This document appears to be a submittal register for the CONSOLIDATE PRIMARY CARE ALBANY STRATTON project. It lists the various submittals required for this project, including project schedules, shop drawings, quality control documents, sustainable construction requirements, and commissioning activities. The submittals are organized by division and specification section, with details on the submittal type, submission schedule, and review and approval process. The document provides instructions for logging and processing submittals, as well as the key status designations (open, closed, etc.). Overall, this submittal register outlines the documentation and approval workflow for this federal construction project.

The related federal contract opportunity is for the Z1DA--MINOR-CONST 528-811 CONSOLIDATE PRIMARY CARE 1st FLOOR PHASE 1 project, solicited by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 2. The solicitation number is 36C24224R0080, but no other details are provided in the document.

View the file

Other files

File Type Posted
528-811_ASPC_Addendum_1_20240530.pdf PDF
36C24224R0080 0004.docx DOCX document
00 41 13.10 - Construction Estimate Breakdown Template.xlsx XLSX spreadsheet
Past Performace Questionaire_PPQ.pdf PDF
PROCEDURES FOR SUBMITTAL OF OFFERS AND PROPOSAL EVALUATION CRITERIA.docx DOCX document
36C24224R0080 0003.docx DOCX document
36C24224R0080 0002.docx DOCX document
36C24224R0080 0001.docx DOCX document
36C24222R0080 Project RFI Questions with Responses 6-07-2024.pdf PDF
Wage Determination.txt TXT text file
Past Performace Questionaire.pdf PDF
Drawings I.pdf PDF
Drawings II.pdf PDF
FAR 52.225-2 Buy American Certification.pdf PDF
Specifications.pdf PDF
852.219-77 VA Notice of Limitations on Subcontracting.docx DOCX document
36C24224R0080_1.docx DOCX document
Contractor Projects Form.docx DOCX document
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VisiSpecs Submittal Register

TRIPLE-C Project Submittal LogInstructionsProject Locationwebsite address
Project NameCONSOLIDATE PRIMARY CARE ALBANY STRATTONTriple C designated staff shall log each submittal into the Project Submittal Log on the day it is received (hardcopy or electronic)
Project Number528-811Triple C designated staff shall review the submittal, or process the submittal to another reviewer (internal or consultant) on the day the submittal is received, including all information below, and date due back
Status KeyOOpenOnce the submittal is reviewed, a Triple C "submittal review stamp" shall be affixed to a Triple C submittal transmittal, and processed back to the Client or Submitter, as appropriate per contract.Add columns as required for tracking additional and revised submittal. Brief over revision requirements
CClosed
First SubmittalSecond SubmittalThird Submittal
STATUS (pending, open, or closed)DIVISIONSPECIFICATION SECTION NUMBERSPECIFICATION SECTION NAMEPARAGRAPH NUMBERSUBMITTAL TYPESUBMSSION SCHEDULESUBMITTAL TYPE (FILTER FOR EXPECTED PRODUCT DATA)SUBMITTAL TYPEDETAILCONTRACTOR SUBMITTAL NUMBERForwarded to Name (consultant, etc.)Forwarded to Firm & Date (consultant, etc.)AE Review CompleteAE responseDate Sent to VAVA Review CompleteVA responseAE Review CompleteAE responseDate Sent to VAVA Review CompleteVA responseAE Review CompleteAE responseDate Sent to VAVA Review CompleteVA response
OPEN/CLOSEDIVISIONSecNumSecNameParNumSubmittalTypeDetailRobbieB&P - dd/mm/yydd/mm/yyA / AN / RRdd/mm/yydd/mm/yyA / AN / RRdd/mm/yyA / AN / RRdd/mm/yydd/mm/yyA / AN / RRdd/mm/yyA / AN / RRdd/mm/yydd/mm/yyA / AN / RR
O0101 32 16.15Project Schedules (Small Projects - Design-Bid-Build)1.5.A.THE COMPLETE PROJECT SCHEDULE SUBMITTAL
Pre-MobilizationInterim schedule.
O0101 32 16.15Project Schedules (Small Projects - Design-Bid-Build)1.5.B.THE COMPLETE PROJECT SCHEDULE SUBMITTAL
Pre-MobilizationComplete final Project Schedule
O0101 33 23Shop Drawings, Product Data, and Samples1.3.A.SUBMITTAL REGISTER
Pre-MobilizationSubmittal register
O0101 33 23Shop Drawings, Product Data, and Samples1.3.E.SUBMITTAL REGISTER
During ConstructionMonthly updates to the submittal register
O0101 45 00Quality Control1.3.B.SUBMITTALS
During ConstructionTest Reports
O0101 57 19Temporary Environmental Controls1.4.A.SUBMITTALS
Pre-ConstructionEnvironmental Protection Plan
O0101 74 19Construction Waste Management1.5.B.SUBMITTALS
Pre-Demolitiona written demolition debris management plan.
O0101 74 19Construction Waste Management1.5.C.SUBMITTALS
Pre-DemolitionWaste Management Plan.
O0101 74 19Construction Waste Management1.5.D.SUBMITTALS
During ConstructionMonthly summary of construction and demolition debris diversion and disposal, quantifying all materials generated at the work site and disposed of or diverted from disposal through recycling.
O0101 81 13Sustainable Construction Requirements1.5.B.SUBMITTALS
Pre-ConstructionSustainability Action Plan
O0101 81 13Sustainable Construction Requirements1.5.C.SUBMITTALS
Low Pollutant-Emitting Materials Tracking SpreadsheetWithin 30 days after Preconstruction Meeting provide a preliminary Low Pollutant-Emitting Materials Tracking Spreadsheet. The Low Pollutant-Emitting Materials Tracking Spreadsheet must be an electronic file and include all materials on Project in categories described under Low Pollutant-Emitting Materials in 01 81 13.
O0101 81 13Sustainable Construction Requirements1.5.D.SUBMITTALS
Pre-ConstructionConstruction Indoor Air Quality (IAQ) Management Plan
O0101 81 13Sustainable Construction Requirements1.5.E.SUBMITTALS
Pre-ConstructionPRODUCT DATAProduct Submittals
O0101 81 13Sustainable Construction Requirements1.5.F.SUBMITTALS
During ConstructionSustainable Construction Progress ReportsConcurrent with each Application for Payment, submit a Sustainable Construction Progress Report to confirm adherence with Sustainability Action Plan.
O0101 81 13Sustainable Construction Requirements1.5.G.SUBMITTALS
Pre-CloseoutCloseout SubmittalsWithin 14 days after Substantial Completion provide the following
O0101 91 00General Commissioning Requirements1.13.A.SUBMITTALS
Pre-CommissioningPreliminary Commissioning Plan SubmittalThe Commissioning Agent has prepared a Preliminary Commissioning Plan based on the final Construction Documents. The Preliminary Commissioning Plan is included as an Appendix to this specification section. The Preliminary Commissioning Plan is provided for information only. It contains preliminary information about the following commissioning activities
O0101 91 00General Commissioning Requirements1.13.B.SUBMITTALS
Pre-CommissioningFinal Commissioning Plan SubmittalBased on the Final Construction Documents and the Contractor’s project team, the Commissioning Agent will prepare the Final Commissioning Plan as described in this section. The Commissioning Agent will submit three hard copies and three sets of electronic files of Final Commissioning Plan. The Contractor shall review the Commissioning Plan and provide any comments to the VA. The Commissioning Agent will incorporate review comments into the Final Commissioning Plan as directed by the VA.
O0101 91 00General Commissioning Requirements1.13.C.SUBMITTALS
Pre-CommissioningSystems Functional Performance Test ProcedureThe Commissioning Agent will submit preliminary Systems Functional Performance Test Procedures to the Contractor, and the VA for review and comment. The Contractor shall return review comments to the VA and the Commissioning Agent. The VA will also return review comments to the Commissioning Agent. The Commissioning Agent will incorporate review comments into the Final Systems Functional Test Procedures to be used in Systems Functional Performance Testing.
O0101 91 00General Commissioning Requirements1.13.D.SUBMITTALS
Pre-CommissioningPre-Functional ChecklistsThe Commissioning Agent will submit Pre-Functional Checklists to be completed by the Contractor.
O0101 91 00General Commissioning Requirements1.13.E.SUBMITTALS
Pre-CommissioningTest and Inspection ReportsThe Commissioning Agent will submit test and inspection reports to the VA with copies to the Contractor and the Architect/Engineer.
O0101 91 00General Commissioning Requirements1.13.F.SUBMITTALS
Pre-CloseoutCorrective Action DocumentsThe Commissioning Agent will submit corrective action documents to the VA Resident Engineer with copies to the Contractor and Architect.
O0101 91 00General Commissioning Requirements1.13.G.SUBMITTALS
Pre-CloseoutPreliminary Commissioning Report SubmittalThe Commissioning Agent will submit three electronic copies of the preliminary commissioning report. One electronic copy, with review comments, will be returned to the Commissioning Agent for preparation of the final submittal.
O0101 91 00General Commissioning Requirements1.13.H.SUBMITTALS
Pre-CloseoutFinal Commissioning Report SubmittalThe Commissioning Agent will submit four sets of electronically formatted information of the final commissioning report to the VA. The final submittal will incorporate comments as directed by the VA.
O0101 91 00General Commissioning Requirements1.13.I.SUBMITTALS
Pre-CommissioningData for Commissioning
O0202 82 11Traditional Asbestos Abatement2.4.A.SUBMITTALS
Pre-MobilizationPRE-START MEETING SUBMITTALS
O0202 82 11Traditional Asbestos Abatement2.4.B.SUBMITTALS
Pre-DemolitionSUBMITTALS DURING ABATEMENT
O0202 82 11Traditional Asbestos Abatement2.4.C.SUBMITTALS
Pre-DemolitionSUBMITTALS AT COMPLETION OF ABATEMENT
O0202 82 13.13Glovebag Asbestos Abatement2.5.A.SUBMITTALS
Pre-MobilizationPRE-start MEETING SUBMITTALS
O0202 82 13.13Glovebag Asbestos Abatement2.5.B.SUBMITTALS
Pre-DemolitionSUBMITTALS DURING ABATEMENT
O0202 82 13.13Glovebag Asbestos Abatement2.5.C.SUBMITTALS
Pre-ConstructionSUBMITTALS AT COMPLETION OF ABATEMENT
O0202 82 13.19Asbestos Floor Tile and Mastic Abatement2.5.A.1.aPRE-START MEETING SUBMITTALSPre-MobilizationSubmit a detailed work schedule for the entire project reflecting contract documents and the phasing/schedule requirements from the CPM chart.
O0202 82 13.19Asbestos Floor Tile and Mastic Abatement2.5.A.1.bPRE-START MEETING SUBMITTALSPre-MobilizationSubmit a staff organization chart showing all personnel who will be working on the project and their capacity/function.Provide their qualifications, training, accreditations, and licenses, as appropriate. Provide a copy of the "Certificate of Worker's Acknowledgment" and the "Affidavit of Medical Surveillance and Respiratory Protection" for each person.
O0202 82 13.19Asbestos Floor Tile and Mastic Abatement2.5.A.1.cPRE-START MEETING SUBMITTALSPre-MobilizationSubmit Asbestos Hazard Abatement Plan developed specifically for this project, incorporating the requirements of the specifications, prepared, signed and dated by the CPIH/CI
O0202 82 13.19Asbestos Floor Tile and Mastic Abatement2.5.A.1.dPRE-START MEETING SUBMITTALSPre-MobilizationSubmit the specifics of the materials and equipment to be used for this projectmanufacturer names, model numbers, performance characteristics, pictures/diagrams, and number available for the following
O0202 82 13.19Asbestos Floor Tile and Mastic Abatement2.5.A.1.ePRE-START MEETING SUBMITTALSPre-MobilizationSubmit the name, location, and phone number of the approved landfill; proof/verification the landfill is approved for ACM disposal; the landfill's requirements for ACM waste; the type of vehicle to be used for transportation; and name, address, and phone number of subcontractor, if used. Proof of asbestos training for transportation personnel shall be provided.
O0202 82 13.19Asbestos Floor Tile and Mastic Abatement2.5.A.1.fPRE-START MEETING SUBMITTALSPre-MobilizationSubmit required notifications and arrangements made with regulatory agencies having regulatory jurisdiction and the specific contingency/emergency arrangements made with local health, fire, ambulance, hospital authorities and any other notifications/arrangements.
O0202 82 13.19Asbestos Floor Tile and Mastic Abatement2.5.A.1.gPRE-START MEETING SUBMITTALSPre-MobilizationSubmit the name, location and verification of the laboratory and/or personnel to be used for analysis of air and/or bulk samples. Personal air monitoring must be done in accordance with OSHA 29 CFR 1926.1101(f) and Appendix A. And area or clearance air monitoring in accordance with EPA AHERA protocols.
O0202 82 13.19Asbestos Floor Tile and Mastic Abatement2.5.A.1.hPRE-START MEETING SUBMITTALSPre-MobilizationSubmit qualifications verificationSubmit the following evidence of qualifications. Make sure that all references are current and verifiable by providing current phone numbers and documentation.
O0202 82 13.19Asbestos Floor Tile and Mastic Abatement2.5.A.1.iPRE-START MEETING SUBMITTALSPre-MobilizationSubmit information on personnelProvide a resume; address each item completely; copies of certificates, accreditations, and licenses. Submit an affidavit signed by the CPIH/CIH stating that all personnel submitted below have medical records in accordance with OSHA 29 CFR 1926.1101(m) and 29 CFR 1910.20 and that the company has implemented a medical surveillance program and written respiratory protection program, and maintains recordkeeping in accordance with the above regulations. Submit the phone number and doctor/clinic/hospital used for medical evaluations.
O0202 82 13.19Asbestos Floor Tile and Mastic Abatement2.5.A.1.jPRE-START MEETING SUBMITTALSPre-MobilizationSubmit copies of State license for asbestos abatement; copy of insurance policy, including exclusions with a letter from agent stating in plain language the coverage provided and the fact that asbestos abatement activities are covered by the policy; copy of the AHAP incorporating the requirements of this specification; information on who provides your training, how often; who provides medical surveillance, how often; who performs and how is personal air monitoring of abatement workers conducted; a list of references of independent laboratories/IH's familiar with your air monitoring and Asbestos Hazard Abatement Plans; copies of monitoring results of the five referenced projects listed and analytical method(s) used.
O0202 82 13.19Asbestos Floor Tile and Mastic Abatement2.5.A.1.lPRE-START MEETING SUBMITTALSPre-MobilizationSubmit, before the start of work, the manufacturer's technical data for all types of encapsulants, all MSDS, and application instructions.
O0202 82 13.19Asbestos Floor Tile and Mastic Abatement2.5.B.1SUBMITTALS DURING ABATEMENTPre-DemolitionThe Competent Person shall maintain and submit a daily log at the regulated area documenting the dates and timespurpose, attendees and summary of meetings; all personnel entering/exiting the regulated area; document and discuss the resolution of unusual events such as barrier breeching, equipment failures, emergencies, and any cause for stopping work; representative air monitoring and results/TWAs/ELs. Submit this information daily to the VPIH/CIH.
O0202 82 13.19Asbestos Floor Tile and Mastic Abatement2.5.B.2SUBMITTALS DURING ABATEMENTPre-DemolitionThe CPIH/CIH shall document and maintain the inspection and approval of the regulated area preparation prior to start of work and daily during work.
O0202 82 13.19Asbestos Floor Tile and Mastic Abatement2.5.CSUBMITTALS DURING ABATEMENTPre-DemolitionThe CPIH/CIH shall submit a project report consisting of the daily log book requirements and documentationof events during the abatement project including waste shipment records signed by the landfill's agent.It will also include information on the containment and transportation of waste from the containment with applicable chain of custody forms. The report shall include a certificate of completion, signed and dated by the CPIH/CIH, in accordance with Attachment #1. All clearance and perimeter area samples must be submitted. The VA Representative will retain the abatement report after completion of the project and provide copies of the abatement report to VAMC Office of Engineer and the Safety Office.
O0202 83 33.13Lead-Based Paint Removal and Disposal1.6.B.SUBMITTALS
Pre-MobilizationPRODUCT DATAManufacturer's Literature and Data
O0202 83 33.13Lead-Based Paint Removal and Disposal1.6.C.SUBMITTALS
Pre-MobilizationTest ReportsSubmit testing laboratory reports.
O0202 83 33.13Lead-Based Paint Removal and Disposal1.6.D.SUBMITTALS
Pre-MobilizationCertificatesCertify completed training.
O0202 83 33.13Lead-Based Paint Removal and Disposal1.6.E.SUBMITTALS
Pre-MobilizationQualificationsSubstantiate qualifications comply with specifications.
O0202 83 33.13Lead-Based Paint Removal and Disposal1.6.F.SUBMITTALS
Pre-DemolitionRecord Documents
O0303 30 53Cast-in-Place Concrete1.4.BSUBMITTALS:
Pre-ConstructionSubmittal DrawingsReinforcing steel
O0303 30 53Cast-in-Place Concrete1.4.CSUBMITTALS:
Pre-ConstructionManufacturer's Literature and Data
O0303 30 53Cast-in-Place Concrete1.4.DSUBMITTALS:
Pre-ConstructionSustainable Construction Submittals
O0303 30 53Cast-in-Place Concrete1.4.ESUBMITTALS:
Pre-ConstructionCertificates
O0303 30 53Cast-in-Place Concrete1.6.F.SUBMITTALS:
Pre-ConstructionTest Report for Concrete Mix DesignsTrial mixes including water�cement // fly ash // ratio curves, concrete mix ingredients, and admixtures.
O0303 30 53Cast-in-Place Concrete1.6.G.SUBMITTALS:
Pre-ConstructionShoring and Reshoring SequenceSubmit for approval a shoring and reshoring sequence for flat slab/flat plate portions, prepared by a registered Professional Engineer. As a minimum, include timing of form stripping, reshoring, number of floors to be re-shored and timing of re-shore removal to serve as an initial outline of procedures subject to modification as construction progresses. Submit revisions to sequence, whether initiated by Resident Engineer (see FORMWORK) or Contractor.
O0303 30 53Cast-in-Place Concrete1.6.H.SUBMITTALS:
During ConstructionTest reports on splitting tensile strength (Fct) of lightweight concrete.
O0404 01 00Maintenance of Masonry1.4.B.SUBMITTALS
Pre-ConstructionPRODUCT DATAManufacturer's Literature and Data
O0404 01 00Maintenance of Masonry1.4.C.SUBMITTALS
Pre-ConstructionSamples
O0404 01 00Maintenance of Masonry1.4.D.SUBMITTALS
During ConstructionTest reports
O0404 05 13Masonry Mortaring1.4.B.SUBMITTALS
Pre-ConstructionPRODUCT DATAManufacturer's Literature and Data
O0404 05 13Masonry Mortaring1.4.C.SUBMITTALS
Pre-ConstructionTest ReportsCertify each product complies with specifications.
O0404 05 13Masonry Mortaring1.4.D.SUBMITTALS
Pre-ConstructionCertificatesCertify each product complies with specifications.
O0404 05 13Masonry Mortaring1.4.E.SUBMITTALS
Pre-ConstructionQualificationsSubstantiate qualifications comply with specifications.
O0404 05 16Masonry Grouting1.4.B.SUBMITTALS
Pre-ConstructionPRODUCT DATAManufacturer's Literature and Data
O0404 05 16Masonry Grouting1.4.C.SUBMITTALS
Pre-ConstructionSustainable Construction Submittals
O0404 05 16Masonry Grouting1.4.D.SUBMITTALS
Pre-ConstructionTest ReportsCertify each product complies with specifications.
O0404 05 16Masonry Grouting1.4.E.SUBMITTALS
Pre-ConstructionCertificatesCertify each product complies with specifications.
O0505 12 00Structural Steel Framing1.4.B.SUBMITTALS
Pre-ConstructionSubmittal Drawings
O0505 12 00Structural Steel Framing1.4.C.SUBMITTALS
Pre-ConstructionSustainable Construction Submittals
O0505 12 00Structural Steel Framing1.4.D.SUBMITTALS
Pre-ConstructionTest ReportsCertify products comply with specifications.
O0505 12 00Structural Steel Framing1.4.E.SUBMITTALS
Pre-ConstructionCertificatesCertify each product complies with specifications.
O0505 12 00Structural Steel Framing1.4.F.SUBMITTALS
Pre-ConstructionQualificationsSubstantiate qualifications comply with specifications.
O0505 12 00Structural Steel Framing1.4.G.SUBMITTALS
Pre-ConstructionDelegated Design Drawings and CalculationsSigned and sealed by responsible Architect/Engineer.
O0505 12 00Structural Steel Framing1.4.H.SUBMITTALS
Pre-ConstructionRecord SurveysSigned and sealed by responsible surveyor or engineer.
O0505 36 00Composite Metal Decking1.4.A.SUBMITTALS
Pre-MobilizationPRODUCT DATAManufacturer's Literature and Data
O0505 36 00Composite Metal Decking1.4.B.SUBMITTALS
Pre-ConstructionSustainable Construction Submittals
O0505 36 00Composite Metal Decking1.4.C.SUBMITTALS
Pre-ConstructionShop Drawings
O0505 36 00Composite Metal Decking1.4.D.SUBMITTALS
Pre-ConstructionPRODUCT DATAManufacturer's Literature and Data
O0505 36 00Composite Metal Decking1.4.E.SUBMITTALS
Pre-ConstructionManufacturer's Written Recommendations
O0505 36 00Composite Metal Decking1.4.F.SUBMITTALS
Pre-ConstructionTest Reports
O0505 36 00Composite Metal Decking1.4.G.SUBMITTALS
Pre-ConstructionTest Reports
O0505 36 00Composite Metal Decking1.4.H.SUBMITTALS
Pre-ConstructionWelding Power Setting Recommendations
O0505 36 00Composite Metal Decking1.4.I.SUBMITTALS
Pre-ConstructionShear Stud Layouts
O0505 36 00Composite Metal Decking1.4.J.SUBMITTALS
Pre-ConstructionCertificates
O0505 36 00Composite Metal Decking1.4.K.SUBMITTALS
Pre-ConstructionCertificates
O0505 36 00Composite Metal Decking1.4.L.SUBMITTALS
Pre-ConstructionPRODUCT DATAManufacturer's Catalog Data for Welding Equipment
O0505 36 00Composite Metal Decking1.4.M.SUBMITTALS
Pre-ConstructionCertificates
O0505 36 00Composite Metal Decking1.4.N.SUBMITTALS
Pre-ConstructionQualifications
O0505 40 00Cold-Formed Metal Framing1.4.B.SUBMITTALS
Pre-ConstructionShop DrawingsShop and erection drawings showing steel unit layout, connections to supporting members, and information necessary to complete installation as shown and specified.
O0505 40 00Cold-Formed Metal Framing1.4.C.SUBMITTALS
Pre-ConstructionPRODUCT DATAManufacturer's Literature and DataShowing steel component sections and specifying structural characteristics.
O0505 40 00Cold-Formed Metal Framing1.4.D.SUBMITTALS
Pre-ConstructionFor cold-formed metal framing indicated to comply with certain design loadings, include structural analysis data sealed and signed by the qualified professional engineer who was responsible for its preparation.
O0505 40 00Cold-Formed Metal Framing1.4.E.SUBMITTALS
Pre-ConstructionBlast Design Calculations
O0505 40 00Cold-Formed Metal Framing1.4.F.SUBMITTALS
Pre-ConstructionSustainable Construction Submittals
O0505 50 00Metal Fabrications1.3.B.SUBMITTALS
Pre-ConstructionPRODUCT DATAManufacturer's Literature and Data
O0505 50 00Metal Fabrications1.3.C.SUBMITTALS
Pre-ConstructionShop Drawings
O0505 50 00Metal Fabrications1.3.D.SUBMITTALS
Pre-ConstructionManufacturer's Certificates
O0505 50 00Metal Fabrications1.3.E.SUBMITTALS
Pre-ConstructionDesign Calculations for specified live loads including dead loads.
O0505 50 00Metal Fabrications1.3.F.SUBMITTALS
Pre-ConstructionSetting drawings and instructionsfor installation of anchors to be preset into concrete and masonry work, and for the positioning of items having anchors to be built into concrete or masonry construction.
O0606 06 60Plastic Fabrication Resin Panels1.3.B.SUBMITTALS
Pre-ConstructionProduct Data
O0606 06 60Plastic Fabrication Resin Panels1.3.C.SUBMITTALS
Pre-ConstructionTest Reports
O0606 06 60Plastic Fabrication Resin Panels1.3.D.SUBMITTALS
Pre-ConstructionBuilding Approvals
O0606 06 60Plastic Fabrication Resin Panels1.3.E.SUBMITTALS
Pre-ConstructionShop Drawings
O0606 06 60Plastic Fabrication Resin Panels1.3.F.SUBMITTALS
Pre-ConstructionSamples for Initial Selection
O0606 06 60Plastic Fabrication Resin Panels1.3.G.SUBMITTALS
Pre-ConstructionSamples for verifications
O0606 10 00Rough Carpentry1.3.B.SUBMITTALS
Pre-ConstructionSustainable Design Submittals
O0606 10 00Rough Carpentry1.3.C.SUBMITTALS
Pre-ConstructionShop Drawings showing framing connection details, fasteners, connections and dimensions.
O0606 10 00Rough Carpentry1.3.D.SUBMITTALS
Pre-ConstructionPRODUCT DATAManufacturer’s Literature and Data
O0606 10 00Rough Carpentry1.3.E.SUBMITTALS
Pre-ConstructionManufacturer’s certificate for unmarked lumber.
O0707 01 50.19Preparation for Re-Roofing1.5.B.SUBMITTALS
Pre-ConstructionSubmittal Drawings
O0707 01 50.19Preparation for Re-Roofing1.5.C.SUBMITTALS
Pre-ConstructionPRODUCT DATAManufacturer's Literature and Data
O0707 01 50.19Preparation for Re-Roofing1.5.D.SUBMITTALS
Pre-ConstructionPhotographsDocument existing conditions potentially affected by roofing operations before work begins.
O0707 01 50.19Preparation for Re-Roofing1.5.E.SUBMITTALS
Pre-ConstructionField Inspection Reports
O0707 01 50.19Preparation for Re-Roofing1.5.F.SUBMITTALS
Pre-ConstructionInfrared Roof Moisture Survey Report.
O0707 08 00Facility Exterior Closure Commissioning1.6.A.SUBMITTALS
The commissioning process requires review of selected Submittals that pertain to the systems to be commissioned. The Commissioning Agent will provide a list of submittals that will be reviewed by the Commissioning Agent. This list will be reviewed and approved by the VA prior to forwarding to the Contractor. Refer to Section 01 33 23 SHOP DRAWINGS, PRODUCT DATA, and SAMPLES for further details.
O0707 08 00Facility Exterior Closure Commissioning1.6.B.SUBMITTALS
The commissioning process requires Submittal review simultaneously with engineering review. Specific submittal requirements related to the commissioning process are specified in Section 01 91 00 GENERAL COMMISSIONING REQUIREMENTS.
O0707 13 00Sheet Waterproofing1.3.B.SUBMITTALS
Pre-ConstructionPRODUCT DATAManufacturer's Literature and Data
O0707 13 00Sheet Waterproofing1.3.C.SUBMITTALS
Pre-ConstructionCertificates
O0707 13 00Sheet Waterproofing1.3.D.SUBMITTALS
Pre-ConstructionSamples
O0707 21 13Thermal Insulation1.4.B.SUBMITTALS
Pre-ConstructionSubmittal Drawings
O0707 21 13Thermal Insulation1.4.C.SUBMITTALS
Pre-ConstructionPRODUCT DATAManufacturer's Literature and Data
O0707 21 13Thermal Insulation1.4.D.SUBMITTALS
Pre-ConstructionSustainable Construction Submittals
O0707 21 23Loose-Fill Insulation1.4.B.SUBMITTALS
Pre-ConstructionPRODUCT DATAManufacturer's Literature and Data
O0707 21 23Loose-Fill Insulation1.4.C.SUBMITTALS
Pre-ConstructionSamples
O0707 21 23Loose-Fill Insulation1.4.D.SUBMITTALS
Pre-ConstructionSustainable Construction Submittals
O0707 22 00Roof and Deck Insulation1.4.B.SUBMITTALS
Pre-ConstructionSubmittal Drawings
O0707 22 00Roof and Deck Insulation1.4.C.SUBMITTALS
Pre-ConstructionPRODUCT DATAManufacturer's Literature and Data
O0707 22 00Roof and Deck Insulation1.4.D.SUBMITTALS
Pre-ConstructionSamples
O0707 22 00Roof and Deck Insulation1.4.E.SUBMITTALS
Pre-ConstructionSustainable Construction Submittals
O0707 22 00Roof and Deck Insulation1.4.F.SUBMITTALS
Pre-ConstructionQualificationsSubstantiate qualifications meet specifications.
O0707 24 00Roof and Deck Insulation1.5.A.SUBMITTALS
Pre-ConstructionSubmittal Procedures
O0707 24 00Roof and Deck Insulation1.5.B.SUBMITTALS
Pre-ConstructionSubmittal Drawings
O0707 24 00Roof and Deck Insulation1.5.C.SUBMITTALS
Pre-ConstructionManufacturer's Literature and Data
O0707 24 00Roof and Deck Insulation1.5.D.SUBMITTALS
Pre-ConstructionTest Reports
O0707 24 00Roof and Deck Insulation1.5.E.SUBMITTALS
Pre-ConstructionQualifications
O0707 27 26Fluid-Applied Membrane Air Barrier, Vapor Permeable1.4.B.SUBMITTALS
Pre-ConstructionPRODUCT DATAManufacturer's Literature and Data
O0707 27 26Fluid-Applied Membrane Air Barrier, Vapor Permeable1.4.C.SUBMITTALS
Pre-ConstructionSustainable Construction Submittals
O0707 27 26Fluid-Applied Membrane Air Barrier, Vapor Permeable1.4.D.SUBMITTALS
Pre-ConstructionTest reports
O0707 27 26Fluid-Applied Membrane Air Barrier, Vapor Permeable1.4.E.SUBMITTALS
Pre-ConstructionCertificatesCertify each product complies with specifications.
O0707 27 26Fluid-Applied Membrane Air Barrier, Vapor Permeable1.4.F.SUBMITTALS
Pre-ConstructionQualificationsSubstantiate qualifications comply with specifications.
O0707 27 26Fluid-Applied Membrane Air Barrier, Vapor Permeable1.4.G.SUBMITTALS
Pre-CloseoutInstallation Audit
O0707 51 13.13Cold-Applied Built-Up Asphalt Roofing1.5.B.SUBMITTALS
Pre-ConstructionSubmittal Drawings
O0707 51 13.13Cold-Applied Built-Up Asphalt Roofing1.5.C.SUBMITTALS
Pre-ConstructionManufacturer's Literature and Data
O0707 51 13.13Cold-Applied Built-Up Asphalt Roofing1.5.D.SUBMITTALS
Pre-ConstructionSamples
O0707 51 13.13Cold-Applied Built-Up Asphalt Roofing1.5.E.SUBMITTALS
Pre-ConstructionSustainable Construction Submittals
O0707 51 13.13Cold-Applied Built-Up Asphalt Roofing1.5.F.SUBMITTALS
Pre-ConstructionCertificates
O0707 51 13.13Cold-Applied Built-Up Asphalt Roofing1.5.G.SUBMITTALS
Pre-ConstructionQualifications
O0707 51 13.13Cold-Applied Built-Up Asphalt Roofing1.5.H.SUBMITTALS
Pre-ConstructionField quality control reports.
O0707 51 13.13Cold-Applied Built-Up Asphalt Roofing1.5.I.SUBMITTALS
Pre-ConstructionTemporary protection plan. Include list of proposed temporary materials.
O0707 51 13.13Cold-Applied Built-Up Asphalt Roofing1.5.J.SUBMITTALS
Pre-ConstructionOperation and Maintenance Data
O0707 53 23Ethylene-Propylene-Diene-Monomer Roofing1.6.B.SUBMITTALS
Pre-ConstructionSubmittal Drawings
O0707 53 23Ethylene-Propylene-Diene-Monomer Roofing1.6.C.SUBMITTALS
Pre-ConstructionManufacturer's Literature and Data
O0707 53 23Ethylene-Propylene-Diene-Monomer Roofing1.6.D.SUBMITTALS
Pre-ConstructionSustainable Construction Submittals
O0707 53 23Ethylene-Propylene-Diene-Monomer Roofing1.6.E.SUBMITTALS
Pre-ConstructionSamples
O0707 53 23Ethylene-Propylene-Diene-Monomer Roofing1.6.F.SUBMITTALS
Pre-ConstructionCertificates
O0707 53 23Ethylene-Propylene-Diene-Monomer Roofing1.6.G.SUBMITTALS
Pre-ConstructionQualifications
O0707 53 23Ethylene-Propylene-Diene-Monomer Roofing1.6.H.SUBMITTALS
Pre-ConstructionField quality control reports.
O0707 53 23Ethylene-Propylene-Diene-Monomer Roofing1.6.I.SUBMITTALS
Pre-ConstructionTemporary protection plan. Include list of proposed temporary materials.
O0707 53 23Ethylene-Propylene-Diene-Monomer Roofing1.6.J.SUBMITTALS
Pre-ConstructionOperation and Maintenance Data
O0707 54 23Thermoplastic Polyolefin (TPO) Roofing1.5.B.SUBMITTALS
Pre-ConstructionSubmittal Drawings
O0707 54 23Thermoplastic Polyolefin (TPO) Roofing1.5.C.SUBMITTALS
Pre-ConstructionPRODUCT DATAManufacturer's Literature and Data
O0707 54 23Thermoplastic Polyolefin (TPO) Roofing1.5.D.SUBMITTALS
Pre-ConstructionSamples
O0707 54 23Thermoplastic Polyolefin (TPO) Roofing1.5.E.SUBMITTALS
Pre-ConstructionSustainable Construction Submittals
O0707 54 23Thermoplastic Polyolefin (TPO) Roofing1.5.F.SUBMITTALS
Pre-ConstructionCertificatesCertify products comply with specifications.
