Att IV - Schedule Pages (amend 06).pdf

PDF 406 KB Posted

Attached to
SPE604-24-R-0403 DLA Energy - Direct Supply Natural Gas South Region
Solicitation number
SPE604-24-R-0403
Issued by

About this file

This is a detailed schedule document showing line item requirements for natural gas delivery to multiple Department of Defense and federal civilian installations across the South Region. The document outlines specific delivery requirements for 40 line items covering facilities in Arkansas, Florida, Georgia, Kentucky, Louisiana, Mississippi, North Carolina, Oklahoma, South Carolina, Tennessee, and Texas.

The schedule provides comprehensive information for each delivery location including total contract volumes, summer and winter quantities, estimated usage patterns, utility account details, rate classes, and special requirements. Notable locations include Fort Moore GA (1,066,000 Dths), Fort Liberty NC (2,616,000 Dths), and Tinker AFB OK (2,055,754 Dths). The delivery period runs from June 1, 2025 through May 31, 2027, with Fort Jackson starting April 1, 2025. The document specifies delivery points, telemetry requirements, alternate fuel capabilities, curtailment parameters, and overage/shortage pricing methodologies for each location. Many facilities require contractor consolidated billing and specific invoice handling procedures. Several locations have special notes regarding pipeline capacity rights, storage services, and specific delivery requirements.

View the file

Other files

File Type Posted
SPE60424R0403 Award Synopsis.pdf PDF
Att IV - Schedule Pages (amend 07) -Rev TW.pdf PDF
SPE604-24-R-0403 Amend 0007.pdf PDF
SPE604-24-R-0403 Amend 0006.PDF PDF
SPE604-24-R-0403 Amend 0005.pdf PDF
Att I - Area of Supply Interest Tech Compliance (Amend 05) Rev.pdf PDF
Att IV - Schedule Pages (Amend 05) -Rev.pdf PDF
SPE604-24-R-0403 Amend 0004.PDF PDF
SPE604-23-R-0403 Amendment 0003.PDF PDF
SPE604-23-R-0403 Amendment 0002.PDF PDF
QA Att 6 - 0043 Moody AFB (AB) Consumption.xlsx XLSX spreadsheet
QA Att 5 - 0042 Ft Eisenhower Consumption.xlsx XLSX spreadsheet
QA Att 4 - 0024-03 Shaw AFB Consumption.xlsx XLSX spreadsheet
QA Att 1 - Florida Locations Consumption.xlsx XLSX spreadsheet
QA Att 2 - 0024-01 Ft. Jackson Consumption.xlsx XLSX spreadsheet
QA Att 3 - 0024-02 JB Chareston (AB) Consumption.xlsx XLSX spreadsheet
Questions and Answers for SPE604-24-R-0403.pdf PDF
SPE604-24-R-0403 Amendment 0001.PDF PDF
Att I Area of Supply Interest Tech Compliance (Amend 01).pdf PDF
Att IV Schedule Pages (Amend 01).pdf PDF
Attachment I - Area of Supply Interest and Tech Compliance.pdf PDF
RFP SPE604-24-R-0403.pdf PDF
Attachment II - Past Performance Information- Experience with End Users.pdf PDF
Attachment V - Reps and Certs.pdf PDF
Attachment III - Small Business SubK Plan.pdf PDF
Attachment IV - Schedule Pages.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offeror: ________________________________________________________ Standalone Customers Submit a single Winter Adjustment Factor and a single Summer Adjustment Factor for each Line Item offered upon.

Line Item Installation State Local Distribution Company (LDC) or Pipeline SIP Publication SIP Location

Total Estimated Volume (Dths)

Total Summer (Dths)

Summer Adjustment

Factor ($/Dth)

Total Winter (Dths)

Winter Adjustment

Factor ($/Dth)

John L McClellan Memorial Hospital;

Eugene J Towbin Healthcare Center

AR Summit Utilities INSIDE FERC'S Enable Gas East 482,880 207,440 275,440

0002 Little Rock AFB AR Summit Utilities INSIDE FERC'S Enable Gas East 437,630 149,740 287,890

0003 FDA Jefferson Labs/NCTR AR Summit Utilities INSIDE FERC'S Enable Gas East 297,380 146,100 151,280

0004 VAMC Fayetteville AR Black Hills Energy INSIDE FERC'S Enable Gas East 140,540 65,080 75,460

0005 Tyndall AFB FL TECO Peoples Gas INSIDE FERC'S FL Gas Zn3 75,000 35,400 39,600

0006 MacDill AFB FL TECO Peoples Gas INSIDE FERC'S FL Gas Zn3 58,640 31,120 27,520

NSA Panama City (Main Lab);

NSA Panama City (Dive School)

FL TECO Peoples Gas INSIDE FERC'S FL Gas Zn3 48,880 18,780 30,100

0008 Federal Bureau of Prisons, Miami FL Florida City Gas INSIDE FERC'S FL Gas Zn3 20,440 11,360 9,080

0009 Fort Moore GA Liberty Gas INSIDE FERC'S SoNat LA 1,066,000 392,000 674,000

0010 VAMC Shreveport LA Centerpoint Entex INSIDE FERC'S Enable Gas East 152,320 73,840 78,480

0011 Fort Johnson LA Gulf South Pipeline INSIDE FERC'S Henry Hub 450,280 148,020 302,260

0012 Barksdale AFB LA CenterPoint Entex INSIDE FERC'S Enable Gas East 369,660 116,550 253,110

0013 Keesler AFB MS Centerpoint Entex INSIDE FERC'S Henry Hub 485,700 239,200 246,500

0014 VAMC Biloxi MS CenterPoint Entex INSIDE FERC'S Henry Hub 173,600 92,100 81,500

0015 Stennis Space Center MS Gulf South Pipeline INSIDE FERC'S Henry Hub 283,000 130,000 153,000

0016 Federal Corrections Complex Butner NC Dominion Energy INSIDE FERC'S Transco Zn5 Del South 355,100 139,304 177,790

0017 Fort Liberty NC Piedmont Natural Gas INSIDE FERC'S Transco Zn5 Del South 2,616,000 976,000 1,640,000

0018 Marine Corps Air Station-Cherry Point NC Piedmont Natural Gas INSIDE FERC'S Transco Zn5 Del South 1,577,000 693,000 884,000

0019 Altus Air Force Base OK Summit Utilities INSIDE FERC'S Enable Gas East 323,350 59,792 263,558

0020 Fort Sill OK Summit Utilities INSIDE FERC'S Enable Gas East 1,053,000 288,000 765,000

0021 McAlester AAP OK Summit Utilities INSIDE FERC'S Enable Gas East 760,240 275,200 485,040

0022 VAMC Oklahoma City OK Oklahoma Natural Gas INSIDE FERC'S Oneok OK 213,180 94,560 118,620

0023 VAMC Muskogee (Jack C. Montgomery) OK Oklahoma Natural Gas INSIDE FERC'S Oneok OK 172,200 83,180 89,020

Joint Base Charleston (Air Base); Ft Jackson;

Shaw AFB

SC Dominion Energy South Carolina INSIDE FERC'S SoNat LA 1,495,440 715,588 779,852

0025 Joint Base Charleston - Weapons Station SC Carolina Gas Transmission Pipeline INSIDE FERC'S SoNat LA 36,964 3,132 33,832

0026 VAMC Nashville TN Piedmont Natural Gas INSIDE FERC'S Tenn LA 500 Leg 286,000 144,400 141,600

0027 VAMC Murfreesboro TN Atmos Energy Corporation INSIDE FERC'S TX Eastern E LA 335,800 186,800 149,000

National Nuclear Security Administration Protection Office

TX Atmos Energy Corporation INSIDE FERC'S Houston ShipChl 723,034 328,518 394,516

0029 Sheppard Air Force Base TX Atmos Energy Corporation INSIDE FERC'S NGPL Texok Zn 662,930 179,756 483,174

0030 DHS Customs and Border Protection TX Centerpoint Entex INSIDE FERC'S Houston ShipChl 20,900 10,440 10,460

0031 VAMC Houston TX Centerpoint Entex INSIDE FERC'S Houston ShipChl 543,304 277,402 265,902

Attachment IV - Solicitation Schedule Page Line Item Summary - SPE604-24-R-0403 (amendment 0006) (Page 1 of 3)

Source Selection Information - See FAR 2.101 and 3.104

Offeror: __________________________________________________________

Standalone Customers Submit a single Winter Adjustment Factor and a single Summer Adjustment Factor for each Line Item offered upon.

Line Item Installation State Local Distribution Company (LDC) or Pipeline SIP Publication SIP Location

Total Estimated Volume (Dths)

Total Summer (Dths)

Summer Adjustment

Factor ($/Dth)

Total Winter (Dths)

Winter Adjustment

Factor ($/Dth)

Patrick AFB; Kennedy Space Center;

Cape Canaveral Air Station

FL Florida City Gas INSIDE FERC'S FL Gas Zn3 480,100 254,680 225,420

NAS Jacksonville;

Naval Station Mayport; MCSF Blount Island

FL TECO Peoples Gas INSIDE FERC'S FL Gas Zn3 807,880 391,380 416,500

Tied Group 1: All Line Items within Tied Group #1 will be awarded to a single supplier. Therefore, the offeror must submit pricing on all items to be considered for award.

Line Item Installation State Local Distribution Company (LDC) or Pipeline SIP Publication SIP Location

Total Estimated Volume (Dths)

Total Summer (Dths)

Summer Adjustment

Factor ($/Dth)

Total Winter (Dths)

Winter Adjustment

Factor ($/Dth)

0034 Pine Bluff Arsenal AR Summit Utilities INSIDE FERC'S Enable Gas East 420,660 174,620 246,040

0035 Red River Army Depot TX Enable Gas Transmission Pipeline INSIDE FERC'S Enable Gas East 662,000 204,000 458,000

Tied Group 2: All Line Items within Tied Group #2 will be awarded to a single supplier. Therefore, the offeror must submit pricing on all items to be considered for award

Line Item Installation State Local Distribution Company (LDC) or Pipeline SIP Publication SIP Location

Total Estimated Volume (Dths)

Total Summer (Dths)

Summer Adjustment

Factor ($/Dth)

Total Winter (Dths)

Winter Adjustment

Factor ($/Dth)

0036 DOE Oak Ridge Operations (ETNG) TN East Tennessee Natural Gas Company

(ETNG)

INSIDE FERC'S Tenn LA 500 Leg 1,558,008 - 1,558,008

0037 DOE Oak Ridge Operations (TGP) TN Tennessee Gas Pipeline INSIDE FERC'S Tenn LA 500 Leg 1,688,814 1,241,200 447,614

Line Item Installation State Local Distribution Company (LDC) or Pipeline SIP Publication SIP Location

Total Estimated Volume (Dths)

Total Summer (Dths)

Summer Adjustment

Factor ($/Dth)

Total Winter (Dths)

Winter Adjustment

Factor ($/Dth)

Vance AFB;

Federal Aviation Administration, MMAC

OK Oklahoma Natural Gas INSIDE FERC'S Oneok OK 295,480 64,840 230,640

0039 Tinker AFB OK Oklahoma Natural Gas INSIDE FERC'S Oneok OK 2,055,754 609,772 1,445,982

Line Item Installation State Local Distribution Company (LDC) or Pipeline SIP Publication SIP Location

Total Estimated Volume (Dths)

Total Summer (Dths)

Summer Adjustment

Factor ($/Dth)

Total Winter (Dths)

Winter Adjustment

Factor ($/Dth)

0040 Fort Campbell CGW OK Clarksville Gas & Water INSIDE FERC'S Henry Hub 1,692,396 407,774 1,284,622

Attachment IV - Solicitation Schedule Page Line Item Summary - SPE600-24-R-0403 (amendment 0006) (Page 2 of 3)

Tied Group 3: All Line Items within Tied Group #4 will be awarded to a single supplier. Therefore, the offeror must submit pricing on all items to be considered for award

Offeror: __________________________________________________________

Line Item Installation State Local Distribution Company (LDC) or Pipeline SIP Publication SIP Location

Total Estimated Volume (Dths)

Total Summer (Dths)

Summer Adjustment

Factor ($/Dth)

Total Winter (Dths)

Winter Adjustment

Factor ($/Dth)

0042 Fort Eisenhower GA Atlanta Gas Light INSIDE FERC'S SoNat LA 687,800 298,000 389,800

0043 Moody AFB - Air Base GA Atlanta Gas Light INSIDE FERC'S SoNat LA 86,500 33,200 53,300

Naval Submarine Base King Bay

Fort Stewart

Hunter Army Airfield

Harry Milton Kandell USARC

SP5 Roy W. Miller, Jr USARC

Dobbins ARB

Forest Park USARC

Athens USARC

Moody AFB - Housing

Eastpoint USARC

Macon USARC

Thomas H. Glenn USARC

Enclave at Fort Gillem

Statham USARC

Federal Law Enforcement Training Center

722,506

Tied Group 5: All Line Items within Tied Group #4 will be awarded to a single supplier. Therefore, the offeror must submit pricing on all items to be considered for award

0044 GA Atlanta Gas Light INSIDE FERC'S SoNat LA 1,406,760 684,254

Line Item Summary - SPE600-24-R-0403 (amendment 0006) (Page 3 of 3) Attachment IV - Solicitation Schedule Page

Line Item Installation

Address

City State

Zip

Summit Utilities

218,440 108,740 109,700

Location

58,160 37,070 21,090 Jun Jul Aug Sep Oct Nov Dec

6,950 7,040 7,380 7,520 8,180 9,770 11,320

109,220 54,370 54,850 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

12,160 11,010 10,590 9,210 8,090 6,950 7,040 7,380 7,520 8,180 9,770 11,320

51,060 17,300 33,760 Jan Feb Mar Apr May

12,160 11,010 10,590 9,210 8,090

Curtailment Days Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

0 0 0 0 0 0 0 0 0 0 0 0

Overage & Shortage Volume Pricing Publication Location Methodology Include Adj. Factor

Overage Treatment Summer Volumes Yes

Winter Volumes Yes Shortage Treatment

Summer Volumes Yes Winter Volumes Yes

Note #1

Note #2 Note #3 Note #4

The Contractor is required to perform contractor consolidated billing in accordance with the statement of work. All pipeline capacity charges and LDC transportation charges will be billed as a pass through to the customer.

GAS DAILY PRICE GUIDE Enable Gas, East Simple Average 1-EOM GAS DAILY PRICE GUIDE Enable Gas, East Simple Average 1-EOM

GAS DAILY PRICE GUIDE Enable Gas, East Simple Average 1-EOM GAS DAILY PRICE GUIDE Enable Gas, East Simple Average 1-EOM

06/01/25 05/31/27 INSIDE FERC'S Enable Gas, East (3) Monthly Order Firm

Solicitation Parameters

Period Beginning Period Ending Publication SIP Delivery Option Delivery Type

Year 2026 Annual Totals Summer Totals Winter Totals

Year 2027 Annual Totals Summer Totals Winter Totals

Estimated Usage Information (All volumes expressed in Dths)

City Gate

Year 2025 Annual Totals Summer Totals Winter Totals

No None 0% Alternate Fuel Type Percent Load Limits on Use Notes

Delivery Point Telemetered Rate Class City Gate Yes LCS-1 TSO

Utility Account Information

LDC or Pipeline

Total Contract Total Summer (Dths) Total Winter (Dths)

Little Rock

AR

72205-0000

Schedule Page By Line Item Detail

John L McClellan Memorial Hospital

Installation Address

0001-01 John L McClellan Memorial Hospital DODAAC/

FEDAAC:4300 W. 7th St.

Address

City State

Zip

Summit Utilities

264,440 98,700 165,740

Location

58,630 27,960 30,670 Jun Jul Aug Sep Oct Nov Dec

6,000 5,000 4,790 4,710 7,460 13,890 16,780

132,220 49,350 82,870 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

19,210 17,150 15,840 12,990 8,400 6,000 5,000 4,790 4,710 7,460 13,890 16,780

73,590 21,390 52,200 Jan Feb Mar Apr May

19,210 17,150 15,840 12,990 8,400

Curtailment Days Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

0 0 0 0 0 0 0 0 0 0 0 0

Overage & Shortage Volume Pricing Publication Location Methodology Include Adj. Factor

Overage Treatment Summer Volumes Yes

Winter Volumes Yes Shortage Treatment

Summer Volumes Yes Winter Volumes Yes

Note #1

Note #2 Note #3 Note #4

The Contractor is required to perform contractor consolidated billing in accordance with the statement of work. All pipeline capacity charges and LDC transportation charges will be billed as a pass through to the customer.

GAS DAILY PRICE GUIDE Enable Gas, East Simple Average 1-EOM GAS DAILY PRICE GUIDE Enable Gas, East Simple Average 1-EOM

GAS DAILY PRICE GUIDE Enable Gas, East Simple Average 1-EOM GAS DAILY PRICE GUIDE Enable Gas, East Simple Average 1-EOM

06/01/25 05/31/27 INSIDE FERC'S Enable Gas, East (3) Monthly Order Firm

Solicitation Parameters

Period Beginning Period Ending Publication SIP Delivery Option Delivery Type

Year 2026 Annual Totals Summer Totals Winter Totals

Year 2027 Annual Totals Summer Totals Winter Totals

Estimated Usage Information (All volumes expressed in Dths)

City Gate

Year 2025 Annual Totals Summer Totals Winter Totals

No None 0% Alternate Fuel Type Percent Load Limits on Use Notes

Delivery Point Telemetered Rate Class City Gate Yes LCS-1 TSO

Utility Account Information

LDC or Pipeline

Total Contract Total Summer (Dths) Total Winter (Dths)

North Little Rock

AR

72114-0000

Schedule Page By Line Item Detail

Eugene J Towbin Healthcare Center

Installation Address

0001-02 Eugene J Towbin Healthcare Center DODAAC /

FEDAAC:

FP4460

220 Ft. Roots Dr.

Address

City State

Zip

Summit Utilities

437,630 149,740 287,890

Location

100,805 46,840 53,965 Jun Jul Aug Sep Oct Nov Dec

8,690 7,800 7,600 8,690 14,060 23,890 30,075

218,815 74,870 143,945 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

34,470 31,690 23,820 16,390 11,640 8,690 7,800 7,600 8,690 14,060 23,890 30,075

118,010 28,030 89,980 Jan Feb Mar Apr May

34,470 31,690 23,820 16,390 11,640

Curtailment Days Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

0 0 0 0 0 0 0 0 0 0 0 0

Overage & Shortage Volume Pricing Publication Location Methodology Include Adj. Factor

Overage Treatment Summer Volumes Yes

Winter Volumes Yes Shortage Treatment

Summer Volumes Yes Winter Volumes Yes

Note #1

Note #2

Note #3 Note #4

The Contractor is required to perform contractor consolidated billing in accordance with the statement of work.

Government owns pipeline capacity of 1,700 dths per day on Enable Gas Transmission. The installation will utilize this capacity via its transportation agreement with the pipeline. The contractor will utilize the installation owned capacity and will provide transportation if the increased usage necessitates additional capacity.

The cost associated with the contractor provided transportation will be included in the adjustment factor.

GAS DAILY PRICE GUIDE Enable Gas, East Simple Average 1-EOM GAS DAILY PRICE GUIDE Enable Gas, East Simple Average 1-EOM

GAS DAILY PRICE GUIDE Enable Gas, East Simple Average 1-EOM GAS DAILY PRICE GUIDE Enable Gas, East Simple Average 1-EOM

Delivery Type

06/01/25 05/31/27 INSIDE FERC'S Enable Gas, East (3) Monthly Order Quantities. Firm

Year 2027 Annual Totals Summer Totals Winter Totals

Solicitation Parameters

Period Beginning Period Ending Publication SIP Delivery Option

Year 2026 Annual Totals Summer Totals Winter Totals

Estimated Usage Information (All volumes expressed in Dths)

City Gate

Year 2025 Annual Totals Summer Totals Winter Totals

No None 0% Alternate Fuel Type Percent Load Limits on Use Notes

Delivery Point Telemetered Rate Class City Gate Yes LCS-1

Utility Account Information

LDC or Pipeline

Total Contract Total Summer (Dths) Total Winter (Dths)

Little Rock AFB

AR

72099-5000

Schedule Page By Line Item Detail

Little Rock AFB

Installation Address

Little Rock AFB DODAAC/FE

DAAC:528 Thomas Ave

Address

City State

Zip

Summit Utilities

297,380 146,100 151,280

Location

79,700 51,190 28,510 Jun Jul Aug Sep Oct Nov Dec

9,950 9,870 9,890 10,020 11,460 13,230 15,280

148,690 73,050 75,640 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

17,010 16,910 13,210 11,230 10,630 9,950 9,870 9,890 10,020 11,460 13,230 15,280

68,990 21,860 47,130 Jan Feb Mar Apr May

17,010 16,910 13,210 11,230 10,630

Curtailment Days Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

0 0 0 0 0 0 0 0 0 0 0 0

Overage & Shortage Volume Pricing Publication Location Methodology Include Adj. Factor

Overage Treatment Summer Volumes Yes

Winter Volumes Yes Shortage Treatment

Summer Volumes Yes Winter Volumes Yes

Note #1

Note #2

Note #3 Note #4

The Government owns pipeline capacity of 850 Dths per day. The installation will utilize capacity via its transportation agreement with the pipeline. The contractor will utilize this capacity and will provide transportation if increased usage necessitates additional capacity. The cost associated with the contractor provided transportation will be included in the adjustment factor.

The contractor is required to perform contractor consolidated billing in accordance with the statement of work.

Installation has one delivery point, CenterPoint Energy meter number 912410.

GAS DAILY PRICE GUIDE Enable Gas, East Simple Average 1-EOM GAS DAILY PRICE GUIDE Enable Gas, East Simple Average 1-EOM

GAS DAILY PRICE GUIDE Enable Gas, East Simple Average 1-EOM GAS DAILY PRICE GUIDE Enable Gas, East Simple Average 1-EOM

Delivery Type 06/01/25 05/31/27 INSIDE FERC'S Enable Gas, East (3) Monthly Order Quantities. Firm

Year 2027 Annual Totals Summer Totals Winter Totals

Solicitation Parameters

Period Beginning Period Ending Publication SIP Delivery Option

Year 2026 Annual Totals Summer Totals Winter Totals

Estimated Usage Information (All volumes expressed in Dths)

City Gate

Year 2025 Annual Totals Summer Totals Winter Totals

No None 0% Alternate Fuel Type Percent Load Limits on Use Notes

Delivery Point Telemetered Rate Class City Gate Yes LCS-1 TSO

Utility Account Information

LDC or Pipeline

Total Contract Total Summer (Dths) Total Winter (Dths)

Jefferson

AR

72079-9501

Schedule Page By Line Item Detail

FDA Jefferson Labs/NCTR

Installation Address

FDA Jefferson Labs/NCTR DODAAC/FE

DAAC:3900 NCTR Road

Address

City State

Zip

Black Hills Energy

140,540 65,080 75,460

Location

36,040 21,560 14,480 Jun Jul Aug Sep Oct Nov Dec

4,220 3,990 3,900 4,100 5,350 6,680 7,800

70,270 32,540 37,730 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

8,470 7,590 7,190 5,920 5,060 4,220 3,990 3,900 4,100 5,350 6,680 7,800

34,230 10,980 23,250 Jan Feb Mar Apr May

8,470 7,590 7,190 5,920 5,060

Curtailment Days Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

0 0 0 0 0 0 0 0 0 0 0 0

Overage & Shortage Volume Pricing Publication Location Methodology Include Adj. Factor

Overage Treatment Summer Volumes GAS DAILY PRICE GUIDE Yes

Winter Volumes GAS DAILY PRICE GUIDE Yes Shortage Treatment

Summer Volumes GAS DAILY PRICE GUIDE Yes Winter Volumes GAS DAILY PRICE GUIDE Yes

Note #1 Note #2 Note #3 Note #4

Enable Gas, East Simple Average 1-EOM

Enable Gas, East Simple Average 1-EOM Enable Gas, East Simple Average 1-EOM

Enable Gas, East Simple Average 1-EOM

Delivery Type

06/01/25 05/31/27 INSIDE FERC'S Enable Gas, East

(3) Monthly Order

Quantities.

