This submittal register outlines the required submissions for an exterior construction contract at Robins Air Force Base. The contract will provide site preparation, demolition, repair, replacement, and minor construction services for facilities, warehouses, and hangars on a firm-fixed price IDIQ basis. Contractors must submit their AF Form 3064 & 3065, schedule of prices, samples of proposed roofing/siding and warranty materials, design analysis, shop drawings, erection drawings, a solid waste disposal plan, list of subcontractors, and details of their proposed project manager and certified foreman within 45 days of the notice to proceed. Closeout documents including AutoCAD and PDF as-built drawings, warranty documentation, manufacturer's inspection reports must also be provided prior to the end of the contract.

View the file

Other files

Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

SCHEDULE OF MATERIAL SUBMITTALS
ROBINS AFBPROJECT NO.PROJECT TITLESOLICITATION/CONTRACT NO.
UHHZ130307RPR/RPL ROOF,IND WST TRMT & DISP, B.113
TO BE COMPLETED BY PROJECT ENGINEER
NO. OF COPIES REQUIRED
BEFORE CONSTRAFTER CONSTR
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALOTHER MATERIAL OR DATACLOSEOUTREQUIRED SUBMITTAL
DATEDATE

RECEIVED

IN

CONTRACTING DATE

TO

CIVIL

ENGR. RETURN

SUSPENSE

DATEFOLLOW-UPDATE CONTRACTOR NOTIFIEDCONTRACTOR RESUBMITTALFINAL
APPROVALREMARKS
APPROVEDDISAPPROVED
1AF Form 3064 & 3065 ( Electronic)1Within 45 days of NTP
2Schedule of Prices (Electronic)1Within 45 days of NTP
3Roofing/Siding Material (Electronic)1Within 45 days of NTP
4Sample of Warrany (Electronic)1Within 45 days of NTP
5Design Analysis (Electronic)1Within 45 days of NTP
6Engineered Shop Drawings (Electronic)1Within 45 days of NTP
7Erection Drawings (Electronic)1Within 45 days of NTP
8Soild Waste Disposal Plan (Electronic)1Within 45 days of NTP
9List of Proposed Subcontractors (Electronic)1Within 45 days of NTP
10Project Manager & Certified Foreman (Electronic)1Within 45 days of NTP
11Auto CAD & PDF Drawings, Closeout Package (Hard & CD)4Prior to Closeout
12Warranty (Hard & CD)4Prior to Closeout
13Manufacter's Inspection Report (Hard & CD)4Prior to Closeout
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
NOTE: This Submittal Schedule is for the Contractor's use in assembling and organizing the Submittals to be made to the Government. See individual specification sections for possible additional submittal requirements.
LEGEND:
A - Include with line 9 Operations and Maintenance Manual
B - Include with line 10 Warranty Book
C - Include with line 14 Color Samples

&LFA4600-11-B-0025

Attachment 3 Page &P &C1B-&P