE
INDICATED, DO NOT PAINT METAL SURFACES OF ANODIZED
ALUMINUM, STAINLESS STEEL, NICKEL, CHROMIUM PLATE,
COPPER, BRASS, BRONZE AND SIMILAR FINISHED
MATERIALS.
9. CONCEALED SURFACES: UNLESS OTHERWISE INDICATED,
DO NOT PAINT SURFACES SUCH AS WALLS AND CEILINGS
IN CONCEALED AND GENERALLY INACCESSIBLE AREAS,
INCLUDING FURRED AREAS, UTILITY TUNNELS, PIPE
SPACES, CHASES AND DUCT SHAFTS. WATERPROOF SEAL
CONCRETE IN PIPE SPACE. NOTE THAT THIS DOES NOT
APPLY TO PAINTING ABOVE CEILINGS FOR THE PURPOSE
OF IDENTIFICATION PAINTING OR LABELING.
10. OPERATING PARTS AND SENSING DEVICES: UNLESS
OTHERWISE INDICATED, DO NOT PAINT MOVING PARTS OF
OPERATING UNITS SUCH AS VALVES, DAMPER
OPERATORS, LINKAGES, MOTOR AND FAN SHAFTS, LIGHT
SENSING OR EMITTING DEVICES THAT MIGHT NOT
FUNCTION PROPERLY IF PAINTED.
11. CODE-REQUIRED LABELS: DO NOT PAINT OVER CODE-
REQUIRED LABELS.
12. ALL FLOORS ARE TO BE CLEANED AND SEALED AT
COMPLETION OF WORK. NO EPOXY PAINT.
13. ALL INTERIOR SURFACES, WALLS, FRAMES, ETC.,
REQUIRED TO HAVE NEW FINISHES APPLIED, SHALL HAVE
ALL EXISTING AND CONTRACTOR CAUSED HOLES, CRACKS,
AND OTHER IMPERFECTIONS FILLED WITH APPROVED
PATCHING MATERIAL. PATCH TO BE FINISHED FLUSH WITH
ADJACENT SURFACE, WITH TEXTURE TO MATCH TEXTURE
OF ADJACENT SURFACE. SEE SPECIFICATIONS FOR
PATCHING REQUIREMENTS.
14. PAINT EXPOSED TOP EDGE OF ALL TERRAZZO FLOOR BASE
TO MATCH WALL PAINT. CLEAN TERRAZZO FACE OF ANY
OLD PAINT.
15. PAINT EXISTING MECHANICAL HEATING UNIT COVER AND
ACCESSORIES, INCLUDING ALL SUPPORT BRACKETS.
PAINT THE HEATING WATER PIPING THAT IS EXPOSED TO
VIEW BELOW THE UNIT. PAINT ALL WALL SURFACES THAT
ARE VISIBLE BEHIND HEATING UNIT WHEN COVER IS IN
PLACE.
16. THE CONTRACTOR SHALL FIELD VERIFY EXISTING PAINT
MATERIALS AND FINISHES. APPLY THE APPROPRIATE
SEPARATION COAT (PRIMER/BONDING COAT) BETWEEN ALL
NON-COMPATIBLE COATINGS (I.E. WHERE NEW WATER-
BORNE ACRYLIC IS TO BE INSTALLED OVER EXISTING OIL
BASE PAINT).
GENERAL PAINTING NOTES:
1. THE PRIMARY OBJECT OF APPLYING SEALANT IS TO
FACILITATE WEATHER TIGHTNESS AT THE EXTERIOR
BUILDING ENVELOPE AND WATER TIGHTNESS AT INTERIOR
WET\DAMP LOCATIONS. PROPER PRIMING MUST BE USED
WITH SEALANTS.
2. THE PRIMARY OBJECT OF APPLYING CAULKING IS TO
ENHANCE APPEARANCE AND FINISH AT INTERIOR
APPLICATIONS AND IN SOME SITUATIONS TO REDUCE
AIRFLOW, SUCH AS AT DUCTS, INTERIOR SIDES OF THE
EXTERIOR ENVELOPE AND AT FIREWALL/SMOKE BARRIER
PENETRATIONS (FIRE CAULKING) AND TO DECREASE
SOUND TRANSMISSION THROUGH WALLS AND CEILINGS.
OTHER USES MAY BE NOTED IN THE SPECIFICATIONS
AND/OR ON THE DRAWINGS. IF THERE ARE QUESTIONS
ABOUT WHERE OR WHAT TYPE OF SEALANT OR CAULKING
SHOULD BE USED, FOLLOW PROCEDURES LISTED IN
SECTION 01 00 00 1.8 REQUESTS FOR INFORMATION (RFI).
3. SPECIFIED SEALANT (AND BACKER RODS, AS REQUIRED)
SHALL BE USED AT HORIZONTAL AND VERTICAL CONCRETE
JOINTS AND AS NOTED.
4. SPECIFIED SEALANT AND BACKER RODS, OR EXPANSION
JOINT MATERIAL, AS REQUIRED, SHALL BE USED AT
MASONRY AND CONCRETE CONTROL JOINTS.
5. APPLY SEALANT TAPE OR TWO CONTINUOUS BEADS OF
SEALANT BETWEEN PERIMETER SOLE PLATES AND
FOUNDATIONS, SLABS AND FLOOR DECKS. SET EXTERIOR
THRESHOLDS IN SEALANT UNLESS NOTED OTHERWISE.
6. SPECIFIED SEALANT OR CAULK SHALL BE USED ALL
AROUND BOTH SIDES OF DOOR FRAMES.
7. SPECIFIED SEALANT OR CAULK SHALL BE USED ALL
AROUND INTERIOR WALL MOUNTED EQUIPMENT FRAMES
AND EXPOSED SUPPORTS.