Firm

Year 2027 Annual Totals Summer Totals Winter Totals

Solicitation Parameters

Period Beginning Period Ending Publication SIP Delivery Option

Year 2026 Annual Totals Summer Totals Winter Totals

Estimated Usage Information

(All volumes expressed in Dths) Meter

Year 2025 Annual Totals Summer Totals Winter Totals

No None 0% N/A Alternate Fuel Type Percent Load Displaceable Limits on Use Notes

Delivery Point Telemetered Rate Class City Gate Yes Sch B4 Trans (AR580)

Utility Account Information

LDC or Pipeline

Total Contract Total Summer (Dths) Total Winter (Dths)

Fayetteville

AR

72703-1944

Schedule Page By Line Item Detail

VAMC Fayetteville

Installation Address

VAMC Fayetteville DODAAC/FE

DAAC:1100 N. College Ave

Address

City State

Zip

TECO Peoples Gas

75,000 35,400 39,600

Location

17,600 11,200 6,400 Jun Jul Aug Sep Oct Nov Dec

2,590 2,090 2,070 2,210 2,240 2,810 3,590

36,900 17,100 19,800 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

5,110 4,500 3,790 3,310 2,590 2,590 2,090 2,070 2,210 2,240 2,810 3,590

20,500 7,100 13,400 Jan Feb Mar Apr May

5,110 4,500 3,790 3,310 3,790

Curtailment Days Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

0 0 0 0 0 0 0 0 0 0 0 0

Overage & Shortage Volume Pricing Publication Location Methodology Include Adj. Factor

Overage Treatment Summer Volumes

Winter Volumes Shortage Treatment

Summer Volumes Winter Volumes

Note #1 Note #2

Note #3

Note #4

Multiple meters will require a single consolidated invoice with a separate breakdown of monthly meter quantities and contractor charges.

Period of performance will start/finish in alignment with TECO Peoples Gas meter reading cycle following the period beginning and period ending cited on this schedule page.

Natural Choice Transportation Service for multiple accounts/meters on TECO-Peoples Natural Gas (supplier must adjust for new or closing accounts).

06/01/25 05/31/27 INSIDE FERC'S FL Gas Zn3 (2) Full Requirements/Pool. Firm

Solicitation Parameters

Period Beginning Period Ending Publication SIP Delivery Option Delivery Type

Year 2026 Annual Totals Summer Totals Winter Totals

Year 2027 Annual Totals Summer Totals Winter Totals

Estimated Usage Information (All volumes expressed in Dths)

Meter

Year 2025 Annual Totals Summer Totals Winter Totals

No None 0% Alternate Fuel Type Percent Load Limits on Use Notes

Delivery Point Telemetered Rate Class City Gate No NCTS

Utility Account Information

LDC or Pipeline

Total Contract Total Summer (Dths) Total Winter (Dths)

Stop 42 Tyndall AFB

FL

32403-5014

Schedule Page By Line Item Detail

Tyndall AFB

Installation Address

Tyndall AFB DODAAC /

FEDAAC:119 Alabama

Address

City State

Zip

TECO Peoples Gas

58,640 31,120 27,520

Location

15,640 10,650 4,990 Jun Jul Aug Sep Oct Nov Dec

2,130 2,110 2,030 2,260 2,120 2,410 2,580

29,320 15,560 13,760 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

3,160 3,130 2,480 2,710 2,200 2,130 2,110 2,030 2,260 2,120 2,410 2,580

13,680 4,910 8,770 Jan Feb Mar Apr May

3,160 3,130 2,480 2,710 2,200

Curtailment Days Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

0 0 0 0 0 0 0 0 0 0 0 0

Overage & Shortage Volume Pricing Publication Location Methodology Include Adj. Factor

Overage Treatment Summer Volumes

Winter Volumes Shortage Treatment

Summer Volumes Winter Volumes

Note #1 Note #2

Note #3

Note #4

Multiple meters will require a single consolidated invoice with a separate breakdown of monthly meter quantities and contractor charges.

Period of performance will start/finish in alignment with TECO Peoples Gas meter reading cycle following the period beginning and period ending cited on this schedule page.

Natural Choice Transportation Service for multiple accounts/meters on TECO-Peoples Natural Gas (supplier must adjust for new or closing accounts).

06/01/25 05/31/27 INSIDE FERC'S FL Gas Zn3 (2) Full Requirements/Pool. Firm

Solicitation Parameters

Period Beginning Period Ending Publication SIP Delivery Option Delivery Type

Year 2026 Annual Totals Summer Totals Winter Totals

Year 2027 Annual Totals Summer Totals Winter Totals

Estimated Usage Information (All volumes expressed in Dths)

Meter

Year 2025 Annual Totals Summer Totals Winter Totals

Yes #4 Oil 35% Yes Emergency Back-up Alternate Fuel Type Percent Load Limits on Use Notes

Delivery Point Telemetered Rate Class City Gate No NCTS

Utility Account Information

LDC or Pipeline

Total Contract Total Summer (Dths) Total Winter (Dths)

MacDill AFB

FL

33621-5000

Schedule Page By Line Item Detail

MacDill AFB

Installation Address

MacDill AFB DODAAC /

FEDAAC:2606 Pelican Ave

Address

City State

Zip

TECO Peoples Gas

36,780 15,300 21,480

Location

7,060 4,040 3,020 Jun Jul Aug Sep Oct Nov Dec

1,130 800 780 600 730 1,090 1,930

18,390 7,650 10,740 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

2,440 2,880 2,400 2,050 1,560 1,130 800 780 600 730 1,090 1,930

11,330 3,610 7,720 Jan Feb Mar Apr May

2,440 2,880 2,400 2,050 1,560

Curtailment Days Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

0 0 0 0 0 0 0 0 0 0 0 0

Overage & Shortage Volume Pricing Publication Location Methodology Include Adj. Factor

Overage Treatment Summer Volumes

Winter Volumes Shortage Treatment

Summer Volumes Winter Volumes

Note #1 Note #2 Note #3

Note #4

Natural Choice Transportation Service for multiple accounts/meters on TECO-Peoples Natural Gas (supplier must adjust for new or closing accounts).

Multiple meters will require a single consolidated invoice with a separate breakdown of monthly meter quantities and contractor charges.

Period of performance will start/finish in alignment with TECO Peoples Gas meter reading cycle following the period beginning and period ending cited on this schedule page.

A hard copy of the invoice must be mailed to the invoice certification office.

06/01/25 05/31/27 INSIDE FERC'S FL Gas Zn3 (2) Full Requirements/Pool. Firm

Solicitation Parameters

Period Beginning Period Ending Publication SIP Delivery Option Delivery Type

Year 2026 Annual Totals Summer Totals Winter Totals

Year 2027 Annual Totals Summer Totals Winter Totals

Estimated Usage Information (All volumes expressed in Dths)

Meter

Year 2025 Annual Totals Summer Totals Winter Totals

No None 0% Alternate Fuel Type Percent Load Limits on Use Notes

Delivery Point Telemetered Rate Class City Gate No NCTS

Utility Account Information

LDC or Pipeline

Total Contract Total Summer (Dths) Total Winter (Dths)

Panama City Beach

FL

32407-0000

Schedule Page By Line Item Detail

NSA Panama City (Main Lab)

Installation Address

0007-01 NSA Panama City (Main Lab) DODAAC /

FEDAAC:101 Vernon Ave

Address

City State

Zip

TECO Peoples Gas

12,100 3,480 8,620

Location

1,820 550 1,270 Jun Jul Aug Sep Oct Nov Dec 190 60 60 90 150 460 810

6,050 1,740 4,310 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 940 1,240 860 650 540 190 60 60 90 150 460 810

4,230 1,190 3,040 Jan Feb Mar Apr May 940 1,240 860 650 540

Curtailment Days Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

0 0 0 0 0 0 0 0 0 0 0 0

Overage & Shortage Volume Pricing Publication Location Methodology Include Adj. Factor

Overage Treatment Summer Volumes

Winter Volumes Shortage Treatment

Summer Volumes Winter Volumes

Note #1 Note #2 Note #3

Note #4

Natural Choice Transportation Service for multiple accounts/meters on TECO-Peoples Natural Gas (supplier must adjust for new or closing accounts).

Multiple meters will require a single consolidated invoice with a separate breakdown of monthly meter quantities and contractor charges.

Period of performance will start/finish in alignment with TECO Peoples Gas meter reading cycle following the period beginning and period ending cited on this schedule page.

A hard copy of the invoice must be mailed to the invoice certification office.

06/01/25 05/31/27 INSIDE FERC'S FL Gas Zn3 (2) Full Requirements/Pool. Firm

Solicitation Parameters

Period Beginning Period Ending Publication SIP Delivery Option Delivery Type

Year 2026 Annual Totals Summer Totals Winter Totals

Year 2027 Annual Totals Summer Totals Winter Totals

Estimated Usage Information (All volumes expressed in Dths)

Meter

Year 2025 Annual Totals Summer Totals Winter Totals

No None 0% Alternate Fuel Type Percent Load Limits on Use Notes

Delivery Point Telemetered Rate Class City Gate No NCTS

Utility Account Information

LDC or Pipeline

Total Contract Total Summer (Dths) Total Winter (Dths)

Panama City Beach

FL

32407-0000

Schedule Page By Line Item Detail

NSA Panama City (Dive School)

Installation Address

0007-02 NSA Panama City (Dive School) DODAAC /

FEDAAC:101 Vernon Ave

Address

City State

Zip

Florida City Gas

20,440 11,360 9,080

Location

5,840 4,020 1,820 Jun Jul Aug Sep Oct Nov Dec 820 810 740 770 880 680 1,140

10,220 5,680 4,540 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

1,130 780 810 820 840 820 810 740 770 880 680 1,140

4,380 1,660 2,720 Jan Feb Mar Apr May

1,130 780 810 820 840

Curtailment Days Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

0 0 0 0 0 0 0 0 0 0 0 0

Overage & Shortage Volume Pricing Publication Location Methodology Include Adj. Factor

Overage Treatment Summer Volumes

Winter Volumes Shortage Treatment

Summer Volumes Winter Volumes

Note #1 Note #2 Note #3 Note #4

06/01/25 05/31/27 INSIDE FERC'S FL Gas Zn3 (2) Full Requirements/Pool. Firm

Solicitation Parameters

Period Beginning Period Ending Publication SIP Delivery Option Delivery Type

Year 2026 Annual Totals Summer Totals Winter Totals

Year 2027 Annual Totals Summer Totals Winter Totals

Estimated Usage Information (All volumes expressed in Dths)

Meter

Year 2025 Annual Totals Summer Totals Winter Totals

No None 0% Alternate Fuel Type Percent Load Limits on Use Notes

Delivery Point Telemetered Rate Class City Gate Yes GS-25K

Utility Account Information

LDC or Pipeline

Total Contract Total Summer (Dths) Total Winter (Dths)

Miami

FL

33177-1297

Schedule Page By Line Item Detail

Federal Bureau of Prisons, Miami

Installation Address

Federal Bureau of Prisons, Miami DODAAC /

FEDAAC:

VAMC52

15801 SW 137th Ave

Installation Fort Moore

Address

City State

Zip

Liberty Gas

1,066,000 392,000 674,000

Location

241,000 129,000 112,000 Jun Jul Aug Sep Oct Nov Dec

23,000 23,000 23,000 25,000 35,000 50,000 62,000

533,000 196,000 337,000 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

93,000 75,000 57,000 37,000 30,000 23,000 23,000 23,000 25,000 35,000 50,000 62,000

292,000 67,000 225,000 Jan Feb Mar Apr May

93,000 75,000 57,000 37,000 30,000

Curtailment Days Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

0 0 0 0 0 0 0 0 0 0 0 0

Overage & Shortage Volume Pricing Publication Location Methodology Include Adj. Factor

Overage Treatment Summer Volumes

Winter Volumes Shortage Treatment

Summer Volumes Winter Volumes

Note #1

Note #2

Note #3 Note #4

06/01/25 05/31/27 INSIDE FERC'S SoNat LA (2) Full Requirements/Pool. Firm

Solicitation Parameters

Period Beginning Period Ending Publication SIP Delivery Option Delivery Type

Year 2025 Annual Totals Summer Totals Winter Totals

Year 2027 Annual Totals Summer Totals Winter Totals

Estimated Usage Information (All volumes expressed in Dths)

City Gate

Year 2025 Annual Totals Summer Totals Winter Totals

Yes Propane 95% Yes N/A Alternate Fuel Type Percent Load Limits on Use Notes

Delivery Point Telemetered Rate Class City Gate Yes

Utility Account Information

LDC or Pipeline

Total Contract Total Summer (Dths) Total Winter (Dths)

Attn: IMBE-PWB (Royer) Fort Moore

GA

31905-4500

Schedule Page By Line Item Detail

Fort Moore

Installation Address

DODAAC/FE

DAAC:6650 Meloy Drive

Installation DODAAC/FEDAAC:

Address

City State

Zip

Centerpoint Entex

152,320 73,840 78,480

Location

39,630 25,020 14,610 Jun Jul Aug Sep Oct Nov Dec

4,920 4,730 4,800 4,910 5,660 7,020 7,590

76,160 36,920 39,240 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

8,810 8,130 7,690 6,440 5,460 4,920 4,730 4,800 4,910 5,660 7,020 7,590

36,530 11,900 24,630 Jan Feb Mar Apr May

8,810 8,130 7,690 6,440 5,460

Curtailment Days Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

0 0 0 0 0 0 0 0 0 0 0 0

Overage & Shortage Volume Pricing Publication Location Methodology Include Adj. Factor

Overage Treatment Summer Volumes

Winter Volumes Shortage Treatment

Summer Volumes Winter Volumes

Note #1

Note #2 Note #3 Note #4

Contractor Consolidated Billing is required for VAMC Shreveport in accordance with the statement of work.

CenterPoint Energy Entex holds the upstream capacity on CEGT for the customer. The contractor is required to use the capacity for deliveries to VAMC Shreveport. The customer is billed directly from CenterPoint for the pipeline capacity.

06/01/25 05/31/27 INSIDE FERC'S Enable Gas, East (2) Full Requirements/Pool. Firm

Solicitation Parameters

Period Beginning Period Ending Publication SIP Delivery Option Delivery Type

Year 2026 Annual Totals Summer Totals Winter Totals

Year 2027 Annual Totals Summer Totals Winter Totals

Estimated Usage Information (All volumes expressed in Dths)

Meter

Year 2025 Annual Totals Summer Totals Winter Totals

No None Alternate Fuel Type Percent Load Displaceable Limits on Use Notes

Delivery Point Telemetered Rate Class City Gate No LCT-1

Utility Account Information

LDC or Pipeline

Total Contract Total Summer (Dths) Total Winter (Dths)

510 East Stoner Ave

Shreveport

LA

71101-0000

Schedule Page By Line Item Detail

VAMC Shreveport

Installation Address

VAMC Shreveport

Address

City State

Zip

Gulf South Pipeline

450,280 148,020 302,260

Location

99,633 46,774 52,859 Jun Jul Aug Sep Oct Nov Dec

10,507 8,539 7,656 8,304 11,768 22,837 30,022

225,140 74,010 151,130 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

39,560 34,868 23,843 15,610 11,626 10,507 8,539 7,656 8,304 11,768 22,837 30,022

125,507 27,236 98,271 Jan Feb Mar Apr May

39,560 34,868 23,843 15,610 11,626

Curtailment Days Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

0 0 0 0 0 0 0 0 0 0 0 0

Overage & Shortage Volume Pricing Publication Location Methodology Include Adj. Factor

Overage Treatment Summer Volumes Yes

Winter Volumes Yes Shortage Treatment

Summer Volumes Yes Winter Volumes Yes

Note #1

Note #2

Note #3

Note #4

The contractor shall be required to perform contractor consolidated billing in accordance with the statement of work. Gulf South Pipeline Company, LP, will forward each installation's transportation invoice to the contractor. In return, the contractor will include these transportation costs and its supply costs on the customer invoice. Therefore, Fort Johnson will receive one invoice from the contractor, which will include both supply costs and Gulf South Pipeline., LP, transportation costs.

The customer has 6,000 DTHs of capacity in its storage account. The storage account will be managed by the contractor to keep customer's supply balanced and provide additional gas in emergency situations or as needed and directed by the installation. Monthly invoices will have seperate line items documenting the starting balance, amount of gas that is either injected or withdrawn, and the ending balance for the storage account. The invoice will also include a seperate line item to reflect the quantity and the additional price and/or credit for any gas that is either injected or withdrawn from the storage account.

A. The customer owns excess capacity on the pipeline. The customer owns a total of 4,200 DTHs/day of FTS on the pipeline. Any excess capacity utilized by the contractor will be rebated to the customer at a rate of 50% of the nominal rate charged to the installation by Gulf South Pipeline for this capacity. The contractor's monthly invoice will include a seperate line item to reflect any credits due for the utilization of excess capacity.

B. The excess capacity will be handled in accordance with the statement of work, paragraph (L), the contractor shall manage the excess capacity.

A. Fort Johnson's total MDQ for Firm (Contract#16106) is 4,200 Dths and its MDQ for No-Notice (Contract #14583) is 800 Dths. Receipt points for Firm and No-Notice for Fort Johnson are SLN#0004708 and SLN#0003260 and delivery points are SLN#0002989 and SLN#002990. The term MDQ is not intended to communicate a maximim monthly order quantity. See clause C700 and 52.216-21.

B. The contractor shall deliver natural gas supplies FOB Burnertip. The contractor's obligation is to deliver gas supplies via Government's owned capacity on the pipeline.

GAS DAILY PRICE GUIDE Henry Hub Simple Average 1-EOM GAS DAILY PRICE GUIDE Henry Hub Simple Average 1-EOM

GAS DAILY PRICE GUIDE Henry Hub Simple Average 1-EOM GAS DAILY PRICE GUIDE Henry Hub Simple Average 1-EOM

06/01/25 05/31/27 INSIDE FERC'S Henry Hub

(3) Monthly Order

Quantities.

Firm

Solicitation Parameters

Period Beginning Period Ending Publication SIP Delivery Option Delivery Type

Year 2026 Annual Totals Summer Totals Winter Totals

Year 2027 Annual Totals Summer Totals Winter Totals

Estimated Usage Information (All volumes expressed in Dths)

Burner Tip

Year 2025 Annual Totals Summer Totals Winter Totals

No None Alternate Fuel Type Percent Load Displaceable Limits on Use Notes

Delivery Point Telemetered Rate Class Burner Tip Yes

Utility Account Information

LDC or Pipeline

Total Contract Total Summer (Dths) Total Winter (Dths)

Bldg 350 Suite 230 Fort Johnson

LA

71459-5440

Schedule Page By Line Item Detail

Fort Johnson

Installation Address

Fort Johnson DODAAC/FE

DAAC:DPW, BOID (Business Operations Div), 6661 Warrior Trail

Address

City State

Zip

Centerpoint Entex

369,660 116,550 253,110

Location

80,614 36,435 44,179 Jun Jul Aug Sep Oct Nov Dec

7,120 6,465 6,299 6,614 9,937 18,266 25,913

184,830 58,275 126,555 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

33,097 30,099 19,180 12,652 9,188 7,120 6,465 6,299 6,614 9,937 18,266 25,913

104,216 21,840 82,376 Jan Feb Mar Apr May

33,097 30,099 19,180 12,652 9,188

Curtailment Days Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

0 0 0 0 0 0 0 0 0 0 0 0

Overage & Shortage Volume Pricing Publication Location Methodology Include Adj. Factor

Overage Treatment Summer Volumes

Winter Volumes Shortage Treatment

Summer Volumes Winter Volumes

Note #1

Note #2

Payment office is DFAS, but do not contact them before contacting the local payment office, Ms Ty'Kesha Williams-Saunders, (318) 456-2158. DFAS address is DFAS DEAMS - F87700 - PAYMENT, ACCTG DISB STATION 387700, 27 ARKANSAS RD, LIMESTONE, ME 04751-6216

Contractor consolidated billing is required in acordance with the statement of work.

06/01/25 05/31/27 INSIDE FERC'S Enable Gas, East (2) Full Requirements/Pool. Firm

Solicitation Parameters

Period Beginning Period Ending Publication SIP Delivery Option Delivery Type

Year 2026 Annual Totals Summer Totals Winter Totals

Year 2027 Annual Totals Summer Totals Winter Totals

Estimated Usage Information

(All volumes expressed in Dths) Meter

Year 2025 Annual Totals Summer Totals Winter Totals

No Alternate Fuel Type Percent Load Displaceable Limits on Use Notes

Delivery Point Telemetered Rate Class City Gate Yes LCS-1

Utility Account Information

LDC or Pipeline

Total Contract Est. Total Summer (Dths) Total Winter (Dths)

334 Davis Ave West, Ste 308 Barksdale

LA

71110-2078

Schedule Page By Line Item Detail

Barksdale AFB

Installation Address

Barksdale AFB DODAAC/FE

DAAC:2d Civil Engineer Sqd

Address

City State

Zip

Centerpoint Entex

485,700 239,200 246,500

Location

132,440 83,160 49,280 Jun Jul Aug Sep Oct Nov Dec

16,340 16,140 15,170 15,410 20,100 21,480 27,800

242,850 119,600 123,250 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

28,230 23,790 21,950 19,400 17,040 16,340 16,140 15,170 15,410 20,100 21,480 27,800

110,410 36,440 73,970 Jan Feb Mar Apr May

28,230 23,790 21,950 19,400 17,040

Curtailment Days Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

0 0 0 0 0 0 0 0 0 0 0 0

Overage & Shortage Volume Pricing Publication Location Methodology Include Adj. Factor

Overage Treatment Summer Volumes

Winter Volumes Shortage Treatment

Summer Volumes Winter Volumes

Note #1 Note #2 Note #3 Note #4

Load data includes service to Base, Medical Center, Multi-family Housing via master meter.

Contractor Consolidated Billing is required for Keesler AFB in accordance with the Statement of Work.

06/01/25 05/31/27 INSIDE FERC'S Henry Hub (2) Full Requirements/Pool. Firm

Solicitation Parameters

Period Beginning Period Ending Publication SIP Delivery Option Delivery Type

Year 2026 Annual Totals Summer Totals Winter Totals

Year 2027 Annual Totals Summer Totals Winter Totals

Estimated Usage Information (All volumes expressed in Dths)

Meter

Year 2025 Annual Totals Summer Totals Winter Totals

No None Alternate Fuel Type Percent Load Limits on Use Notes

Delivery Point Telemetered Rate Class City Gate Yes MT-3

Utility Account Information

LDC or Pipeline

Total Contract Total Summer (Dths) Total Winter (Dths)

500 Fisher Street, Suite 244 Keesler Air Force Base

MS

39534-0000

Schedule Page By Line Item Detail

Keesler Air Force Base

Installation Address

Keesler Air Force Base DODAAC/FE

DAAC:81st Civil Engineering Squadron

Address

City State

Zip

Centerpoint Entex

173,600 92,100 81,500

Location

47,850 32,200 15,650 Jun Jul Aug Sep Oct Nov Dec

6,510 6,200 6,490 6,210 6,790 7,080 8,570

86,800 46,050 40,750 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

9,180 8,070 7,850 7,090 6,760 6,510 6,200 6,490 6,210 6,790 7,080 8,570

38,950 13,850 25,100 Jan Feb Mar Apr May

9,180 8,070 7,850 7,090 6,760

Curtailment Days Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

0 0 0 0 0 0 0 0 0 0 0 0

Overage & Shortage Volume Pricing Publication Location Methodology Include Adj. Factor

Overage Treatment Summer Volumes

Winter Volumes Shortage Treatment

Summer Volumes Winter Volumes

Note #1 Note #2 Note #3 Note #4

06/01/25 05/31/27 INSIDE FERC'S Henry Hub (2) Full Requirements/Pool. Firm

Solicitation Parameters

Period Beginning Period Ending Publication SIP Delivery Option Delivery Type

Year 2026 Annual Totals Summer Totals Winter Totals

Year 2027 Annual Totals Summer Totals Winter Totals

Estimated Usage Information

(All volumes expressed in Dths) Meter

Year 2025 Annual Totals Summer Totals Winter Totals

No Alternate Fuel Type Percent Load Displaceable Limits on Use Notes

Delivery Point Telemetered Rate Class City Gate Yes 49

Utility Account Information

LDC or Pipeline

Total Contract Total Summer (Dths) Total Winter (Dths)

Biloxi

MS

39531-0000

Schedule Page By Line Item Detail

VAMC Biloxi

Installation Address

VAMC Biloxi DODAAC/FE

DAAC:400 Veterans Avenue

Address

City State

Zip

Gulf South Pipeline

283,000 130,000 153,000

Location

73,000 41,500 31,500 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

9,000 9,000 7,500 8,500 7,500 15,500 16,000

141,500 65,000 76,500 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

17,000 15,500 12,500 12,500 11,000 9,000 9,000 7,500 8,500 7,500 15,500 16,000

68,500 23,500 45,000 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

17,000 15,500 12,500 12,500 11,000

Curtailment Days Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

0 0 0 0 0 0 0 0 0 0 0 0

Overage & Shortage Volume Pricing Publication Location Methodology Include Adj. Factor

Overage Treatment Summer Volumes

Winter Volumes Shortage Treatment

Summer Volumes Winter Volumes

Note #1 Note #2 Note #3 Note #4

Delivery Point is North Fee Area Boundary of Stennis Space Center (Gulf South Station Location Number 2568).

Contractor Consolidated Billing (Gulf South Pipeline charges) is required for Stennis Space Center in accordance with the Statement of Work.

All Voucher/Invoice submissions are to be sumbitted through the Invoice Processing Platform (ipp.gov) as per NASA FAR Supplement (NFS) 1852.232.80.

DLA Energy requires an emailed copy of supplier invoices and Gulf South Pipeline invoices.

06/01/25 05/31/27 INSIDE FERC'S Henry Hub (2) Full Requirements/Pool. Firm

Solicitation Parameters

Period Beginning Period Ending Publication SIP Delivery Option Delivery Type

Year 2026 Annual Totals Summer Totals Winter Totals

Year 2027 Annual Totals Summer Totals Winter Totals

Estimated Usage Information (All volumes expressed in Dths)

Meter

Year 2025 Annual Totals Summer Totals Winter Totals

No 0% No Alternate Fuel Type Percent Load Limits on Use Notes

Delivery Point Telemetered Rate Class Burner Tip No FTS

Utility Account Information

LDC or Pipeline

Total Contract Total Summer (Dths) Total Winter (Dths)

Stennis Space Center

MS

39529

Schedule Page By Line Item Detail

Stennis Space Center

Installation Address

Stennis Space Center DODAAC /

FEDAAC:1100 Balch Blvd

Address

City State

Zip

Dominion Energy

317,094 139,304 177,790

Location

82,161 46,403 35,758 Jun Jul Aug Sep Oct Nov Dec

8,950 8,911 8,619 8,177 11,746 16,389 19,369

158,547 69,652 88,895 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

20,276 17,132 15,729 12,580 10,669 8,950 8,911 8,619 8,177 11,746 16,389 19,369

76,386 23,249 53,137 Jan Feb Mar Apr May

20,276 17,132 15,729 12,580 10,669

Curtailment Days Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

0 0 0 0 0 0 0 0 0 0 0 0

Overage & Shortage Volume Pricing Publication Location Methodology Include Adj. Factor

Overage Treatment Summer Volumes

Winter Volumes Shortage Treatment

Summer Volumes Winter Volumes

Note #1 Five meters currently serve the Corrections Complex.

06/01/25 05/31/27 INSIDE FERC'S Transco Zn5 Del South (2) Full Requirements/Pool. Firm

Solicitation Parameters

Period Beginning Period Ending Publication SIP Delivery Option Delivery Type

Year 2026 Annual Totals Summer Totals Winter Totals

Year 2027 Annual Totals Summer Totals Winter Totals

Estimated Usage Information (All volumes expressed in Dths)

City Gate

Year 2025 Annual Totals Summer Totals Winter Totals

Yes #2 Oil 0% Yes Emergency Operations Only Alternate Fuel Type Percent Load Limits on Use Notes

Delivery Point Telemetered Rate Class City Gate Yes 175

Utility Account Information

LDC or Pipeline

Total Contract Total Summer (Dths) Total Winter (Dths)

P.O. Box 999 Butner

NC

27509-0000

Schedule Page By Line Item Detail

Federal Corrections Complex Butner

Installation Address

Federal Corrections Complex Butner DODAAC/FE

DAAC:Old NC Hwy 75

Address

City State

Zip

Piedmont Natural Gas

2,616,000 976,000 1,640,000

Location

625,000 315,000 310,000 Jun Jul Aug Sep Oct Nov Dec

62,000 56,000 56,000 58,000 83,000 135,000 175,000

1,308,000 488,000 820,000 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

205,000 155,000 150,000 98,000 75,000 62,000 56,000 56,000 58,000 83,000 135,000 175,000

683,000 173,000 510,000 Jan Feb Mar Apr May

205,000 155,000 150,000 98,000 75,000

Curtailment Days Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

0 0 0 0 0 0 0 0 0 0 0 0

Overage & Shortage Volume Pricing Publication Location Methodology Include Adj. Factor

Overage Treatment Summer Volumes Yes

Winter Volumes Yes Shortage Treatment

Summer Volumes Yes Winter Volumes Yes

Note #1 Note #2 Note #3 Note #4

GAS DAILY PRICE GUIDE Transco Zn5 Del. South Simple Average 1-EOM GAS DAILY PRICE GUIDE Transco Zn5 Del. South Simple Average 1-EOM

GAS DAILY PRICE GUIDE Transco Zn5 Del. South Simple Average 1-EOM GAS DAILY PRICE GUIDE Transco Zn5 Del. South Simple Average 1-EOM

06/01/25 05/31/27 INSIDE FERC'S Transco Zn5 Del. South

(3) Monthly Order

Quantities.

Firm

Solicitation Parameters

Period Beginning Period Ending Publication SIP Delivery Option Delivery Type

Year 2026 Annual Totals Summer Totals Winter Totals

Year 2027 Annual Totals Summer Totals Winter Totals

Estimated Usage Information (All volumes expressed in Dths)

Meter

Year 2025 Annual Totals Summer Totals Winter Totals

No Alternate Fuel Type Percent Load Limits on Use Notes

Delivery Point Telemetered Rate Class City Gate Yes LGST-113

Utility Account Information

LDC or Pipeline

Total Contract Total Summer (Dths) Total Winter (Dths)

Fort Liberty

NC

28310-5000

Schedule Page By Line Item Detail

Fort Liberty

Installation Address

Fort Liberty DODAAC/FE

DAAC:Directorate of Public Works (MSE-BRG-PWO)

Address

City State

Zip

Piedmont Natural Gas

1,577,000 693,000 884,000

Location

396,500 230,000 166,500 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

45,000 45,000 45,000 45,000 50,000 70,000 96,500

788,500 346,500 442,000 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

100,000 90,500 85,000 63,000 53,500 45,000 45,000 45,000 45,000 50,000 70,000 96,500

392,000 116,500 275,500 Jan Feb Mar Apr May

100,000 90,500 85,000 63,000 53,500

Curtailment Days Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

0 0 0 0 0 0 0 0 0 0 0 0

Overage & Shortage Volume Pricing Publication Location Methodology Include Adj. Factor

Overage Treatment Summer Volumes

Winter Volumes Shortage Treatment

Summer Volumes Winter Volumes

Note #1 Note #2 Note #3 Note #4

06/01/25 05/31/27 INSIDE FERC'S Transco Zn5 Del. South (2) Full Requirements/Pool. Firm

Solicitation Parameters

Period Beginning Period Ending Publication SIP Delivery Option Delivery Type

Year 2026 Annual Totals Summer Totals Winter Totals

Year 2027 Annual Totals Summer Totals Winter Totals

Estimated Usage Information

(All volumes expressed in Dths) Meter

Year 2025 Annual Totals Summer Totals Winter Totals

Yes #2 Oil 100% Yes Emergency Only Alternate Fuel Type Percent Load Displaceable Limits on Use Notes

Delivery Point Telemetered Rate Class City Gate Yes

Utility Account Information

LDC or Pipeline

Total Contract Total Summer (Dths) Total Winter (Dths)

Cherry Point

NC

28533

Schedule Page By Line Item Detail

Marine Corps Air Station-Cherry Point

Installation Address

Marine Corps Air Station-Cherry Point DODAAC/FED

AAC:

30000

PSC Box 8005

Address

City State

Zip

Summit Utilities

323,350 59,792 263,558

Location

68,737 15,439 53,298 Jun Jul Aug Sep Oct Nov Dec

1,749 1,255 1,225 1,483 9,727 23,424 29,874

162,221 30,442 131,779 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

29,214 26,946 22,321 9,644 4,267 1,919 1,697 1,475 1,713 9,727 23,424 29,874

92,392 13,911 78,481 Jan Feb Mar Apr May

29,214 26,946 22,321 9,644 4,267

Curtailment Days Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

0 0 0 0 0 0 0 0 0 0 0 0

Overage & Shortage Volume Pricing Publication Location Methodology Include Adj. Factor

Overage Treatment Summer Volumes Yes

Winter Volumes Yes Shortage Treatment

Summer Volumes Yes Winter Volumes Yes

Note #1 There are two meters that will be served under LCS-1 on the contract. The 1866 W River Dr meter location will remain on utility service at a projected load of 500 dth per year.

GAS DAILY PRICE GUIDE Enable Gas East Simple Average 1-EOM GAS DAILY PRICE GUIDE Enable Gas East Simple Average 1-EOM

GAS DAILY PRICE GUIDE Enable Gas East Simple Average 1-EOM GAS DAILY PRICE GUIDE Enable Gas East Simple Average 1-EOM

06/01/25 05/31/27 INSIDE FERC'S Enable Gas East

(3) Monthly Order

Quantities.

Firm

Solicitation Parameters

Period Beginning Period Ending Publication SIP Delivery Option Delivery Type

Year 2026 Annual Totals Summer Totals Winter Totals

Year 2027 Annual Totals Summer Totals Winter Totals

Estimated Usage Information (All volumes expressed in Dths)

City Gate

Year 2025 Annual Totals Summer Totals Winter Totals

No Alternate Fuel Type Percent Load Limits on Use Notes

Delivery Point Telemetered Rate Class City Gate Yes LCS-1

Utility Account Information

LDC or Pipeline

Total Contract Total Summer (Dths) Total Winter (Dths)

Altus

OK

75323

Schedule Page By Line Item Detail

Altus Air Force Base

Installation Address

Altus Air Force Base DODAAC/FE

DAAC:209 E Sir Dr

Address

City State

Zip

Summit Utilities

1,053,000 288,000 765,000

Location

217,000 87,000 130,000 Jun Jul Aug Sep Oct Nov Dec

16,000 12,000 14,000 15,000 30,000 50,000 80,000

524,000 144,000 380,000 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

95,000 95,000 60,000 35,000 22,000 16,000 12,000 14,000 15,000 30,000 50,000 80,000

312,000 57,000 255,000 Jan Feb Mar Apr May

100,000 95,000 60,000 35,000 22,000

Curtailment Days Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

0 0 0 0 0 0 0 0 0 0 0 0

Overage & Shortage Volume Pricing Publication Location Methodology Include Adj. Factor

Overage Treatment Summer Volumes Yes

Winter Volumes Yes Shortage Treatment

Summer Volumes Yes Winter Volumes Yes

Note #1

Note #2

Note #3 Note #4

CenterPoint Energy Gas Transmission (CEGT) Pipeline requires the contractor to add additional gas for fuel loss for the gas to be delivered to West Pooling Area 2. The cost for this gas will be included in the adjustment factor.

The Government has a rate rider 1 transport agreement with the LDC which includes a pipeline capacity of 7021 Dths per day with CEGT.

CenterPoint Energy Arkla holds the upstream capacity on CEGT for the customer. The contractor is required to use the capacity for deilveries to Fort Sill. The customer is billed directly by CenterPoint for the pipeline capacity.

GAS DAILY PRICE GUIDE Enable Gas, East Simple Average 1-EOM GAS DAILY PRICE GUIDE Enable Gas, East Simple Average 1-EOM

GAS DAILY PRICE GUIDE Enable Gas, East Simple Average 1-EOM GAS DAILY PRICE GUIDE Enable Gas, East Simple Average 1-EOM

06/01/25 05/31/27 INSIDE FERC'S Enable Gas, East

(3) Monthly Order

Quantities.

Firm

Solicitation Parameters

Period Beginning Period Ending Publication SIP Delivery Option Delivery Type

Year 2026 Annual Totals Summer Totals Winter Totals

Year 2027 Annual Totals Summer Totals Winter Totals

Estimated Usage Information (All volumes expressed in Dths)

City Gate

Year 2025 Annual Totals Summer Totals Winter Totals

No Alternate Fuel Type Percent Load Limits on Use Notes

Delivery Point Telemetered Rate Class City Gate Yes LCS-1

Utility Account Information

LDC or Pipeline

Total Contract Total Summer (Dths) Total Winter (Dths)

Building 1950 Fort Sill

OK

73503-5100

Schedule Page By Line Item Detail

Fort Sill

Installation Address

Fort Sill DODAAC/FE

DAAC:

W44DQ1

Director Public Works, 1950…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .