This is a Reliability and Maintenance (RM) Event Report documenting the quarterly maintenance completion status for fuel system infrastructure at Naval Air Weapons Station (NAWS) China Lake under Contract No. 47QSHA18D002M, Order Number W912DY24F0012. The report dated February 13, 2026, covers the second operational year (OY2) Q1 performance for GSA Region SPD-N1 and details maintenance activities across multiple fuel farm facilities including the pump house, storage tanks, aircraft issue stands, and tank truck offload areas.
The maintenance report documents the completion status of numerous system inspections and maintenance tasks organized by component type and UFC (Unified Facilities Criteria) section reference. Key components inspected include signage and markings, filter separators, basket strainers, positive displacement meters, centrifugal pumps, loading and offloading fuel hoses, air eliminator tanks, dual rate-of-flow control valves, defuel/flush valves, pressure control valves, fueling nozzles, aboveground piping, ball valves, double block and bleed valves, thermal and pressure relief valves, fire valves, motor operators, various gauges, sight flow indicators, EFSO (Emergency Fuel Shutoff) systems, aboveground storage tanks (both field-erected and shop-fabricated), floating roofs, and mechanical tape gauges. The majority of inspections at bulk storage facilities were marked as "Completed" with dates between February 10-12, 2026, completed by personnel identified as Tremayne Dale and Roland Despres. Several items at the Flight Line Hot Pit A/C Refuel facility were marked "Not Available" with notation that the facility is "under modernization." Notable deficiencies documented include three offloading hoses with leaking issues and one ball valve that required repairs during the maintenance event, while two floating roof tanks showed deteriorating chime seals requiring a service order. The report indicates compliance with established maintenance schedules and identifies items requiring service order completion or future contract work.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RM Format
| Contract | Contract No. 47QSHA 18D002M Order Number: W912DY24F0012 | GSA Region: | SPD-N1 | |
| Site | NAWS China Lake (CLK) | |||
| Date | 13-Feb-26 | |||
| RM Event(s) | OY2 Q1-SA1 |
| Applicable Facility Assets | UFC System Level Maintenance Frequency | Responsibility | RM Completion Record Result | Date Completed | Completed By | Deficiencies | Responsible FMSR | Notes | Add to Def List? | ||||||||||
| UFC Section Reference | Real Property Facility # | Real Property Facility Name | Operational Area | Component Type | Base Asset ID | Component Unique Identifier (CUID) | Make | Model | Capacity/Size | ||||||||||
| H | Signage and Markings (Section 2-7) | ||||||||||||||||||
| T | A. Check permanent signs and markings for adequacy and readability. Repair or replace deteriorated or illegible signs and markings. | Monthly | OM | ||||||||||||||||
| T | B. Inspect the location of Department of Transportation (DOT) regulated underground pipelines and ensure they are marked in accordance with 49 Code of Federal Regulations (CFR) 195.410. | Monthly | OM | ||||||||||||||||
| T | C. Check that all non-DOT regulated pipelines, tanks, valves, pumps, meters, and other equipment are marked in accordance with UFC 3- 460-01 Section 2-18. If markings are missing or insufficient, repair or add markings in accordance with UFC 3-460-01. | Monthly | OM | ||||||||||||||||
| T | D. Ensure petroleum fuel system Emergency Fuel Shutoff (EFSO) push buttons are properly identified at each location. Ensure that signage is properly secured and that the lettering is legible from 25 feet (7.5 meters) away and not faded. | Monthly | OM | ||||||||||||||||
| T | E. Verify enough movable or temporary signs are maintained in good condition to serve anticipated needs; for example: "DANGER," "CLOSED TO TRAFFIC," "KEEP FLAMES AWAY," "MEN WORKING," "NO SMOKING," "DANGER NO OPEN FLAME OR IGNITION SOURCE BEYOND THIS POINT." Use bilingual signs when appropriate. | Annually | OM | ||||||||||||||||
| I | 2-7 | 201 | FUEL FARM BRANCH OFFICE | Administrative Area | SIGN | Signage/Markings | CLK-0000020286-SIGN-0488 | _miscellaneous | _miscellaneous | _miscellaneous | Completed | 2/12/26 | TREMAYNE DALE | ROLAND DESPRES | |||||
| H | Filter Separators (Section 3-6.2) | ||||||||||||||||||
| T | G. Refer to Section 6-7.2 Differential Pressure Gauges for inspection and maintenance requirements of differential pressure gauges. | Reference to Other | SM | ||||||||||||||||
| T | H. Refer to Section 3-10.2 Automatic Air Vents for inspection and maintenance requirements of automatic air vents. | Reference to Other | SM | ||||||||||||||||
| T | I. Refer to Section 6-6.3 Thermal and Pressure Relief Valves for inspection and maintenance requirements of thermal and pressure relief valves. | Reference to Other | SM | ||||||||||||||||
| T | J. Refer to Section 4-4.2.2 Filter Separator Control Valves for inspection and maintenance requirements of filter separator control valves. | Reference to Other | SM | ||||||||||||||||
| T | A. Open drain under flow conditions until clear fuel is observed from the drain valve. | Daily | OM | ||||||||||||||||
| T | B. Monitor differential pressure of coalescer cartridges. The acceptable maximum differential pressure for a specific filter/separator is dependent on the system flow rate. Monitor and chart differential pressure measurements of filter separators from readings taken during normal operations. Investigate sudden drops or spikes in differential pressure measurement readings. | Daily | OM | ||||||||||||||||
| T | C. Operate filter separator isolation valves. | Quarterly | SM | ||||||||||||||||
| T | D. Inspect components and check operation of water shutoff system. | Quarterly | SM | ||||||||||||||||
| T | E. Change coalescer cartridges. Refer to Section 3-6.2.2 Replacement of Coalescer Cartridges for general instructions on replacement of coalescer cartridges. Military Service-specific SCP may extend the coalescer cartridge replacement frequency based on differential pressure if filters separators are used on high throughput systems. Check expiration date of replacement coalescer cartridges before installation. |
| Frequency: Routine coalescer changes shall be performed as part of the FFP maintenance activities. Coalescer cartridge changes required due to a repair or other circumstance beyond normal system operation shall be performed by service order. | See Description | SM | ||
| T | F. Inspect and clean separator cartridges at time of coalescer cartridge change in accordance with Section 3-6.2.3 Separator Cleaning. Worn or damaged separator cartridges shall be replaced. |
| Frequency: Every 36 months or sooner if required by differential pressure. Every 36 months or sooner if required by differential pressure. Routine separator cartridge cleaning shall be performed as part of the FFP maintenance activities. Separator cartridge changes shall be performed by service order. | See Description | SM | ||
| T | K. Conduct inspections of code rated vessels that meet the requirements of UFC 3-430-07 Operations and Maintenance: Inspection and Certification of Boilers and Unfired Pressure Vessels. |
| Frequency: As required by UFC 3-430-07. This task shall be performed by SO or another contract. The contractor shall identify when this task is required in the Facility Maintenance Plan. | See Description | SM | ||||||||||||||||
