528-811_TripleC-CA-SubmittalLOG and Cutsheet Index.xlsx
XLSX spreadsheet 172 KB Posted
- Solicitation number
- 36C24224R0080
About this file
This document appears to be a submittal register for the CONSOLIDATE PRIMARY CARE ALBANY STRATTON project. It lists the various submittals required for this project, including project schedules, shop drawings, quality control documents, sustainable construction requirements, and commissioning activities. The submittals are organized by division and specification section, with details on the submittal type, submission schedule, and review and approval process. The document provides instructions for logging and processing submittals, as well as the key status designations (open, closed, etc.). Overall, this submittal register outlines the documentation and approval workflow for this federal construction project.
The related federal contract opportunity is for the Z1DA--MINOR-CONST 528-811 CONSOLIDATE PRIMARY CARE 1st FLOOR PHASE 1 project, solicited by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 2. The solicitation number is 36C24224R0080, but no other details are provided in the document.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 528-811_ASPC_Addendum_1_20240530.pdf | ||
| 36C24224R0080 0004.docx | DOCX document | |
| 00 41 13.10 - Construction Estimate Breakdown Template.xlsx | XLSX spreadsheet | |
| Past Performace Questionaire_PPQ.pdf | ||
| PROCEDURES FOR SUBMITTAL OF OFFERS AND PROPOSAL EVALUATION CRITERIA.docx | DOCX document | |
| 36C24224R0080 0003.docx | DOCX document | |
| 36C24224R0080 0002.docx | DOCX document | |
| 36C24224R0080 0001.docx | DOCX document | |
| 36C24222R0080 Project RFI Questions with Responses 6-07-2024.pdf | ||
| Wage Determination.txt | TXT text file | |
| Past Performace Questionaire.pdf | ||
| Drawings I.pdf | ||
| Drawings II.pdf | ||
| FAR 52.225-2 Buy American Certification.pdf | ||
| Specifications.pdf | ||
| 852.219-77 VA Notice of Limitations on Subcontracting.docx | DOCX document | |
| 36C24224R0080_1.docx | DOCX document | |
| Contractor Projects Form.docx | DOCX document |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VisiSpecs Submittal Register
| TRIPLE-C Project Submittal Log | Instructions | Project Location | website address | |||||||||||||||||||||||||
| Project Name | CONSOLIDATE PRIMARY CARE ALBANY STRATTON | Triple C designated staff shall log each submittal into the Project Submittal Log on the day it is received (hardcopy or electronic) | ||||||||||||||||||||||||||
| Project Number | 528-811 | Triple C designated staff shall review the submittal, or process the submittal to another reviewer (internal or consultant) on the day the submittal is received, including all information below, and date due back | ||||||||||||||||||||||||||
| Status Key | O | Open | Once the submittal is reviewed, a Triple C "submittal review stamp" shall be affixed to a Triple C submittal transmittal, and processed back to the Client or Submitter, as appropriate per contract. | Add columns as required for tracking additional and revised submittal. Brief over revision requirements | ||||||||||||||||||||||||
| C | Closed | |||||||||||||||||||||||||||
| First Submittal | Second Submittal | Third Submittal | ||||||||||||||||||||||||||
| STATUS (pending, open, or closed) | DIVISION | SPECIFICATION SECTION NUMBER | SPECIFICATION SECTION NAME | PARAGRAPH NUMBER | SUBMITTAL TYPE | SUBMSSION SCHEDULE | SUBMITTAL TYPE (FILTER FOR EXPECTED PRODUCT DATA) | SUBMITTAL TYPE | DETAIL | CONTRACTOR SUBMITTAL NUMBER | Forwarded to Name (consultant, etc.) | Forwarded to Firm & Date (consultant, etc.) | AE Review Complete | AE response | Date Sent to VA | VA Review Complete | VA response | AE Review Complete | AE response | Date Sent to VA | VA Review Complete | VA response | AE Review Complete | AE response | Date Sent to VA | VA Review Complete | VA response | |
| OPEN/CLOSE | DIVISION | SecNum | SecName | ParNum | Submittal | Type | Detail | Robbie | B&P - dd/mm/yy | dd/mm/yy | A / AN / RR | dd/mm/yy | dd/mm/yy | A / AN / RR | dd/mm/yy | A / AN / RR | dd/mm/yy | dd/mm/yy | A / AN / RR | dd/mm/yy | A / AN / RR | dd/mm/yy | dd/mm/yy | A / AN / RR | ||||
| O | 01 | 01 32 16.15 | Project Schedules (Small Projects - Design-Bid-Build) | 1.5.A. | THE COMPLETE PROJECT SCHEDULE SUBMITTAL | |||||||||||||||||||||||
| Pre-Mobilization | Interim schedule. | |||||||||||||||||||||||||||
| O | 01 | 01 32 16.15 | Project Schedules (Small Projects - Design-Bid-Build) | 1.5.B. | THE COMPLETE PROJECT SCHEDULE SUBMITTAL | |||||||||||||||||||||||
| Pre-Mobilization | Complete final Project Schedule | |||||||||||||||||||||||||||
| O | 01 | 01 33 23 | Shop Drawings, Product Data, and Samples | 1.3.A. | SUBMITTAL REGISTER | |||||||||||||||||||||||
| Pre-Mobilization | Submittal register | |||||||||||||||||||||||||||
| O | 01 | 01 33 23 | Shop Drawings, Product Data, and Samples | 1.3.E. | SUBMITTAL REGISTER | |||||||||||||||||||||||
| During Construction | Monthly updates to the submittal register | |||||||||||||||||||||||||||
| O | 01 | 01 45 00 | Quality Control | 1.3.B. | SUBMITTALS | |||||||||||||||||||||||
| During Construction | Test Reports | |||||||||||||||||||||||||||
| O | 01 | 01 57 19 | Temporary Environmental Controls | 1.4.A. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Environmental Protection Plan | |||||||||||||||||||||||||||
| O | 01 | 01 74 19 | Construction Waste Management | 1.5.B. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Demolition | a written demolition debris management plan. | |||||||||||||||||||||||||||
| O | 01 | 01 74 19 | Construction Waste Management | 1.5.C. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Demolition | Waste Management Plan. | |||||||||||||||||||||||||||
| O | 01 | 01 74 19 | Construction Waste Management | 1.5.D. | SUBMITTALS | |||||||||||||||||||||||
| During Construction | Monthly summary of construction and demolition debris diversion and disposal, quantifying all materials generated at the work site and disposed of or diverted from disposal through recycling. | |||||||||||||||||||||||||||
| O | 01 | 01 81 13 | Sustainable Construction Requirements | 1.5.B. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Sustainability Action Plan | |||||||||||||||||||||||||||
| O | 01 | 01 81 13 | Sustainable Construction Requirements | 1.5.C. | SUBMITTALS | |||||||||||||||||||||||
| Low Pollutant-Emitting Materials Tracking Spreadsheet | Within 30 days after Preconstruction Meeting provide a preliminary Low Pollutant-Emitting Materials Tracking Spreadsheet. The Low Pollutant-Emitting Materials Tracking Spreadsheet must be an electronic file and include all materials on Project in categories described under Low Pollutant-Emitting Materials in 01 81 13. | |||||||||||||||||||||||||||
| O | 01 | 01 81 13 | Sustainable Construction Requirements | 1.5.D. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Construction Indoor Air Quality (IAQ) Management Plan | |||||||||||||||||||||||||||
| O | 01 | 01 81 13 | Sustainable Construction Requirements | 1.5.E. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | PRODUCT DATA | Product Submittals | ||||||||||||||||||||||||||
| O | 01 | 01 81 13 | Sustainable Construction Requirements | 1.5.F. | SUBMITTALS | |||||||||||||||||||||||
| During Construction | Sustainable Construction Progress Reports | Concurrent with each Application for Payment, submit a Sustainable Construction Progress Report to confirm adherence with Sustainability Action Plan. | ||||||||||||||||||||||||||
| O | 01 | 01 81 13 | Sustainable Construction Requirements | 1.5.G. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Closeout | Closeout Submittals | Within 14 days after Substantial Completion provide the following | ||||||||||||||||||||||||||
| O | 01 | 01 91 00 | General Commissioning Requirements | 1.13.A. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Commissioning | Preliminary Commissioning Plan Submittal | The Commissioning Agent has prepared a Preliminary Commissioning Plan based on the final Construction Documents. The Preliminary Commissioning Plan is included as an Appendix to this specification section. The Preliminary Commissioning Plan is provided for information only. It contains preliminary information about the following commissioning activities | ||||||||||||||||||||||||||
| O | 01 | 01 91 00 | General Commissioning Requirements | 1.13.B. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Commissioning | Final Commissioning Plan Submittal | Based on the Final Construction Documents and the Contractor’s project team, the Commissioning Agent will prepare the Final Commissioning Plan as described in this section. The Commissioning Agent will submit three hard copies and three sets of electronic files of Final Commissioning Plan. The Contractor shall review the Commissioning Plan and provide any comments to the VA. The Commissioning Agent will incorporate review comments into the Final Commissioning Plan as directed by the VA. | ||||||||||||||||||||||||||
| O | 01 | 01 91 00 | General Commissioning Requirements | 1.13.C. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Commissioning | Systems Functional Performance Test Procedure | The Commissioning Agent will submit preliminary Systems Functional Performance Test Procedures to the Contractor, and the VA for review and comment. The Contractor shall return review comments to the VA and the Commissioning Agent. The VA will also return review comments to the Commissioning Agent. The Commissioning Agent will incorporate review comments into the Final Systems Functional Test Procedures to be used in Systems Functional Performance Testing. | ||||||||||||||||||||||||||
| O | 01 | 01 91 00 | General Commissioning Requirements | 1.13.D. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Commissioning | Pre-Functional Checklists | The Commissioning Agent will submit Pre-Functional Checklists to be completed by the Contractor. | ||||||||||||||||||||||||||
| O | 01 | 01 91 00 | General Commissioning Requirements | 1.13.E. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Commissioning | Test and Inspection Reports | The Commissioning Agent will submit test and inspection reports to the VA with copies to the Contractor and the Architect/Engineer. | ||||||||||||||||||||||||||
| O | 01 | 01 91 00 | General Commissioning Requirements | 1.13.F. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Closeout | Corrective Action Documents | The Commissioning Agent will submit corrective action documents to the VA Resident Engineer with copies to the Contractor and Architect. | ||||||||||||||||||||||||||
| O | 01 | 01 91 00 | General Commissioning Requirements | 1.13.G. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Closeout | Preliminary Commissioning Report Submittal | The Commissioning Agent will submit three electronic copies of the preliminary commissioning report. One electronic copy, with review comments, will be returned to the Commissioning Agent for preparation of the final submittal. | ||||||||||||||||||||||||||
| O | 01 | 01 91 00 | General Commissioning Requirements | 1.13.H. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Closeout | Final Commissioning Report Submittal | The Commissioning Agent will submit four sets of electronically formatted information of the final commissioning report to the VA. The final submittal will incorporate comments as directed by the VA. | ||||||||||||||||||||||||||
| O | 01 | 01 91 00 | General Commissioning Requirements | 1.13.I. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Commissioning | Data for Commissioning | |||||||||||||||||||||||||||
| O | 02 | 02 82 11 | Traditional Asbestos Abatement | 2.4.A. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Mobilization | PRE-START MEETING SUBMITTALS | |||||||||||||||||||||||||||
| O | 02 | 02 82 11 | Traditional Asbestos Abatement | 2.4.B. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Demolition | SUBMITTALS DURING ABATEMENT | |||||||||||||||||||||||||||
| O | 02 | 02 82 11 | Traditional Asbestos Abatement | 2.4.C. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Demolition | SUBMITTALS AT COMPLETION OF ABATEMENT | |||||||||||||||||||||||||||
| O | 02 | 02 82 13.13 | Glovebag Asbestos Abatement | 2.5.A. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Mobilization | PRE-start MEETING SUBMITTALS | |||||||||||||||||||||||||||
| O | 02 | 02 82 13.13 | Glovebag Asbestos Abatement | 2.5.B. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Demolition | SUBMITTALS DURING ABATEMENT | |||||||||||||||||||||||||||
| O | 02 | 02 82 13.13 | Glovebag Asbestos Abatement | 2.5.C. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | SUBMITTALS AT COMPLETION OF ABATEMENT | |||||||||||||||||||||||||||
| O | 02 | 02 82 13.19 | Asbestos Floor Tile and Mastic Abatement | 2.5.A.1.a | PRE-START MEETING SUBMITTALS | Pre-Mobilization | Submit a detailed work schedule for the entire project reflecting contract documents and the phasing/schedule requirements from the CPM chart. | |||||||||||||||||||||
| O | 02 | 02 82 13.19 | Asbestos Floor Tile and Mastic Abatement | 2.5.A.1.b | PRE-START MEETING SUBMITTALS | Pre-Mobilization | Submit a staff organization chart showing all personnel who will be working on the project and their capacity/function. | Provide their qualifications, training, accreditations, and licenses, as appropriate. Provide a copy of the "Certificate of Worker's Acknowledgment" and the "Affidavit of Medical Surveillance and Respiratory Protection" for each person. | ||||||||||||||||||||
| O | 02 | 02 82 13.19 | Asbestos Floor Tile and Mastic Abatement | 2.5.A.1.c | PRE-START MEETING SUBMITTALS | Pre-Mobilization | Submit Asbestos Hazard Abatement Plan developed specifically for this project, incorporating the requirements of the specifications, prepared, signed and dated by the CPIH/CI | |||||||||||||||||||||
| O | 02 | 02 82 13.19 | Asbestos Floor Tile and Mastic Abatement | 2.5.A.1.d | PRE-START MEETING SUBMITTALS | Pre-Mobilization | Submit the specifics of the materials and equipment to be used for this project | manufacturer names, model numbers, performance characteristics, pictures/diagrams, and number available for the following | ||||||||||||||||||||
| O | 02 | 02 82 13.19 | Asbestos Floor Tile and Mastic Abatement | 2.5.A.1.e | PRE-START MEETING SUBMITTALS | Pre-Mobilization | Submit the name, location, and phone number of the approved landfill; proof/verification the landfill is approved for ACM disposal; the landfill's requirements for ACM waste; the type of vehicle to be used for transportation; and name, address, and phone number of subcontractor, if used. Proof of asbestos training for transportation personnel shall be provided. | |||||||||||||||||||||
| O | 02 | 02 82 13.19 | Asbestos Floor Tile and Mastic Abatement | 2.5.A.1.f | PRE-START MEETING SUBMITTALS | Pre-Mobilization | Submit required notifications and arrangements made with regulatory agencies having regulatory jurisdiction and the specific contingency/emergency arrangements made with local health, fire, ambulance, hospital authorities and any other notifications/arrangements. | |||||||||||||||||||||
| O | 02 | 02 82 13.19 | Asbestos Floor Tile and Mastic Abatement | 2.5.A.1.g | PRE-START MEETING SUBMITTALS | Pre-Mobilization | Submit the name, location and verification of the laboratory and/or personnel to be used for analysis of air and/or bulk samples. Personal air monitoring must be done in accordance with OSHA 29 CFR 1926.1101(f) and Appendix A. And area or clearance air monitoring in accordance with EPA AHERA protocols. | |||||||||||||||||||||
| O | 02 | 02 82 13.19 | Asbestos Floor Tile and Mastic Abatement | 2.5.A.1.h | PRE-START MEETING SUBMITTALS | Pre-Mobilization | Submit qualifications verification | Submit the following evidence of qualifications. Make sure that all references are current and verifiable by providing current phone numbers and documentation. | ||||||||||||||||||||
| O | 02 | 02 82 13.19 | Asbestos Floor Tile and Mastic Abatement | 2.5.A.1.i | PRE-START MEETING SUBMITTALS | Pre-Mobilization | Submit information on personnel | Provide a resume; address each item completely; copies of certificates, accreditations, and licenses. Submit an affidavit signed by the CPIH/CIH stating that all personnel submitted below have medical records in accordance with OSHA 29 CFR 1926.1101(m) and 29 CFR 1910.20 and that the company has implemented a medical surveillance program and written respiratory protection program, and maintains recordkeeping in accordance with the above regulations. Submit the phone number and doctor/clinic/hospital used for medical evaluations. | ||||||||||||||||||||
| O | 02 | 02 82 13.19 | Asbestos Floor Tile and Mastic Abatement | 2.5.A.1.j | PRE-START MEETING SUBMITTALS | Pre-Mobilization | Submit copies of State license for asbestos abatement; copy of insurance policy, including exclusions with a letter from agent stating in plain language the coverage provided and the fact that asbestos abatement activities are covered by the policy; copy of the AHAP incorporating the requirements of this specification; information on who provides your training, how often; who provides medical surveillance, how often; who performs and how is personal air monitoring of abatement workers conducted; a list of references of independent laboratories/IH's familiar with your air monitoring and Asbestos Hazard Abatement Plans; copies of monitoring results of the five referenced projects listed and analytical method(s) used. | |||||||||||||||||||||
| O | 02 | 02 82 13.19 | Asbestos Floor Tile and Mastic Abatement | 2.5.A.1.l | PRE-START MEETING SUBMITTALS | Pre-Mobilization | Submit, before the start of work, the manufacturer's technical data for all types of encapsulants, all MSDS, and application instructions. | |||||||||||||||||||||
| O | 02 | 02 82 13.19 | Asbestos Floor Tile and Mastic Abatement | 2.5.B.1 | SUBMITTALS DURING ABATEMENT | Pre-Demolition | The Competent Person shall maintain and submit a daily log at the regulated area documenting the dates and times | purpose, attendees and summary of meetings; all personnel entering/exiting the regulated area; document and discuss the resolution of unusual events such as barrier breeching, equipment failures, emergencies, and any cause for stopping work; representative air monitoring and results/TWAs/ELs. Submit this information daily to the VPIH/CIH. | ||||||||||||||||||||
| O | 02 | 02 82 13.19 | Asbestos Floor Tile and Mastic Abatement | 2.5.B.2 | SUBMITTALS DURING ABATEMENT | Pre-Demolition | The CPIH/CIH shall document and maintain the inspection and approval of the regulated area preparation prior to start of work and daily during work. | |||||||||||||||||||||
| O | 02 | 02 82 13.19 | Asbestos Floor Tile and Mastic Abatement | 2.5.C | SUBMITTALS DURING ABATEMENT | Pre-Demolition | The CPIH/CIH shall submit a project report consisting of the daily log book requirements and documentationof events during the abatement project including waste shipment records signed by the landfill's agent. | It will also include information on the containment and transportation of waste from the containment with applicable chain of custody forms. The report shall include a certificate of completion, signed and dated by the CPIH/CIH, in accordance with Attachment #1. All clearance and perimeter area samples must be submitted. The VA Representative will retain the abatement report after completion of the project and provide copies of the abatement report to VAMC Office of Engineer and the Safety Office. | ||||||||||||||||||||
| O | 02 | 02 83 33.13 | Lead-Based Paint Removal and Disposal | 1.6.B. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Mobilization | PRODUCT DATA | Manufacturer's Literature and Data | ||||||||||||||||||||||||||
| O | 02 | 02 83 33.13 | Lead-Based Paint Removal and Disposal | 1.6.C. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Mobilization | Test Reports | Submit testing laboratory reports. | ||||||||||||||||||||||||||
| O | 02 | 02 83 33.13 | Lead-Based Paint Removal and Disposal | 1.6.D. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Mobilization | Certificates | Certify completed training. | ||||||||||||||||||||||||||
| O | 02 | 02 83 33.13 | Lead-Based Paint Removal and Disposal | 1.6.E. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Mobilization | Qualifications | Substantiate qualifications comply with specifications. | ||||||||||||||||||||||||||
| O | 02 | 02 83 33.13 | Lead-Based Paint Removal and Disposal | 1.6.F. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Demolition | Record Documents | |||||||||||||||||||||||||||
| O | 03 | 03 30 53 | Cast-in-Place Concrete | 1.4.B | SUBMITTALS: | |||||||||||||||||||||||
| Pre-Construction | Submittal Drawings | Reinforcing steel | ||||||||||||||||||||||||||
| O | 03 | 03 30 53 | Cast-in-Place Concrete | 1.4.C | SUBMITTALS: | |||||||||||||||||||||||
| Pre-Construction | Manufacturer's Literature and Data | |||||||||||||||||||||||||||
| O | 03 | 03 30 53 | Cast-in-Place Concrete | 1.4.D | SUBMITTALS: | |||||||||||||||||||||||
| Pre-Construction | Sustainable Construction Submittals | |||||||||||||||||||||||||||
| O | 03 | 03 30 53 | Cast-in-Place Concrete | 1.4.E | SUBMITTALS: | |||||||||||||||||||||||
| Pre-Construction | Certificates | |||||||||||||||||||||||||||
| O | 03 | 03 30 53 | Cast-in-Place Concrete | 1.6.F. | SUBMITTALS: | |||||||||||||||||||||||
| Pre-Construction | Test Report for Concrete Mix Designs | Trial mixes including water�cement // fly ash // ratio curves, concrete mix ingredients, and admixtures. | ||||||||||||||||||||||||||
| O | 03 | 03 30 53 | Cast-in-Place Concrete | 1.6.G. | SUBMITTALS: | |||||||||||||||||||||||
| Pre-Construction | Shoring and Reshoring Sequence | Submit for approval a shoring and reshoring sequence for flat slab/flat plate portions, prepared by a registered Professional Engineer. As a minimum, include timing of form stripping, reshoring, number of floors to be re-shored and timing of re-shore removal to serve as an initial outline of procedures subject to modification as construction progresses. Submit revisions to sequence, whether initiated by Resident Engineer (see FORMWORK) or Contractor. | ||||||||||||||||||||||||||
| O | 03 | 03 30 53 | Cast-in-Place Concrete | 1.6.H. | SUBMITTALS: | |||||||||||||||||||||||
| During Construction | Test reports on splitting tensile strength (Fct) of lightweight concrete. | |||||||||||||||||||||||||||
| O | 04 | 04 01 00 | Maintenance of Masonry | 1.4.B. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | PRODUCT DATA | Manufacturer's Literature and Data | ||||||||||||||||||||||||||
| O | 04 | 04 01 00 | Maintenance of Masonry | 1.4.C. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Samples | |||||||||||||||||||||||||||
| O | 04 | 04 01 00 | Maintenance of Masonry | 1.4.D. | SUBMITTALS | |||||||||||||||||||||||
| During Construction | Test reports | |||||||||||||||||||||||||||
| O | 04 | 04 05 13 | Masonry Mortaring | 1.4.B. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | PRODUCT DATA | Manufacturer's Literature and Data | ||||||||||||||||||||||||||
| O | 04 | 04 05 13 | Masonry Mortaring | 1.4.C. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Test Reports | Certify each product complies with specifications. | ||||||||||||||||||||||||||
| O | 04 | 04 05 13 | Masonry Mortaring | 1.4.D. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Certificates | Certify each product complies with specifications. | ||||||||||||||||||||||||||
| O | 04 | 04 05 13 | Masonry Mortaring | 1.4.E. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Qualifications | Substantiate qualifications comply with specifications. | ||||||||||||||||||||||||||
| O | 04 | 04 05 16 | Masonry Grouting | 1.4.B. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | PRODUCT DATA | Manufacturer's Literature and Data | ||||||||||||||||||||||||||
| O | 04 | 04 05 16 | Masonry Grouting | 1.4.C. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Sustainable Construction Submittals | |||||||||||||||||||||||||||
| O | 04 | 04 05 16 | Masonry Grouting | 1.4.D. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Test Reports | Certify each product complies with specifications. | ||||||||||||||||||||||||||
| O | 04 | 04 05 16 | Masonry Grouting | 1.4.E. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Certificates | Certify each product complies with specifications. | ||||||||||||||||||||||||||
| O | 05 | 05 12 00 | Structural Steel Framing | 1.4.B. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Submittal Drawings | |||||||||||||||||||||||||||
| O | 05 | 05 12 00 | Structural Steel Framing | 1.4.C. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Sustainable Construction Submittals | |||||||||||||||||||||||||||
| O | 05 | 05 12 00 | Structural Steel Framing | 1.4.D. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Test Reports | Certify products comply with specifications. | ||||||||||||||||||||||||||
| O | 05 | 05 12 00 | Structural Steel Framing | 1.4.E. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Certificates | Certify each product complies with specifications. | ||||||||||||||||||||||||||
| O | 05 | 05 12 00 | Structural Steel Framing | 1.4.F. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Qualifications | Substantiate qualifications comply with specifications. | ||||||||||||||||||||||||||
| O | 05 | 05 12 00 | Structural Steel Framing | 1.4.G. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Delegated Design Drawings and Calculations | Signed and sealed by responsible Architect/Engineer. | ||||||||||||||||||||||||||
| O | 05 | 05 12 00 | Structural Steel Framing | 1.4.H. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Record Surveys | Signed and sealed by responsible surveyor or engineer. | ||||||||||||||||||||||||||
| O | 05 | 05 36 00 | Composite Metal Decking | 1.4.A. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Mobilization | PRODUCT DATA | Manufacturer's Literature and Data | ||||||||||||||||||||||||||
| O | 05 | 05 36 00 | Composite Metal Decking | 1.4.B. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Sustainable Construction Submittals | |||||||||||||||||||||||||||
| O | 05 | 05 36 00 | Composite Metal Decking | 1.4.C. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Shop Drawings | |||||||||||||||||||||||||||
| O | 05 | 05 36 00 | Composite Metal Decking | 1.4.D. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | PRODUCT DATA | Manufacturer's Literature and Data | ||||||||||||||||||||||||||
| O | 05 | 05 36 00 | Composite Metal Decking | 1.4.E. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Manufacturer's Written Recommendations | |||||||||||||||||||||||||||
| O | 05 | 05 36 00 | Composite Metal Decking | 1.4.F. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Test Reports | |||||||||||||||||||||||||||
| O | 05 | 05 36 00 | Composite Metal Decking | 1.4.G. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Test Reports | |||||||||||||||||||||||||||
| O | 05 | 05 36 00 | Composite Metal Decking | 1.4.H. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Welding Power Setting Recommendations | |||||||||||||||||||||||||||
| O | 05 | 05 36 00 | Composite Metal Decking | 1.4.I. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Shear Stud Layouts | |||||||||||||||||||||||||||
| O | 05 | 05 36 00 | Composite Metal Decking | 1.4.J. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Certificates | |||||||||||||||||||||||||||
| O | 05 | 05 36 00 | Composite Metal Decking | 1.4.K. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Certificates | |||||||||||||||||||||||||||
| O | 05 | 05 36 00 | Composite Metal Decking | 1.4.L. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | PRODUCT DATA | Manufacturer's Catalog Data for Welding Equipment | ||||||||||||||||||||||||||
| O | 05 | 05 36 00 | Composite Metal Decking | 1.4.M. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Certificates | |||||||||||||||||||||||||||
| O | 05 | 05 36 00 | Composite Metal Decking | 1.4.N. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Qualifications | |||||||||||||||||||||||||||
| O | 05 | 05 40 00 | Cold-Formed Metal Framing | 1.4.B. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Shop Drawings | Shop and erection drawings showing steel unit layout, connections to supporting members, and information necessary to complete installation as shown and specified. | ||||||||||||||||||||||||||
| O | 05 | 05 40 00 | Cold-Formed Metal Framing | 1.4.C. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | PRODUCT DATA | Manufacturer's Literature and Data | Showing steel component sections and specifying structural characteristics. | |||||||||||||||||||||||||
| O | 05 | 05 40 00 | Cold-Formed Metal Framing | 1.4.D. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | For cold-formed metal framing indicated to comply with certain design loadings, include structural analysis data sealed and signed by the qualified professional engineer who was responsible for its preparation. | |||||||||||||||||||||||||||
| O | 05 | 05 40 00 | Cold-Formed Metal Framing | 1.4.E. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Blast Design Calculations | |||||||||||||||||||||||||||
| O | 05 | 05 40 00 | Cold-Formed Metal Framing | 1.4.F. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Sustainable Construction Submittals | |||||||||||||||||||||||||||
| O | 05 | 05 50 00 | Metal Fabrications | 1.3.B. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | PRODUCT DATA | Manufacturer's Literature and Data | ||||||||||||||||||||||||||
| O | 05 | 05 50 00 | Metal Fabrications | 1.3.C. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Shop Drawings | |||||||||||||||||||||||||||
| O | 05 | 05 50 00 | Metal Fabrications | 1.3.D. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Manufacturer's Certificates | |||||||||||||||||||||||||||
| O | 05 | 05 50 00 | Metal Fabrications | 1.3.E. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Design Calculations for specified live loads including dead loads. | |||||||||||||||||||||||||||
| O | 05 | 05 50 00 | Metal Fabrications | 1.3.F. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Setting drawings and instructions | for installation of anchors to be preset into concrete and masonry work, and for the positioning of items having anchors to be built into concrete or masonry construction. | ||||||||||||||||||||||||||
| O | 06 | 06 06 60 | Plastic Fabrication Resin Panels | 1.3.B. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Product Data | |||||||||||||||||||||||||||
| O | 06 | 06 06 60 | Plastic Fabrication Resin Panels | 1.3.C. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Test Reports | |||||||||||||||||||||||||||
| O | 06 | 06 06 60 | Plastic Fabrication Resin Panels | 1.3.D. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Building Approvals | |||||||||||||||||||||||||||
| O | 06 | 06 06 60 | Plastic Fabrication Resin Panels | 1.3.E. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Shop Drawings | |||||||||||||||||||||||||||
| O | 06 | 06 06 60 | Plastic Fabrication Resin Panels | 1.3.F. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Samples for Initial Selection | |||||||||||||||||||||||||||
| O | 06 | 06 06 60 | Plastic Fabrication Resin Panels | 1.3.G. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Samples for verifications | |||||||||||||||||||||||||||
| O | 06 | 06 10 00 | Rough Carpentry | 1.3.B. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Sustainable Design Submittals | |||||||||||||||||||||||||||
| O | 06 | 06 10 00 | Rough Carpentry | 1.3.C. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Shop Drawings showing framing connection details, fasteners, connections and dimensions. | |||||||||||||||||||||||||||
| O | 06 | 06 10 00 | Rough Carpentry | 1.3.D. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | PRODUCT DATA | Manufacturer’s Literature and Data | ||||||||||||||||||||||||||
| O | 06 | 06 10 00 | Rough Carpentry | 1.3.E. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Manufacturer’s certificate for unmarked lumber. | |||||||||||||||||||||||||||
| O | 07 | 07 01 50.19 | Preparation for Re-Roofing | 1.5.B. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Submittal Drawings | |||||||||||||||||||||||||||
| O | 07 | 07 01 50.19 | Preparation for Re-Roofing | 1.5.C. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | PRODUCT DATA | Manufacturer's Literature and Data | ||||||||||||||||||||||||||
| O | 07 | 07 01 50.19 | Preparation for Re-Roofing | 1.5.D. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Photographs | Document existing conditions potentially affected by roofing operations before work begins. | ||||||||||||||||||||||||||
| O | 07 | 07 01 50.19 | Preparation for Re-Roofing | 1.5.E. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Field Inspection Reports | |||||||||||||||||||||||||||
| O | 07 | 07 01 50.19 | Preparation for Re-Roofing | 1.5.F. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Infrared Roof Moisture Survey Report. | |||||||||||||||||||||||||||
| O | 07 | 07 08 00 | Facility Exterior Closure Commissioning | 1.6.A. | SUBMITTALS | |||||||||||||||||||||||
| The commissioning process requires review of selected Submittals that pertain to the systems to be commissioned. The Commissioning Agent will provide a list of submittals that will be reviewed by the Commissioning Agent. This list will be reviewed and approved by the VA prior to forwarding to the Contractor. Refer to Section 01 33 23 SHOP DRAWINGS, PRODUCT DATA, and SAMPLES for further details. | ||||||||||||||||||||||||||||
| O | 07 | 07 08 00 | Facility Exterior Closure Commissioning | 1.6.B. | SUBMITTALS | |||||||||||||||||||||||
| The commissioning process requires Submittal review simultaneously with engineering review. Specific submittal requirements related to the commissioning process are specified in Section 01 91 00 GENERAL COMMISSIONING REQUIREMENTS. | ||||||||||||||||||||||||||||
| O | 07 | 07 13 00 | Sheet Waterproofing | 1.3.B. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | PRODUCT DATA | Manufacturer's Literature and Data | ||||||||||||||||||||||||||
| O | 07 | 07 13 00 | Sheet Waterproofing | 1.3.C. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Certificates | |||||||||||||||||||||||||||
| O | 07 | 07 13 00 | Sheet Waterproofing | 1.3.D. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Samples | |||||||||||||||||||||||||||
| O | 07 | 07 21 13 | Thermal Insulation | 1.4.B. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Submittal Drawings | |||||||||||||||||||||||||||
| O | 07 | 07 21 13 | Thermal Insulation | 1.4.C. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | PRODUCT DATA | Manufacturer's Literature and Data | ||||||||||||||||||||||||||
| O | 07 | 07 21 13 | Thermal Insulation | 1.4.D. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Sustainable Construction Submittals | |||||||||||||||||||||||||||
| O | 07 | 07 21 23 | Loose-Fill Insulation | 1.4.B. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | PRODUCT DATA | Manufacturer's Literature and Data | ||||||||||||||||||||||||||
| O | 07 | 07 21 23 | Loose-Fill Insulation | 1.4.C. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Samples | |||||||||||||||||||||||||||
| O | 07 | 07 21 23 | Loose-Fill Insulation | 1.4.D. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Sustainable Construction Submittals | |||||||||||||||||||||||||||
| O | 07 | 07 22 00 | Roof and Deck Insulation | 1.4.B. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Submittal Drawings | |||||||||||||||||||||||||||
| O | 07 | 07 22 00 | Roof and Deck Insulation | 1.4.C. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | PRODUCT DATA | Manufacturer's Literature and Data | ||||||||||||||||||||||||||
| O | 07 | 07 22 00 | Roof and Deck Insulation | 1.4.D. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Samples | |||||||||||||||||||||||||||
| O | 07 | 07 22 00 | Roof and Deck Insulation | 1.4.E. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Sustainable Construction Submittals | |||||||||||||||||||||||||||
| O | 07 | 07 22 00 | Roof and Deck Insulation | 1.4.F. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Qualifications | Substantiate qualifications meet specifications. | ||||||||||||||||||||||||||
| O | 07 | 07 24 00 | Roof and Deck Insulation | 1.5.A. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Submittal Procedures | |||||||||||||||||||||||||||
| O | 07 | 07 24 00 | Roof and Deck Insulation | 1.5.B. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Submittal Drawings | |||||||||||||||||||||||||||
| O | 07 | 07 24 00 | Roof and Deck Insulation | 1.5.C. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Manufacturer's Literature and Data | |||||||||||||||||||||||||||
| O | 07 | 07 24 00 | Roof and Deck Insulation | 1.5.D. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Test Reports | |||||||||||||||||||||||||||
| O | 07 | 07 24 00 | Roof and Deck Insulation | 1.5.E. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Qualifications | |||||||||||||||||||||||||||
| O | 07 | 07 27 26 | Fluid-Applied Membrane Air Barrier, Vapor Permeable | 1.4.B. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | PRODUCT DATA | Manufacturer's Literature and Data | ||||||||||||||||||||||||||
| O | 07 | 07 27 26 | Fluid-Applied Membrane Air Barrier, Vapor Permeable | 1.4.C. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Sustainable Construction Submittals | |||||||||||||||||||||||||||
| O | 07 | 07 27 26 | Fluid-Applied Membrane Air Barrier, Vapor Permeable | 1.4.D. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Test reports | |||||||||||||||||||||||||||
| O | 07 | 07 27 26 | Fluid-Applied Membrane Air Barrier, Vapor Permeable | 1.4.E. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Certificates | Certify each product complies with specifications. | ||||||||||||||||||||||||||
| O | 07 | 07 27 26 | Fluid-Applied Membrane Air Barrier, Vapor Permeable | 1.4.F. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Qualifications | Substantiate qualifications comply with specifications. | ||||||||||||||||||||||||||
| O | 07 | 07 27 26 | Fluid-Applied Membrane Air Barrier, Vapor Permeable | 1.4.G. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Closeout | Installation Audit | |||||||||||||||||||||||||||
| O | 07 | 07 51 13.13 | Cold-Applied Built-Up Asphalt Roofing | 1.5.B. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Submittal Drawings | |||||||||||||||||||||||||||
| O | 07 | 07 51 13.13 | Cold-Applied Built-Up Asphalt Roofing | 1.5.C. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Manufacturer's Literature and Data | |||||||||||||||||||||||||||
| O | 07 | 07 51 13.13 | Cold-Applied Built-Up Asphalt Roofing | 1.5.D. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Samples | |||||||||||||||||||||||||||
| O | 07 | 07 51 13.13 | Cold-Applied Built-Up Asphalt Roofing | 1.5.E. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Sustainable Construction Submittals | |||||||||||||||||||||||||||
| O | 07 | 07 51 13.13 | Cold-Applied Built-Up Asphalt Roofing | 1.5.F. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Certificates | |||||||||||||||||||||||||||
| O | 07 | 07 51 13.13 | Cold-Applied Built-Up Asphalt Roofing | 1.5.G. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Qualifications | |||||||||||||||||||||||||||
| O | 07 | 07 51 13.13 | Cold-Applied Built-Up Asphalt Roofing | 1.5.H. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Field quality control reports. | |||||||||||||||||||||||||||
| O | 07 | 07 51 13.13 | Cold-Applied Built-Up Asphalt Roofing | 1.5.I. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Temporary protection plan. Include list of proposed temporary materials. | |||||||||||||||||||||||||||
| O | 07 | 07 51 13.13 | Cold-Applied Built-Up Asphalt Roofing | 1.5.J. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Operation and Maintenance Data | |||||||||||||||||||||||||||
| O | 07 | 07 53 23 | Ethylene-Propylene-Diene-Monomer Roofing | 1.6.B. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Submittal Drawings | |||||||||||||||||||||||||||
| O | 07 | 07 53 23 | Ethylene-Propylene-Diene-Monomer Roofing | 1.6.C. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Manufacturer's Literature and Data | |||||||||||||||||||||||||||
| O | 07 | 07 53 23 | Ethylene-Propylene-Diene-Monomer Roofing | 1.6.D. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Sustainable Construction Submittals | |||||||||||||||||||||||||||
| O | 07 | 07 53 23 | Ethylene-Propylene-Diene-Monomer Roofing | 1.6.E. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Samples | |||||||||||||||||||||||||||
| O | 07 | 07 53 23 | Ethylene-Propylene-Diene-Monomer Roofing | 1.6.F. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Certificates | |||||||||||||||||||||||||||
| O | 07 | 07 53 23 | Ethylene-Propylene-Diene-Monomer Roofing | 1.6.G. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Qualifications | |||||||||||||||||||||||||||
| O | 07 | 07 53 23 | Ethylene-Propylene-Diene-Monomer Roofing | 1.6.H. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Field quality control reports. | |||||||||||||||||||||||||||
| O | 07 | 07 53 23 | Ethylene-Propylene-Diene-Monomer Roofing | 1.6.I. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Temporary protection plan. Include list of proposed temporary materials. | |||||||||||||||||||||||||||
| O | 07 | 07 53 23 | Ethylene-Propylene-Diene-Monomer Roofing | 1.6.J. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Operation and Maintenance Data | |||||||||||||||||||||||||||
| O | 07 | 07 54 23 | Thermoplastic Polyolefin (TPO) Roofing | 1.5.B. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Submittal Drawings | |||||||||||||||||||||||||||
| O | 07 | 07 54 23 | Thermoplastic Polyolefin (TPO) Roofing | 1.5.C. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | PRODUCT DATA | Manufacturer's Literature and Data | ||||||||||||||||||||||||||
| O | 07 | 07 54 23 | Thermoplastic Polyolefin (TPO) Roofing | 1.5.D. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Samples | |||||||||||||||||||||||||||
| O | 07 | 07 54 23 | Thermoplastic Polyolefin (TPO) Roofing | 1.5.E. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Sustainable Construction Submittals | |||||||||||||||||||||||||||
| O | 07 | 07 54 23 | Thermoplastic Polyolefin (TPO) Roofing | 1.5.F. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Certificates | Certify products comply with specifications. | ||||||||||||||||||||||||||
| O | 07 | 07 54 23 | Thermoplastic Polyolefin (TPO) Roofing | 1.5.G. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Qualifications | Substantiate qualifications comply with specifications. | ||||||||||||||||||||||||||
| O | 07 | 07 54 23 | Thermoplastic Polyolefin (TPO) Roofing | 1.5.H. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Field quality control reports. | |||||||||||||||||||||||||||
| O | 07 | 07 54 23 | Thermoplastic Polyolefin (TPO) Roofing | 1.5.I. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Temporary protection plan. Include list of proposed temporary materials. | |||||||||||||||||||||||||||
| O | 07 | 07 54 23 | Thermoplastic Polyolefin (TPO) Roofing | 1.5.J. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Operation and Maintenance Data | |||||||||||||||||||||||||||
| O | 07 | 07 60 00 | Flashing and Sheet Metal | 1.5.B. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Shop Drawings | For all specified items, including | ||||||||||||||||||||||||||
| O | 07 | 07 60 00 | Flashing and Sheet Metal | 1.5.C. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | PRODUCT DATA | Manufacturer's Literature and Data | For all specified items, including | |||||||||||||||||||||||||
| O | 07 | 07 60 00 | Flashing and Sheet Metal | 1.5.D. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Certificates | Indicating compliance with specified finishing requirements, from applicator and contractor. | ||||||||||||||||||||||||||
| O | 07 | 07 81 00 | Applied Fireproofing | 1.3.B. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Sustainable Design Submittals | 1. Volatile organic compounds per volume as specified in PART 2 ‑ PRODUCTS. | ||||||||||||||||||||||||||
| O | 07 | 07 81 00 | Applied Fireproofing | 1.3.C. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Installer qualifications. | |||||||||||||||||||||||||||
| O | 07 | 07 81 00 | Applied Fireproofing | 1.3.D. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Testing laboratory accreditations. | |||||||||||||||||||||||||||
| O | 07 | 07 81 00 | Applied Fireproofing | 1.3.E. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | PRODUCT DATA | Manufacturer's Literature and Data | ||||||||||||||||||||||||||
| O | 07 | 07 81 00 | Applied Fireproofing | 1.3.F. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Certificates | |||||||||||||||||||||||||||
| O | 07 | 07 81 00 | Applied Fireproofing | 1.3.G. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Miscellaneous | |||||||||||||||||||||||||||
| O | 07 | 07 84 00 | Firestopping | 1.3.B. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Sustainable Design Submittals | 1. Volatile organic compounds per volume as specified in PART 2 ‑ PRODUCTS. | ||||||||||||||||||||||||||
| O | 07 | 07 84 00 | Firestopping | 1.3.C. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Installer qualifications. | |||||||||||||||||||||||||||
| O | 07 | 07 84 00 | Firestopping | 1.3.D. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Inspector qualifications. | |||||||||||||||||||||||||||
| O | 07 | 07 84 00 | Firestopping | 1.3.E. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | PRODUCT DATA | Manufacturer's Literature and Data | ||||||||||||||||||||||||||
| O | 07 | 07 84 00 | Firestopping | 1.3.F. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | List of FM, UL, or WH classification number of systems installed. | |||||||||||||||||||||||||||
| O | 07 | 07 84 00 | Firestopping | 1.3.G. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Certified laboratory test reports for ASTM E814 | |||||||||||||||||||||||||||
| O | 07 | 07 84 00 | Firestopping | 1.3.H | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Manufacturer's Certificates attesting compliance with specified requirements. | |||||||||||||||||||||||||||
| O | 07 | 07 92 00 | Joint Sealants | 1.5.B. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Sustainable Design Submittals | 1. Volatile organic compounds per volume as specified in PART 2 ‑ PRODUCTS. | ||||||||||||||||||||||||||
| O | 07 | 07 92 00 | Joint Sealants | 1.5.C. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Installer qualifications. | |||||||||||||||||||||||||||
| O | 07 | 07 92 00 | Joint Sealants | 1.5.D. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Contractor certification. | |||||||||||||||||||||||||||
| O | 07 | 07 92 00 | Joint Sealants | 1.5.E. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | PRODUCT DATA | Manufacturer's installation instructions for each product used. | ||||||||||||||||||||||||||
| O | 07 | 07 92 00 | Joint Sealants | 1.5.F. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Cured samples of exposed sealants for each color. | |||||||||||||||||||||||||||
| O | 07 | 07 92 00 | Joint Sealants | 1.5.G. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | PRODUCT DATA | Manufacturer's Literature and Data | ||||||||||||||||||||||||||
| O | 07 | 07 92 00 | Joint Sealants | 1.5.H. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Manufacturer warranty. | |||||||||||||||||||||||||||
| O | 08 | 08 11 13 | Hollow Metal Doors and Frames | 1.4.B. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Submittal Drawings | |||||||||||||||||||||||||||
| O | 08 | 08 11 13 | Hollow Metal Doors and Frames | 1.4.C. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | PRODUCT DATA | Manufacturer's Literature and Data | ||||||||||||||||||||||||||
| O | 08 | 08 11 13 | Hollow Metal Doors and Frames | 1.4.D. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Sustainable Construction Submittals | |||||||||||||||||||||||||||
| O | 08 | 08 11 13 | Hollow Metal Doors and Frames | 1.4.E. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Test reports | Certify // each product complies // products comply // with specifications. | ||||||||||||||||||||||||||
| O | 08 | 08 11 13 | Hollow Metal Doors and Frames | 1.4.F. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Qualifications | Substantiate qualifications comply with specifications. | ||||||||||||||||||||||||||
| O | 08 | 08 11 13 | Hollow Metal Doors and Frames | 1.4.G. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Blast Design Calculations | |||||||||||||||||||||||||||
| O | 08 | 08 14 00 | Interior Wood Doors | 1.4.B. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Submittal Drawings | |||||||||||||||||||||||||||
| O | 08 | 08 14 00 | Interior Wood Doors | 1.4.C. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | PRODUCT DATA | Manufacturer's Literature and Data | ||||||||||||||||||||||||||
| O | 08 | 08 14 00 | Interior Wood Doors | 1.4.D. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Samples | |||||||||||||||||||||||||||
| O | 08 | 08 14 00 | Interior Wood Doors | 1.4.E. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Sustainable Construction Submittals | |||||||||||||||||||||||||||
| O | 08 | 08 14 00 | Interior Wood Doors | 1.4.F. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Test Reports | Indicate // each product complies // products comply // with specifications. | ||||||||||||||||||||||||||
| O | 08 | 08 14 00 | Interior Wood Doors | 1.4.G. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Operation and Maintenance Data | |||||||||||||||||||||||||||
| O | 08 | 08 31 13 | Access Doors and Frames | 1.4.B. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Submittal Drawings | |||||||||||||||||||||||||||
| O | 08 | 08 31 13 | Access Doors and Frames | 1.4.C. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | PRODUCT DATA | Manufacturer's Literature and Data | ||||||||||||||||||||||||||
| O | 08 | 08 31 13 | Access Doors and Frames | 1.4.D. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Sustainable Construction Submittals | |||||||||||||||||||||||||||
| O | 08 | 08 36 16.13 | High Performance Barn (Sliding) Door | 1.3.B. | SUBMITTALS | Pre-Construction | PRODUCT DATA | Manufacturer's Literature and Data | ||||||||||||||||||||
| O | 08 | 08 36 16.13 | High Performance Barn (Sliding) Door | 1.3.C. | SUBMITTALS | Pre-Construction | Shop Drawings | |||||||||||||||||||||
| O | 08 | 08 36 16.13 | High Performance Barn (Sliding) Door | 1.3.D. | SUBMITTALS | Pre-Construction | Samples | |||||||||||||||||||||
| O | 08 | 08 36 16.13 | High Performance Barn (Sliding) Door | 1.3.E. | SUBMITTALS | Pre-Construction | Certificates | |||||||||||||||||||||
| O | 08 | 08 36 16.13 | High Performance Barn (Sliding) Door | 1.3.F. | SUBMITTALS | Pre-Construction | Warranty Documentation | |||||||||||||||||||||
| O | 08 | 08 36 16.13 | High Performance Barn (Sliding) Door | 1.3.G. | SUBMITTALS | Pre-Construction | Test Reports | |||||||||||||||||||||
| O | 08 | 08 41 13 | Aluminum-Framed Entrances and Storefronts | 1.5.B. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Submittal Drawings | // Minimum 1 to 2 (half size) scale. // | ||||||||||||||||||||||||||
| O | 08 | 08 41 13 | Aluminum-Framed Entrances and Storefronts | 1.5.C. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | PRODUCT DATA | Manufacturer's Literature and Data | ||||||||||||||||||||||||||
| O | 08 | 08 41 13 | Aluminum-Framed Entrances and Storefronts | 1.5.D. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Samples | |||||||||||||||||||||||||||
| O | 08 | 08 41 13 | Aluminum-Framed Entrances and Storefronts | 1.5.E. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Sustainable Construction Submittals | |||||||||||||||||||||||||||
| O | 08 | 08 41 13 | Aluminum-Framed Entrances and Storefronts | 1.5.F. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Test reports | Certify // each product complies // products comply // with specifications. | ||||||||||||||||||||||||||
| O | 08 | 08 41 13 | Aluminum-Framed Entrances and Storefronts | 1.5.G. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Certificates | Certify // each product complies // products comply // with specifications. | ||||||||||||||||||||||||||
| O | 08 | 08 41 13 | Aluminum-Framed Entrances and Storefronts | 1.5.H. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Qualifications | Substantiate qualifications comply with specifications. | ||||||||||||||||||||||||||
| O | 08 | 08 41 13 | Aluminum-Framed Entrances and Storefronts | 1.5.I. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Delegated Design Drawings and Calculations | Signed and sealed by responsible design professional. | ||||||||||||||||||||||||||
| O | 08 | 08 41 13 | Aluminum-Framed Entrances and Storefronts | 1.5.J. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Closeout | Operation and Maintenance Data | |||||||||||||||||||||||||||
| O | 08 | 08 56 53 | Blast Resistant Windows | 1.5.B. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Submittal Drawings | |||||||||||||||||||||||||||
| O | 08 | 08 56 53 | Blast Resistant Windows | 1.5.C. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | PRODUCT DATA | Manufacturer's Literature and Data | ||||||||||||||||||||||||||
| O | 08 | 08 56 53 | Blast Resistant Windows | 1.5.D. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Sustainable Construction Submittals | |||||||||||||||||||||||||||
| O | 08 | 08 56 53 | Blast Resistant Windows | 1.5.E. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Certificates | Indicate each product complies with specifications. | ||||||||||||||||||||||||||
| O | 08 | 08 56 53 | Blast Resistant Windows | 1.5.F. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Certificates | Prepared by qualified blast consultant verifying window and glazing assembly including anchors comply with specified blast resistance performance. | ||||||||||||||||||||||||||
| O | 08 | 08 56 53 | Blast Resistant Windows | 1.5.G. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Delegated Design Submittal | Substantiate qualifications comply with specifications. | ||||||||||||||||||||||||||
| O | 08 | 08 56 53 | Blast Resistant Windows | 1.5.H. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Test Reports | Substantiate qualifications comply with specifications. | ||||||||||||||||||||||||||
| O | 08 | 08 56 53 | Blast Resistant Windows | 1.5.I. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Qualifications | Substantiate qualifications comply with specifications. | ||||||||||||||||||||||||||
| O | 08 | 08 62 50 | Insulated Translucent Wall Skylight System | 1.6.B. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Submittal Drawings | |||||||||||||||||||||||||||
| O | 08 | 08 62 50 | Insulated Translucent Wall Skylight System | 1.6.C. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | PRODUCT DATA | Manufacturer's Literaturer and Data | ||||||||||||||||||||||||||
| O | 08 | 08 62 50 | Insulated Translucent Wall Skylight System | 1.6.D. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Samples | |||||||||||||||||||||||||||
| O | 08 | 08 62 50 | Insulated Translucent Wall Skylight System | 1.6.E. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Shop Drawings | |||||||||||||||||||||||||||
| O | 08 | 08 71 00 | Door Hardware | 1.6.B. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Hardware Schedule | Prepare and submit hardware schedule in the following form | ||||||||||||||||||||||||||
| O | 08 | 08 71 00 | Door Hardware | 1.6.C. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Templates | |||||||||||||||||||||||||||
| O | 08 | 08 71 00 | Door Hardware | 1.6.D. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | PRODUCT DATA | Samples and Manufacturers' Literature | ||||||||||||||||||||||||||
| O | 08 | 08 71 00 | Door Hardware | 1.6.E. | SUBMITTALS | |||||||||||||||||||||||
| Pre-Construction | Certificate of Compliance and Test Reports | Submit certificates that hardware conforms to the requirements specified herein. Certificates shall be accompanied by copies of reports as referenced. The testing shall have been conducted either in the manufacturer's plant and certified by an independent testing laboratory or conducted in an independent laboratory, within four years of submittal of reports for approval. |