O0707 54 23Thermoplastic Polyolefin (TPO) Roofing1.5.G.SUBMITTALS
Pre-ConstructionQualificationsSubstantiate qualifications comply with specifications.
O0707 54 23Thermoplastic Polyolefin (TPO) Roofing1.5.H.SUBMITTALS
Pre-ConstructionField quality control reports.
O0707 54 23Thermoplastic Polyolefin (TPO) Roofing1.5.I.SUBMITTALS
Pre-ConstructionTemporary protection plan. Include list of proposed temporary materials.
O0707 54 23Thermoplastic Polyolefin (TPO) Roofing1.5.J.SUBMITTALS
Pre-ConstructionOperation and Maintenance Data
O0707 60 00Flashing and Sheet Metal1.5.B.SUBMITTALS
Pre-ConstructionShop DrawingsFor all specified items, including
O0707 60 00Flashing and Sheet Metal1.5.C.SUBMITTALS
Pre-ConstructionPRODUCT DATAManufacturer's Literature and DataFor all specified items, including
O0707 60 00Flashing and Sheet Metal1.5.D.SUBMITTALS
Pre-ConstructionCertificatesIndicating compliance with specified finishing requirements, from applicator and contractor.
O0707 81 00Applied Fireproofing1.3.B.SUBMITTALS
Pre-ConstructionSustainable Design Submittals1. Volatile organic compounds per volume as specified in PART 2 ‑ PRODUCTS.
O0707 81 00Applied Fireproofing1.3.C.SUBMITTALS
Pre-ConstructionInstaller qualifications.
O0707 81 00Applied Fireproofing1.3.D.SUBMITTALS
Pre-ConstructionTesting laboratory accreditations.
O0707 81 00Applied Fireproofing1.3.E.SUBMITTALS
Pre-ConstructionPRODUCT DATAManufacturer's Literature and Data
O0707 81 00Applied Fireproofing1.3.F.SUBMITTALS
Pre-ConstructionCertificates
O0707 81 00Applied Fireproofing1.3.G.SUBMITTALS
Pre-ConstructionMiscellaneous
O0707 84 00Firestopping1.3.B.SUBMITTALS
Pre-ConstructionSustainable Design Submittals1. Volatile organic compounds per volume as specified in PART 2 ‑ PRODUCTS.
O0707 84 00Firestopping1.3.C.SUBMITTALS
Pre-ConstructionInstaller qualifications.
O0707 84 00Firestopping1.3.D.SUBMITTALS
Pre-ConstructionInspector qualifications.
O0707 84 00Firestopping1.3.E.SUBMITTALS
Pre-ConstructionPRODUCT DATAManufacturer's Literature and Data
O0707 84 00Firestopping1.3.F.SUBMITTALS
Pre-ConstructionList of FM, UL, or WH classification number of systems installed.
O0707 84 00Firestopping1.3.G.SUBMITTALS
Pre-ConstructionCertified laboratory test reports for ASTM E814
O0707 84 00Firestopping1.3.HSUBMITTALS
Pre-ConstructionManufacturer's Certificates attesting compliance with specified requirements.
O0707 92 00Joint Sealants1.5.B.SUBMITTALS
Pre-ConstructionSustainable Design Submittals1. Volatile organic compounds per volume as specified in PART 2 ‑ PRODUCTS.
O0707 92 00Joint Sealants1.5.C.SUBMITTALS
Pre-ConstructionInstaller qualifications.
O0707 92 00Joint Sealants1.5.D.SUBMITTALS
Pre-ConstructionContractor certification.
O0707 92 00Joint Sealants1.5.E.SUBMITTALS
Pre-ConstructionPRODUCT DATAManufacturer's installation instructions for each product used.
O0707 92 00Joint Sealants1.5.F.SUBMITTALS
Pre-ConstructionCured samples of exposed sealants for each color.
O0707 92 00Joint Sealants1.5.G.SUBMITTALS
Pre-ConstructionPRODUCT DATAManufacturer's Literature and Data
O0707 92 00Joint Sealants1.5.H.SUBMITTALS
Pre-ConstructionManufacturer warranty.
O0808 11 13Hollow Metal Doors and Frames1.4.B.SUBMITTALS
Pre-ConstructionSubmittal Drawings
O0808 11 13Hollow Metal Doors and Frames1.4.C.SUBMITTALS
Pre-ConstructionPRODUCT DATAManufacturer's Literature and Data
O0808 11 13Hollow Metal Doors and Frames1.4.D.SUBMITTALS
Pre-ConstructionSustainable Construction Submittals
O0808 11 13Hollow Metal Doors and Frames1.4.E.SUBMITTALS
Pre-ConstructionTest reportsCertify // each product complies // products comply // with specifications.
O0808 11 13Hollow Metal Doors and Frames1.4.F.SUBMITTALS
Pre-ConstructionQualificationsSubstantiate qualifications comply with specifications.
O0808 11 13Hollow Metal Doors and Frames1.4.G.SUBMITTALS
Pre-ConstructionBlast Design Calculations
O0808 14 00Interior Wood Doors1.4.B.SUBMITTALS
Pre-ConstructionSubmittal Drawings
O0808 14 00Interior Wood Doors1.4.C.SUBMITTALS
Pre-ConstructionPRODUCT DATAManufacturer's Literature and Data
O0808 14 00Interior Wood Doors1.4.D.SUBMITTALS
Pre-ConstructionSamples
O0808 14 00Interior Wood Doors1.4.E.SUBMITTALS
Pre-ConstructionSustainable Construction Submittals
O0808 14 00Interior Wood Doors1.4.F.SUBMITTALS
Pre-ConstructionTest ReportsIndicate // each product complies // products comply // with specifications.
O0808 14 00Interior Wood Doors1.4.G.SUBMITTALS
Pre-ConstructionOperation and Maintenance Data
O0808 31 13Access Doors and Frames1.4.B.SUBMITTALS
Pre-ConstructionSubmittal Drawings
O0808 31 13Access Doors and Frames1.4.C.SUBMITTALS
Pre-ConstructionPRODUCT DATAManufacturer's Literature and Data
O0808 31 13Access Doors and Frames1.4.D.SUBMITTALS
Pre-ConstructionSustainable Construction Submittals
O0808 36 16.13High Performance Barn (Sliding) Door1.3.B.SUBMITTALSPre-ConstructionPRODUCT DATAManufacturer's Literature and Data
O0808 36 16.13High Performance Barn (Sliding) Door1.3.C.SUBMITTALSPre-ConstructionShop Drawings
O0808 36 16.13High Performance Barn (Sliding) Door1.3.D.SUBMITTALSPre-ConstructionSamples
O0808 36 16.13High Performance Barn (Sliding) Door1.3.E.SUBMITTALSPre-ConstructionCertificates
O0808 36 16.13High Performance Barn (Sliding) Door1.3.F.SUBMITTALSPre-ConstructionWarranty Documentation
O0808 36 16.13High Performance Barn (Sliding) Door1.3.G.SUBMITTALSPre-ConstructionTest Reports
O0808 41 13Aluminum-Framed Entrances and Storefronts1.5.B.SUBMITTALS
Pre-ConstructionSubmittal Drawings// Minimum 1 to 2 (half size) scale. //
O0808 41 13Aluminum-Framed Entrances and Storefronts1.5.C.SUBMITTALS
Pre-ConstructionPRODUCT DATAManufacturer's Literature and Data
O0808 41 13Aluminum-Framed Entrances and Storefronts1.5.D.SUBMITTALS
Pre-ConstructionSamples
O0808 41 13Aluminum-Framed Entrances and Storefronts1.5.E.SUBMITTALS
Pre-ConstructionSustainable Construction Submittals
O0808 41 13Aluminum-Framed Entrances and Storefronts1.5.F.SUBMITTALS
Pre-ConstructionTest reportsCertify // each product complies // products comply // with specifications.
O0808 41 13Aluminum-Framed Entrances and Storefronts1.5.G.SUBMITTALS
Pre-ConstructionCertificatesCertify // each product complies // products comply // with specifications.
O0808 41 13Aluminum-Framed Entrances and Storefronts1.5.H.SUBMITTALS
Pre-ConstructionQualificationsSubstantiate qualifications comply with specifications.
O0808 41 13Aluminum-Framed Entrances and Storefronts1.5.I.SUBMITTALS
Pre-ConstructionDelegated Design Drawings and CalculationsSigned and sealed by responsible design professional.
O0808 41 13Aluminum-Framed Entrances and Storefronts1.5.J.SUBMITTALS
Pre-CloseoutOperation and Maintenance Data
O0808 56 53Blast Resistant Windows1.5.B.SUBMITTALS
Pre-ConstructionSubmittal Drawings
O0808 56 53Blast Resistant Windows1.5.C.SUBMITTALS
Pre-ConstructionPRODUCT DATAManufacturer's Literature and Data
O0808 56 53Blast Resistant Windows1.5.D.SUBMITTALS
Pre-ConstructionSustainable Construction Submittals
O0808 56 53Blast Resistant Windows1.5.E.SUBMITTALS
Pre-ConstructionCertificatesIndicate each product complies with specifications.
O0808 56 53Blast Resistant Windows1.5.F.SUBMITTALS
Pre-ConstructionCertificatesPrepared by qualified blast consultant verifying window and glazing assembly including anchors comply with specified blast resistance performance.
O0808 56 53Blast Resistant Windows1.5.G.SUBMITTALS
Pre-ConstructionDelegated Design SubmittalSubstantiate qualifications comply with specifications.
O0808 56 53Blast Resistant Windows1.5.H.SUBMITTALS
Pre-ConstructionTest ReportsSubstantiate qualifications comply with specifications.
O0808 56 53Blast Resistant Windows1.5.I.SUBMITTALS
Pre-ConstructionQualificationsSubstantiate qualifications comply with specifications.
O0808 62 50Insulated Translucent Wall Skylight System1.6.B.SUBMITTALS
Pre-ConstructionSubmittal Drawings
O0808 62 50Insulated Translucent Wall Skylight System1.6.C.SUBMITTALS
Pre-ConstructionPRODUCT DATAManufacturer's Literaturer and Data
O0808 62 50Insulated Translucent Wall Skylight System1.6.D.SUBMITTALS
Pre-ConstructionSamples
O0808 62 50Insulated Translucent Wall Skylight System1.6.E.SUBMITTALS
Pre-ConstructionShop Drawings
O0808 71 00Door Hardware1.6.B.SUBMITTALS
Pre-ConstructionHardware SchedulePrepare and submit hardware schedule in the following form
O0808 71 00Door Hardware1.6.C.SUBMITTALS
Pre-ConstructionTemplates
O0808 71 00Door Hardware1.6.D.SUBMITTALS
Pre-ConstructionPRODUCT DATASamples and Manufacturers' Literature
O0808 71 00Door Hardware1.6.E.SUBMITTALS
Pre-ConstructionCertificate of Compliance and Test ReportsSubmit certificates that hardware conforms to the requirements specified herein. Certificates shall be accompanied by copies of reports as referenced. The testing shall have been conducted either in the manufacturer's plant and certified by an independent testing laboratory or conducted in an independent laboratory, within four years of submittal of reports for approval.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .