Demonstration Project 130307 SUBMITTAL REGISTER.xls
XLS spreadsheet 36 KB Posted
- Attached to
- Exterior Construction Contract Federal contract opportunity
- Solicitation number
- FA8501-22-R-0002
About this file
This submittal register outlines the required submissions for an exterior construction contract at Robins Air Force Base. The contract will provide site preparation, demolition, repair, replacement, and minor construction services for facilities, warehouses, and hangars on a firm-fixed price IDIQ basis. Contractors must submit their AF Form 3064 & 3065, schedule of prices, samples of proposed roofing/siding and warranty materials, design analysis, shop drawings, erection drawings, a solid waste disposal plan, list of subcontractors, and details of their proposed project manager and certified foreman within 45 days of the notice to proceed. Closeout documents including AutoCAD and PDF as-built drawings, warranty documentation, manufacturer's inspection reports must also be provided prior to the end of the contract.
View the file
Other files for this federal contract opportunity
Show all 28
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| SCHEDULE OF MATERIAL SUBMITTALS | |||||||||||
| ROBINS AFB | PROJECT NO. | PROJECT TITLE | SOLICITATION/CONTRACT NO. | ||||||||
| UHHZ130307 | RPR/RPL ROOF,IND WST TRMT & DISP, B.113 | ||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | |||||||||||
| NO. OF COPIES REQUIRED | |||||||||||
| BEFORE CONSTR | AFTER CONSTR | ||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | OTHER MATERIAL OR DATA | CLOSEOUT | REQUIRED SUBMITTAL | |||||||
| DATE | DATE |
RECEIVED
IN
CONTRACTING DATE
TO
CIVIL
ENGR. RETURN
SUSPENSE
| DATE | FOLLOW-UP | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL | |||||
| APPROVAL | REMARKS | ||||||||
| APPROVED | DISAPPROVED | ||||||||
| 1 | AF Form 3064 & 3065 ( Electronic) | 1 | Within 45 days of NTP | ||||||
| 2 | Schedule of Prices (Electronic) | 1 | Within 45 days of NTP | ||||||
| 3 | Roofing/Siding Material (Electronic) | 1 | Within 45 days of NTP | ||||||
| 4 | Sample of Warrany (Electronic) | 1 | Within 45 days of NTP | ||||||
| 5 | Design Analysis (Electronic) | 1 | Within 45 days of NTP | ||||||
| 6 | Engineered Shop Drawings (Electronic) | 1 | Within 45 days of NTP | ||||||
| 7 | Erection Drawings (Electronic) | 1 | Within 45 days of NTP | ||||||
| 8 | Soild Waste Disposal Plan (Electronic) | 1 | Within 45 days of NTP | ||||||
| 9 | List of Proposed Subcontractors (Electronic) | 1 | Within 45 days of NTP | ||||||
| 10 | Project Manager & Certified Foreman (Electronic) | 1 | Within 45 days of NTP | ||||||
| 11 | Auto CAD & PDF Drawings, Closeout Package (Hard & CD) | 4 | Prior to Closeout | ||||||
| 12 | Warranty (Hard & CD) | 4 | Prior to Closeout | ||||||
| 13 | Manufacter's Inspection Report (Hard & CD) | 4 | Prior to Closeout | ||||||
| 14 | |||||||||
| 15 | |||||||||
| 16 | |||||||||
| 17 | |||||||||
| 18 | |||||||||
| 19 | |||||||||
| 20 | |||||||||
| 21 | |||||||||
| 22 | |||||||||
| 23 | |||||||||
| 24 | |||||||||
| 25 | |||||||||
| 26 | |||||||||
| 27 | |||||||||
| 28 | |||||||||
| 29 | |||||||||
| 30 | |||||||||
| 31 | |||||||||
| 32 | |||||||||
| 33 | |||||||||
| 34 | |||||||||
| 35 | |||||||||
| 36 | |||||||||
| 37 | |||||||||
| 38 | |||||||||
| 39 | |||||||||
| 40 | |||||||||
| 41 | |||||||||
| 42 | |||||||||
| 43 | |||||||||
| 44 | |||||||||
| 45 | |||||||||
| 46 | |||||||||
| 47 | |||||||||
| 48 | |||||||||
| 49 | |||||||||
| 50 | |||||||||
| 51 | |||||||||
| 52 | |||||||||
| 53 | |||||||||
| 54 | |||||||||
| 55 | |||||||||
| 56 | |||||||||
| 57 | |||||||||
| 58 | |||||||||
| 59 | |||||||||
| NOTE: This Submittal Schedule is for the Contractor's use in assembling and organizing the Submittals to be made to the Government. See individual specification sections for possible additional submittal requirements. | |||||||||
| LEGEND: | |||||||||
| A - Include with line 9 Operations and Maintenance Manual | |||||||||
| B - Include with line 10 Warranty Book | |||||||||
| C - Include with line 14 Color Samples |
&LFA4600-11-B-0025
Attachment 3 Page &P &C1B-&P
File details come from the government source that posted it. Updated .