Special Standards Responsibility Minimum Requirement .pdf

PDF 283 KB Posted

Attached to
Exterior Construction Contract Federal contract opportunity
Solicitation number
FA8501-22-R-0002
Issued by
Department of the Air Force Materiel Command Air Force Sustainment Center

About this file

This document outlines special standards of responsibility for an exterior construction contract solicitation. The solicitation seeks a firm-fixed price indefinite delivery, indefinite quantity contract for exterior construction projects at Robins Air Force Base, Georgia. Work will include site preparation, demolition, repair, replacement, and minor construction for facilities, warehouses, and hangars. The contract term is one base year with four one-year options. Offerors must provide documentation showing a job foreman certified to install standing seam metal roofs, PVC roofs, and modified bitumen roofs with at least three months of employment history on each. Manufacturers must offer 20-year no-dollar-limit warranties on materials and labor and meet accreditation standards for metal roof systems if providing standing seam metal roofs. Offerors must also demonstrate a working relationship with a registered architect or professional engineer licensed in Georgia who derives most of their income from roof design and will perform design analysis and sealing of drawings.

View the file

Other files for this federal contract opportunity

Other files attached to Exterior Construction Contract, newest first.
File Type Posted
Solicitation Amendment FA850122R00020001 SF 30 (1).pdf PDF
Picture_2.jpg JPG image
Picture_4.jpg JPG image
Picture_6.jpg JPG image
Picture_7.jpg JPG image
Picture_3.jpg JPG image
Picture_8.jpg JPG image
Picture_1.jpg JPG image
Picture_5.jpg JPG image
Robins ECC PPI_Govt Responses.pdf PDF
RFI 3 21 Feb 22 .pdf PDF
RFI 21 February 2022.pdf PDF
ECC Demonstration Site Visit_17 Feb 22.pdf PDF
Proposal site visit Briefing ECC IDIQ.ppt PPT presentation
RFI 2 11 Feb 22.pdf PDF
ECC RFI 1 Question and Answer 08 Feb 22 .pdf PDF
Solicitation - FA850122R0002 (1).pdf PDF
Safety App UHHZ 210375.pdf PDF
Demonstration Project 130307 Statement of Work .pdf PDF
Exterior Construction Contract (ECC) IDIQ SOW .pdf PDF
Civil Engineering Facility Requirements.pdf PDF
Sample Bid Bond ECC IDIQ.pdf PDF
AF Form 2586 Flightline Driving Request.pdf PDF
Demonstration Project 130307 Proposal Worksheet Pricing Worksheet.pdf PDF
Demonstration Project 130307 SUBMITTAL REGISTER.xls XLS spreadsheet
AFMAN 31-116 Motor Vehicle Traffic Supervision.pdf PDF
WR-ALC SAFE-T-GRAM.pdf PDF
Wage Determination.pdf PDF
Show all 28

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UHHZ210375 SPECIAL STANDARDS OF RESPONSIBILITY

The offeror shall provide documentation exhibiting proof of the following:

a. Job foreman who is a certified installer of a qualified manufacturer for each of the following roof systems: Standing Seam Metal Roofs, PVC Roofs and Modified Bitumen Roofs

Acceptable Documentation – Provide payroll verification of employment with Prime Contractor for a minimum period of three months. This shall be accompanied by a certified cover letter by the business owner certifying the aforementioned employment time with the required certifications to include the individual’s installation certifications. (One minimum for each of the three types of roofing).

b. Manufacturer Warranty (All Roofs) – Manufacturer must be able to provide a 20 year No- Dollar-

Limit (NDL) warranty on material and labor for weather-tightness, finishes, and flashing components.

See UFC 3-110-03 Appendix D for warranty items not allowable.

Acceptable Documentation – Provide a sample 20 year NDL warranty on each type of roofing; the installer’s certification must match manufacturer’s sample warranty.

c. Manufacturer Qualifications (Additional for Standing Seam Metal Roofs) – Manufacturer must be accredited in accordance with the International Accreditation Services (IAS) Inspection Programs for the Metal Building Systems/AC472.

Acceptable Documentation – Provide a copy of metal roofing manufacturer’s accreditation.

d. Professional Engineer or Registered Architect registered in the State of Georgia who derives the majority of their income from roof design work to perform and seal all required Design Analysis and drawings.

Acceptable Documentation – Letter from AE firm showing a working relationship with a copy of their professional seal. Working relationship as defined by similiar roof work completed within the last three years with a minimum of three projects. The AE firm must document this relationship within the respective letter.

File details come from the government source that posted it. Updated .