| I | 3-6.2 | 201 | FUEL FARM PUMP HOUSE | Bulk Storage | FLSP | FS #1 Filtration | CLK-0000020317-FLSP-0036 | Facet | VCS-543-236 Serial #95363 | 600GPM | Completed | 2/10/26 | TREMAYNE DALE | ROLAND DESPRES | ||||
| I | 3-6.2 | 201 | FUEL FARM PUMP HOUSE | Bulk Storage | FLSP | FS #2 Filtration | CLK-0000020317-FLSP-0037 | Facet | VCS-543-236 Serial #95367 | 600GPM | Completed | 2/10/26 | TREMAYNE DALE | ROLAND DESPRES | ||||
| I | 3-6.2 | 201 | FUEL FARM PUMP HOUSE | Bulk Storage | FLSP | FS #3 Filtration | CLK-0000020317-FLSP-0038 | Facet | VCS-543-236 Serial #95365 | 600GPM | Completed | 2/10/26 | TREMAYNE DALE | ROLAND DESPRES | ||||
| I | 3-6.2 | 201 | FUEL FARM PUMP HOUSE | Bulk Storage | FLSP | FS #4 Filtration | CLK-0000020317-FLSP-0039 | Facet | VCS-543-236 Serial #95366 | 600GPM | Completed | 2/10/26 | TREMAYNE DALE | ROLAND DESPRES | ||||
| I | 3-6.2 | 201 | FUEL FARM PUMP HOUSE | Bulk Storage | FLSP | FS #5 Filtration | CLK-0000020317-FLSP-0042 | Facet | VCS-543-236 Serial #95364 | 600GPM | Completed | 2/10/26 | TREMAYNE DALE | ROLAND DESPRES | ||||
| I | 3-6.2 | 201 | FUEL FARM HOT PIT A/C REFUEL | Flight Line | FLSP | Filtration | CLK-0000020309-FLSP-0057 | Velcon | SHVM2033150MT Serial #67987 | 600GPM | Not Available | 2/10/206 | TREMAYNE DALE | ROLAND DESPRES | Flight Line under modernization | |||
| H | Basket Strainers (Section 3-6.4) | |||||||||||||||||
| T | A. Monitor and chart differential pressure measurements of basket strainers from readings taken during normal operations. Investigate sudden drops or spikes in differential pressure measurement reading. | Daily | OM | |||||||||||||||
| T | B. Clean and inspect basket and strainer screen. Basket strainer isolation valves shall be closed and the strainer body shall be drained before removing the cover. After cleaning, the strainer screen shall be inserted in the strainer body, and the head tightened and checked for leakage. If strainer is not equipped with means to measure differential pressure, unit shall be opened monthly and inspection. |
| Frequency: Semi-annually if basket strainer is equipped with means to measure differential pressure; otherwise quarterly | See Description | OM | ||||||||||||||||
| T | C. Refer to Section 6-7.2 Differential Pressure Gauges for inspection and maintenance requirements of differential pressure gauges. | Reference to Other | SM | |||||||||||||||
| I | 3-6.4 | 201 | FUEL FARM ARCRFT ISSUE STAND | Bulk Storage | BSTR | Filtration | CLK-0000020315-BSTR-0082 | Titan | BS85 12103013 61210301 | 6" | Completed | 2/12/26 | TREMAYNE DALE | ROLAND DESPRES | ||||
| I | 3-6.4 | 201 | FUEL FARM HOT PIT A/C REFUEL | Flight Line | BSTR | Filtration | CLK-0000020309-BSTR-0345 | Morrison Brothers Co | 286FDI | 3" | Not Available | 2/12/26 | TREMAYNE DALE | ROLAND DESPRES | Flight Line under modernization | |||
| I | 3-6.4 | 201 | FUEL FARM TNK TRCK OFF LOAD | Bulk Storage | BSTR | Filtration | CLK-0000020329-BSTR-0068 | Titan | BS85 12103013 61210301 | 6" | Completed | 2/12/26 | TREMAYNE DALE | ROLAND DESPRES | ||||
| I | 3-6.4 | 201 | FUEL FARM ARCRFT ISSUE STAND | Bulk Storage | BSTR | Filtration | CLK-0000020315-BSTR-0069 | Titan | BS85 12103013 61210301 | 6" | Completed | 2/12/26 | TREMAYNE DALE | ROLAND DESPRES | ||||
| I | 3-6.4 | 201 | FUEL FARM PUMP HOUSE | Bulk Storage | BSTR | Filtration | CLK-0000020317-BSTR-0070 | Titan | BS85 H562 | 600GPM | Completed | 2/12/26 | TREMAYNE DALE | ROLAND DESPRES | ||||
| I | 3-6.4 | 201 | FUEL FARM TNK TRCK OFF LOAD | Bulk Storage | BSTR | Filtration | CLK-0000020329-BSTR-0074 | Titan | BS85 12103013 61210301 | 600GPM | Completed | 2/12/26 | TREMAYNE DALE | ROLAND DESPRES | ||||
| I | 3-6.4 | 201 | FUEL FARM PUMP HOUSE | Bulk Storage | BSTR | Filtration | CLK-0000020317-BSTR-0076 | Titan | BS85 H562 | 600GPM | Completed | 2/12/26 | TREMAYNE DALE | ROLAND DESPRES | ||||
| H | Positive Displacement Meters (Section 3-7.1) | |||||||||||||||||
| T | A. Inspect counter head for unusual noises and smooth operation. | Monthly | OM | |||||||||||||||
| T | B. Positive displacement meters shall be inspected and calibrated semi-annually or when improper performance is suspected; when unusual sounds or register actions develop; or after repairs have been made which may affect performance. Positive displacement meters are satisfactory when the measurement error in the normal flow direction is within ±0.3% of actual quantity delivered (e.g., ±1.8 gallons for a 600-gallon test (±6.8 liters for a 2275-liter test)). Adjustment of the meter’s register will be in accordance with manufacturer’s instructions. Identify the next calibration date on meters (example: Mar 14 for March 2014). Use weather resistant label that will remain legible and affixed for at least one year. |
| Frequency: Calibration shall be done by SO if QAE requests an out of cycle calibration due to circumstances beyond normal operation. | Semi-annually | SM | ||
| T | C. Inspect temperature element operation of meters equipped with temperature compensation feature per manufacturer"s operation and maintenance manual. |
| Frequency: Or as required by manufactures" operation and maintenance manual. | Semi-annually | SM | ||||||||||||||||
| I | 3-7.1 | 201 | FUEL FARM TNK TRCK OFF LOAD | Bulk Storage | PDMT | Meter/calibrations | CLK-0000020329-PDMT-0096 | LectroCount | E2658 48-166856 | 350gpm | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | ||||
| I | 3-7.1 | 201 | FUEL FARM ARCRFT ISSUE STAND | Bulk Storage | PDMT | Meter/calibrations | CLK-0000020315-PDMT-0104 | LectroCount | E2658 48-166856 | 600GPM | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | ||||
| I | 3-7.1 | 201 | FUEL FARM TNK TRCK OFF LOAD | Bulk Storage | PDMT | Meter/calibrations | CLK-0000020329-PDMT-0105 | LectroCount | E2658 48-166856 | 350GPM | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | ||||
| I | 3-7.1 | 201 | FUEL FARM TNK TRCK OFF LOAD | Bulk Storage | PDMT | Meter/calibrations | CLK-0000020329-PDMT-0110 | LectroCount | E2658 48-166856 | 350GPM | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | ||||
| I | 3-7.1 | 201 | FUEL FARM ARCRFT ISSUE STAND | Bulk Storage | PDMT | Meter/calibrations | CLK-0000020315-PDMT-0117 | LectroCount | E2658 48-166856 | 600GPM | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | ||||
| I | 3-7.1 | 201 | FUEL FARM HOT PIT A/C REFUEL | Flight Line | PDMT | Meter/calibrations | CLK-0000020309-PDMT-0404 | Veeder-Root | 845693-211 | 2885 | Not Available | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | Flight Line under modernization | |||
| I | 3-7.1 | 201 | FUEL FARM ARCRFT ISSUE STAND | Bulk Storage | PDMT | Meter/calibrations | CLK-0000020315-PDMT-0423 | LectroCount | E2658 48-166856 | 600GPM | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | ||||
| I | 3-7.1 | 201 | FUEL FARM TNK TRCK OFF LOAD | Bulk Storage | PDMT | Meter/calibrations | CLK-0000020329-PDMT-0436 | LectroCount | E2658 48-166856 | 350gpm | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | ||||
| I | 3-7.1 | 201 | FUEL FARM TNK TRCK OFF LOAD | Bulk Storage | PDMT | Meter/calibrations | CLK-0000020329-PDMT-0072 | LectroCount | E2658 48-166856 | 350gpm | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | ||||
| I | 3-7.1 | 201 | FUEL FARM TNK TRCK OFF LOAD | Bulk Storage | PDMT | Meter/calibrations | CLK-0000020329-PDMT-0073 | LectroCount | E2658 48-166856 | 350gpm | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | ||||
| H | Centrifugal Pumps (Section 3-8.1) | |||||||||||||||||
| T | J. Refer to Section 9-1.7 Electric Motors for inspection and maintenance requirements of electric motors. | Reference to Other | SM | |||||||||||||||
| T | A. Check for proper operations while pump is in use. Check suction and discharge pressure gauge for abnormal readings. | Quarterly | SM | |||||||||||||||
| T | B. Check for unusual noise, vibration, overheating of bearings or case. | Quarterly | SM | |||||||||||||||
| T | C. If equipped with lubricating oil charge, check oil level and adjust as necessary. | Quarterly | SM | |||||||||||||||
| T | D. Tighten or replace loose, missing or damaged nuts, bolts, or screws. | Quarterly | SM | |||||||||||||||
| T | E. Inspect suction and discharge isolation dampeners for misalignment and wear. | Quarterly | SM | |||||||||||||||
| T | F. Inspect mechanical seals, if possible, for proper operating temperature, drips, leaks and dirt. | Quarterly | SM | |||||||||||||||
| T | G. Check alignment, clearances, and rotation of shaft and coupler (requires removal of coupler shroud or cover). | Annually | SM | |||||||||||||||
| T | H. Lubricate pump bearings. | Annually | SM | |||||||||||||||
| T | I. If equipped with lubricating oil charge, drain old oil, and fill with new to full mark on sight indicator (also fill bulb). | Annually | SM | |||||||||||||||
| I | 3-8.1 | 201 | FUEL FARM POL PIPELINE PUMPS | Bulk Storage | CENP | Pump | CLK-00020317PS-CENP-0432 | Union Pump | CM95343A-2 | UNK | Completed | 2/10/26 | TREMAYNE DALE | ROLAND DESPRES | ||||
| I | 3-8.1 | 201 | FUEL FARM PUMP HOUSE | Bulk Storage | CENP | Pump | CLK-0000020317-CENP-0433 | Union Pump | CM95343A-1 | UNK | Completed | 2/10/26 | TREMAYNE DALE | ROLAND DESPRES | ||||
| I | 3-8.1 | 201 | FUEL FARM PUMP HOUSE | Bulk Storage | CENP | Pump | CLK-0000020317-CENP-0437 | Union Pump | CM95343A-1 | UNK | Completed | 2/10/26 | TREMAYNE DALE | ROLAND DESPRES | ||||
| H | Loading Fuel Hoses (Section 3-9.1) | |||||||||||||||||
| T | A. Visually inspect hoses for loose covers, cracks, brittle surface coatings, exposed wire braids, exposed reinforcement, flattening, kinks, and bulges or soft spots which might indicate broken or displaced reinforcement. | Weekly | OM | |||||||||||||||
| T | B. Pressurize hose to normal working pressure. Check flanged and threaded connections for leaks and inspect hose couplers for fluid seepage by pushing at the base of the coupling with your thumbs; a hose softened by fluid seepage must be replaced. | Weekly | OM | |||||||||||||||
| T | C. Check for coupling slippage. Replace hose that shows signs of coupling slippage. | Quarterly | SM | |||||||||||||||
| T | D. Refer to Appendix D, Section D-2.1 Loading Hose Hydrostatic Test for loading hose hydrostatic testing requirements and procedures. The date of testing shall be stenciled on each hose. Hoses shall be removed from the system, and all accessories shall be removed from hoses prior to testing. | Annually | SM | |||||||||||||||
| T | E. Conduct test of fuel hose electrical resistivity using an electrostatic meter in accordance with NFPA 77 & API 2003. | Annually | SM | |||||||||||||||
| I | 3-9.1 | 201 | FUEL FARM HOT PIT A/C REFUEL | Flight Line | LDHS | Hoses | CLK-0000020309-LDHS-0041 | Alemite | PREMIER | 3"X75' | Not Available | 2/10/26 | TREMAYNE DALE | ROLAND DESPRES | Flight Line under modernization | |||
| I | 3-9.1 | 201 | FUEL FARM ARCRFT ISSUE STAND | Bulk Storage | LDHS | Hoses | CLK-0000020315-LDHS-0047 | Alemite | PREMIER | 3"X75' | Completed | 2/10/26 | TREMAYNE DALE | ROLAND DESPRES | ||||
| I | 3-9.1 | 201 | FUEL FARM ARCRFT ISSUE STAND | Bulk Storage | LDHS | Hoses | CLK-0000020315-LDHS-0050 | Alemite | PREMIER | 3"X10' | Completed | 2/10/26 | TREMAYNE DALE | ROLAND DESPRES | ||||
| H | Offloading Fuel Hoses (Sections 3-9.2) | |||||||||||||||||
| T | A. Visually inspect hoses for cracks brittle surface coatings, exposed wire braids, exposed reinforcement, flattening, kinks, and bulges or soft spots which might indicate broken or displaced reinforcement. | Weekly | OM | |||||||||||||||
| T | B. Check flanged and threaded connections for leaks and inspect hose couplers for fluid seepage by pushing at the base of the coupling with thumbs; a hose softened by petroleum fluid seepage must be replaced. Damaged or leaking hoses shall be replaced immediately or isolated and taken out of service. |
| Note: Repairs should be performed by service order unless the repair is covered by the requirements of PWS Section 3.2.1. | Quarterly | SM | |||||||||||||||||
| T | C. Conduct test of offloading fuel hose electrical resistivity as directed in NFPA 77 and API 2003. | Annually | SM | ||||||||||||||||
| I | 3-9.2 | 201 | FUEL FARM TNK TRCK OFF LOAD | Bulk Storage | OLHS | Hoses | CLK-0000020329-OLHS-0043 | GOODYEAR | API 1529/2005 | 3"X10' | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | |||||
| I | 3-9.2 | 201 | FUEL FARM TNK TRCK OFF LOAD | Bulk Storage | OLHS | Hoses | CLK-0000020329-OLHS-0044 | GOODYEAR | API 1529/2005 | 3"X10' | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | |||||
| I | 3-9.2 | 201 | FUEL FARM TNK TRCK OFF LOAD | Bulk Storage | OLHS | Hoses | CLK-0000020329-OLHS-0046 | GOODYEAR | API 1529/2005 | 3"X10' | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | |||||
| I | 3-9.2 | 201 | FUEL FARM TNK TRCK OFF LOAD | Bulk Storage | OLHS | Hoses | CLK-0000020329-OLHS-0049 | GOODYEAR | API 1529/2005 | 3"X10' | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | |||||
| I | 3-9.2 | 201 | FUEL FARM TNK TRCK OFF LOAD | Bulk Storage | OLHS | Hoses | CLK-0000020329-OLHS-0059 | GOODYEAR | API 1529/2005 | 3"X10' | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | |||||
| I | 3-9.2 | 201 | FUEL FARM TNK TRCK OFF LOAD | Bulk Storage | OLHS | Hoses | CLK-0000020329-OLHS-0060 | GOODYEAR | API 1529/2005 | 3"X10' | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | |||||
| I | 3-9.2 | 201 | FUEL FARM TNK TRCK OFF LOAD | Bulk Storage | OLHS | Hoses | CLK-0000020329-OLHS-0061 | GOODYEAR | API 1529/2005 | 3"X10' | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | |||||
| I | 3-9.2 | 201 | FUEL FARM TNK TRCK OFF LOAD | Bulk Storage | OLHS | Hoses | CLK-0000020329-OLHS-0062 | GOODYEAR | API 1529/2005 | 3"X10' | Repaired @ RM | 2/11/26 | TREMAYNE DALE | Eagle Drop Hose CPLD Leaking | ROLAND DESPRES | ||||
| I | 3-9.2 | 201 | FUEL FARM TNK TRCK OFF LOAD | Bulk Storage | OLHS | Hoses | CLK-0000020329-OLHS-0065 | GOODYEAR | API 1529/2005 | 3"X10' | Repaired @ RM | 2/11/26 | TREMAYNE DALE | Offload Rack #1- Hose #2 (10 ft.) Eagle Drop Hose CPLD Leaking | ROLAND DESPRES | ||||
| I | 3-9.2 | 201 | FUEL FARM TNK TRCK OFF LOAD | Bulk Storage | OLHS | Hoses | CLK-0000020329-OLHS-0066 | GOODYEAR | API 1529/2005 | 3"X10' | Repaired @ RM | 2/11/26 | TREMAYNE DALE | Offload Rack #1- Hose #3 (10 ft.) Eagle Drop Hose CPLD Leaking | ROLAND DESPRES | ||||
| H | Air Eliminator Tanks (Section 3-10.1) | ||||||||||||||||||
| T | C. Refer to Section 8-9.3 Tank Pressure/Vacuum Vents for inspection and maintenance requirements of pressure vacuum vents. | Reference to Other | SM | ||||||||||||||||
| T | A. Inspect operation of fuel level probes. Ensure probes operate correctly when the level of fuel in the tank rises to the level of the probe sensing unit. | Annually | SM | ||||||||||||||||
| T | B. Remove the float vent valve from the air eliminator tank. Clean and inspect the sealing surfaces of the float vent valve. Ensure the float is buoyant in fuel and test the valve to ensure it closes properly. | Annually | SM | ||||||||||||||||
| I | 3-10.1 | 201 | FUEL FARM PUMP HOUSE | Bulk Storage | AELT | Pressure/Temperature Control | CLK-0000020317-AELT-0305 | Armstrong | 11AV | 4" | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | |||||
| I | 3-10.1 | 201 | FUEL FARM PUMP HOUSE | Bulk Storage | AELT | Pressure/Temperature Control | CLK-0000020317-AELT-0308 | Armstrong | 11AV | 4" | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | |||||
| I | 3-10.1 | 201 | FUEL FARM PUMP HOUSE | Bulk Storage | AELT | Pressure/Temperature Control | CLK-0000020317-AELT-0309 | Armstrong | 11AV | 4" | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | |||||
| I | 3-10.1 | 201 | FUEL FARM PUMP HOUSE | Bulk Storage | AELT | Pressure/Temperature Control | CLK-0000020317-AELT-0310 | Armstrong | 11AV | 4" | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | |||||
| I | 3-10.1 | 201 | FUEL FARM PUMP HOUSE | Bulk Storage | AELT | Pressure/Temperature Control | CLK-0000020317-AELT-0311 | Armstrong | 11AV | 4" | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | |||||
| I | 3-10.1 | 201 | FUEL FARM PUMP HOUSE | Bulk Storage | AELT | Pressure/Temperature Control | CLK-0000020317-AELT-0330 | Armstrong | 11AV | 4" | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | |||||
| I | 3-10.1 | 201 | FUEL FARM TNK TRCK OFF LOAD | Bulk Storage | AELT | Pressure/Temperature Control | CLK-0000020329-AELT-0421 | ME Industries Inc | AEV366300890 | 4" | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | |||||
| I | 3-10.1 | 201 | FUEL FARM TNK TRCK OFF LOAD | Bulk Storage | AELT | Pressure/Temperature Control | CLK-0000020329-AELT-0422 | ME Industries Inc | AEV366300890 | 4" | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | |||||
| H | Dual Rate-of-Flow Control Valves (Section 4-3.2.8) | ||||||||||||||||||
| T | C. Refer to Section 4-3.2.1 General System Control Valves for additional inspection and maintenance requirements. | Reference to Other | SM | ||||||||||||||||
| T | A. Verify dual rate-of-flow control valve is set to maintain a flow rate of 200 gpm (12.5 lps). | Quarterly | SM | ||||||||||||||||
| T | B. Verify check valve feature is operational. | Quarterly | SM | ||||||||||||||||
| I | 4-3.2.8 | 201 | FUEL FARM PUMP HOUSE | Bulk Storage | DRFCVL | Valves | CLK-0000020317-DRFCVL-0085 | Cla-Val | 150 PN16 | 6" | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | |||||
| I | 4-3.2.8 | 201 | FUEL FARM ARCRFT ISSUE STAND | Bulk Storage | DRFCVL | Valves | CLK-0000020315-DRFCVL-0350 | Cla-Val | 150 PN16 | 4" | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | |||||
| I | 4-3.2.8 | 201 | FUEL FARM ARCRFT ISSUE STAND | Bulk Storage | DRFCVL | Valves | CLK-0000020315-DRFCVL-0353 | Cla-Val | 150 PN16 | 6" | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | |||||
| I | 4-3.2.8 | 201 | FUEL FARM PUMP HOUSE | Bulk Storage | DRFCVL | Valves | CLK-0000020317-DRFCVL-0354 | Cla-Val | 150 PN16 | 6" | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | |||||
| I | 4-3.2.8 | 201 | FUEL FARM PUMP HOUSE | Bulk Storage | DRFCVL | Valves | CLK-0000020317-DRFCVL-0358 | Cla-Val | 150 PN16 | 6" | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | |||||
| I | 4-3.2.8 | 201 | FUEL FARM PUMP HOUSE | Bulk Storage | DRFCVL | Valves | CLK-0000020317-DRFCVL-0360 | Cla-Val | 150 PN16 | 6" | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | |||||
| I | 4-3.2.8 | 201 | FUEL FARM PUMP HOUSE | Bulk Storage | DRFCVL | Valves | CLK-0000020317-DRFCVL-0362 | Cla-Val | 150 PN16 | 6" | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | |||||
| H | Defuel/Flush Valves (Section 4-4.2.3) | ||||||||||||||||||
| T | F. Refer to Section 4-3.2.1 General System Control Valves for additional inspection and maintenance requirements. | Reference to Other | SM | ||||||||||||||||
| T | A. Ensure Solenoids A and B are de-energized with system in automatic mode and lead pump operating. | Quarterly | SM | ||||||||||||||||
| T | B. Ensure Solenoid A is energized and Solenoid B is de-energized to allow main valve to open and drop system pressure to 80 psig (550 kPa) (typical set pressure) with system in automatic mode and lead pump off. | Quarterly | SM | ||||||||||||||||
| T | C. Ensure Solenoid A is de-energized and Solenoid B is energized when system is in flush mode. | Quarterly | SM | ||||||||||||||||
| T | D. Ensure Solenoids A and B are de-energized when system is in tightness test mode. | Quarterly | SM | ||||||||||||||||
| T | E. Check opening and closing speed. Speed should be as fast as possible while still maintaining smooth operation. | Quarterly | SM | ||||||||||||||||
| I | 4-4.2.3 | 201 | FUEL FARM TNK TRCK OFF LOAD | Bulk Storage | DFFCVL | Valves | CLK-0000020329-DFFCVL-0370 | Cla-Val | 3-72-35ACQSTKY | 6" | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | |||||
| H | Pressure Control Valves (Section 4-4.2.7) | ||||||||||||||||||
| T | G. Refer to Section 4-3.2.1 General System Control Valves for additional inspection and maintenance requirements. | Reference to Other | SM | ||||||||||||||||
| T | A. Ensure Solenoid A is energized and Solenoid B is de-energized while system is in automatic mode and lead pump is operating. | Quarterly | SM | ||||||||||||||||
| T | B. Ensure Solenoids A and B are de-energized while system is in automatic mode and lead pump is off. Verify valve opens to maintain system pressure at 75 psig (515 kPa). | Quarterly | SM | ||||||||||||||||
| T | C. Ensure Solenoid A is energized and Solenoid B is de-energized while system is in flush mode and lead pump is operating. | Quarterly | SM | ||||||||||||||||
| T | D. Ensure Solenoids A and B are de-energized while system is in flush mode and pumps are off. | Quarterly | SM | ||||||||||||||||
| T | E. Ensure Solenoids A and B are energized while system is in tightness test mode. | Quarterly | SM | ||||||||||||||||
| T | F. Verify closing speed control. Valve should close as fast as possible while still maintaining smooth operation. | Quarterly | SM | ||||||||||||||||
| I | 4-4.2.7 | 201 | FUEL FARM TNK TRCK OFF LOAD | Bulk Storage | PCVL | Valves | CLK-0000020329-PCVL-0115 | Cla-Val | 4-59-14-KX | 4" | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | |||||
| I | 4-4.2.7 | 201 | FUEL FARM TNK TRCK OFF LOAD | Bulk Storage | PCVL | Valves | CLK-0000020329-PCVL-0312 | Cla-Val | 4-59-14-KX | 4" | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | |||||
| I | 4-4.2.7 | 201 | FUEL FARM PUMP HOUSE | Bulk Storage | PCVL | Valves | CLK-0000020317-PCVL-0387 | Cla-Val | 2683101G | NOT LEGIBLE | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | |||||
| I | 4-4.2.7 | 201 | FUEL FARM HOT PIT A/C REFUEL | Flight Line | PCVL | Valves | CLK-0000020309-PCVL-0413 | Cla-Val | 431-01-180 | 600GPM | Not Available | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | Flight Line under modernization | ||||
| I | 4-4.2.7 | 201 | FUEL FARM PUMP HOUSE | Bulk Storage | PCVL | Valves | CLK-0000020317-PCVL-0444 | Cla-Val | 2683101G | 6" | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | |||||
| I | 4-4.2.7 | 201 | FUEL FARM PUMP HOUSE | Bulk Storage | PCVL | Valves | CLK-0000020317-PCVL-0473 | Cla-Val | 2683101G | 6" | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | |||||
| I | 4-4.2.7 | 201 | FUEL FARM PUMP HOUSE | Bulk Storage | PCVL | Valves | CLK-0000020317-PCVL-0478 | Cla-Val | 2683101G | 6" | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | |||||
| I | 4-4.2.7 | 201 | FUEL FARM PUMP HOUSE | Bulk Storage | PCVL | Valves | CLK-0000020317-PCVL-0481 | Cla-Val | 2683101G | 6" | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | |||||
| H | Fueling Nozzles (Section 4-7.4) | ||||||||||||||||||
| T | A. Inspect the condition of the dust cap at the aircraft adapter end and ensure it is in good working order. Dust caps must be attached to nozzles when they are not is use. | Quarterly | OM | ||||||||||||||||
| T | B. Test leak resistance of poppet valve against full pump pressure. Unusual conditions found during this test indicate that repair is necessary and the nozzle shall be removed from service. | Quarterly | OM | ||||||||||||||||
| T | C. Inspect storage racks for moisture or dirt accumulation. Correct conditions that may be attributing to accumulation of moisture or dirt in the storage racks. | Quarterly | OM | ||||||||||||||||
| T | D. Remove nozzle for inspection of content impinged upon the mesh screen. Clean and dry screens before nozzles are returned to service. If a strainer ball valve is installed upstream of the nozzle only the strainer in the strainer ball valve needs to be check. Nozzles should not be used while strainers are removed from upstream strainer ball valves. | Quarterly | OM | ||||||||||||||||
| T | E. Tests nozzle interlocks. Ensure interlocks prevent release of fuel when the fueling nozzle is not properly connected. Adjust the seating of the poppet valve if required. | Quarterly | OM | ||||||||||||||||
| T | F. Check the operation of the manual valve crank assembly for smooth and positive motion on a special test stand. | Quarterly | OM | ||||||||||||||||
| I | 4-7.4 | 201 | FUEL FARM HOT PIT A/C REFUEL | Flight Line | SRGSP | Pressure/Temperature Control | CLK-0000020309-SRGSP-0118 | Cla-Val | D3 | 3" | Not Available | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | Flight Line under modernization | ||||
| I | 4-7.4 | 201 | FUEL FARM ARCRFT ISSUE STAND | Bulk Storage | SRGSP | Pressure/Temperature Control | CLK-0000020315-SRGSP-0121 | Cla-Val | D3 | 3/4" | Completed | 2/11/206 | TREMAYNE DALE | ROLAND DESPRES | |||||
| I | 4-7.4 | 201 | FUEL FARM ARCRFT ISSUE STAND | Bulk Storage | SRGSP | Pressure/Temperature Control | CLK-0000020315-SRGSP-0124 | Cla-Val | D3 | 3/4" | Completed | 2/11/206 | TREMAYNE DALE | ROLAND DESPRES | |||||
| H | Aboveground Piping (Section 6-1.3) | ||||||||||||||||||
| T | D. Conduct cleaning of petroleum fuel piping in accordance with Section 6-2 General Pipeline Cleaning. |
| Note: This task shall be performed by SO or another contract. The contractor shall identify when this task is required in the Facility Maintenance Plan. | Reference to Other | SM | ||||
| T | A. Conduct petroleum fuel piping visual inspection in accordance with Section 6-1.5 Pipeline Visual Inspection. | Weekly | OM | |||
| T | B. Conduct petroleum fuel piping annual test as specified in Appendix G - Petroleum Fuel Pipeline Pressure Testing Guidelines and Criteria. |
| Note: This task shall be performed by SO or another contract. The contractor shall identify when this task is required in the Facility Maintenance Plan. | Annually | SM | ||
| T | C. Conduct petroleum fuel piping API 570 inspection in accordance with Section 6-1.9 API 570 Inspections. |
Frequency: Every 5 or 10 years depending on API class piping or in accordance with Pipeline Integrity Management Plan (PIMP).
| Note: This task shall be performed by SO or another contract. The contractor shall identify when this task is required in the Facility Maintenance Plan. | See Description | SM | ||||||||||||||||
| I | 6-1.3 | 201 | FUEL FARM TNK TRCK OFF LOAD | Bulk Storage | AGPL | Piping | CLK-0000020329-AGPL-0170 | Cla-Val | STAINLESS STEEL | 4" | Inspection OK | 2/10/26 | TREMAYNE DALE | ROLAND DESPRES | This task shall be performed by SO or another contract. The contractor shall identify when this task is required in the Facility Maintenance Plan. | |||
| I | 6-1.3 | 201 | FUEL FARM TNK TRCK OFF LOAD | Bulk Storage | AGPL | Piping | CLK-0000020329-AGPL-0171 | Cla-Val | STAINLESS STEEL | 4" | Inspection OK | 2/10/26 | TREMAYNE DALE | ROLAND DESPRES | This task shall be performed by SO or another contract. The contractor shall identify when this task is required in the Facility Maintenance Plan. | |||
| I | 6-1.3 | 201 | FUEL FARM TNK TRCK OFF LOAD | Bulk Storage | AGPL | Piping | CLK-0000020329-AGPL-0172 | Cla-Val | STAINLESS STEEL | 4" | Inspection OK | 2/10/26 | TREMAYNE DALE | ROLAND DESPRES | This task shall be performed by SO or another contract. The contractor shall identify when this task is required in the Facility Maintenance Plan. | |||
| I | 6-1.3 | 201 | FUEL FARM TNK TRCK OFF LOAD | Bulk Storage | AGPL | Piping | CLK-0000020329-AGPL-0173 | Cla-Val | STAINLESS STEEL | 4" | Inspection OK | 2/10/26 | TREMAYNE DALE | ROLAND DESPRES | This task shall be performed by SO or another contract. The contractor shall identify when this task is required in the Facility Maintenance Plan. | |||
| I | 6-1.3 | 201 | FUEL FARM TNK TRCK OFF LOAD | Bulk Storage | AGPL | Piping | CLK-0000020329-AGPL-0176 | Cla-Val | STAINLESS STEEL | 4" | Inspection OK | 2/10/26 | TREMAYNE DALE | ROLAND DESPRES | This task shall be performed by SO or another contract. The contractor shall identify when this task is required in the Facility Maintenance Plan. | |||
| I | 6-1.3 | 201 | FUEL FARM TNK TRCK OFF LOAD | Bulk Storage | AGPL | Piping | CLK-0000020329-AGPL-0178 | Cla-Val | STAINLESS STEEL | 4" | Inspection OK | 2/10/26 | TREMAYNE DALE | ROLAND DESPRES | This task shall be performed by SO or another contract. The contractor shall identify when this task is required in the Facility Maintenance Plan. | |||
| I | 6-1.3 | 201 | FUEL FARM POL PIPELINE | Bulk Storage | AGPL | Piping | CLK-0000020326-AGPL-0179 | Cla-Val | STAINLESS STEEL | 4" | Inspection OK | 2/10/26 | TREMAYNE DALE | ROLAND DESPRES | This task shall be performed by SO or another contract. The contractor shall identify when this task is required in the Facility Maintenance Plan. | |||
| I | 6-1.3 | 201 | FUEL FARM TNK TRCK OFF LOAD | Bulk Storage | AGPL | Piping | CLK-0000020329-AGPL-0183 | Cla-Val | STAINLESS STEEL | 4" | Inspection OK | 2/10/26 | TREMAYNE DALE | ROLAND DESPRES | This task shall be performed by SO or another contract. The contractor shall identify when this task is required in the Facility Maintenance Plan. | |||
| I | 6-1.3 | 201 | FUEL FARM TNK TRCK OFF LOAD | Bulk Storage | AGPL | Piping | CLK-0000020329-AGPL-0184 | Cla-Val | STAINLESS STEEL | 4" | Inspection OK | 2/10/26 | TREMAYNE DALE | ROLAND DESPRES | This task shall be performed by SO or another contract. The contractor shall identify when this task is required in the Facility Maintenance Plan. | |||
| I | 6-1.3 | 201 | FUEL FARM TNK TRCK OFF LOAD | Bulk Storage | AGPL | Piping | CLK-0000020329-AGPL-0185 | Cla-Val | STAINLESS STEEL | 4" | Inspection OK | 2/10/26 | TREMAYNE DALE | ROLAND DESPRES | This task shall be performed by SO or another contract. The contractor shall identify when this task is required in the Facility Maintenance Plan. | |||
| I | 6-1.3 | 201 | FUEL FARM TNK TRCK OFF LOAD | Bulk Storage | AGPL | Piping | CLK-0000020329-AGPL-0186 | Cla-Val | STAINLESS STEEL | 4" | Inspection OK | 2/10/26 | TREMAYNE DALE | ROLAND DESPRES | This task shall be performed by SO or another contract. The contractor shall identify when this task is required in the Facility Maintenance Plan. | |||
| H | Ball Valves (Section 6-6.2.4) | |||||||||||||||||
| T | E. Refer to Section 6-6.2.10 Manual Valve Gear Operators for inspection and maintenance of gear operators if equipped. | Reference to Other | SM | |||||||||||||||
| T | A. Open and close valve to check for ease of operation. | Quarterly | SM | |||||||||||||||
| T | B. Lubricate overhead ball valve chain operator gears. | Quarterly | SM | |||||||||||||||
| T | C. Adjust packing per manufacturer’s specifications. | Quarterly | SM | |||||||||||||||
| T | D. Inspect valve exterior for corrosion and tightness of bolts. Repaint/tighten as required. |
| Note: Coating repairs performed under this item count as part of the requirement in PWS Section 3.2.1.2. | Quarterly | SM | |||||||||||||||||
| I | 6-6.2.4 | 201 | FUEL FARM PUMP HOUSE | Bulk Storage | BLVL | Valves | CLK-0000020317-BLVL-0086 | Velan | 2000 WOG | 6" | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | |||||
| I | 6-6.2.4 | 201 | FUEL FARM PUMP HOUSE | Bulk Storage | BLVL | Valves | CLK-0000020317-BLVL-0089 | Velan | 2000 WOG | 6" | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | |||||
| I | 6-6.2.4 | 201 | FUEL FARM PUMP HOUSE | Bulk Storage | BLVL | Valves | CLK-0000020317-BLVL-0094 | Velan | 2000 WOG | 6" | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | |||||
| I | 6-6.2.4 | 201 | FUEL FARM PUMP HOUSE | Bulk Storage | BLVL | Valves | CLK-0000020317-BLVL-0095 | Velan | 2000 WOG | 6" | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | |||||
| I | 6-6.2.4 | 201 | FUEL FARM PUMP HOUSE | Bulk Storage | BLVL | Valves | CLK-0000020317-BLVL-0098 | Velan | 2000 WOG | 6" | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | |||||
| I | 6-6.2.4 | 201 | FUEL FARM JP-8 STORAGE TANK | Bulk Storage | BLVL | Valves | CLK-0000020319-BLVL-0101 | FLOTEK | W8F3495 | 1" | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | |||||
| I | 6-6.2.4 | 201 | FUEL FARM PUMP HOUSE | Bulk Storage | BLVL | Valves | CLK-0000020317-BLVL-0102 | Velan | 2000 WOG | 6" | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | |||||
| I | 6-6.2.4 | 201 | FUEL FARM PUMP HOUSE | Bulk Storage | BLVL | Valves | CLK-0000020317-BLVL-0103 | Velan | 2000 WOG | 6" | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | |||||
| I | 6-6.2.4 | 201 | FUEL FARM PUMP HOUSE | Bulk Storage | BLVL | Valves | CLK-0000020317-BLVL-0106 | Velan | 2000 WOG | 6" | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | |||||
| I | 6-6.2.4 | 201 | FUEL FARM PUMP HOUSE | Bulk Storage | BLVL | Valves | CLK-0000020317-BLVL-0112 | Velan | 2000 WOG | 6" | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | |||||
| I | 6-6.2.4 | 201 | FUEL FARM TNK TRCK OFF LOAD | Bulk Storage | BLVL | Valves | CLK-0000020329-BLVL-0116 | Velan | 200WOG | 6" | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | |||||
| I | 6-6.2.4 | 201 | FUEL FARM JP-8 STORAGE TANK | Bulk Storage | BLVL | Valves | CLK-0000020319-BLVL-0119 | FLOTEK | W8F3495 | 1" | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | |||||
| I | 6-6.2.4 | 201 | FUEL FARM JP-8 STORAGE TANK | Bulk Storage | BLVL | Valves | CLK-0000020318-BLVL-0120 | FLOTEK | W8F3495 | 1" | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | |||||
| I | 6-6.2.4 | 201 | FUEL FARM JP-8 STORAGE TANK | Bulk Storage | BLVL | Valves | CLK-0000020319-BLVL-0122 | FLOTEK | W8F3495 | 1 | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | |||||
| I | 6-6.2.4 | 201 | FUEL FARM JP-8 STORAGE TANK | Bulk Storage | BLVL | Valves | CLK-0000020319-BLVL-0123 | FLOTEK | W8F3495 | 1" | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | |||||
| I | 6-6.2.4 | 201 | FUEL FARM JP-8 STORAGE TANK | Bulk Storage | BLVL | Valves | CLK-0000020319-BLVL-0125 | FLOTEK | W8F3495 | 1" | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | |||||
| I | 6-6.2.4 | 201 | FUEL FARM JP-8 STORAGE TANK | Bulk Storage | BLVL | Valves | CLK-0000020318-BLVL-0126 | FLOTEK | W8F3495 | 1" | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | |||||
| I | 6-6.2.4 | 201 | FUEL FARM HOT PIT A/C REFUEL | Flight Line | BLVL | Valves | CLK-0000020309-BLVL-0128 | FLOTEK | SERIES 5000 | 5" | Not Available | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | Flight Line under modernization | ||||
| I | 6-6.2.4 | 201 | FUEL FARM PUMP HOUSE | Bulk Storage | BLVL | Valves | CLK-0000020317-BLVL-0130 | Velan | 2000 WOG | 6" | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | |||||
| I | 6-6.2.4 | 201 | FUEL FARM JP-8 STORAGE TANK | Bulk Storage | BLVL | Valves | CLK-0000020318-BLVL-0131 | FLOTEK | W8F3495 | 1" | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | |||||
| I | 6-6.2.4 | 201 | FUEL FARM JP-8 STORAGE TANK | Bulk Storage | BLVL | Valves | CLK-0000020318-BLVL-0132 | FLOTEK | W8F3495 | 1" | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | |||||
| I | 6-6.2.4 | 201 | FUEL FARM HOT PIT A/C REFUEL | Flight Line | BLVL | Valves | CLK-0000020309-BLVL-0133 | FLOTEK | SERIES 5000 | 5" | Not Available | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | Flight Line under modernization | ||||
| I | 6-6.2.4 | 201 | FUEL FARM JP-8 STORAGE TANK | Bulk Storage | BLVL | Valves | CLK-0000020318-BLVL-0134 | FLOTEK | W8F3495 | 1" | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | |||||
| I | 6-6.2.4 | 201 | FUEL FARM PUMP HOUSE | Bulk Storage | BLVL | Valves | CLK-0000020317-BLVL-0139 | Velan | 2000 WOG | 6" | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | |||||
| I | 6-6.2.4 | 201 | FUEL FARM ARCRFT ISSUE STAND | Bulk Storage | BLVL | Valves | CLK-0000020315-BLVL-0144 | Velan | 200WOG | 4" | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | |||||
| I | 6-6.2.4 | 201 | FUEL FARM ARCRFT ISSUE STAND | Bulk Storage | BLVL | Valves | CLK-0000020315-BLVL-0145 | Velan | 200WOG | 4" | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | |||||
| I | 6-6.2.4 | 201 | FUEL FARM ARCRFT ISSUE STAND | Bulk Storage | BLVL | Valves | CLK-0000020315-BLVL-0146 | Velan | 200WOG | 4" | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | |||||
| I | 6-6.2.4 | 201 | FUEL FARM ARCRFT ISSUE STAND | Bulk Storage | BLVL | Valves | CLK-0000020315-BLVL-0147 | Velan | CF8M | 6" | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | |||||
| I | 6-6.2.4 | 201 | FUEL FARM PUMP HOUSE | Bulk Storage | BLVL | Valves | CLK-0000020317-BLVL-0148 | Velan | 2000 WOG | 6" | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | |||||
| I | 6-6.2.4 | 201 | FUEL FARM ARCRFT ISSUE STAND | Bulk Storage | BLVL | Valves | CLK-0000020315-BLVL-0150 | Velan | CF811 | 1" | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | |||||
| I | 6-6.2.4 | 201 | FUEL FARM JP-8 STORAGE TANK | Bulk Storage | BLVL | Valves | CLK-0000020318-BLVL-0151 | FLOTEK | W8F3495 | 1" | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | |||||
| I | 6-6.2.4 | 201 | FUEL FARM JP-8 STORAGE TANK | Bulk Storage | BLVL | Valves | CLK-0000020319-BLVL-0156 | FLOTEK | W8F3495 | 1" | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | |||||
| I | 6-6.2.4 | 201 | FUEL FARM JP-8 STORAGE TANK | Bulk Storage | BLVL | Valves | CLK-0000020318-BLVL-0157 | FLOTEK | W8F3495 | 1" | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | |||||
| I | 6-6.2.4 | 201 | FUEL FARM TNK TRCK OFF LOAD | Bulk Storage | BLVL | Valves | CLK-0000020329-BLVL-0161 | Velan | 200 WOG | 6" | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | |||||
| I | 6-6.2.4 | 201 | FUEL FARM TNK TRCK OFF LOAD | Bulk Storage | BLVL | Valves | CLK-0000020329-BLVL-0162 | Velan | 200 WOG | 6" | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | |||||
| I | 6-6.2.4 | 201 | FUEL FARM PUMP HOUSE | Bulk Storage | BLVL | Valves | CLK-0000020317-BLVL-0164 | Velan | 2000 WOG | 6" | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | |||||
| I | 6-6.2.4 | 201 | FUEL FARM PUMP HOUSE | Bulk Storage | BLVL | Valves | CLK-0000020317-BLVL-0165 | Velan | 2000 WOG | 6" | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | |||||
| I | 6-6.2.4 | 201 | FUEL FARM TNK TRCK OFF LOAD | Bulk Storage | BLVL | Valves | CLK-0000020329-BLVL-0167 | Velan | 200 WOG | 6" | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | |||||
| I | 6-6.2.4 | 201 | FUEL FARM PUMP HOUSE | Bulk Storage | BLVL | Valves | CLK-0000020317-BLVL-0168 | Velan | 2000 WOG | 6" | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | |||||
| I | 6-6.2.4 | 201 | FUEL FARM PUMP HOUSE | Bulk Storage | BLVL | Valves | CLK-0000020317-BLVL-0169 | Velan | 2000 WOG | 6" | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | |||||
| I | 6-6.2.4 | 201 | FUEL FARM PUMP HOUSE | Bulk Storage | BLVL | Valves | CLK-0000020317-BLVL-0174 | Velan | 2000 WOG | 6" | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | |||||
| I | 6-6.2.4 | 201 | FUEL FARM PUMP HOUSE | Bulk Storage | BLVL | Valves | CLK-0000020317-BLVL-0177 | Velan | 2000 WOG | 6" | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | |||||
| I | 6-6.2.4 | 201 | FUEL FARM PUMP HOUSE | Bulk Storage | BLVL | Valves | CLK-0000020317-BLVL-0181 | Velan | 2000 WOG | 6" | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | |||||
| I | 6-6.2.4 | 201 | FUEL FARM PUMP HOUSE | Bulk Storage | BLVL | Valves | CLK-0000020317-BLVL-0182 | Velan | 2000 WOG | 6" | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | |||||
| I | 6-6.2.4 | 201 | FUEL FARM ARCRFT ISSUE STAND | Bulk Storage | BLVL | Valves | CLK-0000020315-BLVL-0187 | Velan | CFM-8 | 3/4" | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | |||||
| I | 6-6.2.4 | 201 | FUEL FARM PUMP HOUSE | Bulk Storage | BLVL | Valves | CLK-0000020317-BLVL-0189 | Velan | 2000 WOG | 6" | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | |||||
| I | 6-6.2.4 | 201 | FUEL FARM HOT PIT A/C REFUEL | Flight Line | BLVL | Valves | CLK-0000020309-BLVL-0190 | FLOTEK | SERIES 5000 | 5" | Not Available | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | Flight Line under modernization | ||||
| I | 6-6.2.4 | 201 | FUEL FARM PUMP HOUSE | Bulk Storage | BLVL | Valves | CLK-0000020317-BLVL-0191 | Velan | 2000 WOG | 6" | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | |||||
| I | 6-6.2.4 | 201 | FUEL FARM PUMP HOUSE | Bulk Storage | BLVL | Valves | CLK-0000020317-BLVL-0192 | Velan | 2000 WOG | 6" | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | |||||
| I | 6-6.2.4 | 201 | FUEL FARM PUMP HOUSE | Bulk Storage | BLVL | Valves | CLK-0000020317-BLVL-0193 | Velan | 2000 WOG | 6" | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | |||||
| I | 6-6.2.4 | 201 | FUEL FARM PUMP HOUSE | Bulk Storage | BLVL | Valves | CLK-0000020317-BLVL-0194 | Velan | 2000 WOG | 6" | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | |||||
| I | 6-6.2.4 | 201 | FUEL FARM PUMP HOUSE | Bulk Storage | BLVL | Valves | CLK-0000020317-BLVL-0195 | Velan | 2000 WOG | 6" | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | |||||
| I | 6-6.2.4 | 201 | FUEL FARM TNK TRCK OFF LOAD | Bulk Storage | BLVL | Valves | CLK-0000020329-BLVL-0199 | Velan | 200 WOG | 6" | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | |||||
| I | 6-6.2.4 | 201 | FUEL FARM PUMP HOUSE | Bulk Storage | BLVL | Valves | CLK-0000020317-BLVL-0201 | Velan | 2000 WOG | 6" | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | |||||
| I | 6-6.2.4 | 201 | FUEL FARM PUMP HOUSE | Bulk Storage | BLVL | Valves | CLK-0000020317-BLVL-0202 | Velan | 2000 WOG | 6" | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | |||||
| I | 6-6.2.4 | 201 | FUEL FARM JP-8 STORAGE TANK | Bulk Storage | BLVL | Valves | CLK-0000020318-BLVL-0204 | FLOTEK | W8F3495 | 1" | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | |||||
| I | 6-6.2.4 | 201 | FUEL FARM JP-8 STORAGE TANK | Bulk Storage | BLVL | Valves | CLK-0000020318-BLVL-0213 | FLOTEK | W8F3495 | 1" | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | |||||
| I | 6-6.2.4 | 201 | FUEL FARM JP-8 STORAGE TANK | Bulk Storage | BLVL | Valves | CLK-0000020318-BLVL-0214 | FLOTEK | W8F3495 | 1" | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | |||||
| I | 6-6.2.4 | 201 | FUEL FARM JP-8 STORAGE TANK | Bulk Storage | BLVL | Valves | CLK-0000020318-BLVL-0215 | FLOTEK | W8F3495 | 1" | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | |||||
| I | 6-6.2.4 | 201 | FUEL FARM PUMP HOUSE | Bulk Storage | BLVL | Valves | CLK-0000020317-BLVL-0216 | Velan | 2000 WOG | 6" | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | |||||
| I | 6-6.2.4 | 201 | FUEL FARM PUMP HOUSE | Bulk Storage | BLVL | Valves | CLK-0000020317-BLVL-0217 | Velan | 2000 WOG | 6" | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | |||||
| I | 6-6.2.4 | 201 | FUEL FARM JP-8 STORAGE TANK | Bulk Storage | BLVL | Valves | CLK-0000020319-BLVL-0218 | FLOTEK | W8F3495 | 1" | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | |||||
| I | 6-6.2.4 | 201 | FUEL FARM JP-8 STORAGE TANK | Bulk Storage | BLVL | Valves | CLK-0000020319-BLVL-0219 | FLOTEK | W8F3495 | 1" | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | |||||
| I | 6-6.2.4 | 201 | FUEL FARM JP-8 STORAGE TANK | Bulk Storage | BLVL | Valves | CLK-0000020318-BLVL-0220 | FLOTEK | W8F3495 | 1" | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | |||||
| I | 6-6.2.4 | 201 | FUEL FARM JP-8 STORAGE TANK | Bulk Storage | BLVL | Valves | CLK-0000020318-BLVL-0221 | FLOTEK | W8F3495 | 1" | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | |||||
| I | 6-6.2.4 | 201 | FUEL FARM PUMP HOUSE | Bulk Storage | BLVL | Valves | CLK-0000020317-BLVL-0222 | Velan | 2000 WOG | 6" | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | |||||
| I | 6-6.2.4 | 201 | FUEL FARM PUMP HOUSE | Bulk Storage | BLVL | Valves | CLK-0000020317-BLVL-0224 | Velan | 2000 WOG | 6" | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | |||||
| I | 6-6.2.4 | 201 | FUEL FARM PUMP HOUSE | Bulk Storage | BLVL | Valves | CLK-0000020317-BLVL-0225 | Velan | 2000 WOG | 6" | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | |||||
| I | 6-6.2.4 | 201 | FUEL FARM PUMP HOUSE | Bulk Storage | BLVL | Valves | CLK-0000020317-BLVL-0227 | Velan | 2000 WOG | 6" | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | |||||
| I | 6-6.2.4 | 201 | FUEL FARM PUMP HOUSE | Bulk Storage | BLVL | Valves | CLK-0000020317-BLVL-0230 | Velan | 2000 WOG | 6" | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | |||||
| I | 6-6.2.4 | 201 | FUEL FARM TNK TRCK OFF LOAD | Bulk Storage | BLVL | Valves | CLK-0000020329-BLVL-0236 | Velan | 200 WOG | 6" | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | |||||
| I | 6-6.2.4 | 201 | FUEL FARM HOT PIT A/C REFUEL | Flight Line | BLVL | Valves | CLK-0000020309-BLVL-0238 | FLOTEK | SERIES 5000 | 5" | Not Available | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | Flight Line under modernization | ||||
| I | 6-6.2.4 | 201 | FUEL FARM TNK TRCK OFF LOAD | Bulk Storage | BLVL | Valves | CLK-0000020329-BLVL-0239 | FLOTEK | SERIES 5000 | 5" | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | |||||
| I | 6-6.2.4 | 201 | FUEL FARM PUMP HOUSE | Bulk Storage | BLVL | Valves | CLK-0000020317-BLVL-0240 | Velan | 2000 WOG | 6" | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | |||||
| I | 6-6.2.4 | 201 | FUEL FARM PUMP HOUSE | Bulk Storage | BLVL | Valves | CLK-0000020317-BLVL-0243 | Velan | 2000 WOG | 6" | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | |||||
| I | 6-6.2.4 | 201 | FUEL FARM PUMP HOUSE | Bulk Storage | BLVL | Valves | CLK-0000020317-BLVL-0244 | Velan | 2000 WOG | 6" | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | |||||
| I | 6-6.2.4 | 201 | FUEL FARM PUMP HOUSE | Bulk Storage | BLVL | Valves | CLK-0000020317-BLVL-0245 | Velan | 2000 WOG | 6" | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | |||||
| I | 6-6.2.4 | 201 | FUEL FARM PUMP HOUSE | Bulk Storage | BLVL | Valves | CLK-0000020317-BLVL-0246 | Velan | 2000 WOG | 6" | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | |||||
| I | 6-6.2.4 | 201 | FUEL FARM HOT PIT A/C REFUEL | Flight Line | BLVL | Valves | CLK-0000020309-BLVL-0248 | FLOTEK | SERIES 5000 | 5" | Not Available | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | Flight Line under modernization | ||||
| I | 6-6.2.4 | 201 | FUEL FARM HOT PIT A/C REFUEL | Flight Line | BLVL | Valves | CLK-0000020309-BLVL-0249 | FLOTEK | SERIES 5000 | 5" | Not Available | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | Flight Line under modernization | ||||
| I | 6-6.2.4 | 201 | FUEL FARM JP-8 STORAGE TANK | Bulk Storage | BLVL | Valves | CLK-0000020319-BLVL-0250 | FLOTEK | W8F3495 | 1" | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | |||||
| I | 6-6.2.4 | 201 | FUEL FARM HOT PIT A/C REFUEL | Flight Line | BLVL | Valves | CLK-0000020309-BLVL-0251 | FLOTEK | SERIES 5000 | 5" | Not Available | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | Flight Line under modernization | ||||
| I | 6-6.2.4 | 201 | FUEL FARM TNK TRCK OFF LOAD | Bulk Storage | BLVL | Valves | CLK-0000020329-BLVL-0253 | Velan | 2000 WOG | 6" | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | |||||
| I | 6-6.2.4 | 201 | FUEL FARM PUMP HOUSE | Bulk Storage | BLVL | Valves | CLK-0000020317-BLVL-0254 | Velan | 2000 WOG | 6" | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | |||||
| I | 6-6.2.4 | 201 | FUEL FARM PUMP HOUSE | Bulk Storage | BLVL | Valves | CLK-0000020317-BLVL-0255 | Velan | 2000 WOG | 6" | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | |||||
| I | 6-6.2.4 | 201 | FUEL FARM JP-8 STORAGE TANK | Bulk Storage | BLVL | Valves | CLK-0000020319-BLVL-0256 | FLOTEK | W8F3495 | 1" | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | |||||
| I | 6-6.2.4 | 201 | FUEL FARM JP-8 STORAGE TANK | Bulk Storage | BLVL | Valves | CLK-0000020319-BLVL-0257 | FLOTEK | W8F3495 | 1" | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | |||||
| I | 6-6.2.4 | 201 | FUEL FARM JP-8 STORAGE TANK | Bulk Storage | BLVL | Valves | CLK-0000020319-BLVL-0260 | FLOTEK | W8F3495 | 1" | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | |||||
| I | 6-6.2.4 | 201 | FUEL FARM PUMP HOUSE | Bulk Storage | BLVL | Valves | CLK-0000020317-BLVL-0261 | Velan | 2000 WOG | 6" | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | |||||
| I | 6-6.2.4 | 201 | FUEL FARM JP-8 STORAGE TANK | Bulk Storage | BLVL | Valves | CLK-0000020319-BLVL-0262 | FLOTEK | W8F3495 | 1" | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | |||||
| I | 6-6.2.4 | 201 | FUEL FARM JP-8 STORAGE TANK | Bulk Storage | BLVL | Valves | CLK-0000020318-BLVL-0267 | FLOTEK | W8F3495 | 1" | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | |||||
| I | 6-6.2.4 | 201 | FUEL FARM ARCRFT ISSUE STAND | Bulk Storage | BLVL | Valves | CLK-0000020315-BLVL-0275 | Velan | 9996-001 | 4" | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | |||||
| I | 6-6.2.4 | 201 | FUEL FARM ARCRFT ISSUE STAND | Bulk Storage | BLVL | Valves | CLK-0000020315-BLVL-0276 | Velan | 9996-001 | 4" | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | |||||
| I | 6-6.2.4 | 201 | FUEL FARM TNK TRCK OFF LOAD | Bulk Storage | BLVL | Valves | CLK-0000020329-BLVL-0277 | Velan | 9996-001 | 4" | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | |||||
| I | 6-6.2.4 | 201 | FUEL FARM TNK TRCK OFF LOAD | Bulk Storage | BLVL | Valves | CLK-0000020329-BLVL-0278 | Velan | 9996-001 | 4" | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | |||||
| I | 6-6.2.4 | 201 | FUEL FARM PUMP HOUSE | Bulk Storage | BLVL | Valves | CLK-0000020317-BLVL-0279 | Velan | 2000 WOG | 6" | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | |||||
| I | 6-6.2.4 | 201 | FUEL FARM ARCRFT ISSUE STAND | Bulk Storage | BLVL | Valves | CLK-0000020315-BLVL-0280 | Velan | 6-150 | 6" | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | |||||
| I | 6-6.2.4 | 201 | FUEL FARM PUMP HOUSE | Bulk Storage | BLVL | Valves | CLK-0000020317-BLVL-0281 | Velan | 2000 WOG | 6" | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | |||||
| I | 6-6.2.4 | 201 | FUEL FARM PUMP HOUSE | Bulk Storage | BLVL | Valves | CLK-0000020317-BLVL-0282 | Velan | 2000 WOG | 6" | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | |||||
| I | 6-6.2.4 | 201 | FUEL FARM TNK TRCK OFF LOAD | Bulk Storage | BLVL | Valves | CLK-0000020329-BLVL-0284 | Apollo | CF8M-TFE-316 | 4" | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | |||||
| I | 6-6.2.4 | 201 | FUEL FARM PUMP HOUSE | Bulk Storage | BLVL | Valves | CLK-0000020317-BLVL-0287 | Velan | 2000 WOG | 6" | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | |||||
| I | 6-6.2.4 | 201 | FUEL FARM PUMP HOUSE | Bulk Storage | BLVL | Valves | CLK-0000020317-BLVL-0288 | Velan | 2000 WOG | 6" | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | |||||
| I | 6-6.2.4 | 201 | FUEL FARM TNK TRCK OFF LOAD | Bulk Storage | BLVL | Valves | CLK-0000020329-BLVL-0290 | Cameron | B811 | 8" | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | |||||
| I | 6-6.2.4 | 201 | FUEL FARM PUMP HOUSE | Bulk Storage | BLVL | Valves | CLK-0000020317-BLVL-0291 | Velan | 2000 WOG | 6" | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | |||||
| I | 6-6.2.4 | 201 | FUEL FARM ARCRFT ISSUE STAND | Bulk Storage | BLVL | Valves | CLK-0000020315-BLVL-0294 | Velan | 6-150 | 6" | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | |||||
| I | 6-6.2.4 | 201 | FUEL FARM ARCRFT ISSUE STAND | Bulk Storage | BLVL | Valves | CLK-0000020315-BLVL-0295 | Velan | CFM-8 | 3/4" | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | |||||
| I | 6-6.2.4 | 201 | FUEL FARM PUMP HOUSE | Bulk Storage | BLVL | Valves | CLK-0000020317-BLVL-0296 | Velan | 2000 WOG | 6" | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | |||||
| I | 6-6.2.4 | 201 | FUEL FARM PUMP HOUSE | Bulk Storage | BLVL | Valves | CLK-0000020317-BLVL-0297 | Velan | 2000 WOG | 6" | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES | |||||
| I | 6-6.2.4 | 201 | FUEL FARM TNK TRCK OFF LOAD | Bulk Storage | BLVL | Valves | CLK-0000020329-BLVL-0299 | Velan | 200 WOG | 6" | Completed | 2/11/26 | TREMAYNE DALE | ROLAND DESPRES |