ENERGY QAP C16.67-2 SFD (NOV 2018).pdf

PDF 129 KB Posted

Attached to
SPE60520R0230 - Fuel Support for Europe Federal contract opportunity
Solicitation number
SPE605-20-R-0230
Issued by
Defense Logistics Agency Energy

View the file

Other files for this federal contract opportunity

Other files attached to SPE60520R0230 - Fuel Support for Europe, newest first.
File Type Posted
Amendment 0007.pdf PDF
Award Table 0001-0013.pdf PDF
Amendment 0006.pdf PDF
Amendment 0005.pdf PDF
Amendment 0004.pdf PDF
ENERGY QAP C16.64-1 JP8 (OCT 2018).pdf PDF
Amendment 0003.pdf PDF
Awardee Table.pdf PDF
Amendment 0002.pdf PDF
SPE60520R0230 00002.pdf PDF
ENERGY QAP C16.18-2 DF2 (NOV 2018).pdf PDF
Amendment 0001.pdf PDF
Award Table with list of Awardee.xlsx XLSX spreadsheet
SF1449 SPE60520R0230.pdf PDF
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEFENSE LOGISTICS AGENCY ENERGY Page 1 of 1

8725 JOHN J. KINGMAN ROAD

FORT BELVOIR, VIRGINIA 22060-6222

Signature

Prepared by:

Quality/Technical Support Office Approval

Contracting Approval:

DISTRIBUTION STATEMENT – A: APPROVED FOR PUBLIC RELEASE. DISTRIBUTION IS UNLIMITED

C16.67-2 DIESEL FUEL SPECIFICATION (SFD) (PC&S) (EUROPE) (MIDDLE EAST) (DLA ENERGY NOV 2018)

NATIONAL STOCK NUMBER PRODUCT NOMENCLATURE DLA ENERGY PRODUCT CODE

9140-01-556-9156 Diesel Fuel SFD

Supplies delivered under this contract shall conform to all National environmental requirements applicable to the geographic location of the receiving activity on the date of delivery. The list of such requirements contained in this contract is not intended to be a complete list and the Contractor shall be responsible for determining the existence of all such requirements. In the event that a National environmental requirement is more stringent than a specification contained in this contract, the Contractor shall deliver product that complies with the more stringent requirement. Product that fails to meet the more stringent requirement will be considered a nonconforming supply. Product(s) supplied shall fully meet the requirements of the applicable specification(s) as cited below.

Product shall conform to the latest revision of commercial specification EN 590. Product shall be visually free of undissolved water, sediment, and suspended matter. Product classification is shown above. Maximum sulfur content, as stated in EN 590, is 10 mg/kg (0.0010 wt%).

a) FOR LOCATIONS IN KOSOVO:

(1) TESTING REQUIREMENTS: The following additional tests shall be performed and results reported:

i. Color: ISO 2049/ASTM D1500

ii. Acid Number: ISO 6618/ASTM D974

(2) In addition to the EN 590 specification requirement for water content of 200 mg/kg or ppm (0.0200 wt%) maximum, and particulate content of 24 mg/kg or ppm (0.0024 wt%) maximum, the diesel fuel shall have a maximum haze rating of 2 when tested in accordance with ASTM D4176, Procedure 2. In case of dispute, the haze rating shall be determined at 25 °C (77 °F) with a maximum haze rating of 2 and shall contain no more than 24 mg/kg (0.0024 wt%) sediment and no more than 200 mg/kg (0.0200 wt%) water.

(3) Diesel during the summer months, May 1st to September 30th, shall comply with Grade A of Table 2 in EN 590.

(4) Diesel during winter months, October 1 to April 30th, shall comply with the Class 1 limits set in Table 3 of EN 590.

b) FOR LOCATIONS IN AFGHANISTAN: Diesel fuel delivered to all locations in Afghanistan shall meet the Grade E, -

15°C maximum cold filter plugging point, as detailed in EN 590 Section 5.6.1, Table 2 – Climate Related Requirements and Test Methods – Temperate Climates.

c) FOR ALL LOCATIONS: Written exception(s) or deviation(s) must be submitted to DLA Energy contracting officer if the Contractor is unable to meet any of the characteristic requirements of the above listed specification(s). Exception(s) and/or deviation(s) must state the reason why the contractor is unable to meet requirements, if this will be for the entirety of the performance period, if it is source specific, the Contractor’s course of action on how they plan on resolving this issue, and any proposed changes to specification requirement limit(s) for that product.

2018-11-16T10:10:12-0500
ATKINS.RENRICK.L.1024389320
2018-11-16T10:25:11-0500
BANISZEWSKI.DANIEL.J.1287388698
2018-11-16T21:11:17-0500
PETERSON.DAVID.W.1074069483

File details come from the government source that posted it. Updated .