8. SPECIFIED SEALANT OR CAULK SHALL BE USED AT JOINTS
BETWEEN DIFFERENT WALL MATERIALS (TILE TO BRICK,
CMU TO GYPSUM BOARD, WOOD TO STONE, METAL PANEL
TO PLAM, ETC).
9. USE SPECIFIED CAULK OR SEALANT AT WALL MATERIAL
GAPS OF 1/16TH INCH OR MORE.
10. SEAL ALL AROUND ATTACHMENTS TO, AND PENETRATIONS
THROUGH, FLOORS AND WALLS.
11. USE SPECIFIED SEALANT AROUND WALL, FLOOR AND
CEILING PIPE PENETRATIONS. WHERE ESCUTCHEONS ARE
SPECIFIED OR PROVIDED, SET THE ESCUTCHEONS IN A
BED OF SEALANT.
12. USE SPECIFIED CAULK OR SEALANT AROUND
PENETRATIONS IN EXTERIOR WALLS AND SOFFITS, SUCH
AS AT HOSE BIBS, FD CONNECTIONS, ELECTRIC SERVICE
ENTRIES, GAS PIPE ENTRIES, ELECTRIC OUTLETS,
LIGHTING, VENTS, ETC.
GENERAL SEALANT / CAULKING
NOTES:
1. THESE GENERAL NOTES APPLY TO ALL DRAWINGS.
GENERAL NOTES ARE PROVIDED TO ALERT THE
CONTRACTOR TO AREAS OF ATTENTION. THESE NOTES
ARE NOT ALL INCLUSIVE, AND ARE NOT A SUBSTITUTE FOR
THE SPECIFICATIONS. THE CONTRACTOR IS RESPONSIBLE
FOR ALL WORK, COORDINATION AND SUBMITTALS AS
DETAILED IN THE CONSTRUCTION DOCUMENTS AND THE
SPECIFICATIONS.
2. COMPLY WITH ALL APPLICABLE CODES, RULES, AND
REGULATIONS. WHEN REQUIRED BY CODE, ALL WORK
MUST BE INSPECTED AND SUBMITTED FOR THE VA'S FINAL
APPROVAL.
3. REFER TO SPECIFICATIONS SECTION 01 00 00 AND PHASING
DRAWINGS (GC300s) FOR COORDINATION OF WORK
REQUIRING OFF HOURS OR WEEKEND WORK.
4. ALL EXISTING CONDITIONS AND DIMENSIONS SHALL BE
VERIFIED BY THE CONTRACTOR(S) PRIOR TO FABRICATION
AND CONSTRUCTION. IF INCONSISTENCIES,
CONTRADICTIONS OR OMISSIONS ARE DISCOVERED
FOLLOW PROCEDURES LISTED IN SECTION 01 00 00 1.8
REQUESTS FOR INFORMATION (RFI).
5. GENERAL CONTRACTOR SHALL COORDINATE ALL
MECHANICAL AND ELECTRICAL DUCT SIZES AND
LOCATIONS FOR NEW AND EXISTING DUCTS AFFECTED.
6. ALL EXITS TO BE OPERABLE FROM THE INSIDE WITHOUT
THE USE OF A KEY OR SPECIAL KNOWLEDGE.
7. WALL OUTLETS, SWITCHES,THERMOSTATS, ETC. TO BE
INSTALLED LEVEL WITH EACH OTHER AND PLUMB U.N.O.
8. THE WORK INDICATED IN THE NOTES DESCRIBES THE
GENERAL SCOPE OF WORK ONLY AND IS NOT INTENDED
TO BE INCLUSIVE OF ALL WORK REQUIRED TO COMPLETE
FULL SCOPE OF WORK.
9. DO NOT MEASURE DRAWINGS. ALL DIMENSIONS SHALL BE
FIELD VERIFIED. IF DIMENSIONAL INFORMATION IS
REQUIRED & NOT FOUND, FOLLOW PROCEDURES LISTED IN
SECTION 01 00 00 1.8 REQUESTS FOR INFORMATION (RFI).
10. FIELD VERIFICATION: BEFORE BIDDING AND DURING
CONSTRUCTION, CONTRACTOR SHALL VERIFY THAT
ACTUAL CONDITIONS ARE THOSE REFLECTED BY THE
CONTRACT DOCUMENTS. REPORT DISCREPANCIES TO
ARCHITECT AND COR PRIOR TO BIDDING OR PERFORMING
WORK RELATED TO ANY DISCREPANCIES. SEE
SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.
11. MOST EXPENSIVE BID: IF THERE ARE SCHEDULES,
SYSTEMS, SUBCONTRACT, OR MATERIAL CONFLICTS NOT
BROUGHT TO THE ARCHITECT'S AND COR'S ATTENTION
PRIOR TO BIDDING, THE CONTRACTOR WILL BE DEEMED TO
HAVE ELECTED THE MORE COSTLY TIME, METHOD,
SYSTEM, PRODUCT, SUBCONTRACT AND/OR MATERIAL.
12. NIC: CONSTRUCTION OF WORK INDICATED ON DRAWINGS
AS "NIC" IS NOT IN THE CONTRACT. HOWEVER, THE
CONTRACTOR SHALL COORDINATE ITS WORK, WITH WORK
INDICATED AS NIC.
13. SITE COORDINATION: COORDINATE ALL SITE OPERATIONS
WITH COR, INCLUDING STAGING AREAS, MATERIAL
STORAGE, ACCESS TO WORK, TIMING OF WORK, NOISY
OPERATIONS, INTERRUPTION OF UTILITIES. SEE
SPECIFICATIONS.
14. TRADE COORDINATION: CONTRACTOR SHALL COORDINATE
THE PLACEMENT OF EACH TRADE'S WORK SO THAT THERE
ARE NO CONFLICTS AND NO SYSTEM'S OPERATION OR
FUNCTION IMPAIRED. IT IS ESPECIALLY IMPORTANT TO
COORDINATE PENETRATIONS THROUGH FOUNDATIONS,
FLOORS, WALLS AND CEILING SPACES. SEE
SPECIFICATIONS.
15. PROVIDE GALVANIC SEPARATION MATERIAL, BETWEEN
DISSIMILAR METALS. SEE SPECIFICATIONS.
16. ALL WOOD IN CONTACT WITH CONCRETE OR MASONRY
SHALL BE FIRE TREATED. SEE SPECIFICATIONS. ALL
SURFACE ATTACHED METAL SHALL BE SEPARATED FROM
CONCRETE OR MASONRY BY NON-METALLIC MATERIAL
SUCH AS #30 FELT, "PEEL AND STICK" OR OTHER MATERIAL
AS APPROVED BY ARCHITECT AND COR.
17. EXTERIOR / INTERIOR ELEVATIONS DO NOT SHOW ALL
EQUIPMENT, FIXTURES, DEVICES, MECHANICAL, PLUMBING
OR ELECTRICAL ITEMS. SEE ARCHITECTURAL, INTERIOR,
MECHANICAL AND ELECTRICAL PLANS FOR ADDITIONAL
ELEVATION COORDINATION.
18. ANY CUTTING/WELDING WILL REQUIRE DAILY HOT WORK
PERMITS TO BE COORDINATED WITH COR. SUBMIT
CERTIFICATIONS AS REQUIRED BY THE SPECIFICATIONS.
GENERAL NOTES: GENERAL FIRE & LIFE SAFETY
NOTES:
FIRE ALARM
1. DESIGN SHALL BE AN APPROVED FIRE ALARM SYSTEM IN
ACCORDANCE WITH CLASS "A" PROTECTION OF NFPA 101
LIFE SAFETY CODE.
2. SUBMIT PER SECTION 01 33 23 SHOP DRAWINGS, PRODUCT
DATA, AND SAMPLES; AND SECTION 28 31 00 FIRE
DETECTION AND ALARM FOR APPROVAL PRIOR TO THE
INSTALLATION.
3. THE ALBANY STRATTON VAMC HAS AN ON-CALL SERVICE
MAINTENANCE CONTRACT FOR MAINTENANCE AND
TESTING OF THE FIRE ALARM SYSTEM. IN ACCORDANCE
WITH THIS CONTRACT THE FIRE ALARM MAINTENANCE
CONTRACTOR MUST CERTIFY ALL PROGRAMMING DONE
TO THE FIRE ALARM SYSTEM. UNDER THIS CONTRACT,
THE CONSTRUCTION CONTRACTOR MUST EITHER HIRE
THE CURRENT FIRE ALARM MAINTENANCE CONTRACTOR
TO PERFORM ALL FIRE ALARM PROGRAMMING WORK OR IF
THE PROGRAMMING IS COMPLETED BY ANOTHER FIRE
ALARM CONTRACTOR, THE CONSTRUCTION CONTRACTOR
MUST HIRE THE CURRENT FIRE ALARM MAINTENANCE
CONTRACTOR TO FULLY INSPECT, TEST, AND CERTIFY THE
PROGRAMMING WORK DONE BY ANOTHER CONTRACTOR.
4. WHENEVER FIRE ALARM WORK TAKES PLACE IN AN AREA
THAT IS BEING REMODELED, AT THE BEGINNING OF THE
PROJECT THE CONTRACTOR IS TO TEST FIRE ALARM AND
DOCUMENT ANY DEFICIENCIES. THE DEFICIENCIES
WHETHER OR NOT THEY ARE MODIFIED AS PART OF THE
PROJECT AND SHALL BE REPAIRED PRIOR TO THE
CONCLUSION OF THE PROJECT.
5. AT THE CONCLUSION OF THE WORK, THE FIRE ALARM
CONTRACTOR IS TO TEST ALL FIRE ALARM DEVICES
WITHIN THE AREA OF THE REMODEL AREA WHETHER OR
NOT THEY WERE MODIFIED AS PART OF THE PROJECT.
FIRE EXTINGUISHERS
1. CONTRACTOR SHALL PROVIDE JOB SITE WITH TEMPORARY
PORTABLE FIRE EXTINGUISHERS AND SHALL MAINTAIN
THEM DURING THE COURSE OF CONSTRUCTION. EACH
EXTINGUISHER SHALL BE 10 LB. CAPACITY, CAPABLE OF
EXTINGUISHING CLASS A, B & C FIRES. ALL EXTINGUISHERS
SHALL BE UL LABELED AND SHALL BE DRY CHEMICAL TYPE.
REFER TO SECTION 01 35 26 FOR SAFETY REQUIREMENTS.
EXIT & EMERGENCY LIGHTING
1. EXIT SIGNS SHALL CLEARLY INDICATE DIRECTION LEADING
TO EXTERIOR WITH MINIMUM 6" HIGH LETTERS AT
REQUIRED EXITS, EXIT DISCHARGE AND AT ALL CORRIDOR
INTERSECTIONS AND CHANGES OF DIRECTION. EXIT WAY;
CORRIDORS AND STAIRS SHALL BE ILLUMINATED BY A
SUITABLE EMERGENCY LIGHTING SYSTEM TO OPERATE
WHEN NORMAL POWER IS INTERRUPTED. EMERGENCY
LIGHTING SHALL PROVIDE A MINIMUM OF 5 FOOT CANDLE
POWER AT FLOOR LEVEL. REFER TO SPECIFICATIONS
26 51 00 AND 26 56 00.
2. EXIT AND EMERGENCY LIGHTING SHALL CONFORM WITH
THE CURRENT NEC GUIDELINES, THE VA LIFE SAFETY
MANUAL ( 8TH ED, JUNE 2021), AND NFPA 101, 2021
3. TEMPORARY LIGHTING IS TO MEET ALL OSHA STANDARDS.
4. TEMPORARY EXITING DURING CONSTRUCTION AND FOR
CONTRACTOR USE SHALL BE CLEARLY MARKED.
FIRE SPRINKLER SYSTEM
1. EXISTING FIRE SPRINKLER MAIN STAND PIPES RETAINED.
CONNECT INTO MAINS WITH NEW BRANCH LINES.
CONTRACTOR TO VERIFY THE EXACT SIZE AND LOCATION
IN FIELD.
2. ALL NEW SPRINKLER HEADS, HANGERS AND RESTRAINTS
TO BE INSTALLED IN ACCORDANCE WITH 2019 NFPA 13.
3. ALL NEW PIPING FOR SPRINKLER HEADS SHALL BE HARD
PIPED, NO FLEXIBLE CONNECTIONS ARE PERMISSIBLE.
4. WHENEVER EXISTING FIRE SPRINKLER PIPING IS
REMOVED, THE FIRE SPRINKLER CONTRACTOR IS TO
ANALYZE THE PIPING FOR OBSTRUCTIONS AND PROVIDE
WRITTEN OBSTRUCTION DOCUMENTATION IN
ACCORDANCE WITH NFPA REQUIREMENTS TO THE VA.
DISCONNECT, PUT OUT OF SERVICE AND DRAIN
SPRINKLER SYSTEM WITHIN CONSTRUCTION AREA PRIOR
TO ANY REMOVAL.
5. REFER TO SPECIFICATIONS 01 35 26 FOR SAFETY
REQUIREMENTS AND 10 44 13 FOR FIRE EXTINGUISHERS.
FIRE STOPPING
1. FIRE STOPPING IS REQUIRED. SEE SECTION 07 84 00 FIRE
STOPPING.
GENERAL
1. ANY DECORATIONS USED SHALL BE NON-COMBUSTIBLE
OR FLAME-PROOFED IN AN APPROVED MANNER.
2. INSULATION APPLIED TO EXTERIOR SURFACE OF DUCTS
LOCATED IN BUILDINGS SHALL HAVE A FLAME SPREAD OF
NOT MORE THAN 25 AND SMOKE-DEVELOPED RATING OF
NOT MORE THAN 50 WHEN TESTED AS A COMPOSITE
INSTALLATION, INCLUDING INSULATION, FACING
MATERIALS, TAPES AND ADHESIVES NORMALLY APPLIED.
3. ALL INSULATION MATERIALS INSTALLED WITHIN FLOOR-
CEILING ASSEMBLIES, ROOF CEILING ASSEMBLIES, WALLS
SHALL HAVE A FLAME-SPREAD RATING NOT TO EXCEED 25
AND A SMOKE DENSITY NOT TO EXCEED 50 WHEN TESTED
IN ACCORDANCE WITH ASTM E 84.
4. HAND-ACTIVATED, DOOR-OPENING HARDWARE SHALL BE
CENTERED BETWEEN 30" AND 44" ABOVE THE FLOOR.
LATCHING AND LOCKING DOORS THAT ARE HAND-
ACTIVATED AND WHICH ARE IN A PATH OF TRAVEL SHALL
BE OPERABLE WITH A SINGLE EFFORT BY LEVER-TYPE
HARDWARE, PANIC BARS, PUSH-PULL PASSAGE WITHOUT
REQUIRING THE ABILITY TO GRASP THE OPENING
HARDWARE. LOCKED EXIT DOORS SHALL OPERATE AS
ABOVE IN EGRESS DIRECTION. DOOR CLOSERS (EXCEPT
FIRE DOORS) SHALL HAVE SWEEP PERIOD SO THAT FROM
AN OPEN POSITION OF 70 DEGREES, THE DOOR WILL TAKE
AT LEAST 3 SECONDS TO MOVE TO A POINT 3" FROM THE
LATCH, MEASURED FROM THE LEADING EDGE OF THE
DOOR.
5. MAXIMUM EFFORT TO OPERATE DOORS SHALL NOT
EXCEED:
A. LEVERS AND EXIT DEVICES (ONE HAND): 5 LBF.
B. SET DOOR LEAF IN MOTION: 30 LBF.
C. TO CLOSE / OPEN TO MIN REQ. WIDTH: 15 LBF.
6. ALL FLOOR, WALL, AND CEILING PENETRATIONS FOR
PIPING, DUCTS, CONDUIT, ETC. SHALL BE SEALED WITH A
UL APPROVED METHOD AND MATERIAL.
1. REFER TO FIRE PROTECTION DRAWINGS AND
SPECIFICATIONS FOR MORE DETAILED INFORMATION.
2. THE BUILDING IS EQUIPPED WITH A FIRE SPRINKLER AND
FIRE ALARM SYSTEM. AREAS OUTSIDE OF THE CURRENT
CONSTRUCTION PHASE WILL BE OCCUPIED AND MUST
HAVE FULLY FUNCTIONING FIRE ALARM AND SPRINKLER
SYSTEMS AT ALL TIMES.
3. WHEN FIRE SPRINKLERS OR ALARM ARE REQUIRED TO BE
SHUT DOWN FOR ANY PERIOD OF TIME, (FOR TIE-IN),
PROVIDE AN ANALYSIS OF IMPACT AND COORDINATE WITH
THE COR TO SCHEDULE A TIME WITH THE LEAST IMPACT
ON OCCUPANTS.
4. FIRE ALARM SYSTEM WITHIN THE ACTIVE PHASE'S
CONSTRUCTION AREA WILL BE PUT OUT OF SERVICE PER
THE SPECIFICATIONS.
1. ALTHOUGH SIGNIFICANT EFFORTS HAVE BEEN MADE TO
COORDINATE DIMENSIONS, THERE MAY BE DISCREPANCIES
AND/OR OMISSIONS. IF ENCOUNTERED, CONTACT THE
ARCHITECT AND COR FOR ADDITIONAL INFORMATION. IF
DIMENSIONAL INFORMATION IS REQUIRED & NOT FOUND,
FOLLOW PROCEDURES LISTED IN SECTION 01 33 23
REQUESTS FOR INFORMATION (RFI). IF DISCREPANCIES
ARE DISCOVERED AFTER THE BID ALLOW PROCEDURES
LISTED IN SECTION 01 33 23 REQUESTS FOR INFORMATION
(RFI) PRIOR TO CONSTRUCTION OF THE AFFECTED AREA.
2. ACTUAL CONSTRUCTION CONDITIONS AND/OR MATERIAL
AND EQUIPMENT SIZES MAY NOT BE THOSE ANTICIPATED
BY THE DESIGNERS. THROUGH FIELD INVESTIGATION AND
SHOP DRAWINGS CONTRACTOR SHALL VERIFY
DIMENSIONS AND RECOMMEND DIMENSIONAL
MODIFICATIONS AS REQUIRED.
3. ARCHITECTURAL DIMENSIONS MAY BE FOUND ON FLOOR
PLANS, EXPANDED PLANS, REFLECTED CEILING PLANS,
SECTIONS, DETAILS, DOOR SCHEDULES, INTERIOR
ELEVATIONS AND EXTERIOR ELEVATIONS.
4. ADDITIONAL DIMENSIONS MAY BE SHOWN ON
STRUCTURAL, MECHANICAL AND ELECTRICAL DRAWINGS.
MECHANICAL AND ELECTRICAL EQUIPMENT SCHEDULES
MAY ALSO CONTAIN DIMENSIONAL INFORMATION RELATED
TO EQUIPMENT SIZES AND CLEARANCES.
5. DESIGNATIONS ARE NOTED AS NOMINAL, NOT ACTUAL (2 X
4 STUD); DIMENSIONS ARE SHOWN AS ACTUAL, NOT
NOMINAL (1 1/2" X 3 1/2" STUD). DIMENSIONS ARE NOT
ROUNDED, BUT UN-ROUNDED DIMENSIONS SHOULD NOT
BE VIEWED AS MAXIMUM CONSTRUCTION TOLERANCE.
(FOR INSTANCE, MASONRY OPENING DIMENSIONS MAY BE
SHOWN IN THE 16THS OF AN INCH, BUT STANDARD
MASONRY CONSTRUCTION TOLERANCES MAY BE +/- 1/4").
6. FLOOR PLAN DIMENSIONS
A. THE LOWEST FLOOR OVERALL BUILDING
DIMENSIONS ARE FROM THE OUTSIDE FACE OF THE
FOUNDATION WALL TO THE OPPOSITE OUTSIDE
FACE OF THE FOUNDATION WALL (OR, FROM
OUTSIDE GRIDLINE TO OUTSIDE GRIDLINE) AS
SHOWN.
B. DIMENSIONS FOR NON-LOAD BEARING WALLS ARE
TO ONE FACE OF THE WALL, BOTH FACES OF
MASONRY WALLS, OR BOTH FACES OF CONCRETE
WALLS, ETC, UNLESS NOTED OTHERWISE.
C. WALL DIMENSIONS ARE ACTUAL, NOT NOMINAL
(UNLESS NOTED AS "NOM").
D. DOOR OPENING DIMENSIONS IN FRAME
CONSTRUCTION (WOOD OR STEEL STUDS) ARE
TYPICALLY SHOWN AT THEIR CENTERLINES.
HOWEVER, WHEN THE EDGE OF THE DOOR IS
IMPORTANT, OR MAKES THE PLACEMENT CLEARER,
THE DIMENSION MAY BE TO THE ACTUAL FRAME
EDGE.
E. DOOR DIMENSIONS IN LOAD-BEARING MASONRY
AND CONCRETE WALLS ARE TO "ROUGH"
OPENINGS (FACES OF MASONRY OR CONCRETE).
TYPICAL DOOR ROUGH OPENING DIMENSIONS ARE
THE FRAME WIDTH PLUS 1/2" (1/4" CLEARANCE
EACH SIDE) AND PLUS 1/2" TOTAL FOR THE
HEAD/SILL DIMENSIONS.
F. "TYPICAL" DOOR FRAME CLEARANCE DIMENSIONS
TO ADJACENT WALLS: BETWEEN FRAME FACES
AND FACES OF STUDS, OR FACES OF MASONRY OR
CONCRETE, AT NEARBY PERPENDICULAR WALLS
ARE TYPICALLY 4", DEPENDING ON HARDWARE
CLEARANCES AND FRAME REQUIREMENTS (2.5"-
DOOR HANDLE PLUS 1" -WALL STOP PLUS 1/2" GB=
4.0"). COORDINATE SHOP DRAWINGS PRIOR TO
ORDERING DOORS AND HARDWARE.
G. TYPICAL WINDOW DIMENSIONS ARE TO ROUGH
OPENING. COORDINATE WITH WINDOW
MANUFACTURER FOR UNIT DIMENSIONS AND SHIM
ALLOWANCES.
H. SOME DIMENSIONS REQUIRED TO BE CLEAR, SUCH
AS AT REQUIRED EXIT WAYS, APPLIANCE COVES OR
PREFABRICATED STAIR ENCLOSURES, ARE NOTED
"CLR" OR "CLEAR" AND ARE SHOWN TO THE FACES
OF FINISHES.
I. DIMENSIONS DESIGNATED WITH "MIN" INDICATE
THE MINIMUM CLEARANCE OR SEPARATION
REQUIRED.
7. ROOF PLAN DIMENSIONS
A. UN-DIMENSIONED LOCATIONS OF ROOFTOP
EQUIPMENT AND CONSTRUCTION OFTEN MAY BE
DETERMINED BY THE FLOOR PLAN BELOW, SUCH
AS ROOF HATCH DETERMINED BY REFERENCE TO A
FIXED WALL AND LADDER, OR MECHANICAL
EQUIPMENT DETERMINED BY DUCT PENETRATIONS
BETWEEN JOISTS. ACTUAL LOCATION OF ROOF TOP
EQUIPMENT OFTEN DEPENDS ON FIELD
INVESTIGATION OF ROOF STRUCTURE THAT IS NOT
ACCESSIBLE UNTIL CONSTRUCTION BEGINS. NOTE
ADDED: PROVIDE FIELD DIMENSIONS ON SHOP
DRAWINGS AND COORDINATION DRAWINGS.
B. UN-DIMENSIONED ITEMS SUCH AS EQUIPMENT
RAILS, HVAC EQUIPMENT, SCREEN WALLS,
ANTENNAS, WALK PADS, LADDERS, SCUPPER
LOCATIONS, ETC., MAY BE LOCATED FROM
MECHANICAL AND ELECTRICAL DRAWINGS AND
COORDINATION DRAWINGS. CONFIRM ALL ROOF
ITEM DIMENSIONS WITH THE ARCHITECT AND COR
THRU THE SHOP DRAWINGS PROCESS PRIOR TO
CONSTRUCTION.
8. VERTICAL DIMENSIONS
A. UNLESS NOTED OTHERWISE, THE FIRST FLOOR
REFERENCE ELEVATION IS 0'-0". THIS IS
REFERENCED TO THE EXISTING FIRST FLOOR SLAB
ELEVATION (INCLUDING TOPPING SLAB, BUT NOT
INCLUDING FINISH). ELEVATIONS BELOW 0'-0" ARE
"-" (PREFIXED WITH A MINUS SIGN).
B. BUILDING, FLOOR AND ROOF HEIGHTS SHOWN ON
ARCHITECTURAL DRAWINGS ARE TO TOP OF
DECKING OR SHEATHING, BUT DO NOT INCLUDE
FINISHES OR ROOFING MATERIAL.
C. WALL OPENINGS: DOOR AND LOUVER HEIGHTS ARE
TO FINISH HEIGHTS (UNLESS THEY ARE IN LOAD-
BEARING MASONRY OR CONCRETE WALLS, WHERE
THEY ARE TO ROUGH OPENINGS). HEIGHT
REFERENCES SHOULD BE TO THE NEXT LOWER
FINISH FLOOR ELEVATION
D. LIGHTING HEIGHTS ON WALLS ARE TO
CENTERLINES OF THE ELECTRICAL BOXES, UNO.
EQUIPMENT, VENT, PLUMBING AND FIXTURE
ELEVATIONS ARE TO CENTERLINES OF THE WALL
PENETRATIONS, UNO.
E. SOME VERTICAL DIMENSIONS ARE SHOWN ON
PLANS FOR DEPRESSIONS, RIDGES, CURBS, AND
ELEVATION CHANGES. A PLAN ELEVATION CHANGE
SYMBOL LOOKS LIKE A STEP OR VERTICAL "Z" AND
INDICATES THE + OR - ELEVATION CHANGE IN
INCHES FROM THE FINISHED FLOOR ELEVATION
(FFE) NEXT TO IT.
GENERAL DIMENSIONING
NOTES:
1. HALF-TONED OR LIGHT LINES INDICATE EXISTING
CONSTRUCTION TO REMAIN. DASHED BOLD LINES INDICATE
EXTENT OF DEMOLITION.
2. TEMPORARY BRACING OR SHORING MAY BE NECESSARY,
AND SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR.
3. REFER TO SPECIFICATIONS SECTION 01 00 00 AND PHASING
DRAWINGS (GC300s) FOR COORDINATION OF WORK
REQUIRING OFF HOURS OR WEEKEND DEMOLITION WORK.
4. CONTRACTOR SHALL COORDINATE DEMOLITION ACTIVITIES
TO MEET APPROVAL OF VA. COORDINATE DEMOLITION
WORK WITH ALL DISCIPLINES. CONTRACTOR SHALL
DISPOSE OF ALL ITEMS PER SPECIFICATIONS. THE COR
RESERVES THE RIGHT TO SELECT SPECIFIC ITEMS FOR
SALVAGE. THESE ITEMS SHALL BE IDENTIFIED DURING THE
PRE-CONSTRUCTION WALK THROUGH.
5. CONTRACTOR SHALL PATCH AND REPAIR ALL OPENINGS,
VOIDS OR PENETRATIONS LEFT BY THE DEMOLITION,
INSTALLATION OR CONSTRUCTION OF EQUIPMENT, PIPING,
DUCTS, ETC. TO MAINTAIN THE INTEGRITY OF THE WALL,
FLOOR, AND/OR ROOF ASSEMBLY. ALL VOIDS SHALL BE
FILLED WITH FIRESTOPPING WITHIN 24 HRS TO MAINTAIN
FIRE RATINGS.
6. THE ACCESSIBLE PARKING AREA AND GENERAL PARKING
AREAS OF THE PROJECT SITE WILL BE IMPACTED BY
CONSTRUCTION ACTIVITIES. TEMPORARY BARRICADES
PERTAINING TO THE CONTRACTOR'S ACTIVITIES SHALL BE
INSTALLED TO PREVENT POSSIBLE INJURY IN AND AROUND
DEMOLITION AND CONSTRUCTION AREAS IN ACCORDANCE
WITH THE LATEST OSHA REQUIREMENTS. COORDINATE
CONTRACTOR STAGING AREA AND PUBLIC ACCESS WITH
COR PRIOR TO CONSTRUCTION. PROTECT SIGNAGE WITHIN
PROJECT AREA. REFER TO SPECIFICATIONS 01 00 00 1.6
FOR OPERATIONS AND STORAGE AREA REQUIREMENTS.
7. SEE SPECIFICATIONS 02 41 00 FOR CUTTING AND PATCHING
AND DEMOLITION FOR RELATED DEMOLITION WORK.
8. SEE DRAWINGS FOR ADDITIONAL PROJECT RELATED
UTILITY & DEMOLITION WORK AND PROJECT PHASING
NOTES. COORDINATE UTILITY SYSTEM SHUTDOWNS WITH
COR. REFER TO REQUIREMENTS IN GENERAL CONDITIONS,
DEMOLITION, AND INDIVIDUAL TRADE DIVISIONS.
GENERAL DEMOLITION NOTES:
1. ACCESS TO EXISTING FIRE EXIT SHALL REMAIN
OPERATIONAL DURING ALL PHASES OF CONSTRUCTION.
ENSURE ADEQUATE EGRESS CLEARANCES ARE
MAINTAINED AND NOT IMPEDED DURING PHASED
CONSTRUCTION.
2. GENERAL NOTES APPLY TO ALL DRAWING SETS.
3. SUBCONTRACTORS FOR EACH TRADE ARE ADVISED THAT
INFORMATION PERTINENT TO THEIR WORK MAY OCCUR IN
OTHER PORTIONS OF THE CONTRACT DOCUMENTS. ALL
NOTES ARE TO BE REVIEWED AND APPLIED TO RELATED
BUILDING DOCUMENTS.
4. FIELD VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS.
IF INCONSISTENCIES, CONTRADICTIONS OR OMISSIONS
ARE DISCOVERED FOLLOW PROCEDURES LISTED IN
SECTION 01 00 00 1.8 REQUESTS FOR INFORMATION (RFI)
BEFORE AND/OR DURING CONSTRUCTION.
5. CROSS REFERENCES SHOWN ON DRAWINGS DO NOT
NECESSARILY INDICATE ALL LIKE CONDITIONS AND DO NOT
LIMIT APPLICATION OF ANY DRAWING OR DETAIL. WHERE
SPECIFIC DIMENSIONS, DETAILS, OR DESIGN INTENT
CANNOT BE DETERMINED, FOLLOW PROCEDURES LISTED
IN SECTION 01 00 00 1.8 REQUESTS FOR INFORMATION (RFI)
PRIOR TO PROCEEDING WITH WORK.
6. REVIEW SPECIFICATIONS FOR INSTRUCTIONS NOT SHOWN
ON DRAWINGS. INFORMATION COMMON TO SEVERAL
DRAWINGS MAY BE NOTED ON ONLY ONCE.
CONTRACTORS ARE RESPONSIBLE FOR ENTIRE SET OF
DOCUMENTS.
7. PATCH ALL HOLES IN EXISTING SURFACES AND WHERE
EQUIPMENT HAS BEEN REMOVED OR DEMOLITION HAS
OCCURRED AND PREPARE WALL SURFACES (PATCH, SKIM
COAT, PAINT AND FINISH TO MATCH ADJACENT SURFACES)
AS REQUIRED IN PREPARATION FOR NEW FINISHES
SCHEDULED. PATCH TO MATCH ADJACENT SURFACES IF
NOT SCHEDULED.
8. DIMENSIONS ARE TO STRUCTURAL GRIDLINE OR FACE OF
FINISHED WALL UNLESS NOTED OTHERWISE.
9. PROVIDE METAL BACKING AND/OR METAL BLOCKING IN
WALLS AS REQUIRED AT ALL WALL-MOUNTED ITEMS.
VERIFY HEIGHT AND LENGTH WITH ACTUAL EQUIPMENT.
REFER TO METAL BACKING AND BLOCKING DETAILS ON
SHEET A-722. AT EXISTING WALLS, REMOVE WALL
MATERIAL TO INSTALL METAL BACKING/BLOCKING FOR
NEW WALL-MOUNTED ITEMS.
10. ALL EXISTING FLOOR AND WALL OPENINGS AND
DEPRESSIONS NOT USED IN THE NEW WORK SHALL BE
FILLED OR CLOSED WITH UL RATED MATERIALS TO MEET
REQUIRED FIRE RATING AND MATCH ADJACENT FINISHES.
REFER TO S-521 FOR STRUCTURAL DETAILS.
11. DRAWINGS ARE NOT TO BE SCALED. CONTRACTOR TO
VERIFY ALL DIMENSIONS AND FIELD CONDITIONS PRIOR TO
COMMENCING THE WORK.
12. COORDINATE WITH INTERIORS SHEETS FOR CORNER
GUARD AND WALL PROTECTION LOCATIONS AND DETAILS.
13. RADIUS EXPOSED COUNTERTOP CORNERS 2" RADIUS,
TYPICALLY. (2" WHERE 3MM EDGE BANDING, 1" RADIUS AT
PLAM EDGES.) SEE CASEWORK DETAILS.
14. CAULK ALL COUNTERTOPS, BACKSPLASHES AND CABINETS
AT LOCATIONS WHERE THEY MEET WALLS. SEAL ALL CUT-
OUTS IN COUNTERTOPS. SEE CASEWORK DETAILS.
15. MATCH ALL FINISHED WALL THICKNESS WHERE NEW
WALLS OCCUR IN LINE WITH EXISTING WALLS.
16. CONTRACTOR TO PROVIDE FIRE, SMOKE, DIRT, DUST &
NOISE CONTAINMENT BARRIERS BETWEEN THE WORK
AREA & THE ADJACENT OCCUPIED SPACES. REFER TO
SPECIFICATIONS 01 00 00 AND 01 35 26.1 AND GC300 SERIES
DRAWINGS.
17. ALL PIPING, CONDUITS, AND RELATED MECHANICAL AND
ELECTRICAL ITEMS SHALL BE CONCEALED WITHIN
DRYWALL AND/OR PLASTER FURRING AS REQUIRED IN
FINISHED AREAS WHETHER SHOWN ON DRAWINGS OR NOT
UNLESS OTHERWISE NOTED.
18. PROVIDE CONTINUOUS SEAL AT ALL MECHANICAL AND
ELECTRICAL EQUIPMENT PENETRATIONS OF RATED
WALLS, ABOVE AND BELOW CEILINGS, WITH A UL
APPROVED FIRE-STOPPING MATERIAL.
19. PROVIDE CONTINUOUS SEAL AT ALL MECHANICAL AND
ELECTRICAL EQUIPMENT PENETRATIONS OF ACOUSTICAL
WALLS, ABOVE AND BELOW CEILINGS, WITH AN APPROVED
SOUND-STOPPING MATERIAL.
20. ALL INTERIOR WALLS WILL BE TYPE 'S' CONSTRUCTION
UNLESS OTHERWISE INDICATED. ALL FRAMING AROUND
COLUMNS WILL BE TYPE 'L2' CONSTRUCTION UNLESS
OTHERWISE INDICATED. REFER TO LIFE SAFETY PLAN
SHEETS GI100 AND GI101 FOR WALL RATINGS.
21. WHEN WALL PARTITIONS OF DIFFERENT FIRE RATING
INTERSECT, THE HIGHEST RATED PARTITION TAKES
PRECEDENCE.
22. ALL EXISTING TO REMAIN CEILING AND WALL GRILLES,
DIFFUSERS AND LIGHTS, SPRINKLER HEADS, OCCUPANCY
AND FIRE ALARM DETECTORS TO BE CLEANED IN AREAS
OF CONSTRUCTION. REFER TO SECTION 23 31 00 FOR DUCT
CLEANING REQUIREMENTS.
23. VERIFY THAT THE EXISTING WALLS REQUIRING FIRE
RATING ARE MAINTAINED DURING CONSTRUCTION. IF ANY
WALLS ARE DAMAGED, THEY MUST BE REPAIRED. ENSURE
FIRE RATING MEASURES EXTEND TO FLOOR SLAB ABOVE.
24. REFER TO LIFE SAFETY PLANS AND FLOOR PLANS FOR
LOCATION OF REQUIRED WALL RATINGS.
25. ALL THERMOSTAT LOCATIONS TO BE COORDINATED ON
MECHANICAL SUBMITTAL DRAWINGS BEFORE
INSTALLATION.
GENERAL SHEET NOTES:
STAIR 12
SW12SW12
STERILE INST
STOR
D8D8
ELECTRICAL
D7D7
ASST. CHIEF/
CLERK
D6D6
CHIEF OFFICE
D5D5
STAFF/CONF
D4D4
MECH.
D2D2
LOGISTICS
STORAGE
D1BD1B
STORAGE
D3AD3A
CORRIDOR
D1D1
PREP
STERILIZE
D9AD9A
STERILIZER
UNLOADING
D9BD9B
DECON
D10D10
CART WASH
D10CD10C
DET WATER
D10AD10A
ANTE CLEAN
D9D9
MENS
LOCKER
D9CD9C
TLT./
SHOWER
D9DD9D
TECH WORK
RM
D11AD11A
DECON
D1-2D1-2
MECHANICAL
D19BD19B
PLUMB
D17AD17A
TEMP
LOGISTICS
STORAGE
D14D14
CASE CART
HOLDING
D8AD8A
KITCHEN
D3D3
DAY GOODS
STORAGE
C79-2C79-2
DRY GOODS
STORAGE
C-792AC-792A
BREAK RM
C72AC72A
DRY GOODS
BREAK OUT
ROOM
C79C79
WARES WASH
RM.
C76-1C76-1
COOLER
C76-2AC76-2A
COOLER
C76-2BC76-2B
COOLER
C76-2CC76-2C
OFFICE
C-XC-X
OFFICE
C-YC-Y
WOMEN'S RM
C-ZC-Z
DISTRIBUTION
UNIT
C46C46
MAIL CENTER
C51C51
WAREHOUSE
C00C00
OFFICE
C51-4C51-4
MEN'S RM
C50C50
STAIR 9
SW9SW9
STAIR 4
SW4SW4
STAIR 7
SW7SW7
OXYGEN
STOR.
C51-1C51-1
VESTIBULE
C76-2DC76-2D
LOADING
C72C72
LOGISTICS
C67C67
CONFERENCE
C67AC67A
OFFICE
C67BC67B
OFFICE
C67CC67C
C49C49
FREEZER
C76-2EC76-2E
WASH / PREP
C77-1C77-1
DRY GOODS
C77-2C77-2
STAIR 5
SW5SW5
STAIR 2
SW2SW2
STAIR 6
SW6SW6
STAIR 1
SW1SW1
STAIR 3
SW3SW3
MAIN
KITCHEN
COMPRESSOR
ROOM
C79K-1C79K-1
LOGISTICS
OFFICE
d221d221 MECH d222d222
STAIR 8
SW8SW8
STAFF
ELEVATORS
VISITOR
ELEVATORS
FREIGHT
ELEVATORS TEMP ANTE
D13D13
ANTE
D10BD10B
SPS -
UNOCCUPIED
D1-3D1-3
SPS
STORAGE
(OCCUPIED)
D1-4D1-4
LIFE SAFETY SYMBOLS
EXIT LIGHTING
TM
FIRE…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .