This is a Request for Proposal (RFP) for a Design-Build (DB) project to install a CT Scanner (Low Dose CT) system at James A. Haley Veteran's Hospital in Tampa, Florida. The solicitation number is 36C24826R0085, issued March 6, 2026, with Phase 1 proposals due March 23, 2026 at 10:00 AM EST.

This is a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSBs). The project involves design and construction services to bring the imaging suite into compliance with VA CFM Technical Information Library standards. The contract performance period is 281 calendar days after Notice to Proceed. The magnitude of construction is estimated between $1,000,000 and $2,000,000. A two-phase evaluation process will be used, with up to five Phase 1 proposals selected to submit Phase 2 technical and price proposals. Phase 1 evaluation criteria include technical approach and qualifications, specialized experience with three relevant projects from the past five years, and past performance. Phase 2 will add evaluation of schedule and key personnel factors, with pricing considered as well. Payment and performance bonds are required at 100% of the order price within 10 calendar days of award. A bid guarantee of 20% of bid price or $3,000,000 (whichever is less) must accompany proposals. Prevailing wage determination FL20260208 (dated January 2, 2026) applies. The offeror must be registered in SAM.gov and certified as an SDVOSB through the SBA VetCert program. Offers must remain open for 120 calendar days following the proposal due date. The contractor must perform at least 15% of contract costs with its own employees, excluding material costs.

View the file

Other files

File Type Posted
Plumbing - Bldg 1 first.pdf PDF
Mechanical - basement-Floor - Arch E1 wit hmark up.pdf PDF
1-S3.pdf PDF
1-S9.pdf PDF
1-2.pdf PDF
1-12.pdf PDF
1-1.pdf PDF
Electrical riser diagrams - Bldg 1.pdf PDF
life safety 1.pdf PDF
CT-M443425-PRE-00-A.pdf PDF
Mechanical - basement-Chilled Water - Arch E1.pdf PDF
Mechanical - basement-Floor - Arch E1.pdf PDF
1-S4B.pdf PDF
1-S1.pdf PDF
1-S7.pdf PDF
1-6.pdf PDF
1-10.pdf PDF
1-11.pdf PDF
1-3.pdf PDF
1-5.pdf PDF
1-13.pdf PDF
Electrical - Bldg 1 Ground.pdf PDF
Fire Protection - Bldg 1 ground.pdf PDF
Electrical - Bldg 1 Third.pdf PDF
Architectural - Bldg 1 ground.pdf PDF
Plumbing - Bldg 1 ground.pdf PDF
Busway D Wing - Ansi C ATS drawing.pdf PDF
Busway B Wing - Ansi C bust way 3th.pdf PDF
1-S16.pdf PDF
1-S5.pdf PDF
1-S2.pdf PDF
1-S6.pdf PDF
1-8.pdf PDF
1-15.pdf PDF
1-4.pdf PDF
1-14.pdf PDF
36C24826R0085 0001.pdf PDF
Specialized Experience Form 3 Pages.pdf PDF
Drawing-Arch Bldg 1 Project Location 1 Page.pdf PDF
Drawing-Equipment Layout 1 Page.pdf PDF
WD FL20260208 01.02.2026 Hillsborough 8 Pages.pdf PDF
Spec 014219 7 Pages.pdf PDF
PPQ 4 Pages.pdf PDF
LOS 2 Pages.pdf PDF
EMR 1 Page.pdf PDF
Contractor Work Plan and Peer Review 8 Pages.pdf PDF
Spec 010000 52 Pages.pdf PDF
Spec 013216.16 23 Pages.pdf PDF
A.3 PRICE COST Schedule.pdf PDF
SOW 673-CSI-131 24 Pages.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. SOLICITATION NUMBER 2. TYPE OF SOLICITATION 3. DATE ISSUED PAGE OF PAGES

4. CONTRACT NUMBER 5. REQUISITION/PURCHASE REQUEST NUMBER 6. PROJECT NUMBER

7. ISSUED BY CODE 8. ADDRESS OFFER TO

a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

12b. CALENDAR DAYS

13. ADDITIONAL SOLICITATION REQUIREMENTS:

STANDARD FORM 1442 (REV. 8/2014)STANDARD FORM 1442

Prescribed by GSA-FAR (48 CFR) 52.236-1(d)

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

SOLICITATIONSOLICITATION

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

9. FOR INFORMATION

CALL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SEALED BID (IFB)

NEGOTIATED (RFP)

11. The Contractor shall begin performance within ____________ calendar days and complete it within ____________ calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See _____________________________).

YES NO

a. Sealed offers in original and ___________________copies to perform the work required are due at the place specified in Item 8 by _____________ (hour) local time _____________________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, the date and time offers are due.

b. An offer guarantee is, is not required.

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

d. Offers providing less than _______________________ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

36C24826R0085 X

03-06-2026

673-CSI-131

36C248

Department of Veterans Affairs Network Contracting Office 8 (NCO 8)

8875 Hidden River Pkwy Ste 160A Tampa FL 33637

Department of Veterans Affairs Network Contracting Office 8 (NCO 8)

8875 Hidden River Pkwy Ste 160A Tampa FL 33637

Stacy Figlinski 813-940-2788

Project Title: DB Install CT Scanner (LDCT) Project Number: 673-CSI-131 Project Location: James A. Haley Veteran’s Hospital, 13000 Bruce B. Downs Boulevard, Tampa, FL 33612

This solicitation is 100% set-aside for Service Disabled Veteran-Owned Small Businesses (SDVOSB).

System for Award Management: https://www.sam.gov SBA Veteran Small Business Certification: https://veterans.certify.sba.gov

As stated elsewhere in the solicitation, this procurement is a two-phase Design Build IAW FAR Part 36.3.

One solicitation will be issued covering both phases. In Phase 1, proposals will be evaluated to determine which offerors will submit proposals in Phase 2. Black 13A refers to Phase 1 Proposals.

Phase 1 Proposals Due: 3/23/2026 at 10:00 AM EST

All VA Campuses are Smoke Free Facilities.

15 281

X X 52.211-10

X 10

10:00 AM EDT

03-23-2026

X

14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NUMBER

16. REMITTANCE ADDRESS

CODE FACILITY CODE

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of the solicitation, if this offer is accepted by the Government in writing within __________ calendar days after the date offers are due.

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

AMENDMENT

NUMBER

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER 20b. SIGNATURE 20c. OFFER DATE

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO 10 U.S.C. 2304(c)( ) 41 U.S.C. 3304(a) ( )

26. ADMINISTERED BY 27. PAYMENT WILL BE MADE BY

PHONE: FAX:

28. NEGOTIATED AGREEMENT 29. AWARD Your Contractor agrees offer on this solicitation is hereby accepted as to the items listed. This to furnish and deliver all items or perform all work requirements identified award consummates the contract, which consists of (a) the Government on this form and any continuation sheets for the consideration stated in solicitation and your offer, and (b) this contract award. No further cont-this contract. The rights and obligations of the parties to this contract ractual document is necessary.

shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31a. NAME OF CONTRACTING OFFICER

TO SIGN

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. AWARD DATE

BY

OFFER

AWARD

STANDARD FORM 1442 (REV. 8/2014) BACK

(Include ZIP Code) (Include area code)

(Include only if different than Item 14.)

(Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

(Type or print)

(4 copies unless otherwise specified)

(Type or print) (Type or print)

(Contractor is required to sign this document and return _______ copies to issuing office.)

(Contractor is not required to sign this document.)

(Must be fully completed by offeror)

(To be completed by Government)

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

36C248

Department of Veterans Affairs Network Contracting Office 8 (NCO 8)

8875 Hidden River Pkwy Tampa FL 33637

Department of Veterans Affairs Financial Services Center

P.O. Box 149971 Austin TX 78714-9971

Stacy Figlinski

36C24826R0085

Table of Contents

PART I - THE SCHEDULE

SECTION A - SOLICITATION/CONTRACT FORM

A.1 SF 1442 SOLICITATION, OFFER, AND AWARD (Construction, Alteration, or Repair)

A.2 SF 1442 SOLICITATION, OFFER, AND AWARD (CONSTRUCTION,

ALTERATION, OR REPAIR)– BACK

A.3 PRICE/COST SCHEDULE

ITEM INFORMATION

A.4 DELIVERY SCHEDULE

INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS

2.1 52.201-1 ACQUISITION 360: VOLUNTARY SURVEY (SEP 2023)

2.2 52.216-1 TYPE OF CONTRACT (NOV 2025) (DEVIATION)

2.3 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE

OF THE WORK (NOV 2025) (DEVIATION)

2.4 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION

MATERIALS (MAY 2014)

2.5 52.228-1 BID GUARANTEE (SEP 1996)

2.6 52.228-17 INDIVIDUAL SURETY—PLEDGE OF ASSETS (BID GUARANTEE)

(FEB 2021)

2.7 52.232-18 AVAILABILITY OF FUNDS (APR 1984)

2.8 52.233-2 SERVICE OF PROTEST (SEP 2006)

2.9 52.240-90 SECURITY PROHIBITIONS AND EXCLUSIONS REPRESENTATIONS

AND CERTIFICATIONS (NOV 2025) (DEVIATION)

2.10 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE

(FEB 1998)

2.11 VAAR 852.228-72 ASSISTING SERVICE-DISABLED VETERAN-OWNED AND

VETERAN-OWNED SMALL BUSINESSES IN OBTAINING BONDS (DEC 2009)

2.12 VAAR 852.233-71 ALTERNATE PROTEST PROCEDURE (OCT 2018)

2.13 PARTNERING

REPRESENTATIONS AND CERTIFICATIONS

3.1 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018)

3.2 52.209-13 VIOLATION OF ARMS CONTROL TREATIES OR AGREEMENTS—

CERTIFICATION (NOV 2021)

GENERAL CONDITIONS

4.1 52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND

CERTIFICATIONS (DEC 2014)

4.2 52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING

RESPONSIBILITY MATTERS (OCT 2018)

4.3 52.219-14 LIMITATIONS ON SUBCONTRACTING (NOV 2025) (DEVIATION)

4.4 52.219-28 POSTAWARD SMALL BUSINESS PROGRAM REREPRESENTATION

(NOV 2025) (DEVIATION)

4.5 52.222-35 EQUAL OPPORTUNITY FOR VETERANS (NOV 2025) (DEVIATION) ..30

4.6 52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL

LABOR RELATIONS ACT (NOV 2025) (DEVIATION)

4.7 52.225-9 BUY AMERICAN—CONSTRUCTION MATERIALS (DEVIATION) (NOV

2025)

4.8 SUPPLEMENTAL INSURANCE REQUIREMENTS

4.9 52.240-91 SECURITY PROHIBITIONS AND EXCLUSIONS (NOV 2025)

(DEVIATION)

4.10 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

4.11 52.222-36 EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (NOV

2025) (DEVIATION)

4.12 VAAR 852.219-73 VA NOTICE OF TOTAL SET-ASIDE FOR CERTIFIED

SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESSES (JAN 2023)

(DEVIATION)

4.13 VAAR 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING—

CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION (JAN 2023)

(DEVIATION)

4.14 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV

2018)

4.15 VAAR 852.236-71 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION

(APR 2019)

4.16 VAAR 852.236-79 CONTRACTOR PRODUCTION REPORT (APR 2019)

4.17 VAAR 852.236-80 SUBCONTRACTS AND WORK COORDINATION (APR 2019)

4.18 VAAR 852.242-71 ADMINISTRATIVE CONTRACTING OFFICER (OCT 2020) ..57

4.19 VAAR 852.243-70 CONSTRUCTION CONTRACT CHANGES—SUPPLEMENT

(SEP 2019)

DESIGN BUILD SPECIFICATIONS

4.20 SCHEDULE OF PAYMENTS FOR DESIGN SERVICES

4.21 OWNERSHIP OF ORIGINAL DOCUMENTS

4.22 RETENTION OF REVIEW DOCUMENTS

4.23 CONTRACT DRAWINGS AND SPECIFICATIONS GOVERNMENT FURNISHED

PLANNING INFORMATION

4.24 COORDINATION WITH MEDICAL CENTER

4.25 RESPONSIBILITY OF THE DESIGN-BUILD CONTRACTOR

ATTACHMENTS

A.3 PRICE/COST SCHEDULE

ITEM INFORMATION

ITEM

NUMBER

DESCRIPTION OF

SUPPLIES/SERVIC

ES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1.00 JB _____________

DESIGN-BUILD SERVICES: Project 673-CSI-131, Install CT Scanner (LDCT). The contractor shall provide all labor, materials, tools, equipment, supervision, and design-build services necessary for the design and construction of the project described herein and other specific tasks as further defined by the Statement of Work (SOW). All quotes are to provide both design and construction services for this project.

PERIOD OF PERFORMANCE: 281 calendar days from Government issuance of Notice to Proceed (NTP).

PRINCIPAL NAICS CODE: 236220 - Commercial and Institutional Building Construction PRODUCT/SERVICE CODE: Y1DA - Construction of Hospitals and Infirmaries

GRAND TOTAL _____________

A.4 DELIVERY SCHEDULE

ITEM

NUMBER SHIPPING INFORMATION

QUANTIT

Y

DELIVERY

DATE

0001 SHIP TO: James A. Haley Veteran’s Hospital 13000 Bruce B. Downs Boulevard Tampa, FL 33612

USA

1.00 281 Days After

NTP

INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO

BIDDERS/OFFERORS

REQUEST FOR PROPOSAL

SOLICITATION NO. 36C24826R0085

ISSUE DATE: March 6, 2026 PHASE 1 PROPOSAL DUE DATE: March 23, 2026 at 10:00 AM EST

PROJECT NUMBER: 673-CSI-131

PROJECT TITLE: Design Build (DB) Install CT Scanner (LDCT)

PROJECT LOCATION: James A. Haley Veteran’s Hospital, 13000 Bruce B. Downs Boulevard, Tampa, FL 33612

PROJECT SUMMARY: The contractor shall provide all labor, tools, and materials necessary for the following work: Design-Build project to support the installation of a new GE Revolution Ascend (CT LDCT) system. This project is classified as a new equipment installation and will require both design and construction services to bring the IR (LDCT) suite into compliance with current VA CFM Technical Information Library (TIL) standards. Project is located at the James A. Haley Veteran’s Hospital, 13000 Bruce B. Downs Boulevard, Tampa, FL 33612.

OFFICE ISSUING THIS REQUEST:

Department of Veterans Affairs Network Contracting Office (NCO) 8 Contracting Officer: Stacy Figlinski Email: Stacy.Figlinski@va.gov

PART I – GENERAL INFORMATION

1. All references to “Bid” or “Bidder” shall be understood to mean “Offer” or “Offeror”.

2. DEFINITIONS:

a. Design-Build (D/B) as defined by the Department of Veterans Affairs (VA) is the procurement by the

Government, under one contract, with one firm or joint venture (JV) as identified in your basic contract, for both design and construction services for a specific project.

b. Contracting Officer Representative (COR): The COR responsible for administering contracts under the immediate direction of the Contracting Officer.

c. Design Build Contract: This term, as used herein, refers to the Contract to perform the design and construction of the project.

d. Contractor: This term, as used herein, refers to the contractor under this contract or the D/B team.

e. AE: This term, as used herein, refers to the Architect-Engineer firm(s)that are a part of the D/B team, also referred to as D/B/AE.

3. MAGNITUDE OF CONSTRUCTION: Between $1,000,000 and $2,000,000 per VAAR 836.204(f)(1).

4. SITE VISIT: NO PRE-PROPOSAL/SITE VISIT WILL BE CONDUCTED DURING PHASE 1 OF THIS SOLICITATION. Those offerors selected to participate in Phase 2 of the solicitation will receive information about a Phase 2 pre-proposal conference/Site Visit in the invitation to participate in Phase 2.

5. OFFER ACCEPTANCE PERIOD: Offers providing less than one-hundred and twenty (120) calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

6. REQUESTS FOR INFORMATION: Requests for Information (RFIs) shall be submitted by the prime contractor through email only to the Contracting Officer. No solicitation questions will be accepted in any other format. The cutoff for submission of RFIs for Phase 1 is March 11, 2026, at 10:00 AM EST. Responses will be provided through an Amendment posted to SAM.gov in a Question & Answer format visible to all offerors.

7. SPECIFICATIONS AND DRAWINGS: All applicable specifications and drawings, if available, will be provided electronically in SAM.gov as attachments to this RFP. No hard copies will be made available to proposing contractors.

8. SDVOSB VERIFICATION: The Government will confirm SDVOSB status verification for the submitted proposals. Evaluations will be performed on proposals submitted by verified SDVOSBs only. Subsequent confirmation of SDVOSB verification status will be performed for the apparent awardee. Verification is done through the following two websites: System for Award Management (SAM): https://www.sam.gov and SBA Veteran Small Business Certification (VetCert): https://veterans.certify.sba.gov. The Offeror must be registered with both websites. No other SDVOSB documentation will be accepted.

9. LIMITATIONS ON SUBCONTRACTING: (Reference Contract Clause FAR 52.219-14 for further information): By submission of an offer and execution of a contract, the Offeror agrees that in performance of the contract, the concern will perform at least fifteen (15) percent of the cost of the contract, not including the cost of materials, with its own employees.

10. FUNDS: Award is subject to availability of FY26 funding.

11. BONDS: (Reference Contract Clause FAR 52.228-15 for further information on applicability):

A payment and performance bond shall be provided. The penal sum shall be one hundred percent (100%) of order price. Bonds and other payment protection shall be provided within 10 calendar days of award of the Contract. The Notice to Proceed will not be issued until the Contractor provides sufficient bonding to cover the work being performed. Provide electronically only. NCO 8 no longer accepts bonds through the mail.

12. OFFER GUARANTEE (BID BOND) (SUBMIT WITH YOUR PRICE PROPOSAL): Per FAR Clause 52.228- 1-Bid Guarantee, the amount of the bid guarantee shall be 20 percent of the bid price Or $3,000,000, whichever is less. Provide with price proposal.

13. WAGE DETERMINATION: Wages for all contractors and subcontractors must comply with Davis Bacon Wage Determinations. The current determination is General Decision FL20260208 dated 01/02/2026. Be advised the determination that is current at the time of the Contract award is the determination that will apply for the project.

Current determinations are always available at: http://www.sam.gov/.

14. CONTRACT PERFORMANCE PERIOD: 281 calendar days after receipt of written Notice to Proceed performed in concurrent or sequential phases as indicated or required.

15. SAFETY AND ENVIRONMENTAL RECORD: (SUBMIT WITH PHASE ONE TECHNICAL

PROPOSAL) Offerors shall submit with their proposal a completed Attachment 02 - Safety or Environmental Violations and Experience Modification Rate (EMR) Form, which supplies the Government information pertaining to your firm’s past Safety and Environmental record. A submitted form represents a certification of your firm’s past Safety and Environmental record identifying serious, willful, or repeat violations from OSHA or any EPA violations within the last 3 years. Please attach explanation for any violations.

PART II – PROPOSAL PREPARATION

1. This RFP addresses both the Phase 1 and Phase 2 proposal requirements. Do not submit the pricing information requested in Phase 2 with the Phase 1 proposal.

2. The Phase 1 proposals will be evaluated to determine which offerors will be invited to submit Phase 2 technical and price proposals.

3. A maximum of five (5) most highly rated Phase 1 proposals will be invited to submit a Phase 2 proposal.

4. Prospective vendors shall provide their proposal in any of the following formats: .pdf, .docx, or .doc to the issuing office address identified above. All technical proposals and the price proposal shall be provided via email to Stacy.Figlinski@va.gov. The technical proposal shall address each of the evaluation criteria.

5. During Phase 2, the price proposal shall be provided as a separate file from the technical proposal. The price proposal shall include a copy of the vendor’s VetCert registration information, a copy of the vendor SAM.gov registration information, and a price sheet with pricing on the statement of items. While there is no page limit to the price proposal, it shall also be on 8 ½” x 11” pages, when printed. The price breakdown shall be filled out in its entirety.

6. PROPOSAL FORMAT:

Technical Proposal Format Phase 1 and Phase 2. Technical proposals for Phases 1 and 2 shall address all information requested and will then be evaluated against the stated factors. General Information Required for technical proposals is:

a. Cover page with the following:

1. Solicitation Number

2. Project Title and Project Number

3. Business Name and Address

4. Point of Contact Name, Phone Number, and Email

5. SAM UEI number

b. Table of Contents

c. Signed SF 1442 by the SDVOSB/Authorized Person, with Blocks 14-20C completed including acknowledgement of any Amendments issued.

d. Completed Technical Factors, titled and distinctly separate from one another.

Price Proposal Format Phase 2. The price proposal shall include the following information:

a. Cover page with the following:

1. Solicitation Number

2. Project Title and Project Number

3. Business Name and Address

4. Point of Contact Name, Phone Number, and Email

5. SAM UEI number

b. Signed Offer/Acknowledgement of Amendments for Phase 2 (if any)

c. Copy of current SBA VetCert SDVOSB certification (printout from website is acceptable)

d. Bid Bond

e. Completed A.3 PRICE/COST SCHEDULE

f. Completed Project Price Breakdown form provided with this solicitation.

g. Completed Mandatory (LOS) Certification. A signed copy shall be submitted in a separate PDF document

(do not combine/save with other documents).

h. Completed Experience Modification Rate (EMR) Form

PART III – EVALUATION FACTORS

1. Technical Evaluation Factors for Phase 1 (factors 1 through 3 below):

Factor 1: Technical Approach and Technical Qualifications

1. Provide a narrative describing the proposed primary construction firms and primary design firms for this contract and the rationale for proposing this arrangement. Provide the role, responsibilities, and contractual relationships between the various firms.

2. The narrative shall also include a simple organizational chart that clearly identifies the lines of authority between the entities. If the experience of an entity is being claimed in Factor 2, that entity must be named in the above narrative and organizational chart.

3. Provide information that describes intended Design Build Team overall strategy for successfully completing the design-build contract per SOW and solicitation requirements.

4. Describe the Offeror's understanding of the challenges, risks, and technical approach with respect to design and construction of this project.

5. Briefly describe ability to obtain the necessary resources to perform this project.

6. Briefly describe technical competence and design expertise involving site preparation work at a healthcare facility.

Formatting and Other Restrictions: The submission is limited to 20 pages.

Factor 2: Specialized Experience

1. Describe specialized experience directly related to the scope of work. Offeror shall provide a total of three (3) work experience projects meeting the requirements of this solicitation in performance at any point during the previous five (5) years from the solicitation date or currently ongoing (at least 50% complete) that best represent the Offeror’s work experience required on this solicitation. The information provided will be used to evaluate the relevancy and depth of each Offeror’s specialized experience. Offerors are responsible for providing project descriptions in sufficient detail to permit evaluation of project relevancy to this procurement.

2. Projects provided for experience should demonstrate experience designing, constructing, and managing a project that involves the same or similar tasks outlined in the Statement of Work. The work experience must be similar in size, scope and complexity to the work required under this solicitation.

3. Offeror experience shall be submitted using the attached Specialized Experience Information Form. All fields of the “Specialized Experience Information Form” must be completed, and all data must be accurate and current.

Formatting and Other Restrictions: The submission is limited to 16 pages.

Factor 3. Past Performance

For each project referenced in Factor 2, provide the completed Contractor Performance Assessment Reporting System (CPARS) records for those projects. If CPARS records are unavailable submit past performance information using the attached Past Performance Questionnaire form. Include the contract number, period of performance, and agency point of contact information. The Contracting Officer may utilize any other means necessary to evaluate past performances, such as customer surveys and prior experience with contractor.

Formatting and Other Restrictions: Limited to CPARS records or Past Performance Questionnaire. PPQs must be signed by person who fills in the form. Unsigned forms may not be considered.

- - - END OF PHASE 1 EVALUATION FACTORS - - -

2. Technical Evaluation Factors for Phase 2 (factors 4 and 5 below):

Factor 4: Schedule

1.Schedule Narrative: Describe in detail, how your company will meet the schedule without causing disruptions to the facility during normal business hours, nights, and weekends. Also, describe actions to be taken by the offeror if completion of work is anticipated to fall behind schedule. Describe any technical difficulties that may be encountered in a project of this type and preventative measures or solutions to overcome these issues.

2.The offeror is required to submit a proposed progress schedule in a time-scaled bar graph format. The horizontal axis will be scaled for the time beginning with the Notice to Proceed and concluding with contract completion.

Assume the Notice to Proceed will be issued fifteen (15) calendar days after the award date. Note, there is no guarantee that the Notice to Proceed will be issued within this timeframe. The vertical axis will show the milestones and major portions of the contract work. All schedule items will show a start date and a completion date. The detailed schedule will indicate specific tasks with dates for each step of the process.

Formatting and Other Restrictions: The submission is limited to 10, 8-1/2” x 11” pages in total.

Factor 5: Key Personnel

1. Identify key personnel to be assigned to the project, to include principal managers, designers (The A/E services shall include the services of a registered Architect or Engineer), construction project manager, structural engineer, fire protection engineer, onsite supervisor with overall site responsibility, superintendent of the contractor's own forces, manager of subcontracts, quality control manager and the project scheduler who will be directly responsible for the day-to-day design and construction activities.

2. Provide resumes of key personnel for both design and construction periods.

3. Provide biographical data for key personnel for both the design and build portions of the work. Biographical data shall include name of individual, company position, years with the company, name of the company, work and educational background, and position that the individual will hold regarding this contract.

4. Indicate which individuals are used for the design phase and which are used during the construction phase.

Indicate what percentage of each individual’s time would be committed to the project during both the design and construction phases.

Formatting and Other Restrictions: No page limit for this factor.

3. Pricing:

Factor 6: Price Proposal

The Government will evaluate price based on the total price. Contractor is to complete the Project Price Breakdown form, which will be included with the Phase 2 request for proposals. A.3 PRICE/COST SCHEDULE will also be provided and filled in with total price. Total price consists of the basic requirement. The price proposal shall show direct and indirect project price break down. The price breakdown shall reflect the Base proposed items using, at a minimum, the following cost elements:

a. Labor (Direct & Indirect),

b. Materials, Material Markups, Materials overhead,

c. Equipment

d. Subcontractor Cost

e. Travel

f. Other Direct Costs

g. Overhead expenses

h. Indirect Cost

i. General & Administrative (G&A) expenses

j. Profit

Technical Evaluations - All technical factors when combined are more important than price.

Cost Proposal - Offerors are advised that if the technical proposals are essentially equal, award will be made on the basis of the lowest cost.

PART IV – AWARD

1. The Government will evaluate proposals submitted in response to this solicitation which meet the requirements that have been provided above.

2. This procurement will be a single award on a trade-off basis resulting from this solicitation to the responsible offeror.

3. Award may be made without discussions, except for minor clarifications.

2.1 52.201-1 ACQUISITION 360: VOLUNTARY SURVEY (SEP 2023)

(a) All actual and potential offerors are encouraged to provide feedback on the preaward and debriefing processes, as applicable. Feedback may be provided to agencies up to 45 days after award. The feedback is anonymous, unless the participant self-identifies in the survey. Actual and potential offerors can participate in the survey by selecting the following link: https:// www.acquisition.gov/360.

(b) The Contracting Officer will not review the information provided until after contract award and will not consider it in the award decision. The survey is voluntary and does not convey any protections, rights, or grounds for protest. It creates a way for actual and potential offerors to provide the Government constructive feedback about the preaward and debriefing processes, as applicable, used for a specific acquisition.

(End of Clause)

2.2 52.216-1 TYPE OF CONTRACT (NOV 2025) (DEVIATION)

The Government contemplates award of a Firm-Fixed-Price contract resulting from this solicitation.

(End of Provision)

2.3 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—

SECONDARY SITE OF THE WORK (NOV 2025) (DEVIATION)

(a)(1) The offeror must notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements, of this solicitation.

(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror must request a determination from the Contracting Officer.

(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror must request a wage determination from the Contracting Officer.

(2) The due date for receipt of offers will not be extended as a result of an offeror's request for a wage determination for a secondary site of the work.

(End of Provision)

2.4 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT—

CONSTRUCTION MATERIALS (MAY 2014)

(a) Definitions. "Commercially available off-the-shelf (COTS) item," "construction material," "domestic construction material," and "foreign construction material," as used in this provision, are defined in the clause of this solicitation entitled "Buy American—Construction Materials" (Federal Acquisition Regulation (FAR) clause 52.225-9).

(b) Requests for determinations of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American statute should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of the clause at FAR 52.225-9 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American statute before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.

(c) Evaluation of offers.

(1) The Government will evaluate an offer requesting exception to the requirements of the Buy American statute, based on claimed unreasonable cost of domestic construction material, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(3)(i) of the clause at FAR 52.225-9.

(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.

(d) Alternate offers.

(1) When an offer includes foreign solicitation in paragraph (b)(2) of the clause at FAR 52.225-9, the offeror also may submit an alternate offer based on use of equivalent domestic construction material.

(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of the clause at FAR 52.225-9 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.

(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of the clause at FAR 52.225-9 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic construction material, and the offeror shall be required to furnish such domestic construction material. An offer based on use of the foreign construction material for which an exception was requested—

(i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or

(ii) May be accepted if revised during negotiations.

(End of Provision)

2.5 52.228-1 BID GUARANTEE (SEP 1996)

(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.

(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States. The Contracting Officer will return bid guarantees, other than bid bonds—

(1) To unsuccessful bidders as soon as practicable after the opening of bids; and

(2) To the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.

(c) The amount of the bid guarantee shall be 20 percent of the bid price or $3,000,000.00, whichever is less.

(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.

(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.

(End of Provision)

2.6 52.228-17 INDIVIDUAL SURETY—PLEDGE OF ASSETS (BID

GUARANTEE) (FEB 2021)

(a) Offerors shall obtain from each person acting as an individual surety on a bid guarantee—

(1) A pledge of assets that meets the eligibility, valuation, and security requirements described in the Federal Acquisition Regulation (FAR) 28.203–1; and

(2) Standard Form 28, Affidavit of Individual Surety.

(b) The Offeror shall include with its offer the information required at paragraph (a) of this provision within the timeframe specified in the provision at FAR 52.228–1, Bid Guarantee, or as otherwise established by the Contracting Officer.

(c) The Contracting Officer may release the security interest on the individual surety’s assets in support of a bid guarantee based upon evidence that the offer supported by the individual surety will not result in contract award.

(End of Provision)

2.7 52.232-18 AVAILABILITY OF FUNDS (APR 1984)

Funds are not presently available for this contract. The Government's obligation under this contract is contingent upon the availability of appropriated funds from which payment for contract purposes can be made. No legal liability on the part of the Government for any payment may arise until funds are made available to the Contracting Officer for this contract and until the Contractor receives notice of such availability, to be confirmed in writing by the Contracting Officer.

(End of Clause)

2.8 52.233-2 SERVICE OF PROTEST (SEP 2006)

Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from:

Stacy Figlinski

Contracting Officer Hand-Carried Address:

Hand Carry Not Accepted

Email Only to Stacy Figlinski Stacy.Figlinski@va.gov

Mailing Address:

(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.

(End of Provision)

2.9 52.240-90 SECURITY PROHIBITIONS AND EXCLUSIONS

REPRESENTATIONS AND CERTIFICATIONS (NOV 2025) (DEVIATION)

(a) Definitions. As used in this provision—

Backhaul, covered article, covered telecommunications equipment or services, critical technology, FASCSA order, Intelligence community, interconnection arrangements, national security system, roaming, sensitive compartmented information, sensitive compartmented information system, source, and substantial or essential component have the meanings provided in the clause 52.240-91, Security Prohibitions and Exclusions.

Business operations means engaging in commerce in any form, including by acquiring, developing, maintaining, owning, selling, possessing, leasing, or operating equipment, facilities, personnel, products, services, personal property, real property, or any other apparatus of business or commerce.

Marginalized populations of Sudan means—

(1) Adversely affected groups in regions authorized to receive assistance under section 8(c) of the Darfur Peace and Accountability Act (Pub. L. 109-344) (50 U.S.C. 1701 note); and

(2) Marginalized areas in Northern Sudan described in section 4(9) of such Act.

Restricted business operations means business operations in Sudan that include power production activities, mineral extraction activities, oil-related activities, or the production of military equipment, as those terms are defined in the Sudan Accountability and Divestment Act of 2007 (Pub. L. 110-174). Restricted business operations do not include business operations that the person (as that term is defined in Section 2 of the Sudan Accountability and Divestment Act of 2007) conducting the business can demonstrate—

(1) Are conducted under contract directly and exclusively with the regional government of southern Sudan;

(2) Are conducted under specific authorization from the Office of Foreign Assets Control in the Department of the Treasury, or are expressly exempted under Federal law from the requirement to be conducted under such authorization;

(3) Consist of providing goods or services to marginalized populations of Sudan;

(4) Consist of providing goods or services to an internationally recognized peacekeeping force or humanitarian organization;

(5) Consist of providing goods or services that are used only to promote health or education;

or

(6) Have been voluntarily suspended.

Sensitive technology—

(1) Means hardware, software, telecommunications equipment, or any other technology that is to be used specifically—

(i) To restrict the free flow of unbiased information in Iran; or

(ii) To disrupt, monitor, or otherwise restrict speech of the people of Iran; and

(2) Does not include information or informational materials the export of which the President does not have the authority to regulate or prohibit pursuant to section 203(b)(3) of the International Emergency Economic Powers Act (50 U.S.C. 1702(b)(3)).

(b) Procedures.

(1) Covered telecommunications and video surveillance. The Offeror shall review the list of excluded parties in the System for Award Management (SAM) at https://www.sam.gov for entities excluded from receiving federal awards for “covered telecommunications equipment or services.”

(2) FASCSA Orders.

(i) The Offeror shall search in SAM for the phrase “FASCSA order” for any covered article, or any products or services produced or provided by a source, if there is an applicable FASCSA order described in paragraph (e) of FAR 52.240-91, Security Prohibitions and Exclusions.

(ii) The Offeror shall review the solicitation for any FASCSA orders that are not in SAM but are effective and apply to the solicitation and resultant contract (see FAR 40.204-1(c)(2)).

(iii) FASCSA orders issued after the date of solicitation do not apply unless added by an amendment to the solicitation.

(c) Covered telecommunications equipment or services representations. By submission of its offer, the Offeror represents that, after conducting a reasonable inquiry (that looks at any information in the Offeror’s possession but does not need to include an internal or third-party audit)—

(1) It will not provide covered telecommunications equipment or services to the Government in the performance of any contract, subcontract or other contractual instrument resulting from this solicitation, except as waived by the solicitation, or as disclosed in paragraph (g); and

(2) It does not use covered telecommunications equipment or services, or use any equipment, system, or service that uses covered telecommunications equipment or services, except as waived by the solicitation, or as disclosed in paragraph (g).

(d) FASCSA Representation. By submission of this offer, the offeror represents that it has conducted a reasonable inquiry, and that the offeror does not propose to provide or use in response to this solicitation any covered article, or any products or services produced or provided by a source, if the covered article or the source is prohibited by an applicable FASCSA order in effect on the date the solicitation was issued, except as waived by the solicitation, or as disclosed in paragraph (g). A reasonable inquiry will look at any information in the offeror’s possession but does not need to include an internal or third-party audit.

(e) Sudan certification. By submission of its offer, the offeror certifies, after conducting a reasonable inquiry (that looks at any information in the offeror’s possession but does not need to include an internal or third-party audit), that the offeror does not conduct any restricted business operations in Sudan.

(f) Iran Representation and Certifications.

(1) Except as provided in paragraph (f)(2) of this provision or if a waiver has been granted in accordance with FAR 40.203-3, the offeror, after conducting a reasonable inquiry (that looks at any information in the offeror’s possession but does not need to include an internal or third-party audit), by submission of its offer—

(i) Represents, to the best of its knowledge and belief, that the offeror does not export any sensitive technology to the government of Iran or any entities or individuals owned or controlled by, or acting on behalf or at the direction of, the government of Iran;

(ii) Certifies that the offeror, or any person (as defined at section 15 of the Iran Sanctions Act of 1996, Pub. L. 104-172, 50 U.S.C. 1701 note) owned or controlled by the offeror, does not engage in any activities for which sanctions may be imposed under section 5 of the Act. These sanctioned activities are in the areas of development of the petroleum resources of Iran, production of refined petroleum products in Iran, sale and provision of refined petroleum products to Iran, and contributing to Iran’s ability to acquire or develop certain weapons or technologies; and

(iii) Certifies that the offeror, and any person owned or controlled by the offeror, does not knowingly engage in any transaction that exceeds $15,000 with Iran’s Revolutionary Guard Corps or any of its officials, agents, or affiliates, the property and interests in property of which are blocked pursuant to the International Emergency Economic Powers Act (50 U.S.C. 1701 et seq.) (see OFAC’s Specially Designated Nationals and Blocked Persons List at https://www.treasury.gov/resource-center/sanctions/SDN-List/Pages/default.aspx)

(2) Exception for trade agreements. The representation and certification requirements of paragraph (f)(1) of this provision do not apply if—

(i) This solicitation includes a trade agreements notice or certification (e.g., 52.225-6, Trade Agreements Certificate); and

(ii) The offeror has certified that all the offered products to be supplied are designated country end products or designated country construction material.

(iii) The offeror shall email questions concerning sensitive technology to the Department of State at CISADA106@state.gov.

(g) Disclosure.

(1) If the Offeror is not able to represent compliance with the prohibitions in paragraphs (c) or (d), then the Offeror shall disclose within 72 hours to the contracting office identified in paragraph (g)(2) the following information for each product or service not compliant:

(i) Contract number and order number, if applicable;

(ii) Identification of whether this disclosure relates to paragraph (c) on covered telecommunication equipment or services, or to paragraph (d) on FASCSA orders;

(iii) A description of the products or services that the Contractor identifies or has reason to suspect is prohibited (include brand; model number, such as the original equipment manufacturer (OEM) number, manufacturer part number, or wholesaler number; and item description, as applicable);

(iv) The entity that produced the product or service (include entity name, unique entity identifier, Contractor and Government Entity (CAGE) code, facilities responsible for design, fabrication, assembly, packaging, and test of the product, and whether the entity was the OEM or a distributor (provide manufacturer codes and distributor codes used for the product));

(v) Description of the functionality of the product or service and how that functionality impacts the risk to the product or service;

(vi) An explanation of any factors relevant to determining if the product or service should be permitted by an applicable exception, exemption, or waiver (if the offeror would like the Government to consider a waiver);

(vii) Whether alternative products or services are available that would be compliant with the prohibition;

(viii) If the product or service is related to item maintenance, include the following information on the item being maintained:

(A) Brand;

(B) Model number, OEM number, manufacturer part number, or wholesaler number; and

(C) Item description, as applicable.

(ix) Any readily available information about mitigation actions undertaken or recommended.

(2) If a disclosure is required to be submitted to a contracting office, the offeror shall submit the disclosure as follows:

(i) If a Department of Defense contracting office, the offeror shall submit the disclosure to the website at https://dibnet.dod.mil.

(ii) For all other contracting offices, the Offeror shall submit the disclosure to the Contracting Officer.

(3) If the disclosure provided does not contain any of the information required by paragraph (1), and the Offeror later discovers new information that is required by paragraph (1), then the Offeror shall submit a subsequent disclosure within 72 hours of discovering the new information.

(h) Executive agency review of disclosures. The Contracting Officer will review disclosures provided in paragraph (g) to determine if any applicable waiver may be sought. The Contracting Officer may choose not to pursue a waiver and may instead make an award to an Offeror that does not require a waiver.

(End of Provision)

2.10 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY

REFERENCE (FEB 1998)

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):

https://www.acquisition.gov/browse/index/far https://www.va.gov/oal/library/vaar/

(End of Provision)

FAR

Number

Title Date

52.204-7 SYSTEM FOR AWARD MANAGEMENT—REGISTRATION

(DEVIATION)

NOV 2025

52.215-1 INSTRUCTIONS TO OFFERORS—COMPETITIVE

ACQUISITION

NOV 2021

2.11 VAAR 852.228-72 ASSISTING SERVICE-DISABLED VETERAN-OWNED

AND VETERAN-OWNED SMALL BUSINESSES IN OBTAINING BONDS (DEC

2009) Prime contractors are encouraged to assist service-disabled veteran-owned and veteran-owned small business potential subcontractors in obtaining bonding, when required. Mentor firms are encouraged to assist protégé firms under VA's Mentor-Protégé Program in obtaining acceptable bid, payment, and performance bonds, when required, as a prime contractor under a solicitation or contract and in obtaining any required bonds under subcontracts.

(End of Clause)

2.12 VAAR 852.233-71 ALTERNATE PROTEST PROCEDURE (OCT 2018)

(a) As an alternative to filing a protest with the Contracting Officer, an interested party may file a protest by mail or electronically with: Executive Director, Office of Acquisition and Logistics, Risk Management and Compliance Service (003A2C), Department of Veterans Affairs, 810 Vermont Avenue NW, Washington, DC 20420 or Email: EDProtests@va.gov.

(b) The protest will not be considered if the interested party has a protest on the same or similar issue(s) pending with the Contracting Officer.

(End of Provision)

PLEASE NOTE: The correct mailing information for filing alternate protests is as follows:

Deputy Assistant Secretary for Acquisition and Logistics, Risk Management Team, Department of Veterans Affairs 810 Vermont Avenue, N.W.

Washington, DC 20420

Or for solicitations issued by the Office of Construction and Facilities Management:

Director, Office of Construction and Facilities Management 811 Vermont Avenue, N.W.

Washington, DC 20420

2.13 PARTNERING

(a) In order to most effectively accomplish this contract, the Government proposes to form a cohesive partnership with the Contractor and its subcontractors. This partnership would strive to draw on the strengths of each organization in an effort to achieve a quality project, done right the first time, within the budget and on schedule.

(b) This partnership will be totally voluntary. The focus of partnering is to build cooperative relationships with the private sector and avoid or minimize disputes and to nurture a more collaborative ethic characterized by trust, cooperation and teamwork. Partnering is defined as the creation of a relationship between the owner and contractor that promotes mutual and beneficial goals. It is a non-contractual, but formally structured agreement between the parties.

The ultimate goal is the elimination of the "us" versus "them" thinking, and formation of a "we" mentality for the benefit of the project.

(c) Any cost associated with effectuating this partnership will be agreed to by both parties and will be shared equally with no change in contract price.

FAR

Number

Title Date

852.233-70 PROTEST CONTENT/ALTERNATIVE DISPUTE

RESOLUTION

OCT 2018

852.239-75 INFORMATION AND COMMUNICATION TECHNOLOGY

ACCESSIBILITY NOTICE

FEB 2023

REPRESENTATIONS AND CERTIFICATIONS

3.1 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT

2018)

(a) Definitions. As used in this provision—

"Administrative proceeding" means a non-judicial process that is adjudicatory in nature in order to make a determination of fault or liability (e.g., Securities and Exchange Commission Administrative Proceedings, Civilian Board of Contract Appeals Proceedings, and Armed Services Board of Contract Appeals Proceedings). This includes administrative proceedings at the Federal and State level but only in connection with performance of a Federal contract or grant.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .