This is an equipment layout and pre-installation technical document for a GE HealthCare Revolution Ascend CT (Computed Tomography) system installation at James A Haley Veterans Hospital in Tampa, Florida. The preliminary study drawing (revision A, dated 12 March 2025) specifies the spatial configuration, dimensions, and technical requirements for the medical imaging equipment installation.
The equipment layout indicates placement of 10 major components including the gantry (18,698 BTU/h heat output, 3,980 lbs), NG Elite 1700 table (1,024 BTU/h, 1,169 lbs), standalone console, power distribution unit, storage cabinet, and supporting infrastructure within the exam and control rooms. Room dimensions require 14 feet finished ceiling height, 9 feet 6 inches slab height, and a false ceiling at 11 feet 6 inches, with total space of approximately 25 feet 10 inches in length. The document specifies that minimum opening for equipment delivery is 42 inches by 82 inches, contingent on a 96-inch corridor width. Critical technical specifications include power supply requirements of 3 phases plus ground at 200/220/240/380/400/420/440/460/480 volts (±10%), 50/60 Hz (±3 Hz), with maximum power demand of 100 kVA and continuous demand of 20 kVA at 0.85 power factor. Environmental conditions require operating temperatures of 18–26°C (64–79°F) for the exam room and control room at elevations up to 2,400 meters, with relative humidity maintained at 30–60%. The customer/contractor is responsible for site preparation, floor strength verification, delivery logistics, and radiological protection determination by a qualified physicist in accordance with local regulations.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EQUIPMENT LAYOUT
TAMPA, FLORIDA
JAMES DUMM
REVOLUTION ASCEND
CPC
Date
Drawn by Verified by GON/Quote PIM Manual
/02CT-M443425-PRE-00-A.DWG
(727) 300-9347
James.dumm@gehealthcare.com
CPC 5987663-1EN
USA
1:48
2010018990V14
12/FEB/2026
JAMES A HALEY VETERANS HOSPITAL
Scale
REV DATE MODIFICATIONS
A 12/MAR/2025 PRELIM BASED ON DC-469144
Format
A3
Concession
Sheet
Rev
File Name
GE HealthCare does not take responsibility for any damages resulting from changes on drawings made by others. Errors may occur by not referring to the complete set of final issue drawings. GE HealthCare cannot accept responsibility for any damage due to the partial use of GE HealthCare final issue drawings, however caused. All dimensions are in millimeters unless otherwise specified. Do not scale from printed pdf files. GE HealthCare accepts no responsibility or liability for defective work due to scaling from these drawings.
A mandatory component of this drawing set is the GE HealthCare Pre Installation manual. Failure to reference the Pre Installation manual will result in incomplete documentation required for site design and preparation.
Pre Installation documents for GE HealthCare products can be accessed on the web at: https://www.gehealthcare.com/support/manuals
PRELIMINARY STUDY
CONTROL ROOM
EXAM ROOM
LEGEND
A GE SUPPLIED D AVAILABLE FROM GE
B GE SUPPLIED/CONTRACTOR INSTALLED E EQUIPMENT EXISTING IN ROOM
C CUSTOMER/CONTRACTOR SUPPLIED AND
INSTALLED * ITEM TO BE REINSTALLED FROM
ANOTHER SITE
BY ITEM DESCRIPTION
MAX HEAT
OUTPUT
(BTU/h)
WEIGHT (lbs)
A 1 POWER BOX - 22
A 2 STANDALONE CONSOLE 3207 51
A 3 OPERATOR'S CHAIR - -
A 4 AUTO PATIENT POSITIONING DEPTH
CAMERA - 7
A 5 GANTRY 18698 3980
A 6 NG ELITE 1700 TABLE 1024 1169
A 7 PARTIAL UPS 2832 265
A 8 GE STORAGE CABINET - 150
B 9 MAIN DISCONNECT PANEL (MDP) - 46
A 10 POWER DISTRIBUTION UNIT (PDU) 3412 816
C 11 MINIMUM OPENING FOR EQUIPMENT DELIVERY IS 42 in x 82 in, CONTINGENT ON A 96 in CORRIDOR WIDTH
EXAM ROOM HEIGHT
FINISHED FLOOR TO SLAB HEIGHT
FALSE CEILING HEIGHT
14'-0"
9'-6"
12 3
11'-6"
23'-1"
6' -2
4' -1
1"
'-1
0"
6' -0
'-6
TEMPERATURE AND HUMIDITY SPECIFICATIONS
STORAGE CONDITIONS
IN-USE CONDITIONS
Temperature 0°C to +30°C
32°F to +86°F
Temperature gradient ≤ 3°C/h
≤ 5.4°F/h Relative humidity (1) 20% to 60% Humidity gradient ≤ 5%/h
AIR RENEWAL
According to local standards.
Storage longer than 6 months is not recommended.
(1) Non-condensing
EXAM ROOM CONTROL ROOM
Temperature (up to 2400 m [7875 ft])
Min Recommended Max Min Recommended Max
18°C 22°C 26°C 18°C 22°C 26°C
64°F 72°F 79°F 64°F 72°F 79°F
Temperature (up to 3000 m [9843 ft])
18°C 22°C 25°C 18°C 22°C 25°C
64°F 72°F 77°F 64°F 72°F 77°F
Temperature (up to 4000 m [13124 ft])
18°C 22°C 23°C 18°C 22°C 23°C
64°F 72°F 73.4°F 64°F 72°F 73.4°F Relative humidity (1) 30% to 60% 30% to 60%
System heat dissipation Max Max
6.78 kW 0.94 kW
NOTE
In case of using air conditioning systems that have a risk of water leakage it is recommended not to install it above electric equipment or to take measures to protect the equipment from dropping water.
DELIVERY
THE CUSTOMER/CONTRACTOR SHOULD:
· Provide an area adjacent to the installation site for delivery and unloading of the GE equipment.
· Ensure that the dimensions of all doors, corridors, ceiling heights are sufficient to accommodate the movement of GE equipment from the delivery area into the definitive installation room.
· Ensure that access routes for equipment will accommodate the weights of the equipment and any transportation, lifting and rigging equipment.
· Ensure that all necessary arrangements for stopping and unloading on public or private property not belonging to the customer have been made.
DIMENSIONS OF DELIVERY WITH DOLLY TRANSPORT EQUIPMENT
EQUIPMENT DIMENSIONS WEIGHT
GANTRY (new dollies) LENGTH 3024 mm 119 in
2003 kg 4416 lbsWIDTH 1290 mm 51 in
HEIGHT 2209 mm 87 in
NG ELITE 1700 TABLE
LENGTH 2524 mm 100 in 582 kg 1283 lbsWIDTH 936 mm 36.8 in
HEIGHT 1049 mm 41.3 in
GANTRY (old dollies) LENGTH 2910 mm 115 in
2035 kg 4486 lbsWIDTH 1290 mm 51 in
HEIGHT 2000 mm 79 in
· Power supply should come into a man disconnect panel (MDP) containing the protective units and controls.
· The section of the supply cable should be calculated in accordance with its length and the maximum permissible voltage drops.
· There must be discrimination between supply cable protective device at the beginning of the installation
(main low-voltage transformer side) and the protective devices in the MDP.
SUPPLY CHARACTERISTICS
· Power input must be separate from any others which may generate transients (elevators, air conditioning, radiology rooms equipped with high speed film changers...).
· All equipment (lighting, power outlets, etc...) installed with GE system components must be powered separately.
· The minimum recommended transformer size for a dedicated distribution transformer provided for the system is 125 kVA (100kVA option) or 93.75kVA (75kVA option), rated 2.4% regulation at unity power factor.
· Phase imbalance 2% maximum.
· Transients must be less than 1500V peak. (on a 400V line)
POWER REQUIREMENTS
POWER SUPPLY
3 PHASES+G
200/220/240/380/400/420/440/460/480 V ± 10%
FREQUENCIES 50/60 Hz ± 3 Hz MAXIMUM POWER DEMAND 100 kVA AVERAGE (CONTINUOUS) POWER DEMAND 20 kVA
POWER FACTOR 0.85
This drawing is a preliminary drawing. Site conditions and/or equipment configuration may have a significant impact on room layout and site preparation. Final study must be done before installation of the GE equipment. GE cannot accept any responsibility for errors due to lack of information.
The room dimensions used to create the equipment layout may originate from a previous layout and may not be accurate as they may not have been verified on site. GE cannot take any responsibility for errors due to lack of information.
It is the responsibility of the customer to prepare the site in accordance with the specifications stated in the final drawings. These drawings are not to be used for actual construction purposes. The company cannot take responsibility for any damage resulting therefrom.
The customer must ensure the floor strength is sufficient to support the fixings as required. A qualified structural engineer must be consulted and all work carried out according to his specifications.
Suitable radiological protection must be determined by a qualified radiological physicist in conformation with local regulations. GE does not take responsibility for the specification or provision of radio-protection.
DISCLAIMER
THE UNDERSIGNED, HEREBY CERTIFIES THAT I HAVE READ AND APPROVED THE PLANS IN THIS DOCUMENT.
DATE NAME SIGNATURE
DateRev /02CT-M443425-PRE-00-A.DWG A 12/MAR/2025REVOLUTION ASCENDJAMES A HALEY VETERANS HOSPITAL Details 02
| Sheets and Views |
| CT-M443425-PRE-00-A-A2 - Equipment Layout |
| CT-M443425-PRE-00-A-Details |
File details come from the government source that posted it. Updated .