SF1449 SPE60520R0230.pdf
PDF 4 MB Posted
- Attached to
- SPE60520R0230 - Fuel Support for Europe Federal contract opportunity
- Solicitation number
- SPE605-20-R-0230
- Issued by
- Defense Logistics Agency Energy
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 0007.pdf | ||
| Award Table 0001-0013.pdf | ||
| Amendment 0006.pdf | ||
| Amendment 0005.pdf | ||
| Amendment 0004.pdf | ||
| ENERGY QAP C16.64-1 JP8 (OCT 2018).pdf | ||
| Amendment 0003.pdf | ||
| ENERGY QAP C16.67-2 SFD (NOV 2018).pdf | ||
| Awardee Table.pdf | ||
| Amendment 0002.pdf | ||
| SPE60520R0230 00002.pdf | ||
| ENERGY QAP C16.18-2 DF2 (NOV 2018).pdf | ||
| Amendment 0001.pdf | ||
| Award Table with list of Awardee.xlsx | XLSX spreadsheet |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
1. REQUISITION NUMBER PAGE 1 OF
2. CONTRACT NO. 3. AWARD/EFFECTIVE 4. ORDER NUMBER 5. SOLICITATION NUMBER 6. SOLICITATION ISSUE
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME b. TELEPHONE NUMBER (No collect calls)
8. OFFER DUE DATE/
9. ISSUED BY
13b. RATING
14. METHOD OF SOLICITATION
CODE
15. DELIVER TO 16. ADMINISTERED BY CODE
18a. PAYMENT WILL BE MADE BY CODE17a. CONTRACTOR/
OFFEROR
CODE
FACILITY
CODE
CODE
TELEPHONE NO.
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN
OFFER
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK
BELOW IS CHECKED
RFQ IFB RFP
SEE ADDENDUM
19.
ITEM NO.
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
(Use Reverse and/or Attach Additional Sheets as Necessary)
25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Govt. Use Only)
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED
29. AWARD OF CONTRACT: REF. OFFER
DATED . . YOUR OFFER ON SOLICITATION
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR
30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED
31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
31b. NAME OF CONTRACTING OFFICER (Type or print) 31c. DATE SIGNED
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA - FAR (48 CFR) 53.212
10. THIS ACQUISITION IS UNRESTRICTED OR
NAICS:
SIZE STANDARD:
13a. THIS CONTRACT IS A
RATED ORDER UNDER
DPAS (15 CFR 700)
SET ASIDE: % FOR:
11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
12. DISCOUNT TERMS
ARE ARE NOT ATTACHED
ARE ARE NOT ATTACHED
27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA
8 (A)
EDWOSB
WOMEN-OWNED SMALL BUSINESS
(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
HUBZONE SMALL
BUSINESS
SMALL BUSINESS
SPE605-20-R-0230
Mark Davis 571-767-0341
SPE605
SAME AS BLOCK 9
SEE SCHEDULE WITHIN SOLICITATION
324110
DATE
05/29/20
DATE
2020 APR 24
LOCAL TIME
2020 MAY 08
3:00 PM EST
DLA ENERGY
ATTN: FEPCA ROOM 3928
8725 JOHN J. KINGMAN STE 4950
FORT BELVOIR VA 22060-6222
P.P. 3.22
DO-C9
0084347366
STANDARD FORM 1449 (REV. 2/2012) BACK
19.
ITEM NO.
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
40. PAID BY
32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f. TELPHONE NUMBER OF AUTHORZED GOVERNMENT REPRESENTATIVE
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
33. SHIP NUMBER 34. VOUCHER NUMBER 35. AMOUNT VERIFIED
CORRECT FOR
PARTIAL FINAL
37. CHECK NUMBER
38. S/R ACCOUNT NO. 39. S/R VOUCHER NUMBER
36. PAYMENT
COMPLETE PARTIAL FINAL
SEE SCHEDULE WITHIN SOLICITATION
SPE605-20-R-0230
PP1.6W – Sea Breeze
SPECIAL INSTRUCTIONS FOR OFFERORS
a) This RFP is being issued in accordance with FAR Subpart 12, Acquisition of Commercial Items, and FAR Subpart 13.5, Simplified Procedures for Certain Commercial Items.
b) This acquisition has not been set-aside for small businesses and is issued under Full and Open Competition in accordance with FAR 6.1. The NAICS code is 324110.
c) Solicitation Number SPE605-20-R-0230 is issued as a Request for Proposals (RFP).
d) The resulting award action will be the award of a fixed-price requirements type contract with economic price adjustment (EPA).
e) All line items included herein will be awarded to the Lowest Priced Technically Acceptable offer on a line item-by-line item basis.
f) The description, quantities, locations, delivery hours, equipment, etc. required for this solicitation are listed under Solicitation Clause B1.05-1 SUPPLIES TO BE FURNISHED (PC&S) (UKRAINE)
(DLA ENERGY AUG 1997).
g) ECONOMIC PRICE ADJUSTMENT AND BASE REFERENCE PRICE: Please refer to B19.02 ECONOMIC PRICE ADJUSTMENT (OVERSEAS) (DLA ENERGY JAN 2012). The base reference date is February 24, 2020. Offerors should use the publication listed for each line item schedule as the escalation reference for their offer prices.
CLOSING DATE (Clin(s):0001): May 08, 2020, 3:00PM, FORT BELVOIR, VA TIME.
CLOSING DATE: This is an open continuous solicitation with successive closing dates for DLA Energy Posts, Camps and Stations (PC&S) Purchase Program 1.6W. The first closing date is May 08, 2020, and is for the one Contract Line Items (CLINs) contained in this first closing. Solicitation No. SPE605-20-R-0230 has a performance period from July 07, 2020 through November 30, 2023. The offeror agrees to hold the prices in its offer firm for 180 calendar days from the date specified for receipt of offers. (Ref: FAR 52.212- 1(d)).
The Government anticipates receiving new requirements throughout the performance period. Therefore, solicitation SPE605-20-R-0230 will remain open until November 30, 2022, for any new CLINs to be solicited. As new requirements are received, the Government will issue amendment(s) to the solicitation, with new closing dates for the new requirements, and afford all offerors an opportunity to compete for the new CLINs.
PROPOSAL SUBMISSION: Offers shall be submitted by email to DLAEnergyFEPCA@dla.mil by the closing date and time listed above.
ORDERING PERIOD: The ordering period for all contracts awarded under this solicitation will be Date of Award through November 30, 2023. Quantities stated in the SCHEDULE represent the government’s best estimates covering this period.
mailto:DLAEnergyFEPCA@dla.mil
TAX AND FEE INFORMATION: Offerors are hereby notified that the United States is exempt from taxes in the countries for this requirement. Offerors shall not include taxes in their offer prices. Offerors are expected to know the relevant business procedures in the countries where fuel will be delivered. The winning offeror is expected to procure tax exemptions in a timely manner in order to meet the period of performance.
SUMMARY OF OFFER SUBMISSION REQUIREMENTS:
IN ADDITION TO MEETING THE OFFER SUBMISSION REQUIREMENTS OF FAR 52.212-1,
OFFERORS SHALL DO THE FOLLOWING:
1. Offerors must be registered in the following systems:
a. System for Award Management (SAM) at https://www.sam.gov,
b. Wide Area Work Flow (WAWF) at https://wawf.eb.mil/ (which includes MyInvoice)
c. DLA Internet Bid Board System (DIBBS) at https://www.dibbs.bsm.dla.mil
REGISTRATION IN THESE SYSTEMS IS REQUIRED BY THE OFFER SUBMISSION DUE DATE
AND TIME.
2. Offerors shall write/type in their proposed unit prices in Solicitation Clause B1.05-1 SUPPLIES TO BE FURNISHED (PC&S) (UKRAINE) (DLA ENERGY AUG 1997). Offer prices shall be expressed as a unit price ($) per U.S. gallon.
3. Offerors shall provide copies of their supplier commitment letters and transportation agreements with the offer for all unique; fuel types, suppliers, and transportation provider on all CLINs being solicited.
(a) Transportation Agreement - an agreement between offeror and the designated transportation company that will make final delivery to the site specified in the schedule (See Section B). There is no formal format outside of business letter head, date, and signatory authority (one authorized to represent the transportation company) of the Transportation company and Offeror. This piece of information also coincides with provision L117 in the solicitation. If the Offeror will be delivering its own fuel to a site please ensure to indicate as such under L117. However, if other than the Offeror will be making delivery of fuel please be sure to not only provide the stated agreement but also fill out L117.
(b) Letter of commitment - is between the Offeror and the refinery/terminal of which the fuel will be pulled/purchased from. There is no formal format outside of business letter head, date, and a commitment to have fuel available IF the Offeror were to receive award. Finally, on the same letter ensure to have applicable refinery/terminal signatory authority (one that can represent the company) and the Offeror’s signatory authority. Commitment letter shall match the refinery/terminal that provided the Certificate of Analysis or Certificate of Quality.
4. Offerors shall provide copies of certificates of analysis or certificates of quality for unique fuel types, and suppliers, for all CLINs being solicited. Certificate of Analysis or Certificate of Quality shall match the refinery/terminal that provided the Commitment letter
(a) Minimum requirements to consider COA/COQ ACCEPTABLE https://www.sam.gov/ http://www.dibbs.bsm.dla.mil/
(1) COA/COQ shall be from the most recent testing and be dated no more than 12 calendar months (preferably 6) from the closing date of solicitation.
(2) COA/COQ shall be in compliance with DFARS 252.225-7021 TRADE AGREEMENTS (SEP 2019).
5. Offerors shall submit a completed and signed Standard Form (SF) 1449, “Solicitation/Contract/Order for Commercial Items,” provided herein.
6. Offerors shall submit completed copies of the certifications and representations provided in Section K of the RFP, or affirmatively state in writing that all certifications and representations are electronically available on the System for Award Management website.
7. By submitting an offer, the offeror accepts the terms and conditions of the entire solicitation, and accepts that these terms and conditions are applicable to the offer unless exceptions are clearly stated within the offer.
8. If the offeror has any questions or concerns about this solicitation please submit by May 04, 2020 by 3:00 PM Eastern Standard time.
TABLE OF CONTENTS
SECTION B – SUPPLIES OR SERVICES AND PRICE/COST
B1.05-1 SUPPLIES TO BE FURNISHED (PC&S) (UKRAINE) (DLA ENERGY AUG 1997)
SCHEDULE
B19.02 ECONOMIC PRICE ADJUSTMENT (OVERSEAS) (DLA ENERGY JAN 2012)
SECTION C - DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
C1.02 ASSIST DATABASE OF SPECIFICATIONS (DLA ENERGY DEC 2016)
C16.09 TURBINE FUEL, AVIATION (JET A1) (DLA ENERGY OCT 2017)
SECTION D - PACKAGING AND MARKING
SECTION E - INSPECTION AND ACCEPTANCE
FAR 52.246-2 INSPECTION OF SUPPLIES -- FIXED-PRICE (AUG 1996)
E1.21 CONTRACTOR INSPECTION RESPONSIBILITIES (JET A/A-1) (BULK/PC&S) (DLA ENERGY FEB 2014)
E12 POINT OF ACCEPTANCE (DLA ENERGY JUL 2015)
E18.01 SAMPLE SUBMISSION (DLA ENERGY AUG 2009)
E21.01 POINT OF INSPECTION (DLA ENERGY JUN 2015)
E22 LIST OF INSPECTION OFFICES FOR DLA ENERGY CONTRACTS (DLA ENERGY APR 2016)
E35 NONCONFORMING SUPPLIES AND SERVICES (DLA ENERGY DEC 2011)
E37 SOURCE RESTRICTION AND SOURCE INSPECTION (PC&S) (DLA ENERGY DEC 2011)
E40.01 MATERIAL INSPECTION AND RECEIVING REPORT (MIRR)/WIDE AREA WORKFLOW (WAWF) ENERGY RECEIVING REPORT (ERR) (BULK FUEL/DIRECT DELIVERY AVIATION FUEL) (DLA ENERGY JUL 2014)
SECTION F - DELIVERIES OR PERFORMANCE
FAR 52.211-16 VARIATION IN QUANTITY (APR 1984)
FAR 52.247-34 F.O.B. – DESTINATION (NOV 1991)
F1.01-1 DELIVERY CONDITIONS FOR TRANSPORT TRUCKS, TRUCKS AND TRAILERS, AND TANK WAGONS (DLA
ENERGY JAN 2012)
F1.09-2 DETERMINATION OF INVOICE QUANTITY (PC&S) (DLA ENERGY JAN 2012)
F1.11 DLA INTERNET BID BOARD SYSTEM (DIBBS) (DLA ENERGY APR 2014)
F1.31 DELIVERY CONDITIONS (PC&S) (UKRAINE) (DLA ENERGY FEB 1995)
F3 TRANSPORT TRUCK AND/OR TRUCK AND TRAILER FREE TIME AND DETENTION RATES (PC&S) (DLA ENERGY
AUG 2005) 21
F3.03 NOTIFICATION OF CHANGE IN TRANSPORTATION COMPANY (PC&S) (DLA ENERGY APR 2005)
F4 DELIVERY AND ORDERING PERIODS (DLA ENERGY JUN 2002)
F51 SHIPMENT AND ROUTING (OVERSEAS) (DLA ENERGY NOV 2005)
F98 DELIVERY CONDITIONS FOR ALL GRADES OF MOTOR GASOLINE AND AVIATION FUELS (DLA ENERGY OCT 1992) 23
SECTION G - CONTRACT ADMINISTRATION DATA
DFARS 252.232-7003 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS AND RECEIVING REPORTS (DEC 2018)
DFARS 252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)
G3 INVOICE NUMBERING REQUIREMENTS (DLA ENERGY AUG 1998)
G9.07-5 ELECTRONIC TRANSFER OF FUNDS PAYMENTS – FEDERAL RESERVE WIRE TRANSFER SYSTEM (DLA
ENERGY JAN 2012)
G150.07-2 SUBMISSION OF INVOICES FOR PAYMENT (OVERSEAS PC&S) (DLA ENERGY JAN 2012)
SECTION H - SPECIAL CONTRACT REQUIREMENTS
SECTION I - CONTRACT CLAUSES
FAR 52.203-3 GRATUITIES (APR 1984) (INCORPORATED BY REFERENCE (IBR))
FAR 52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE (OCT 2018)
FAR 52.204-18 COMMERCIAL AND GOVERNMENT ENTITY CODE MAINTENANCE (JUL 2016)
FAR 52.204-21 – BASIC SAFEGUARDING OF COVERED CONTRACTOR INFORMATION SYSTEMS (JUN 2016)
FAR 52.212-4 CONTRACT TERMS AND CONDITIONS-COMMERCIAL ITEMS (OCT 2018)
FAR 52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR EXECUTIVE ORDERS --
COMMERCIAL ITEMS (MAR 2020)
FAR 52.214-34 -- SUBMISSION OF OFFERS IN THE ENGLISH LANGUAGE (APR 1991)
FAR 52.214-35 -- SUBMISSION OF OFFERS IN U.S. CURRENCY (APR 1991)
FAR 52.215-8 ORDER OF PRECEDENCE – UNIFORM CONTRACT FORMAT (OCT 1997)
FAR 52.216-21 REQUIREMENTS (OCT 1995)
FAR 52.229-6 TAXES-FOREIGN FIXED-PRICE CONTRACTS (FEB 2013)
FAR 52.232-17 INTEREST (MAY 2014)
FAR 52.232-40 PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS SUBCONTRACTORS (DEC 2013) (IBR) ... 55
FAR 52.242-13 BANKRUPTCY (JUL 1995) (IBR)
FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
FAR 52.253-1 COMPUTER GENERATED FORMS (JAN 1991)
DFARS 252.203-7000 REQUIREMENTS RELATING TO COMPENSATION OF FORMER DOD OFFICIALS (SEP 2011) (IBR)
DFARS 252.204-7012 SAFEGUARDING COVERED DEFENSE INFORMATION AND CYBER INCIDENT REPORTING (OCT
2016) (IBR) 56
DFARS 252.205-7000 PROVISION OF INFORMATION TO COOPERATIVE AGREEMENT HOLDERS (DEC 1991) DFARS 252.209-7004 SUBCONTRACTING WITH FIRMS THAT ARE OWNED OR CONTROLLED BY THE GOVERNMENT
OF A COUNTRY THAT IS A STATE SPONSOR OF TERRORISM (MAY 2019)
DFARS 252.211-7003 ITEM UNIQUE IDENTIFICATION AND VALUATION (MAR 2016)
DFARS 252.216-7006 ORDERING (SEP 2019)
DFARS 252.225-7012 PREFERENCE FOR CERTAIN DOMESTIC COMMODITIES (DEC 2017)
DFARS 252.225-7021 TRADE AGREEMENTS - BASIC (SEP 2019)
DFARS 252.225-7041 CORRESPONDENCE IN ENGLISH (JUN 1997)
DFARS 252.225-7043 ANTITERRORISM/FORCE PROTECTION FOR DEFENSE CONTRACTORS OUTSIDE THE UNITED
STATES (JUN 2015)
DFARS 252.229-7000 INVOICES EXCLUSIVE OF TAXES OR DUTIES (JUN 1997)
DFARS 252.229-7001 TAX RELIEF-BASIC (SEP 2014)
DFARS 252.232-7008 ASSIGNMENT OF CLAIMS (OVERSEAS) (JUN 1997)
DFARS 252.232-7010 LEVIES ON CONTRACT PAYMENTS (DEC 2006) (IBR)
DFARS 252.233-7001 CHOICE OF LAW (OVERSEAS) (JUN 1997)
DFARS 252.243-7001 PRICING OF CONTRACT MODIFICATIONS (DEC 1991)
DFARS 252.243-7002 REQUESTS FOR EQUITABLE ADJUSTMENT (DEC 2012) (IBR)
DFARS 252.244-7000 SUBCONTRACTS FOR COMMERCIAL ITEMS AND COMMERCIAL COMPONENTS (DOD
CONTRACTS) (JUN 2013) (IBR)
DFARS 252.247-7023 TRANSPORTATION OF SUPPLIES BY SEA (FEB 2019)
DLAD 52.233-9001 DISPUTES – AGREEMENT TO USE ALTERNATIVE DISPUTE RESOLUTION (ADR) (DEC 2016)
I1.01 DEFINITIONS (DLA ENERGY JUN 2009)
I11.01-2 ADMINISTRATIVE COST OF TERMINATION FOR CAUSE – COMMERCIAL ITEMS (DLA ENERGY FEB 1996)
I28.01 FEDERAL, STATE, AND LOCAL TAXES (DLA ENERGY NOV 2011) (DEVIATION)
I28.02-2 FEDERAL, STATE, AND LOCAL TAXES AND FEES (DLA ENERGY DEC 19)
I28.03-1 TAX EXEMPTION CERTIFICATES (DLA ENERGY AUG 2003)
I86.06 DELIVERY-ORDER LIMITATIONS (OVERSEAS PC&S) (DLA ENERGY AUG 1990)
I186 PROTECTION OF GOVERNMENT PROPERTY AND SPILL PREVENTION (DLA ENERGY FEB 2009)
I209.09 EXTENSION PROVISIONS (DLA ENERGY JAN 2012)
SECTION J – LIST OF ATTACHMENTS
SECTION K - REPRESENTATIONS, CERTIFICATIONS AND STATEMENTS
FAR 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018)
FAR 52.212-3 OFFEROR REPRESENTATIONS AND CERTIFICATIONS -- COMMERCIAL ITEMS (MAR 2020) FAR 52.222-56 CERTIFICATION REGARDING TRAFFICKING IN PERSONS COMPLIANCE PLAN (MAR 2015)
FAR 52.229-6 TAXES-FOREIGN FIXED-PRICE CONTRACTS (FEB 2013)
DFARS 252.203-7005 REPRESENTATION RELATING TO COMPENSATION OF FORMER DOD OFFICIALS (NOV 2011) DFARS 252.204-7016 COVERED DEFENSE TELECOMMUNICATIONS EQUIPMENT OR SERVICES—REPRESENTATION
(DEC 2019)
DFARS 252.204-7017 PROHIBITION ON THE ACQUISITION OF COVERED DEFENSE TELECOMMUNICATIONS
EQUIPMENT OR SERVICES—REPRESENTATION (DEC 2019)
DFARS 252.225-7050 DISCLOSURE OF OWNERSHIP OR CONTROL BY THE GOVERNMENT OF A COUNTRY THAT IS A
STATE SPONSOR OF TERRORISM (DEC 2018)
DFARS 252.225-7974 REPRESENTATION REGARDING BUSINESS OPERATIONS WITH THE MADURO REGIME
(DEVIATION 2020-O0005) (FEB 2020)
DFARS 252.247-7022 REPRESENTAITON OF EXTENT OF TRANSPORTATION BY SEA (JUN 2019)
K15 RELEASE OF PRICES (DLA ENERGY MAR 2009)
K33.01 AUTHORIZED NEGOTIATORS (DLA ENERGY APR 2007)
K86 FOREIGN TAXES (DLA ENERGY NOV 2014)
K150 WIDE AREA WORKFLOW (WAWF) SUPPLEMENTAL INVOICE SUBMISSION (DLA ENERGY MAY 2014)
SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS
FAR 52.204-7 SYSTEM FOR AWARD MANAGEMENT (OCT 2018)
FAR 52.212-1 INSTRUCTIONS TO OFFERORS-COMMERCIAL ITEMS (MAR 2020)
FAR52.216-1 TYPE OF CONTRACT (APR 1984)
FAR 52.233-2 SERVICE OF PROTEST (SEP 2006)
FAR 52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (APR 1984)
DFARS 252.204-7008 COMPLIANCE WITH SAFEGUARDING COVERED DEFENSE INFORMATION CONTROLS (OCT 2016)
DFARS 252.215-7008 ONLY ONE OFFER (JUL 2019)
DLAD L06 AGENCY PROTESTS (DEC 2016)
L1.02 PROPOSAL ACCEPTANCE PERIOD (DLA ENERGY NOV 1991)
L2.11-4 E-MAIL PROPOSALS (DLA ENERGY OCT 2010)
L54 SITE VISIT (DLA ENERGY OCT 1992)
L117 NOTIFICATION OF TRANSPORTATION COMPANY TO BE UTILIZED IN THE DELIVERY OF PRODUCT (PC&S) (DLA
ENERGY JAN 2012)
SECTION M - EVALUATION FACTORS FOR AWARD
FAR 52.212-2 EVALUATION - COMMERCIAL ITEMS (OCT 2014)
M55 CONVERSION FACTORS (DLA ENERGY MAR 2007)
M72 EVALUATION OF OFFERS (EXCEPTIONS/DEVIATIONS) (DLA ENERGY APR 1997)
SECTION B – SUPPLIES OR SERVICES AND PRICE/COST
B1.05-1 SUPPLIES TO BE FURNISHED (PC&S) (UKRAINE) (DLA ENERGY AUG 1997)
The supplies to be furnished during the period specified in the REQUIREMENTS clause, the delivery points, methods of delivery, and estimated quantities are shown below. The quantities shown are best estimates of required quantities only. Unless otherwise specified, the total quantity ordered and required to be delivered may be greater than or less than such quantities. The Government agrees to order from the Contractor and the Contractor shall, if ordered, deliver during the contract period all items awarded under this contract. This is a firm-fixed-price requirements-type contract. The prices paid under this contract will be firm-fixed price as stated in the Schedule listed below:
SCHEDULE
LINE
ITEM
NSN /
Product Description
COUNTRY DELIVERY POINT DELIVERY
MODE
QUANTITY
(gallon)
0001 9130-00-753-5026 JET
FUEL, AVIATION (JA1) Ukraine
Kulbakine (MYKOLAIV) - Military Airport
GPS 46.9369726, 32.0647768
Mykolaiv, Ukraine
Tank Truck with Pump and
Meter
634,016
ITEM PRODUCT TOTAL ESTIMATED UNIT PRICE PER GALLON
QTY (USG)
0001 JA1 634,016 USG $_________________________
Product: (JA1) JET FUEL, AVIATION NSN: 9130-00-753-5026
Period of Performance: 07/07/2020-11/30/2023 Escalator: PLWFMEDCRG-Platts Jet FOB Med Cargo (AAIDL00) Prior Week Average (Updated Monday)
Base-Ref: 2/24/20 Base-Price: $1.555173 NSN Delivery Identification State 9130-00-753-5026 CDXSEABREZ - Kulbakine (MYKOLAIV) - Military Airport MYKOLAI
JET FUEL, AVIATION (JA1)
Delivery Address: GPS 46.9369726, 32.0647768 MYKOLAIV 99999
Service Code Delivery DODAAC Ordering Office DODAAC
NAVY N00061 N00061
Mode : TANK TRUCK W/PUMP & METER
No. of Tanks Capacity Type Tank Location
1 2,500,000 BELOW GROUND TANK(S) SEE NARRATIVE
Delivery Hours: Monday-Sunday 0800-1700 (Central European Time)
Delivery Notes: Deliver into tank, this requirement will support the annual exercise executed in July each year.
The request per this exercise is 158,504 USG JA1. This TSW will support 2020-2023 and the iteration of the exercise totaling 634,016.
B19.02 ECONOMIC PRICE ADJUSTMENT (OVERSEAS) (DLA ENERGY JAN 2012)
(a) WARRANTIES. The Contractor warrants that--
(1) The unit prices set forth in the Schedule do not include allowances for any portion of the contingency covered by this contract provision; and
(2) The prices to be invoiced hereunder shall be computed in accordance with the provisions of this contract.
(b) DEFINITIONS. As used throughout this contract provision, the term--
(1) Award price means the unit price offered by the Contractor and set forth opposite the item in the Schedule.
(2) Reference price means the market price, this is either published in an independent publication or supplied by the Contractor, with which the award price is to fluctuate. The reference price should be a market price for the same or similar product(s) as the item being purchased.
(3) Date of delivery means--
(i) FOR TANKER OR BARGE DELIVERIES.
(A) F.O.B. ORIGIN. The date and time vessel commences loading;
(B) F.O.B. DESTINATION. The date and time vessel commences discharging;
(ii) FOR PIPELINE DELIVERIES. The date and time product commences to move past the specified f.o.b. point; and
(iii) FOR ALL OTHER TYPES OF DELIVERIES. The date product is received.
(c) ADJUSTMENTS. The prices payable under this contract shall be the award price increased or decreased by the amount, determined according to the following formula, that the reference price shall have increased or decreased, to and including the date of delivery.
(1) The amount of increase or decrease in the award price shall be based on the same number of cents, or fraction thereof, that the reference price increases or decreases per like unit of measure.
(2) The reference price with which the award price for the listed item is to fluctuate (and which is more fully defined in the Table below) is-
SEE PARAGRAPH K ENTITLED "TABLE" BELOW FOR DETAILS.
(3) COMMERCIAL. For price adjustments utilizing commercial publications such as Platts Oilgram, etc., the reference price in effect on the date of delivery shall be that item's reference price that is in effect for the dates in the Table below. If an effective date is not cited in a publication, then the date of Publication shall apply. An increase or decrease in any reference price published in a trade price service or in a commercial journal shall apply only to deliveries made on or after the effective date of such trade price service or commercial journal. In the event of a holiday for which an effective date is not used, the latest effective price(s) prior to the effective date shall be used.
NOTE: Platts issues corrections to its published prices on a regular basis. Platts posts corrections to its website (www.platts.com) for its subscribers. If a correction to a reference price is found on the Platts website, all of the items that use that reference price will be corrected. DLA Energy will correct any other reference prices, as notice of the correction is received. DLA Energy will work with the pricing services to determine the appropriate price, whenever an offeror or contractor can show that the price referenced should be reviewed.
(4) NONCOMMERCIAL (NOTIFICATION). For price adjustments utilizing a reference price indicator other than commercial publications such as Platts Oilgram, the Contractor shall notify the Contracting Officer of any changes in the reference price in writing within 15 calendar days from the date thereof.
(i) INCREASES. Any increase in unit price as a result of an increase in reference price shall apply only to deliveries made on or after the date of receipt by the Contracting Officer of a written notification from the Contractor of such increase. However, the prices payable under this contract shall in no event exceed the Contractor's posted or established selling price in effect on the date of delivery for the product supplied in the form of delivery made at the point of delivery.
Also, no notification incorporating an increase in a contract unit price shall be executed pursuant to this contract provision until the increase has been verified by the Contracting Officer.
(ii) DECREASES. If the Contractor fails to notify the Contracting Officer of any decrease in the reference price, within the allotted 15 day period, such decrease shall apply to all deliveries made on or after the effective date of such decrease. However, if any overpayment is made to the Contractor as a result of the Contractor's failure to give timely notice to the Contracting Officer of any decrease in the established price, the Contractor shall be charged interest on such overpayment from the date of the overpayment to the date of reimbursement by the Contractor for the overpayment in accordance with the Disputes paragraph of the CONTRACT TERMS AND CONDITIONS - COMMERCIAL ITEMS clause of this contract.
(5) Where the reference price is the Contractor's established price (see (c)(2)(iii) above), the Contractor warrants that the product selected is one for which, except for modification required by the specifications of this contract, the Contractor has an established price. Such price is the net price after applying any applicable standard trade discounts offered by the Contractor for its catalog, list, or schedule price. The Contractor further warrants that, as of the current date, any differences between the unit prices of the line items identified in the Schedule and the Contractor's established price for like quantities of the nearest commercial equivalents of such contract items are due to compliance with contract specifications and to compliance with any requirements that this contract may contain for preservation, packaging, and packing beyond standard commercial practice.
(d) MODIFICATIONS. Any resultant price changes shall be provided via notification through contract modifications and/or postings to the DLA Energy web page at http://www.desc.dla.mil under the heading Vendor Resources and then Product Price Adjustments.
(e) FAILURE TO DELIVER. Notwithstanding any other conditions of this contract provision, no upward adjustment shall apply to product scheduled under the contract to be delivered before the effective date of the adjustment, unless the Contractor's failure to deliver according to the delivery schedule results from causes beyond the Contractor's control and without its fault or negligence, within the meaning of the Excusable Delays and Termination for Cause paragraphs of the CONTRACT TERMS AND CONDITONS - COMMERCIAL ITEMS clause of the this contract in which case the contract shall be amended to make an equitable extension of the delivery schedule.
(f) UPWARD CEILING ON ECONOMIC PRICE ADJUSTMENT. The Contractor agrees that the total increase in any contract unit price pursuant to these economic price adjustment provisions shall not exceed 575 percent of the award price, except as provided hereafter:
(1) If at any time the Contractor has reason to believe that within the near future a price adjustment under the conditions of this contract provision will be required that will exceed the current contract ceiling price for any item, the Contractor shall promptly notify the Contracting Officer in writing of the expected increase. The notification shall include a revised ceiling the Contractor believes is sufficient to permit completion of remaining contract performance, along with appropriate explanation and documentation as required by the Contracting Officer.
(2) If an actual increase in the reference price would raise a contract unit price for an item above the current ceiling, the Contractor shall have no obligation under this contract to fill pending or future orders for such item, as of the effective date of the increase, unless the Contracting Officer issues a contract modification to raise the ceiling. If the contract ceiling will not be raised, the Contracting Officer shall so promptly notify the Contractor in writing.
(g) REVISION OF REFERENCE PRICE INDICATOR. In the event-
(1) Any applicable reference price is discontinued or its method of derivation is altered substantially;
(2) The reference price is an average of published or posted prices, and any one price ceases to be published or posted;
(3) The reference price is published in a trade price service or commercial journal and such publication ceases to publish said reference price or changes its method of quoting prices; or
(4) The Contracting Officer determines that the reference price consistently and substantially failed to reflect market conditions the parties shall mutually agree upon an appropriate and comparable substitute for determining the price adjustment described hereunder. The contract shall be modified to reflect such substitute effective on the date the indicator was discontinued, altered, or began to consistently and substantially fail to reflect market conditions. If the parties fail to agree on an appropriate substitute, the matter shall be resolved in accordance with the Disputes paragraph of the CONTRACT TERMS AND CONDITIONS - COMMERCIAL ITEMS clause of this contract.
(h) CONVERSION FACTORS. If this contract provision requires quantity conversion for economic price adjustment purposes, the conversion factors for applicable products, as specified in the CONVERSION FACTORS contract provision, apply unless otherwise specified in the Schedule.
(i) EXAMINATION OF RECORDS. The Contractor agrees that the Contracting Officer or designated representatives shall have the right to examine the Contractor's books, records, documents, or other data the Contracting Officer deems necessary to verify Contractor adherence to the provisions of this contract provision.
(j) FINAL INVOICE. The Contractor shall include a statement on the final invoice that the amounts invoiced hereunder have applied all decreases required by this contract provision.
(k) TABLE.
CLINS PRODUCT
CODE
ESCALATOR
NAME
ESCALATOR
ID
February 24, 2020
BASE
REFERENCE
PRICE
CONVERSION
RATE
0001 JA1 Platts Jet FOB Med Cargo (AAIDL00)
Prior Week Average (Updated Monday)
PLWFMEDCRG $1.555173 328.42
NOTE: PRICES WILL ESCALATE ON A WEEKLY BASIS UPDATING MONDAYS.
THE LAST ELECTRONIC PUBLICATION PREVAILS.
SECTION C - DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
See Section J – List of Attachments for full text of Section C Quality Assurance
Provisions
C1.02 ASSIST DATABASE OF SPECIFICATIONS (DLA ENERGY DEC 2016)
C16.09 TURBINE FUEL, AVIATION (JET A1) (DLA ENERGY OCT 2017)
SECTION D - PACKAGING AND MARKING
NOT APPLICABLE
SECTION E - INSPECTION AND ACCEPTANCE
FAR 52.246-2 INSPECTION OF SUPPLIES -- FIXED-PRICE (AUG 1996)
(a) Definition. “Supplies,” as used in this clause, includes but is not limited to raw materials, components, intermediate assemblies, end products, and lots of supplies.
(b) The Contractor shall provide and maintain an inspection system acceptable to the Government covering supplies under this contract and shall tender to the Government for acceptance only supplies that have been inspected in accordance with the inspection system and have been found by the Contractor to be in conformity with contract requirements. As part of the system, the Contractor shall prepare records evidencing all inspections made under the system and the outcome. These records shall be kept complete and made available to the Government during contract performance and for as long afterwards as the contract requires. The Government may perform reviews and evaluations as reasonably necessary to ascertain compliance with this paragraph. These reviews and evaluations shall be conducted in a manner that will not unduly delay the contract work. The right of review, whether exercised or not, does not relieve the Contractor of the obligations under the contract.
(c) The Government has the right to inspect and test all supplies called for by the contract, to the extent practicable, at all places and times, including the period of manufacture, and in any event before acceptance. The
Government shall perform inspections and tests in a manner that will not unduly delay the work. The Government assumes no contractual obligation to perform any inspection and test for the benefit of the Contractor unless specifically set forth elsewhere in this contract.
(d) If the Government performs inspection or test on the premises of the Contractor or a subcontractor, the Contractor shall furnish, and shall require subcontractors to furnish, at no increase in contract price, all reasonable facilities and assistance for the safe and convenient performance of these duties. Except as otherwise provided in the contract, the Government shall bear the expense of Government inspections or tests made at other than the Contractor’s or subcontractor’s premises; provided, that in case of rejection, the Government shall not be liable for any reduction in the value of inspection or test samples.
(e)
(1) When supplies are not ready at the time specified by the Contractor for inspection or test, the Contracting Officer may charge to the Contractor the additional cost of inspection or test.
(2) The Contracting Officer may also charge the Contractor for any additional cost of inspection or test when prior rejection makes reinspection or retest necessary.
(f) The Government has the right either to reject or to require correction of nonconforming supplies. Supplies are nonconforming when they are defective in material or workmanship or are otherwise not in conformity with contract requirements. The Government may reject nonconforming supplies with or without disposition instructions.
(g) The Contractor shall remove supplies rejected or required to be corrected. However, the Contracting Officer may require or permit correction in place, promptly after notice, by and at the expense of the Contractor. The Contractor shall not tender for acceptance corrected or rejected supplies without disclosing the former rejection or requirement for correction, and, when required, shall disclose the corrective action taken.
(h) If the Contractor fails to promptly remove, replace, or correct rejected supplies that are required to be removed or to be replaced or corrected, the Government may either
(1) by contract or otherwise, remove, replace, or correct the supplies and charge the cost to the Contractor or
(2) terminate the contract for default.
Unless the Contractor corrects or replaces the supplies within the delivery schedule, the Contracting Officer may require their delivery and make an equitable price reduction. Failure to agree to a price reduction shall be a dispute.
(i)
(1) If this contract provides for the performance of Government quality assurance at source, and if requested by the Government, the Contractor shall furnish advance notification of the time --
(i) When Contractor inspection or tests will be performed in accordance with the terms and conditions of the contract; and
(ii) When the supplies will be ready for Government inspection.
(2) The Government’s request shall specify the period and method of the advance notification and the Government representative to whom it shall be furnished. Requests shall not require more than 2 workdays of advance notification if the Government representative is in residence in the Contractor’s plant, nor more than 7 workdays in other instances.
(j) The Government shall accept or reject supplies as promptly as practicable after delivery, unless otherwise provided in the contract. Government failure to inspect and accept or reject the supplies shall not relieve the Contractor from responsibility, nor impose liability on the Government, for nonconforming supplies.
(k) Inspections and tests by the Government do not relieve the Contractor of responsibility for defects or other failures to meet contract requirements discovered before acceptance. Acceptance shall be conclusive, except for latent defects, fraud, gross mistakes amounting to fraud, or as otherwise provided in the contract.
(l) If acceptance is not conclusive for any of the reasons in paragraph (k) hereof, the Government, in addition to any other rights and remedies provided by law, or under other provisions of this contract, shall have the right to require the Contractor
(1) at no increase in contract price, to correct or replace the defective or nonconforming supplies at the original point of delivery or at the Contractor’s plant at the Contracting Officer’s election, and in accordance with a reasonable delivery schedule as may be agreed upon between the Contractor and the Contracting Officer; provided, that the Contracting Officer may require a reduction in contract price if the Contractor fails to meet such delivery schedule, or
(2) within a reasonable time after receipt by the Contractor of notice of defects or nonconformance, to repay such portion of the contract as is equitable under the circumstances if the Contracting Officer elects not to require correction or replacement. When supplies are returned to the Contractor, the Contractor shall bear the transportation cost from the original point of delivery to the Contractor’s plant and return to the original point when that point is not the Contractor’s plant. If the Contractor fails to perform or act as required in (1) or (2) above and does not cure such failure within a period of 10 days (or such longer period as the Contracting Officer may authorize in writing) after receipt of notice from the Contracting Officer specifying such failure, the Government shall have the right by contract or otherwise to replace or correct such supplies and charge to the Contractor the cost occasioned the Government thereby.
See Section J – List of Attachments for full text of E Quality Assurance Provisions, listed below.
E1.21 CONTRACTOR INSPECTION RESPONSIBILITIES (JET A/A-1) (BULK/PC&S) (DLA
ENERGY FEB 2014)
E12 POINT OF ACCEPTANCE (DLA ENERGY JUL 2015)
E18.01 SAMPLE SUBMISSION (DLA ENERGY AUG 2009)
E21.01 POINT OF INSPECTION (DLA ENERGY JUN 2015)
E22 LIST OF INSPECTION OFFICES FOR DLA ENERGY CONTRACTS (DLA ENERGY
APR 2016)
E35 NONCONFORMING SUPPLIES AND SERVICES (DLA ENERGY DEC 2011)
E37 SOURCE RESTRICTION AND SOURCE INSPECTION (PC&S) (DLA ENERGY DEC
2011)
E40.01 MATERIAL INSPECTION AND RECEIVING REPORT (MIRR)/WIDE AREA
WORKFLOW (WAWF) ENERGY RECEIVING REPORT (ERR) (BULK FUEL/DIRECT DELIVERY
AVIATION FUEL) (DLA ENERGY JUL 2014)
SECTION F - DELIVERIES OR PERFORMANCE
FAR 52.211-16 VARIATION IN QUANTITY (APR 1984)
(a) A variation in the quantity of any item called for by this contract will not be accepted unless the variation has been caused by conditions of loading, shipping, or packing, or allowances in manufacturing processes, and then only to the extent, if any, specified in paragraph (b) of this clause.
(b) The permissible variation shall be limited to:
10 Percent increase 10 Percent decrease
This increase or decrease shall apply to each quantity specified in the delivery schedule.
FAR 52.247-34 F.O.B. – DESTINATION (NOV 1991)
(a) The term “f.o.b. destination,” as used in this clause, means --
(1) Free of expense to the Government, on board the carrier’s conveyance, at a specified delivery point where the consignee’s facility (plant, warehouse, store, lot, or other location to which shipment can be made) is located; and
(2) Supplies shall be delivered to the destination consignee’s wharf (if destination is a port city and supplies are for export), warehouse unloading platform, or receiving dock, at the expense of the Contractor. The Government shall not be liable for any delivery, storage, demurrage, accessorial, or other charges involved before the actual delivery (or “constructive placement” as defined in carrier tariffs) of the supplies to the destination, unless such charges are caused by an act or order of the Government acting in its contractual capacity. If rail carrier is used, supplies shall be delivered to the specified unloading platform of the consignee. If motor carrier (including “piggyback”) is used, supplies shall be delivered to truck tailgate at the unloading platform of the consignee, except when the supplies delivered meet the requirements of Item 568 of the National Motor Freight Classification for “heavy or bulky freight.” When supplies meeting the requirements of the referenced Item 568 are delivered, unloading (including movement to the tailgate) shall be performed by the consignee, with assistance from the truck driver, if requested. If the contractor uses rail carrier or freight forwarded for less than carload shipments, the contractor shall ensure that the carrier will furnish tailgate delivery, when required, if transfer to truck is required to complete delivery to consignee.
(b) The Contractor shall --
(1)
(i) Pack and mark the shipment to comply with contract specifications; or
(ii) In the absence of specifications, prepare the shipment in conformance with carrier requirements;
(2) Prepare and distribute commercial bills of lading;
(3) Deliver the shipment in good order and condition to the point of delivery specified in the contract;
(4) Be responsible for any loss of and/or damage to the goods occurring before receipt of the shipment by the consignee at the delivery point specified in the contract;
(5) Furnish a delivery schedule and designate the mode of delivering carrier; and
(6) Pay and bear all charges to the specified point of delivery.
F1.01-1 DELIVERY CONDITIONS FOR TRANSPORT TRUCKS, TRUCKS AND TRAILERS, AND
TANK WAGONS (DLA ENERGY JAN 2012)
IMPORTANT NOTE on EPA TESTING OF UNDERGROUND TANKS. If the "volumetric" method is used for annual EPA testing of underground tanks, the "topping off" of tanks for this test is outside the scope of DLA Energy requirements contracts.
(a) F.O.B. ORIGIN. On items calling for delivery at Contractor's refinery, terminal, or bulk plant f.o.b. transport truck, truck and trailer, or tank wagon—
(1) Supplies ordered hereunder shall be delivered, at Contractor's expense, into equipment specified in the Schedule.
(2) Unless otherwise specified in the Schedule, all deliveries shall be made on the day specified in the delivery order unless otherwise authorized by the receiving activity during normal working hours of such activity, provided that the Contractor shall have received the order at least 48 hours prior to the day so specified.
(b) F.O.B. DESTINATION. On items calling for delivery f.o.b. destination by means of transport truck, truck and trailer, or tank wagon--
(1) The Contractor shall not be required to deliver by transport truck or truck and trailer a quantity less than a full load nor into more than one storage tank, with the following exceptions:
(i) An order placed under an item of this contract calling for delivery by transport truck of motor gasoline, fuel oil, diesel fuel, or kerosene, or, if this procurement is for Central America only, jet fuel, may require delivery of a quantity as low as 5,200 gallons whenever the activity is restricted either by a tank capacity or by a directive from receiving a larger quantity; and
(ii) Where the Schedule provides for multiple drop deliveries, the Contractor may be required to deliver into more than one storage tank. Where truck and trailer is the method of delivery specified, the Contractor may, at its option, make delivery by transport truck. In the case of deliveries in Alaska, where truck and trailer or transport truck is the method of delivery specified, the Contractor may, at its option, make delivery by tank wagon.
(2) Unless otherwise specified in the Schedule, all deliveries shall be made on the day specified in the delivery order unless otherwise authorized by the receiving activity during normal working hours of such activity, provided that the Contractor shall have received the order at least 48 hours prior to the day so specified.
(3) The Contractor shall not be required to deliver by tank wagon a quantity of less than 575 liters (or 150 gallons) but, at the Government's option, may be required to deliver into more than one storage tank.
(4) When delivery is made by tank wagon, such wagon shall be equipped with pump, meter, and a minimum of 100 feet (30 meters) of hose. Where delivery is made by transport truck or truck and trailer, such delivery equipment shall be equipped with a minimum of 15 feet of hose.
(5) When delivery is made by tank wagon, transport truck, or truck and trailer to a Government facility, the Contractor shall present delivery equipment and product in such condition at destination so as to permit complete off-loading within the prescribed free time.
(6) Unless otherwise provided in the Schedule, free time for unloading trucks, transport trucks, or trucks and trailers shall be unlimited.
(7) When delivery is made by tank wagon, transport truck, or truck and trailer to a Government facility—
(i) The Contractor shall provide properly maintained delivery equipment and properly trained delivery personnel to reasonably assure that delivery can be made without damage to vegetation and asphalt pavement adjacent to storage facilities being filled. The Contractor’s delivery personnel who have not exercised reasonable care and delivery equipment that is poorly maintained may be refused entrance to the installation by the installation Commander.
(ii) The Contractor shall present delivery equipment and product in such condition at destination so as to permit complete off-loading within the prescribed free time.
F1.09-2 DETERMINATION OF INVOICE QUANTITY (PC&S) (DLA ENERGY JAN 2012)
(a) QUANTITY. The quantity of supplies furnished under this contract shall be determined as follows:
(1) F.O.B. DESTINATION.
(i) DELIVERIES BY TANKER OR BARGE.
(A) On items requiring delivery on an f.o.b. destination basis by tanker or barge, the quantity shall be determined on the basis of--
(1) Calibrated meters on the receiving tank system; or
(2) Receiving tank measurements.
(B) All quantities shall be converted to net gallons at 60 degrees Fahrenheit (or liters at 15 degrees Celsius).
(ii) DELIVERIES BY RAIL TANK CAR.
(A) On items requiring delivery on an f.o.b. destination basis by rail tank car, the quantity of supplies furnished under this contract shall be determined (at the Government’s option) on the basis of--
(1) Calibrated meter on the receiving tank system;
(2) Weigh, using calibrated scales at the receiving location; or
(3) Receiving tank measurements.
(B) All quantities shall be converted to net gallons at 60 degrees Fahrenheit (or liters at 15 degrees Celsius).
(iii) DELIVERIES BY TANK TRUCK/TRUCK AND TRAILER/TANK WAGON.
(A) If the narrative requires a tank wagon (which is always equipped with a meter), that meter shall be used to determine quantity at time of delivery. The quantity shall be read directly from the meter. On items requiring delivery on a f.o.b. destination basis by tank truck or truck and trailer, quantity shall be determined in the following order of preference:
(1) Calibrated meter on the receiving tank system
(2) Calibrated meter on the conveyance
(3) Weight using calibrated scales at the receiving location.
(4) Loading rack meter ticket. The ticket must be generated at the time of loading and be based on a calibrated loading rack meter. The loading rack ticket shall be mechanically annotated with the gross and net gallons (or gross and net liters), the observed and corrected API gravity (or density), and the temperature at which the product was measured.
(5) Receipt tank measurements (as identified in the Schedule).
(B) All quantities, other than delivery by tank wagon, shall be converted, either mechanically or manually, to net gallons at 60 degrees Fahrenheit (or liters at 15 degrees Celsius).
(C) If a loading rack meter ticket is used to determine quantity for a biodiesel blend, the quantity shall be converted to net (volume corrected) gallons at 60 degrees Fahrenheit (or liters at 15 degrees Celsius). The Contractor shall prepare separate loading rack meter tickets for the diesel portion and for the biodiesel blend stock B100 (the industry designation for pure biodiesel), hereinafter referred to as the B100 portion of the load. The B100 loading rack meter shall be recorded at gross (ambient) temperature when the loading meter is not capable of providing a net (volume corrected) quantity. The total shall be the sum of the net diesel and gross B100. When the B100 loading rack meters are capable of providing a net (volume corrected) quantity, the total receipt quantity shall be the sum of the net diesel and the net B100.
(2) F.O.B. ORIGIN. All quantities shall be converted to net gallons at 60 degrees Fahrenheit (or liters at 15 degrees Celsius).
(i) DELIVERIES INTO TANKER OR BARGE. On items requiring delivery at the Contractor's refinery, terminal, or bulk plant on an f.o.b. origin basis into a tanker or barge, the quantity shall be determined (at the Contractor's option) on the basis of--
(A) Calibrated meter; or
(B) Shipping/shore tank measurement.
(ii) DELIVERIES INTO RAIL TANK CAR. On items requiring delivery at the Contractor’s refinery, terminal, or bulk plant on an f.o.b. origin basis, the quantity shall be determined (at the Contractor’s option) on the basis of--
(A) Certified loading rack meter;
(B) Weight, using calibrated scales; or
(C) Certified capacity tables for the rail tank car.
(iii) DELIVERIES BY TANK TRUCK/TRUCK AND TRAILER/TANK WAGON.
(A) On items requiring delivery at the Contractor's refinery, terminal, or bulk plant on an f.o.b.
origin basis, the quantity shall be determined (at the Contractor's option) on the basis of--
(1) Calibrated loading rack meter;
(2) Weight, using calibrated scales; or
(3) Certified capacity tables of the conveyance loaded.
(B) WATER BOTTOMS.
(1) Every delivery must be free of all water bottoms prior to discharge; and
(2) The Contractor is responsible for their removal and disposal.
(b) MEASUREMENT RESTRICTIONS. All methods of measurements described in this contract provision are subject to government safety and environmental restrictions, foreign or domestic.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .