Specialized Experience Form 3 Pages.pdf

PDF 67 KB Posted

Attached to
Y1DA--FY26: NRM (PROJ:673-CSI-131) D/B Install CT Scanner (LDCT)
Solicitation number
36C24826R0085
Issued by

About this file

This is a Specialized Experience Form template used to document contractor qualifications for federal contract proposals. Offerors must submit exactly three (3) completed project examples; submissions with fewer than three projects may receive lower ratings, while those exceeding three projects will not be evaluated. Each project submission requires comprehensive documentation across multiple information sheets.

The form requires detailed contractor information including firm name, address, DUNS number, CAGE code, contact details, and points of contact for each project. Offerors must provide contract/task order numbers, award dates, project titles and locations, and specify their role (prime contractor, subcontractor, joint venture, or other). The submission must identify the percentage of project work performed by the offeror's company and, if applicable, provide complete prime contractor information. Additionally, offerors must supply government agency details and contracting officer contact information for the awarding agency. The form requires a detailed description of the project scope, the offeror's specific roles and responsibilities, and relevance to the current solicitation. Performance documentation must include contract performance period dates, actual completion dates, identification of any difficulties, obstacles, or unforeseen conditions encountered and their resolutions, completion percentage status (with notation if less than 50% complete), contract termination information if applicable, and original versus final contract pricing with explanations for any modifications or price differences.

View the file

Other files

File Type Posted
Plumbing - Bldg 1 first.pdf PDF
Mechanical - basement-Floor - Arch E1 wit hmark up.pdf PDF
1-S3.pdf PDF
1-S9.pdf PDF
1-2.pdf PDF
1-12.pdf PDF
1-1.pdf PDF
Electrical - Bldg 1 Ground.pdf PDF
Fire Protection - Bldg 1 ground.pdf PDF
Electrical - Bldg 1 Third.pdf PDF
Architectural - Bldg 1 ground.pdf PDF
Plumbing - Bldg 1 ground.pdf PDF
Busway D Wing - Ansi C ATS drawing.pdf PDF
Busway B Wing - Ansi C bust way 3th.pdf PDF
1-S16.pdf PDF
1-S5.pdf PDF
1-S2.pdf PDF
1-S6.pdf PDF
1-8.pdf PDF
1-15.pdf PDF
1-4.pdf PDF
1-14.pdf PDF
Electrical riser diagrams - Bldg 1.pdf PDF
life safety 1.pdf PDF
CT-M443425-PRE-00-A.pdf PDF
Mechanical - basement-Chilled Water - Arch E1.pdf PDF
Mechanical - basement-Floor - Arch E1.pdf PDF
1-S4B.pdf PDF
1-S1.pdf PDF
1-S7.pdf PDF
1-6.pdf PDF
1-10.pdf PDF
1-11.pdf PDF
1-3.pdf PDF
1-5.pdf PDF
1-13.pdf PDF
36C24826R0085 0001.pdf PDF
Drawing-Arch Bldg 1 Project Location 1 Page.pdf PDF
Drawing-Equipment Layout 1 Page.pdf PDF
Spec 010000 52 Pages.pdf PDF
Spec 013216.16 23 Pages.pdf PDF
A.3 PRICE COST Schedule.pdf PDF
SOW 673-CSI-131 24 Pages.pdf PDF
WD FL20260208 01.02.2026 Hillsborough 8 Pages.pdf PDF
Spec 014219 7 Pages.pdf PDF
PPQ 4 Pages.pdf PDF
LOS 2 Pages.pdf PDF
EMR 1 Page.pdf PDF
Contractor Work Plan and Peer Review 8 Pages.pdf PDF
Site Map 1 Page.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SPECIALIZED EXPERIENCE FORM

SPECIALIZED EXPERIENCE INFORMATION SHEET

PROJECT NO. [ ] Page 1 Must have a total of THREE (3) projects, more than 3 will not be evaluated; less than 3 may result in a lower rating.

a. Contractor Information of awarded contract (Firm Name, Address, DUNS Number and Cage Code, Phone number, POC Name, POC email, Company email)

b. Contract and/or Task Order Number and Award Date (mm/dd/yyyy)

c. Project Title/Name and Location

d. Work Performed as: Prime Contractor, Subcontractor, Joint Venture, Other (explain)

e. Percent (%) of project work performed by your company

f. if you work as subcontractor, who was the prime?

(Firm Name, Address, DUNS Number and Cage Code, Phone number, POC Name, POC email, Company email)

g. Government Agency/Company which awarded contract to offeror, and Contact Information, such Contracting Officer/Procurement Official/Point of Contract (Name, Title, Email, Phone Number).

EXPERIENCE INFORMATION SHEET

PROJECT NO. [ ] Page 2

h. Description of project’s scope of work and the offeror’s specific roles and responsibilities in the project:

Describe work performed in sufficient detail to permit evaluation of project relevancy to this procurement. Detail how work performed is relevant to the effort required by the solicitation? Use continuation sheet for additional information, if necessary

EXPERIENCE INFORMATION SHEET

PROJECT NO. [ ] Page 3

i. Describe any difficulties and/or obstacles encountered during performance; steps taken toward resolution

j. Describe unforeseen conditions and how each were resolved

k. Performance Period, including contract start date (mm/dd/yyyy), and original completion date, if not completed, projected date (mm/dd/yyyy) contract start date: original completion date, if not completed, projected completion date (mm/dd/yyyy)

l. Actual Completion Date (mm/dd/yyyy), and if not completed, why?

Actual Completion Date:

If not completed, Why?

m. Project is 50% or more complete? YES [ ] No [ ]. If “No” explain percentage of completion, if not 50% completed for any reason, rating may be lower.

n. The Offerors shall indicate if any of the contracts listed were terminated and the type and reasons for the termination.

o. Original Contract Price (Award Amount), Final Contract Price (to include all modifications, if applicable), Explain Differences.

Original Contract Price: Final Contract Price:

Explain Differences:

File details come from the government source that posted it. Updated .