Att IV - Schedule Pages (amend 07) -Rev TW.pdf

PDF 1 MB Posted

Attached to
SPE604-24-R-0403 DLA Energy - Direct Supply Natural Gas South Region
Solicitation number
SPE604-24-R-0403
Issued by

About this file

This document is a Schedule Page (Attachment IV) detailing natural gas requirements for multiple Department of Defense and federal civilian installations across the southern United States. The solicitation (SPE604-24-R-0403) covers direct supply natural gas for 45 different installations in Arkansas, Florida, Louisiana, Mississippi, North Carolina, Oklahoma, South Carolina, Georgia, Tennessee, and Texas, with a 24-month performance period beginning June 1, 2025 (with a slightly different start date for Fort Jackson on April 1, 2025).

The total estimated gas volume is approximately 16,745,091 dekatherms, with individual installation requirements ranging from as low as 1,582 dekatherms (Harry Milton Kandell USARC) to as high as 2,616,000 dekatherms (Federal Corrections Complex Butner). The contract will be a fixed-price agreement with economic price adjustment, utilizing various pricing indices including Gas Daily Price Guide for different pipeline zones. Installations will be served by multiple local distribution companies such as Atlanta Gas Light, Centerpoint Energy, Dominion Energy, and others. Offers are due by 3:00 p.m. Eastern Daylight Time on September 5, 2024, with questions accepted via email by August 16, 2024. The solicitation is being issued by the Defense Logistics Agency Energy.

View the file

Other files

File Type Posted
SPE60424R0403 Award Synopsis.pdf PDF
SPE604-24-R-0403 Amend 0007.pdf PDF
Att IV - Schedule Pages (amend 06).pdf PDF
SPE604-24-R-0403 Amend 0006.PDF PDF
SPE604-24-R-0403 Amend 0005.pdf PDF
Att I - Area of Supply Interest Tech Compliance (Amend 05) Rev.pdf PDF
Att IV - Schedule Pages (Amend 05) -Rev.pdf PDF
SPE604-24-R-0403 Amend 0004.PDF PDF
SPE604-23-R-0403 Amendment 0003.PDF PDF
SPE604-23-R-0403 Amendment 0002.PDF PDF
QA Att 6 - 0043 Moody AFB (AB) Consumption.xlsx XLSX spreadsheet
QA Att 5 - 0042 Ft Eisenhower Consumption.xlsx XLSX spreadsheet
QA Att 4 - 0024-03 Shaw AFB Consumption.xlsx XLSX spreadsheet
QA Att 1 - Florida Locations Consumption.xlsx XLSX spreadsheet
QA Att 2 - 0024-01 Ft. Jackson Consumption.xlsx XLSX spreadsheet
QA Att 3 - 0024-02 JB Chareston (AB) Consumption.xlsx XLSX spreadsheet
Questions and Answers for SPE604-24-R-0403.pdf PDF
SPE604-24-R-0403 Amendment 0001.PDF PDF
Att I Area of Supply Interest Tech Compliance (Amend 01).pdf PDF
Att IV Schedule Pages (Amend 01).pdf PDF
Attachment I - Area of Supply Interest and Tech Compliance.pdf PDF
RFP SPE604-24-R-0403.pdf PDF
Attachment II - Past Performance Information- Experience with End Users.pdf PDF
Attachment V - Reps and Certs.pdf PDF
Attachment III - Small Business SubK Plan.pdf PDF
Attachment IV - Schedule Pages.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Line Item Installation

Address

City State

Zip

Summit Utilities

218,440 108,740 109,700

Location

58,160 37,070 21,090 Jun Jul Aug Sep Oct Nov Dec

6,950 7,040 7,380 7,520 8,180 9,770 11,320

109,220 54,370 54,850 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

12,160 11,010 10,590 9,210 8,090 6,950 7,040 7,380 7,520 8,180 9,770 11,320

51,060 17,300 33,760 Jan Feb Mar Apr May

12,160 11,010 10,590 9,210 8,090

Curtailment Days Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

0 0 0 0 0 0 0 0 0 0 0 0

Overage & Shortage Volume Pricing Publication Location Methodology Include Adj. Factor

Overage Treatment Summer Volumes Yes

Winter Volumes Yes Shortage Treatment

Summer Volumes Yes Winter Volumes Yes

Note #1

Note #2 Note #3 Note #4

Schedule Page By Line Item Detail

John L McClellan Memorial Hospital Installation Address

0001-01 John L McClellan Memorial Hospital DODAAC/

FEDAAC:4300 W. 7th St.

Little Rock

AR

72205-0000

Delivery Point Telemetered Rate Class City Gate Yes LCS-1 TSO

Utility Account Information LDC or Pipeline

Total Contract Total Summer (Dths) Total Winter (Dths)

No None 0% Alternate Fuel Type Percent Load Limits on Use Notes

Year 2026 Annual Totals Summer Totals Winter Totals

Year 2027 Annual Totals Summer Totals Winter Totals

Estimated Usage Information (All volumes expressed in Dths)

City Gate

Year 2025 Annual Totals Summer Totals Winter Totals

06/01/25 05/31/27 INSIDE FERC'S Enable Gas, East (3) Monthly Order Firm

Solicitation Parameters

Period Beginning Period Ending Publication SIP Delivery Option Delivery Type

GAS DAILY PRICE GUIDE Enable Gas, East Simple Average 1-EOM GAS DAILY PRICE GUIDE Enable Gas, East Simple Average 1-EOM

GAS DAILY PRICE GUIDE Enable Gas, East Simple Average 1-EOM GAS DAILY PRICE GUIDE Enable Gas, East Simple Average 1-EOM

The Contractor is required to perform contractor consolidated billing in accordance with the statement of work. All pipeline capacity charges and LDC transportation charges will be billed as a pass through to the customer.

Address

City State

Zip

Summit Utilities

264,440 98,700 165,740

Location

58,630 27,960 30,670 Jun Jul Aug Sep Oct Nov Dec

6,000 5,000 4,790 4,710 7,460 13,890 16,780

132,220 49,350 82,870 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

19,210 17,150 15,840 12,990 8,400 6,000 5,000 4,790 4,710 7,460 13,890 16,780

73,590 21,390 52,200 Jan Feb Mar Apr May

19,210 17,150 15,840 12,990 8,400

Curtailment Days Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

0 0 0 0 0 0 0 0 0 0 0 0

Overage & Shortage Volume Pricing Publication Location Methodology Include Adj. Factor

Overage Treatment Summer Volumes Yes

Winter Volumes Yes Shortage Treatment

Summer Volumes Yes Winter Volumes Yes

Note #1

Note #2 Note #3 Note #4

Schedule Page By Line Item Detail

Eugene J Towbin Healthcare Center Installation Address

0001-02 Eugene J Towbin Healthcare Center DODAAC /

FEDAAC: FP4460220 Ft. Roots Dr.

North Little Rock

AR

72114-0000

Delivery Point Telemetered Rate Class City Gate Yes LCS-1 TSO

Utility Account Information LDC or Pipeline

Total Contract Total Summer (Dths) Total Winter (Dths)

No None 0% Alternate Fuel Type Percent Load Limits on Use Notes

Year 2026 Annual Totals Summer Totals Winter Totals

Year 2027 Annual Totals Summer Totals Winter Totals

Estimated Usage Information (All volumes expressed in Dths)

City Gate

Year 2025 Annual Totals Summer Totals Winter Totals

06/01/25 05/31/27 INSIDE FERC'S Enable Gas, East (3) Monthly Order Firm

Solicitation Parameters

Period Beginning Period Ending Publication SIP Delivery Option Delivery Type

GAS DAILY PRICE GUIDE Enable Gas, East Simple Average 1-EOM GAS DAILY PRICE GUIDE Enable Gas, East Simple Average 1-EOM

GAS DAILY PRICE GUIDE Enable Gas, East Simple Average 1-EOM GAS DAILY PRICE GUIDE Enable Gas, East Simple Average 1-EOM

The Contractor is required to perform contractor consolidated billing in accordance with the statement of work. All pipeline capacity charges and LDC transportation charges will be billed as a pass through to the customer.

Address

City State

Zip

Summit Utilities

437,630 149,740 287,890

Location

100,805 46,840 53,965 Jun Jul Aug Sep Oct Nov Dec

8,690 7,800 7,600 8,690 14,060 23,890 30,075

218,815 74,870 143,945 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

34,470 31,690 23,820 16,390 11,640 8,690 7,800 7,600 8,690 14,060 23,890 30,075

118,010 28,030 89,980 Jan Feb Mar Apr May

34,470 31,690 23,820 16,390 11,640

Curtailment Days Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

0 0 0 0 0 0 0 0 0 0 0 0

Overage & Shortage Volume Pricing Publication Location Methodology Include Adj. Factor

Overage Treatment Summer Volumes Yes

Winter Volumes Yes Shortage Treatment

Summer Volumes Yes Winter Volumes Yes

Note #1

Note #2 Note #3 Note #4

Schedule Page By Line Item Detail Little Rock AFB

Installation Address Little Rock AFB DODAAC/FE

DAAC:528 Thomas Ave

Little Rock AFB

AR

72099-5000

Delivery Point Telemetered Rate Class City Gate Yes LCS-1

Utility Account Information LDC or Pipeline

Total Contract Total Summer (Dths) Total Winter (Dths)

No None 0% Alternate Fuel Type Percent Load Limits on Use Notes

Year 2026 Annual Totals Summer Totals Winter Totals

Estimated Usage Information (All volumes expressed in Dths)

City Gate

Year 2025 Annual Totals Summer Totals Winter Totals

Delivery Type

06/01/25 05/31/27 INSIDE FERC'S Enable Gas, East (3) Monthly Order Quantities. Firm

Year 2027 Annual Totals Summer Totals Winter Totals

Solicitation Parameters Period Beginning Period Ending Publication SIP Delivery Option

GAS DAILY PRICE GUIDE Enable Gas, East Simple Average 1-EOM GAS DAILY PRICE GUIDE Enable Gas, East Simple Average 1-EOM

GAS DAILY PRICE GUIDE Enable Gas, East Simple Average 1-EOM GAS DAILY PRICE GUIDE Enable Gas, East Simple Average 1-EOM

The Contractor is required to perform contractor consolidated billing in accordance with the statement of work.

Government owns pipeline capacity of 1,700 dths per day on Enable Gas Transmission. The installation will utilize this capacity via its transportation agreement with the pipeline. The contractor will utilize the installation owned capacity and will provide transportation if the increased usage necessitates additional capacity.

The cost associated with the contractor provided transportation will be included in the adjustment factor.

Address

City State

Zip

Summit Utilities

297,380 146,100 151,280

Location

79,700 51,190 28,510 Jun Jul Aug Sep Oct Nov Dec

9,950 9,870 9,890 10,020 11,460 13,230 15,280

148,690 73,050 75,640 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

17,010 16,910 13,210 11,230 10,630 9,950 9,870 9,890 10,020 11,460 13,230 15,280

68,990 21,860 47,130 Jan Feb Mar Apr May

17,010 16,910 13,210 11,230 10,630

Curtailment Days Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

0 0 0 0 0 0 0 0 0 0 0 0

Overage & Shortage Volume Pricing Publication Location Methodology Include Adj. Factor

Overage Treatment Summer Volumes Yes

Winter Volumes Yes Shortage Treatment

Summer Volumes Yes Winter Volumes Yes

Note #1

Note #2

Note #3 Note #4

Schedule Page By Line Item Detail

FDA Jefferson Labs/NCTR Installation Address

FDA Jefferson Labs/NCTR DODAAC/FE

DAAC:3900 NCTR Road

Jefferson

AR

72079-9501

Delivery Point Telemetered Rate Class City Gate Yes LCS-1 TSO

Utility Account Information LDC or Pipeline

Total Contract Total Summer (Dths) Total Winter (Dths)

No None 0% Alternate Fuel Type Percent Load Limits on Use Notes

Year 2026 Annual Totals Summer Totals Winter Totals

Estimated Usage Information (All volumes expressed in Dths)

City Gate

Year 2025 Annual Totals Summer Totals Winter Totals

Delivery Type 06/01/25 05/31/27 INSIDE FERC'S Enable Gas, East (3) Monthly Order Quantities. Firm

Year 2027 Annual Totals Summer Totals Winter Totals

Solicitation Parameters

Period Beginning Period Ending Publication SIP Delivery Option

GAS DAILY PRICE GUIDE Enable Gas, East Simple Average 1-EOM GAS DAILY PRICE GUIDE Enable Gas, East Simple Average 1-EOM

GAS DAILY PRICE GUIDE Enable Gas, East Simple Average 1-EOM GAS DAILY PRICE GUIDE Enable Gas, East Simple Average 1-EOM

The Government owns pipeline capacity of 850 Dths per day. The installation will utilize capacity via its transportation agreement with the pipeline. The contractor will utilize this capacity and will provide transportation if increased usage necessitates additional capacity. The cost associated with the contractor provided transportation will be included in the adjustment factor.

The contractor is required to perform contractor consolidated billing in accordance with the statement of work.

Installation has one delivery point, CenterPoint Energy meter number 912410.

Address

City State

Zip

Black Hills Energy

140,540 65,080 75,460

Location

36,040 21,560 14,480 Jun Jul Aug Sep Oct Nov Dec

4,220 3,990 3,900 4,100 5,350 6,680 7,800

70,270 32,540 37,730 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

8,470 7,590 7,190 5,920 5,060 4,220 3,990 3,900 4,100 5,350 6,680 7,800

34,230 10,980 23,250 Jan Feb Mar Apr May

8,470 7,590 7,190 5,920 5,060

Curtailment Days Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

0 0 0 0 0 0 0 0 0 0 0 0

Overage & Shortage Volume Pricing Publication Location Methodology Include Adj. Factor

Overage Treatment Summer Volumes GAS DAILY PRICE GUIDE Yes

Winter Volumes GAS DAILY PRICE GUIDE Yes Shortage Treatment

Summer Volumes GAS DAILY PRICE GUIDE Yes Winter Volumes GAS DAILY PRICE GUIDE Yes

Note #1 Note #2 Note #3 Note #4

Schedule Page By Line Item Detail

VAMC Fayetteville Installation Address

VAMC Fayetteville DODAAC/FE

DAAC:1100 N. College Ave

Fayetteville

AR

72703-1944

Delivery Point Telemetered Rate Class City Gate Yes Sch B4 Trans (AR580)

Utility Account Information LDC or Pipeline

Total Contract Total Summer (Dths) Total Winter (Dths)

No None 0% N/A Alternate Fuel Type Percent Load Displaceable Limits on Use Notes

Year 2026 Annual Totals Summer Totals Winter Totals

Estimated Usage Information (All volumes expressed in Dths)

Meter

Year 2025 Annual Totals Summer Totals Winter Totals

Year 2027 Annual Totals Summer Totals Winter Totals

Solicitation Parameters Period Beginning Period Ending Publication SIP Delivery Option

Enable Gas, East Simple Average 1-EOM Enable Gas, East Simple Average 1-EOM

Enable Gas, East Simple Average 1-EOM

Delivery Type

06/01/25 05/31/27 INSIDE FERC'S Enable Gas, East (3) Monthly Order Quantities. Firm

Enable Gas, East Simple Average 1-EOM

Address

City State

Zip

TECO Peoples Gas

75,000 35,400 39,600

Location

17,600 11,200 6,400 Jun Jul Aug Sep Oct Nov Dec

2,590 2,090 2,070 2,210 2,240 2,810 3,590

36,900 17,100 19,800 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

5,110 4,500 3,790 3,310 2,590 2,590 2,090 2,070 2,210 2,240 2,810 3,590

20,500 7,100 13,400 Jan Feb Mar Apr May

5,110 4,500 3,790 3,310 3,790

Curtailment Days Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

0 0 0 0 0 0 0 0 0 0 0 0

Overage & Shortage Volume Pricing Publication Location Methodology Include Adj. Factor

Overage Treatment Summer Volumes

Winter Volumes Shortage Treatment

Summer Volumes Winter Volumes

Note #1 Note #2

Note #3

Note #4

Schedule Page By Line Item Detail

Tyndall AFB Installation Address

Tyndall AFB DODAAC /

FEDAAC:119 Alabama Stop 42 Tyndall AFB

FL

32403-5014

Delivery Point Telemetered Rate Class City Gate No NCTS

Utility Account Information LDC or Pipeline

Total Contract Total Summer (Dths) Total Winter (Dths)

No None 0% Alternate Fuel Type Percent Load Limits on Use Notes

Year 2026 Annual Totals Summer Totals Winter Totals

Year 2027 Annual Totals Summer Totals Winter Totals

Estimated Usage Information (All volumes expressed in Dths)

Meter

Year 2025 Annual Totals Summer Totals Winter Totals

06/01/25 05/31/27 INSIDE FERC'S FL Gas Zn3 (2) Full Requirements/Pool. Firm

Solicitation Parameters

Period Beginning Period Ending Publication SIP Delivery Option Delivery Type

Multiple meters will require a single consolidated invoice with a separate breakdown of monthly meter quantities and contractor charges.

Period of performance will start/finish in alignment with TECO Peoples Gas meter reading cycle following the period beginning and period ending cited on this schedule page.

Natural Choice Transportation Service for multiple accounts/meters on TECO-Peoples Natural Gas (supplier must adjust for new or closing accounts).

Address

City State

Zip

TECO Peoples Gas

58,640 31,120 27,520

Location

15,640 10,650 4,990 Jun Jul Aug Sep Oct Nov Dec

2,130 2,110 2,030 2,260 2,120 2,410 2,580

29,320 15,560 13,760 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

3,160 3,130 2,480 2,710 2,200 2,130 2,110 2,030 2,260 2,120 2,410 2,580

13,680 4,910 8,770 Jan Feb Mar Apr May

3,160 3,130 2,480 2,710 2,200

Curtailment Days Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

0 0 0 0 0 0 0 0 0 0 0 0

Overage & Shortage Volume Pricing Publication Location Methodology Include Adj. Factor

Overage Treatment Summer Volumes

Winter Volumes Shortage Treatment

Summer Volumes Winter Volumes

Note #1 Note #2

Note #3

Note #4

Schedule Page By Line Item Detail MacDill AFB

Installation Address MacDill AFB DODAAC /

FEDAAC:2606 Pelican Ave

MacDill AFB

FL

33621-5000

Delivery Point Telemetered Rate Class City Gate No NCTS

Utility Account Information LDC or Pipeline

Total Contract Total Summer (Dths) Total Winter (Dths)

Yes #4 Oil 35% Yes Emergency Back-up Alternate Fuel Type Percent Load Limits on Use Notes

Year 2026 Annual Totals Summer Totals Winter Totals

Year 2027 Annual Totals Summer Totals Winter Totals

Estimated Usage Information (All volumes expressed in Dths)

Meter

Year 2025 Annual Totals Summer Totals Winter Totals

06/01/25 05/31/27 INSIDE FERC'S FL Gas Zn3 (2) Full Requirements/Pool. Firm

Solicitation Parameters

Period Beginning Period Ending Publication SIP Delivery Option Delivery Type

Multiple meters will require a single consolidated invoice with a separate breakdown of monthly meter quantities and contractor charges.

Period of performance will start/finish in alignment with TECO Peoples Gas meter reading cycle following the period beginning and period ending cited on this schedule page.

Natural Choice Transportation Service for multiple accounts/meters on TECO-Peoples Natural Gas (supplier must adjust for new or closing accounts).

Address

City State

Zip

TECO Peoples Gas

36,780 15,300 21,480

Location

7,060 4,040 3,020 Jun Jul Aug Sep Oct Nov Dec

1,130 800 780 600 730 1,090 1,930

18,390 7,650 10,740 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

2,440 2,880 2,400 2,050 1,560 1,130 800 780 600 730 1,090 1,930

11,330 3,610 7,720 Jan Feb Mar Apr May

2,440 2,880 2,400 2,050 1,560

Curtailment Days Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

0 0 0 0 0 0 0 0 0 0 0 0

Overage & Shortage Volume Pricing Publication Location Methodology Include Adj. Factor

Overage Treatment Summer Volumes

Winter Volumes Shortage Treatment

Summer Volumes Winter Volumes

Note #1 Note #2 Note #3

Note #4

Schedule Page By Line Item Detail

NSA Panama City (Main Lab) Installation Address

0007-01 NSA Panama City (Main Lab) DODAAC /

FEDAAC:101 Vernon Ave

Panama City Beach

FL

32407-0000

Delivery Point Telemetered Rate Class City Gate No NCTS

Utility Account Information LDC or Pipeline

Total Contract Total Summer (Dths) Total Winter (Dths)

No None 0% Alternate Fuel Type Percent Load Limits on Use Notes

Year 2026 Annual Totals Summer Totals Winter Totals

Year 2027 Annual Totals Summer Totals Winter Totals

Estimated Usage Information (All volumes expressed in Dths)

Meter

Year 2025 Annual Totals Summer Totals Winter Totals

06/01/25 05/31/27 INSIDE FERC'S FL Gas Zn3 (2) Full Requirements/Pool. Firm

Solicitation Parameters Period Beginning Period Ending Publication SIP Delivery Option Delivery Type

Natural Choice Transportation Service for multiple accounts/meters on TECO-Peoples Natural Gas (supplier must adjust for new or closing accounts).

Multiple meters will require a single consolidated invoice with a separate breakdown of monthly meter quantities and contractor charges.

Period of performance will start/finish in alignment with TECO Peoples Gas meter reading cycle following the period beginning and period ending cited on this schedule page.

A hard copy of the invoice must be mailed to the invoice certification office.

Address

City State

Zip

TECO Peoples Gas

12,100 3,480 8,620

Location

1,820 550 1,270 Jun Jul Aug Sep Oct Nov Dec 190 60 60 90 150 460 810

6,050 1,740 4,310 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 940 1,240 860 650 540 190 60 60 90 150 460 810

4,230 1,190 3,040 Jan Feb Mar Apr May 940 1,240 860 650 540

Curtailment Days Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

0 0 0 0 0 0 0 0 0 0 0 0

Overage & Shortage Volume Pricing Publication Location Methodology Include Adj. Factor

Overage Treatment Summer Volumes

Winter Volumes Shortage Treatment

Summer Volumes Winter Volumes

Note #1 Note #2 Note #3

Note #4

Schedule Page By Line Item Detail

NSA Panama City (Dive School) Installation Address

0007-02 NSA Panama City (Dive School) DODAAC /

FEDAAC:101 Vernon Ave

Panama City Beach

FL

32407-0000

Delivery Point Telemetered Rate Class City Gate No NCTS

Utility Account Information LDC or Pipeline

Total Contract Total Summer (Dths) Total Winter (Dths)

No None 0% Alternate Fuel Type Percent Load Limits on Use Notes

Year 2026 Annual Totals Summer Totals Winter Totals

Year 2027 Annual Totals Summer Totals Winter Totals

Estimated Usage Information (All volumes expressed in Dths)

Meter

Year 2025 Annual Totals Summer Totals Winter Totals

06/01/25 05/31/27 INSIDE FERC'S FL Gas Zn3 (2) Full Requirements/Pool. Firm

Solicitation Parameters Period Beginning Period Ending Publication SIP Delivery Option Delivery Type

Natural Choice Transportation Service for multiple accounts/meters on TECO-Peoples Natural Gas (supplier must adjust for new or closing accounts).

Multiple meters will require a single consolidated invoice with a separate breakdown of monthly meter quantities and contractor charges.

Period of performance will start/finish in alignment with TECO Peoples Gas meter reading cycle following the period beginning and period ending cited on this schedule page.

A hard copy of the invoice must be mailed to the invoice certification office.

Address

City State

Zip

Florida City Gas

20,440 11,360 9,080

Location

5,840 4,020 1,820 Jun Jul Aug Sep Oct Nov Dec 820 810 740 770 880 680 1,140

10,220 5,680 4,540 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

1,130 780 810 820 840 820 810 740 770 880 680 1,140

4,380 1,660 2,720 Jan Feb Mar Apr May

1,130 780 810 820 840

Curtailment Days Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

0 0 0 0 0 0 0 0 0 0 0 0

Overage & Shortage Volume Pricing Publication Location Methodology Include Adj. Factor

Overage Treatment Summer Volumes

Winter Volumes Shortage Treatment

Summer Volumes Winter Volumes

Note #1 Note #2 Note #3 Note #4

Schedule Page By Line Item Detail

Federal Bureau of Prisons, Miami Installation Address

Federal Bureau of Prisons, Miami DODAAC /

FEDAAC: VAMC5215801 SW 137th Ave

Miami

FL

33177-1297

Delivery Point Telemetered Rate Class City Gate Yes GS-25K

Utility Account Information LDC or Pipeline

Total Contract Total Summer (Dths) Total Winter (Dths)

No None 0% Alternate Fuel Type Percent Load Limits on Use Notes

Year 2026 Annual Totals Summer Totals Winter Totals

Year 2027 Annual Totals Summer Totals Winter Totals

Estimated Usage Information (All volumes expressed in Dths)

Meter

Year 2025 Annual Totals Summer Totals Winter Totals

06/01/25 05/31/27 INSIDE FERC'S FL Gas Zn3 (2) Full Requirements/Pool. Firm

Solicitation Parameters Period Beginning Period Ending Publication SIP Delivery Option Delivery Type

Installation Fort Moore

Address

City State

Zip

Liberty Gas

1,066,000 392,000 674,000

Location

241,000 129,000 112,000 Jun Jul Aug Sep Oct Nov Dec

23,000 23,000 23,000 25,000 35,000 50,000 62,000

533,000 196,000 337,000 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

93,000 75,000 57,000 37,000 30,000 23,000 23,000 23,000 25,000 35,000 50,000 62,000

292,000 67,000 225,000 Jan Feb Mar Apr May

93,000 75,000 57,000 37,000 30,000

Curtailment Days Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

0 0 0 0 0 0 0 0 0 0 0 0

Overage & Shortage Volume Pricing Publication Location Methodology Include Adj. Factor

Overage Treatment Summer Volumes

Winter Volumes Shortage Treatment

Summer Volumes Winter Volumes

Note #1 Note #2 Note #3 Note #4

Schedule Page By Line Item Detail

Fort Moore Installation Address

DODAAC/FE

DAAC:6650 Meloy Drive Attn: IMBE-PWB (Royer) Fort Moore

GA

31905-4500

Delivery Point Telemetered Rate Class City Gate Yes

Utility Account Information LDC or Pipeline

Total Contract Total Summer (Dths) Total Winter (Dths)

Yes Propane 95% Yes N/A Alternate Fuel Type Percent Load Limits on Use Notes

Year 2025 Annual Totals Summer Totals Winter Totals

Year 2027 Annual Totals Summer Totals Winter Totals

Estimated Usage Information (All volumes expressed in Dths)

City Gate

Year 2025 Annual Totals Summer Totals Winter Totals

06/01/25 05/31/27 INSIDE FERC'S SoNat LA (2) Full Requirements/Pool. Firm

Installation DODAAC/FEDAAC:

Address

City State

Zip

Centerpoint Entex

152,320 73,840 78,480

Location

39,630 25,020 14,610 Jun Jul Aug Sep Oct Nov Dec

4,920 4,730 4,800 4,910 5,660 7,020 7,590

76,160 36,920 39,240 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

8,810 8,130 7,690 6,440 5,460 4,920 4,730 4,800 4,910 5,660 7,020 7,590

36,530 11,900 24,630 Jan Feb Mar Apr May

8,810 8,130 7,690 6,440 5,460

Curtailment Days Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

0 0 0 0 0 0 0 0 0 0 0 0

Overage & Shortage Volume Pricing Publication Location Methodology Include Adj. Factor

Overage Treatment Summer Volumes

Winter Volumes Shortage Treatment

Summer Volumes Winter Volumes

Note #1

Note #2 Note #3 Note #4

Schedule Page By Line Item Detail

VAMC Shreveport Installation Address

VAMC Shreveport 510 East Stoner Ave

Shreveport

LA

71101-0000

Delivery Point Telemetered Rate Class City Gate No LCT-1

Utility Account Information LDC or Pipeline

Total Contract Total Summer (Dths) Total Winter (Dths)

No None Alternate Fuel Type Percent Load Displaceable Limits on Use Notes

Year 2026 Annual Totals Summer Totals Winter Totals

Year 2027 Annual Totals Summer Totals Winter Totals

Estimated Usage Information (All volumes expressed in Dths)

Meter

Year 2025 Annual Totals Summer Totals Winter Totals

06/01/25 05/31/27 INSIDE FERC'S Enable Gas, East (2) Full Requirements/Pool. Firm

Solicitation Parameters Period Beginning Period Ending Publication SIP Delivery Option Delivery Type

Contractor Consolidated Billing is required for VAMC Shreveport in accordance with the statement of work.

CenterPoint Energy Entex holds the upstream capacity on CEGT for the customer. The contractor is required to use the capacity for deliveries to VAMC Shreveport. The customer is billed directly from CenterPoint for the pipeline capacity.

Address

City State

Zip

Gulf South Pipeline

450,280 148,020 302,260

Location

99,633 46,774 52,859 Jun Jul Aug Sep Oct Nov Dec

10,507 8,539 7,656 8,304 11,768 22,837 30,022

225,140 74,010 151,130 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

39,560 34,868 23,843 15,610 11,626 10,507 8,539 7,656 8,304 11,768 22,837 30,022

125,507 27,236 98,271 Jan Feb Mar Apr May

39,560 34,868 23,843 15,610 11,626

Curtailment Days Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

0 0 0 0 0 0 0 0 0 0 0 0

Overage & Shortage Volume Pricing Publication Location Methodology Include Adj. Factor

Overage Treatment Summer Volumes Yes

Winter Volumes Yes Shortage Treatment

Summer Volumes Yes Winter Volumes Yes

Note #1

Note #2

Note #3

Note #4

Schedule Page By Line Item Detail Fort Johnson

Installation Address Fort Johnson DODAAC/FE

DAAC:DPW, BOID (Business Operations Div), 6661 Warrior Trail Bldg 350 Suite 230 Fort Johnson

LA

71459-5440

Delivery Point Telemetered Rate Class Burner Tip Yes

Utility Account Information LDC or Pipeline

Total Contract Total Summer (Dths) Total Winter (Dths)

No None Alternate Fuel Type Percent Load Displaceable Limits on Use Notes

Year 2026 Annual Totals Summer Totals Winter Totals

Year 2027 Annual Totals Summer Totals Winter Totals

Estimated Usage Information (All volumes expressed in Dths)

Burner Tip

Year 2025 Annual Totals Summer Totals Winter Totals

06/01/25 05/31/27 INSIDE FERC'S Henry Hub (3) Monthly Order Quantities. Firm

Solicitation Parameters Period Beginning Period Ending Publication SIP Delivery Option Delivery Type

GAS DAILY PRICE GUIDE Henry Hub Simple Average 1-EOM GAS DAILY PRICE GUIDE Henry Hub Simple Average 1-EOM

GAS DAILY PRICE GUIDE Henry Hub Simple Average 1-EOM GAS DAILY PRICE GUIDE Henry Hub Simple Average 1-EOM

The contractor shall be required to perform contractor consolidated billing in accordance with the statement of work. Gulf South Pipeline Company, LP, will forward each installation's transportation invoice to the contractor. In return, the contractor will include these transportation costs and its supply costs on the customer invoice. Therefore, Fort Johnson will receive one invoice from the contractor, which will include both supply costs and Gulf South Pipeline., LP, transportation costs.

The customer has 6,000 DTHs of capacity in its storage account. The storage account will be managed by the contractor to keep customer's supply balanced and provide additional gas in emergency situations or as needed and directed by the installation. Monthly invoices will have seperate line items documenting the starting balance, amount of gas that is either injected or withdrawn, and the ending balance for the storage account. The invoice will also include a seperate line item to reflect the quantity and the additional price and/or credit for any gas that is either injected or withdrawn from the storage account.

A. The customer owns excess capacity on the pipeline. The customer owns a total of 4,200 DTHs/day of FTS on the pipeline. Any excess capacity utilized by the contractor will be rebated to the customer at a rate of 50% of the nominal rate charged to the installation by Gulf South Pipeline for this capacity. The contractor's monthly invoice will include a seperate line item to reflect any credits due for the utilization of excess capacity.

B. The excess capacity will be handled in accordance with the statement of work, paragraph (L), the contractor shall manage the excess capacity.

A. Fort Johnson's total MDQ for Firm (Contract#16106) is 4,200 Dths and its MDQ for No-Notice (Contract #14583) is 800 Dths. Receipt points for Firm and No-Notice for Fort Johnson are SLN#0004708 and SLN#0003260 and delivery points are SLN#0002989 and SLN#002990. The term MDQ is not intended to communicate a maximim monthly order quantity. See clause C700 and 52.216-21.

B. The contractor shall deliver natural gas supplies FOB Burnertip. The contractor's obligation is to deliver gas supplies via Government's owned capacity on the pipeline.

Address

City State

Zip

Centerpoint Entex

369,660 116,550 253,110

Location

80,614 36,435 44,179 Jun Jul Aug Sep Oct Nov Dec

7,120 6,465 6,299 6,614 9,937 18,266 25,913

184,830 58,275 126,555 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

33,097 30,099 19,180 12,652 9,188 7,120 6,465 6,299 6,614 9,937 18,266 25,913

104,216 21,840 82,376 Jan Feb Mar Apr May

33,097 30,099 19,180 12,652 9,188

Curtailment Days Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

0 0 0 0 0 0 0 0 0 0 0 0

Overage & Shortage Volume Pricing Publication Location Methodology Include Adj. Factor

Overage Treatment Summer Volumes

Winter Volumes Shortage Treatment

Summer Volumes Winter Volumes

Note #1

Note #2

334 Davis Ave West, Ste 308 Barksdale

LA

71110-2078

Schedule Page By Line Item Detail

Barksdale AFB Installation Address

Barksdale AFB DODAAC/FE

DAAC:2d Civil Engineer Sqd

Utility Account Information LDC or Pipeline

Total Contract Est. Total Summer (Dths) Total Winter (Dths)

Alternate Fuel Type Percent Load Displaceable Limits on Use Notes

Delivery Point Telemetered Rate Class City Gate Yes LCS-1

Estimated Usage Information (All volumes expressed in Dths)

Meter

Year 2025 Annual Totals Summer Totals Winter Totals

No

Firm

Solicitation Parameters Period Beginning Period Ending Publication SIP Delivery Option Delivery Type

Year 2026 Annual Totals Summer Totals Winter Totals

Year 2027 Annual Totals Summer Totals Winter Totals

06/01/25 05/31/27 INSIDE FERC'S Enable Gas, East (2) Full Requirements/Pool.

Payment office is DFAS, but do not contact them before contacting the local payment office, Ms Ty'Kesha Williams-Saunders, (318) 456-2158. DFAS address is DFAS DEAMS - F87700 - PAYMENT, ACCTG DISB STATION 387700, 27 ARKANSAS RD, LIMESTONE, ME 04751-6216

Contractor consolidated billing is required in acordance with the statement of work.

Address

City State

Zip

Centerpoint Entex

485,700 239,200 246,500

Location

132,440 83,160 49,280 Jun Jul Aug Sep Oct Nov Dec

16,340 16,140 15,170 15,410 20,100 21,480 27,800

242,850 119,600 123,250 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

28,230 23,790 21,950 19,400 17,040 16,340 16,140 15,170 15,410 20,100 21,480 27,800

110,410 36,440 73,970 Jan Feb Mar Apr May

28,230 23,790 21,950 19,400 17,040

Curtailment Days Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

0 0 0 0 0 0 0 0 0 0 0 0

Overage & Shortage Volume Pricing Publication Location Methodology Include Adj. Factor

Overage Treatment Summer Volumes

Winter Volumes Shortage Treatment

Summer Volumes Winter Volumes

Note #1 Note #2 Note #3 Note #4

500 Fisher Street, Suite 244 Keesler Air Force Base

MS

39534-0000

Schedule Page By Line Item Detail

Keesler Air Force Base Installation Address

Keesler Air Force Base DODAAC/FE

DAAC:81st Civil Engineering Squadron

Delivery Point Telemetered Rate Class City Gate Yes MT-3

Utility Account Information LDC or Pipeline

Total Contract Total Summer (Dths) Total Winter (Dths)

No None Alternate Fuel Type Percent Load Limits on Use Notes

Year 2026 Annual Totals Summer Totals Winter Totals

Year 2027 Annual Totals Summer Totals Winter Totals

Estimated Usage Information (All volumes expressed in Dths)

Meter

Year 2025 Annual Totals Summer Totals Winter Totals

06/01/25 05/31/27 INSIDE FERC'S Henry Hub (2) Full Requirements/Pool. Firm

Solicitation Parameters Period Beginning Period Ending Publication SIP Delivery Option Delivery Type

Load data includes service to Base, Medical Center, Multi-family Housing via master meter.

Contractor Consolidated Billing is required for Keesler AFB in accordance with the Statement of Work.

Address

City State

Zip

Centerpoint Entex

173,600 92,100 81,500

Location

47,850 32,200 15,650 Jun Jul Aug Sep Oct Nov Dec

6,510 6,200 6,490 6,210 6,790 7,080 8,570

86,800 46,050 40,750 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

9,180 8,070 7,850 7,090 6,760 6,510 6,200 6,490 6,210 6,790 7,080 8,570

38,950 13,850 25,100 Jan Feb Mar Apr May

9,180 8,070 7,850 7,090 6,760

Curtailment Days Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

0 0 0 0 0 0 0 0 0 0 0 0

Overage & Shortage Volume Pricing Publication Location Methodology Include Adj. Factor

Overage Treatment Summer Volumes

Winter Volumes Shortage Treatment

Summer Volumes Winter Volumes

Note #1 Note #2 Note #3 Note #4

Schedule Page By Line Item Detail

VAMC Biloxi

Installation Address VAMC Biloxi DODAAC/FE

DAAC:400 Veterans Avenue

Biloxi

MS

39531-0000

Delivery Point Telemetered Rate Class City Gate Yes 49

Utility Account Information LDC or Pipeline

Total Contract Total Summer (Dths) Total Winter (Dths)

No Alternate Fuel Type Percent Load Displaceable Limits on Use Notes

Year 2026 Annual Totals Summer Totals Winter Totals

Year 2027 Annual Totals Summer Totals Winter Totals

Estimated Usage Information (All volumes expressed in Dths)

Meter

Year 2025 Annual Totals Summer Totals Winter Totals

06/01/25 05/31/27 INSIDE FERC'S Henry Hub (2) Full Requirements/Pool. Firm

Address

City State

Zip

Gulf South Pipeline

283,000 130,000 153,000

Location

73,000 41,500 31,500 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

9,000 9,000 7,500 8,500 7,500 15,500 16,000

141,500 65,000 76,500 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

17,000 15,500 12,500 12,500 11,000 9,000 9,000 7,500 8,500 7,500 15,500 16,000

68,500 23,500 45,000 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

17,000 15,500 12,500 12,500 11,000

Curtailment Days Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

0 0 0 0 0 0 0 0 0 0 0 0

Overage & Shortage Volume Pricing Publication Location Methodology Include Adj. Factor

Overage Treatment Summer Volumes

Winter Volumes Shortage Treatment

Summer Volumes Winter Volumes

Note #1 Note #2 Note #3 Note #4

Stennis Space Center

MS

39529

Schedule Page By Line Item Detail

Stennis Space Center Installation Address

Stennis Space Center DODAAC /

FEDAAC:1100 Balch Blvd

Utility Account Information LDC or Pipeline

Total Contract Total Summer (Dths) Total Winter (Dths)

Alternate Fuel Type Percent Load Limits on Use Notes

Delivery Point Telemetered Rate Class Burner Tip No FTS

Estimated Usage Information (All volumes expressed in Dths)

Meter

Year 2025 Annual Totals Summer Totals Winter Totals

No 0% No

Firm

Solicitation Parameters Period Beginning Period Ending Publication SIP Delivery Option Delivery Type

Year 2026 Annual Totals Summer Totals Winter Totals

Year 2027 Annual Totals Summer Totals Winter Totals

06/01/25 05/31/27 INSIDE FERC'S Henry Hub (2) Full Requirements/Pool.

Delivery Point is North Fee Area Boundary of Stennis Space Center (Gulf South Station Location Number 2568).

Contractor Consolidated Billing (Gulf South Pipeline charges) is required for Stennis Space Center in accordance with the Statement of Work.

All Voucher/Invoice submissions are to be sumbitted through the Invoice Processing Platform (ipp.gov) as per NASA FAR Supplement (NFS) 1852.232.80.

DLA Energy requires an emailed copy of supplier invoices and Gulf South Pipeline invoices.

Address

City State

Zip

Dominion Energy

317,094 139,304 177,790

Location

82,161 46,403 35,758 Jun Jul Aug Sep Oct Nov Dec

8,950 8,911 8,619 8,177 11,746 16,389 19,369

158,547 69,652 88,895 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

20,276 17,132 15,729 12,580 10,669 8,950 8,911 8,619 8,177 11,746 16,389 19,369

76,386 23,249 53,137 Jan Feb Mar Apr May

20,276 17,132 15,729 12,580 10,669

Curtailment Days Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

0 0 0 0 0 0 0 0 0 0 0 0

Overage & Shortage Volume Pricing Publication Location Methodology Include Adj. Factor

Overage Treatment Summer Volumes

Winter Volumes Shortage Treatment

Summer Volumes Winter Volumes

Note #1

P.O. Box 999 Butner

NC

27509-0000

Schedule Page By Line Item Detail

Federal Corrections Complex Butner Installation Address

Federal Corrections Complex Butner DODAAC/FE

DAAC:Old NC Hwy 75

Utility Account Information LDC or Pipeline

Total Contract Total Summer (Dths) Total Winter (Dths)

Alternate Fuel Type Percent Load Limits on Use Notes

Delivery Point Telemetered Rate Class City Gate Yes 175

Estimated Usage Information (All volumes expressed in Dths)

City Gate

Year 2025 Annual Totals Summer Totals Winter Totals

Yes #2 Oil 0% Yes Emergency Operations Only

Firm

Solicitation Parameters Period Beginning Period Ending Publication SIP Delivery Option Delivery Type

Year 2026 Annual Totals Summer Totals Winter Totals

Year 2027 Annual Totals Summer Totals Winter Totals

06/01/25 05/31/27 INSIDE FERC'S Transco Zn5 Del South (2) Full Requirements/Pool.

Five meters currently serve the Corrections Complex.

Address

City State

Zip

Piedmont Natural Gas

2,616,000 976,000 1,640,000

Location

625,000 315,000 310,000 Jun Jul Aug Sep Oct Nov Dec

62,000 56,000 56,000 58,000 83,000 135,000 175,000

1,308,000 488,000 820,000 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

205,000 155,000 150,000 98,000 75,000 62,000 56,000 56,000 58,000 83,000 135,000 175,000

683,000 173,000 510,000 Jan Feb Mar Apr May

205,000 155,000 150,000 98,000 75,000

Curtailment Days Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

0 0 0 0 0 0 0 0 0 0 0 0

Overage & Shortage Volume Pricing Publication Location Methodology Include Adj. Factor

Overage Treatment Summer Volumes Yes

Winter Volumes Yes Shortage Treatment

Summer Volumes Yes Winter Volumes Yes

Note #1 Note #2 Note #3 Note #4

Schedule Page By Line Item Detail

Fort Liberty Installation Address

Fort Liberty DODAAC/FE

DAAC:Directorate of Public Works (MSE-BRG-PWO)

Fort Liberty

NC

28310-5000

Delivery Point Telemetered Rate Class City Gate Yes LGST-113

Utility Account Information LDC or Pipeline

Total Contract Total Summer (Dths) Total Winter (Dths)

No Alternate Fuel Type Percent Load Limits on Use Notes

Year 2026 Annual Totals Summer Totals Winter Totals

Year 2027 Annual Totals Summer Totals Winter Totals

Estimated Usage Information (All volumes expressed in Dths)

Meter

Year 2025 Annual Totals Summer Totals Winter Totals

06/01/25 05/31/27 INSIDE FERC'S Transco Zn5 Del. South (3) Monthly Order Quantities. Firm

Solicitation Parameters Period Beginning Period Ending Publication SIP Delivery Option Delivery Type

GAS DAILY PRICE GUIDE Transco Zn5 Del. South Simple Average 1-EOM GAS DAILY PRICE GUIDE Transco Zn5 Del. South Simple Average 1-EOM

GAS DAILY PRICE GUIDE Transco Zn5 Del. South Simple Average 1-EOM GAS DAILY PRICE GUIDE Transco Zn5 Del. South Simple Average 1-EOM

Address

City State

Zip

Piedmont Natural Gas

1,577,000 693,000 884,000

Location

396,500 230,000 166,500 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

45,000 45,000 45,000 45,000 50,000 70,000 96,500

788,500 346,500 442,000 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

100,000 90,500 85,000 63,000 53,500 45,000 45,000 45,000 45,000 50,000 70,000 96,500

392,000 116,500 275,500 Jan Feb Mar Apr May

100,000 90,500 85,000 63,000 53,500

Curtailment Days Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

0 0 0 0 0 0 0 0 0 0 0 0

Overage & Shortage Volume Pricing Publication Location Methodology Include Adj. Factor

Overage Treatment Summer Volumes

Winter Volumes Shortage Treatment

Summer Volumes Winter Volumes

Note #1 Note #2 Note #3 Note #4

Schedule Page By Line Item Detail

Marine Corps Air Station-Cherry Point

Installation Address Marine Corps Air Station-Cherry Point DODAAC/FED

AAC: 30000PSC Box 8005

Cherry Point

NC

28533

Delivery Point Telemetered Rate Class City Gate Yes

Utility Account Information LDC or Pipeline

Total Contract Total Summer (Dths) Total Winter (Dths)

Yes #2 Oil 100% Yes Emergency Only Alternate Fuel Type Percent Load Displaceable Limits on Use Notes

Year 2026 Annual Totals Summer Totals Winter Totals

Year 2027 Annual Totals Summer Totals Winter Totals

Estimated Usage Information (All volumes expressed in Dths)

Meter

Year 2025 Annual Totals Summer Totals Winter Totals

06/01/25 05/31/27 INSIDE FERC'S Transco Zn5 Del. South (2) Full Requirements/Pool. Firm

Address

City State

Zip

Summit Utilities

323,350 59,792 263,558

Location

68,737 15,439 53,298 Jun Jul Aug Sep Oct Nov Dec

1,749 1,255 1,225 1,483 9,727 23,424 29,874

162,221 30,442 131,779 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

29,214 26,946 22,321 9,644 4,267 1,919 1,697 1,475 1,713 9,727 23,424 29,874

92,392 13,911 78,481 Jan Feb Mar Apr May

29,214 26,946 22,321 9,644 4,267

Curtailment Days Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

0 0 0 0 0 0 0 0 0 0 0 0

Overage & Shortage Volume Pricing Publication Location Methodology Include Adj. Factor

Overage Treatment Summer Volumes Yes

Winter Volumes Yes Shortage Treatment

Summer Volumes Yes Winter Volumes Yes

Note #1

Schedule Page By Line Item Detail

Altus Air Force Base Installation Address

Altus Air Force Base DODAAC/FE

DAAC:209 E Sir Dr

Altus

OK

75323

Delivery Point Telemetered Rate Class City Gate Yes LCS-1

Utility Account Information LDC or Pipeline

Total Contract Total Summer (Dths) Total Winter (Dths)

No Alternate Fuel Type Percent Load Limits on Use Notes

Year 2026 Annual Totals Summer Totals Winter Totals

Year 2027 Annual Totals Summer Totals Winter Totals

Estimated Usage Information (All volumes expressed in Dths)

City Gate

Year 2025 Annual Totals Summer Totals Winter Totals

06/01/25 05/31/27 INSIDE FERC'S Enable Gas East (3) Monthly Order Quantities. Firm

Solicitation Parameters Period Beginning Period Ending Publication SIP Delivery Option Delivery Type

GAS DAILY PRICE GUIDE Enable Gas East Simple Average 1-EOM GAS DAILY PRICE GUIDE Enable Gas East Simple Average 1-EOM

GAS DAILY PRICE GUIDE Enable Gas East Simple Average 1-EOM GAS DAILY PRICE GUIDE Enable Gas East Simple Average 1-EOM

There are two meters that will be served under LCS-1 on the contract. The 1866 W River Dr meter location will remain on utility service at a projected load of 500 dth per year.

Address

City State

Zip

Summit Utilities

1,053,000 288,000 765,000

Location

217,000 87,000 130,000 Jun Jul Aug Sep Oct Nov Dec

16,000 12,000 14,000 15,000 30,000 50,000 80,000

524,000 144,000 380,000 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

95,000 95,000 60,000 35,000 22,000 16,000 12,000 14,000 15,000 30,000 50,000 80,000

312,000 57,000 255,000 Jan Feb Mar Apr May

100,000 95,000 60,000 35,000 22,000

Curtailment Days Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

0 0 0 0 0 0 0 0 0 0 0 0

Overage & Shortage Volume Pricing Publication Location Methodology Include Adj. Factor

Overage Treatment Summer Volumes Yes

Winter Volumes Yes Shortage Treatment

Summer Volumes Yes Winter Volumes Yes

Note #1

Note #2

Note #3 Note #4

Building 1950 Fort Sill

OK

73503-5100

Schedule Page By Line Item Detail

Fort Sill Installation Address

Fort Sill DODAAC/FE

DAAC: W44DQ1Director Public Works, 1950 Barbour Rd.

Delivery Point Telemetered Rate Class City Gate Yes LCS-1

Utility Account Information LDC or Pipeline

Total Contract Total Summer (Dths) Total Winter (Dths)

No Alternate Fuel Type Percent Load Limits on Use Notes

Year 2026 Annual Totals Summer Totals Winter Totals

Year 2027 Annual Totals Summer Totals Winter Totals

Estimated Usage Information (All volumes expressed in Dths)

City Gate

Year 2025 Annual Totals Summer Totals Winter Totals

06/01/25 05/31/27 INSIDE FERC'S Enable Gas, East (3) Monthly Order Quantities. Firm

Solicitation Parameters Period Beginning Period Ending Publication SIP Delivery Option Delivery Type

GAS DAILY PRICE GUIDE Enable Gas, East Simple Average 1-EOM GAS DAILY PRICE GUIDE Enable Gas, East Simple Average 1-EOM

GAS DAILY PRICE GUIDE Enable Gas, East Simple Average 1-EOM GAS DAILY PRICE GUIDE Enable Gas, East Simple Average 1-EOM

CenterPoint Energy Gas Transmission (CEGT) Pipeline requires the contractor to add additional gas for fuel loss for the gas to be delivered to West Pooling Area 2. The cost for this gas will be included in the adjustment factor.

The Government has a rate rider 1 transport agreement with the LDC which includes a pipeline capacity of 7021 Dths per day with CEGT.

CenterPoint Energy Arkla holds the upstream capacity on CEGT for the customer. The contractor is required to use the capacity for deilveries to Fort Sill. The customer is billed directly by CenterPoint for the pipeline capacity.

Address

City State

Zip

Summit Utilities

760,240 275,200 485,040

Location

171,320 84,320 87,000 Jun Jul Aug Sep Oct Nov Dec

16,920 16,050 15,770 16,150 19,430 38,220 48,780

380,120 137,600 242,520 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

58,220 52,420 44,880 30,950 22,330 16,920 16,050 15,770 16,150 19,430 38,220 48,780

208,800 53,280 155,520 Jan Feb Mar Apr May

58,220 52,420 44,880 30,950 22,330

Curtailment Days Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

0 0 0 0 0 0 0 0 0 0 0 0

Overage & Shortage Volume Pricing Publication Location Methodology Include Adj. Factor

Overage Treatment Summer Volumes Yes

Winter Volumes Yes Shortage Treatment

Summer Volumes Yes Winter Volumes Yes

Note #1

Note #2

Note #3 Note #4

Bldg 6 McAlester

OK

74501-9002

Schedule Page By Line Item Detail McAlester AAP

Installation Address McAlester AAP DODAAC/FE

DAAC:1 C-Tree RD

Utility Account Information LDC or Pipeline

Total Contract Est. Volume (Dths) Total Summer (Dths) Total Winter (Dths)

Delivery Point Telemetered Rate Class

Yes #2 Oil 20% Yes For emergency use only

City Gate Yes LCS-1

Alternate Fuel Type Percent Load Limits on Use Notes

Year 2026 Annual Totals Summer Totals Winter Totals

Year 2027 Annual Totals Summer Totals Winter Totals

Estimated Usage Information (All volumes expressed in Dths)

Burner Tip

Year 2025 Annual Totals Summer Totals Winter Totals

06/01/25 05/31/27 INSIDE FERC'S Enable Gas, East (3) Monthly Order Quantities. Firm

Solicitation Parameters Period Beginning Period Ending Publication SIP Delivery Option Delivery Type

GAS DAILY PRICE GUIDE Enable Gas, East Simple Average 1-EOM GAS DAILY PRICE GUIDE Enable Gas, East Simple Average 1-EOM

GAS DAILY PRICE GUIDE Enable Gas, East Simple Average 1-EOM GAS DAILY PRICE GUIDE Enable Gas, East Simple Average 1-EOM

The contractor shall be required to perform contractor consolidated billing in accordance with the statement of work. Summit Utilities, Inc. and Enable Gas Transmission LLC will forward each installation's transportation invoice to the contractor. In return, the contractor will include these transportation costs and its supply costs on the customer invoice. Therefore, McAlester will receive one invoice from the contractor, which will include both supply costs and Summit Utilities, Inc. and Enable Gas Transmission LLC, transportation costs.

Contractor to submit invoices via the electronic payment system specified by the installation; Wide Area Workflow (WAWF) or its successor.

McAlester has pipeline capacity with Enable Gas Transmission LLC- November-March(2,225 dths/day); April (1,125 dths/day); May-October (1,000 dths/day)

Address

City State

Zip

Oklahoma Natural Gas

213,180 94,560 118,620

Location

54,450 31,410 23,040 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

5,930 5,540 5,550 5,840 8,550 10,610 12,430

106,590 47,280 59,310 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

13,780 12,190 10,300 8,500 7,370 5,930 5,540 5,550 5,840 8,550 10,610 12,430

52,140 15,870 36,270 Jan Feb Mar Apr May

13,780 12,190 10,300 8,500 7,370

Curtailment Days Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep

0 0 0 0 0 0 0 0 0 0 0 0

Overage & Shortage Volume Pricing

Publication Location Methodology Include Adj. Factor Overage Treatment

Summer Volumes Yes Winter Volumes Yes

Shortage Treatment Summer Volumes Yes

Winter Volumes Yes

Note #1 Note #2 Note #3 Note #4

Schedule Page By Line Item Detail

VAMC Oklahoma City Installation Address

VAMC Oklahoma City DODAAC/FE

DAAC:921 NE 13th Street

Oklahoma City

OK

73104-0000

Utility Account Information

LDC or Pipeline

Total Contract Est. Volume (Dths) Total Summer (Dths) Total Winter (Dths)

Delivery Point Telemetered Rate Class City Gate Yes 391-T

Alternate Fuel Type Percent Load Limits on Use Notes

Estimated Usage Information (All volumes expressed in Dths)

Burner Tip

Year 2025 Annual Totals Summer Totals Winter Totals

No None

Firm

Solicitation Parameters Period Beginning Period Ending SIP Publication SIP Location Delivery Option Delivery Type

Year 2026 Annual Totals Summer Totals Winter Totals

Year 2027 Annual Totals Summer Totals Winter Totals

GAS DAILY PRICE GUIDE Oneok OK Simple Average 1-EOM GAS DAILY PRICE GUIDE Oneok OK Simple Average 1-EOM

06/01/25 05/31/27 INSIDE FERC'S Oneok OK (3) Monthly Order Quantities.

GAS DAILY PRICE GUIDE Oneok OK Simple Average 1-EOM

Address

City State

Zip

Oklahoma Natural Gas

172,200 83,180 89,020

Location

44,540 28,220 16,320 Jun Jul Aug Sep Oct Nov Dec

5,170 5,640 5,390 5,430 6,590 7,630 8,690

86,100 41,590 44,510 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

10,960 9,100 8,130 6,570 6,800 5,170 5,640 5,390 5,430 6,590 7,630 8,690

41,560 13,370 28,190 Jan Feb Mar Apr May

10,960 9,100 8,130 6,570 6,800

Curtailment Days Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep

0 0 0 0 0 0 0 0 0 0 0 0

Overage & Shortage Volume Pricing Publication Location Methodology Include Adj. Factor

Overage Treatment Summer Volumes Yes

Winter Volumes Yes Shortage Treatment

Summer Volumes Yes Winter Volumes Yes

Note #1 Note #2 Note #3 Note #4

Schedule Page By Line Item Detail

VAMC Muskogee (Jack C. Montgomery) Installation Address

VAMC Muskogee (Jack C. Montgomery) DODAAC/FED

AAC:1011 Honor Heights Drive

Muskogee

OK

74401-0000

Utility Account Information LDC or Pipeline

Total Contract Est. Volume (Dths) Total Summer (Dths) Total Winter (Dths)

Delivery Point Telemetered Rate Class City Gate Yes 391-T

Alternate Fuel Type Percent Load Limits on Use Notes

Estimated Usage Information (All volumes expressed in Dths)

Burner Tip

Year 2025 Annual Totals Summer Totals Winter Totals

Yes #2 Oil 10% Yes Emergency Back-up Only

Firm

Solicitation Parameters Period Beginning Period Ending SIP Publication SIP Location Delivery Option Delivery Type

Year 2026 Annual Totals Summer Totals Winter Totals

Year 2027 Annual Totals Summer Totals Winter Totals

GAS DAILY PRICE GUIDE Oneok OK Simple Average 1-EOM GAS DAILY PRICE GUIDE Oneok OK Simple Average 1-EOM

06/01/25 05/31/27 INSIDE FERC'S Oneok OK (3) Monthly Order Quantities.

Address

City State

Zip

Dominion Energy South Carolina

1,247,484 637,692 609,792

Location

391,077 273,879 117,198 Apr May Jun Jul Aug Sep Oct Nov Dec

47,907 42,027 35,505 35,114 34,809 35,180 43,337 52,996 64,202

578,775 273,879 304,896 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

65,737 62,836 59,125 47,907 42,027 35,505 35,114 34,809 35,180 43,337 52,996 64,202

277,632 89,934 187,698 Jan Feb Mar Apr May

65,737 62,836 59,125 47,907 42,027

Curtailment Days Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

Overage & Shortage Volume Pricing Publication Location Methodology Include Adj. Factor

Overage Treatment Summer Volumes

Winter Volumes Shortage Treatment

Summer Volumes Winter Volumes

Note #1

Note #2

Note #3

Note #4

Note #5

Schedule Page By Line Item Detail Fort Jackson

Installation Address 0024-01 Fort Jackson DODAAC/FE

DAAC: W913712601 Washington Rd.

Fort Jackson

SC

29207-5400

Delivery Point Telemetered Rate Class City Gate Yes 36

Utility Account Information LDC or Pipeline

Total Contract Total Summer (Dths) Total Winter (Dths)

No None 0% Alternate Fuel Type Percent Load Limits on Use Notes

Year 2026 Annual Totals Summer Totals Winter Totals

Year 2027 Annual Totals Summer Totals Winter Totals

Estimated Usage Information (All volumes expressed in Dths)

Meter

Year 2025 Annual Totals Summer Totals Winter Totals

04/01/25 05/31/27 INSIDE FERC'S Transco Zone 5 Del So (3) Monthly Order Quantities. Secondary Firm

Solicitation Parameters Period Beginning Period Ending Publication SIP Delivery Option Delivery Type

GAS DAILY PRICE GUIDE Transco Zone 5 Del So See Note 2 GAS DAILY PRICE GUIDE Transco Zone 5 Del So See Note 2

GAS DAILY PRICE GUIDE Transco Zone 5 Del So See Note 2 GAS DAILY PRICE GUIDE Transco Zone 5 Del So See Note 2

The pricing methodology for calculating the overage/shortage for Delivery Option 3 as stated in C700 par (e)(3) is revised as follows. The 10% allowance does not apply. The overage and shortage methodology will be applied on a daily basis. The monthly order quantity will be divided by the number of days in the month to determine the average daily order quantity.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .