SF30_SPE60325R05080001 ATTACHMENT 1.pdf

PDF 2 MB Posted

Attached to
NAS Jacksonville, FL
Solicitation number
SPE603-25-R-0508
Issued by

About this file

This document is a solicitation (RFP) for Government-Owned Contractor-Operated (GOCO) Aircraft & Ground Fuel Services and Storage & Distribution at Naval Air Station (NAS) Jacksonville, Florida. The contract will be a firm-fixed price, five-year agreement with a base period from December 1, 2025 through November 30, 2029, and an optional five-year extension from December 1, 2029 through November 30, 2034. The requirement involves operating and maintaining fuel storage facilities supporting pilot training, deployable squadrons, Fleet Readiness Center Southeast, U.S. Customs aircraft, Carrier Air Wing Squadrons, and Air Mobility Command, with three aboveground jet fuel (JP-5) tanks supplied by commercial tank trucks.

Key solicitation details include a pre-proposal conference on August 27, 2025, proposal submissions due via email, and evaluation using a Lowest Price Technically Acceptable (LPTA) source selection procedure. The solicitation is issued by the Defense Logistics Agency (DLA) Energy, with a competitive range approach that may include discussions with offerors. Proposals will be evaluated across three factors: Technical/Management (with eight sub-factors), Past Performance, and Price, with a 180-day offer acceptance period. The contract includes provisions for potential six-month extension options and compliance with various federal contracting regulations and cybersecurity requirements.

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION SPE603-25-R-0508

NAS Jacksonville, FL

TABLE OF CONTENTS

SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS

SERVICES TO BE FURNISHED AND PRICES 13

SECTION C - SPECIFICATIONS/STATEMENT OF WORK

PWS PERFORMANCE WORK STATEMENT Attach I

SECTION E - INSPECTION AND ACCEPTANCE

THE QUALITY ASSURANCE PROVISIONS (QAP) LISTED IN THIS SECTION ARE HEREBY

INCORPORATED IN FULL TEXT UNDER ATTACHMENT VII OF THIS SOLICITATION

FAR 52.246-4 INSPECTION OF SERVICES-FIXED-PRICE (AUG 1996) 15

SECTION F- DELIVERIES OR PERFORMANCE

FAR 52.242-15 STOP-WORK ORDER (AUG 1989) 16

F-0001 F1.04 GENERAL RECEIVING AND STORING CONDITIONS (DLA ENERGY

DEC 2017)

F-0002 F1.14 DETERMINATION OF QUANTITY (STORAGE) (DLA ENERGY NOV

1997)

F-0003 F76 CONTRACT PERIOD/PERFORMANCE REQUIREMENTS (STORAGE)

(DLA ENERGY DEC 1991)

SECTION G - CONTRACT ADMINISTRATION DATA

DFARS

252.232-7006

WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023) 22

SECTION H - SPECIAL CONTRACT REQUIREMENTS

H-0001 H11 GUARD SERVICE (DLA ENERGY MAR 1982) 26

H-0002 PROCUREMENT NOTE H14 CONTRACTOR PERSONNEL SECURTY

REQUIREMENTS (DEC 2021)

H-0003 H19 REPORTING AND CONTAINING OIL SPILLS (DOMESTIC STORAGE)

(DLA ENERGY JAN 2012)

SECTION I - CONTRACT CLAUSES

FAR 52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE (OCT 2018) 31

FAR 52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND

CERTIFICATIONS (DEC 2014)

FAR 52.204-21 BASIC SAFEGUARDING OF COVERED CONTRACTOR INFORMATION

SYSTEMS (NOV 2021)

FAR 52.204-22 ALTERNATIVE LINE ITEM PROPOSAL (JAN 2017) 34

FAR 52.204-23 PROHIBITION ON CONTRACTING FOR HARDWARE, SOFTWARE, AND

SERVICES DEVELOPED OR PROVIDED BY KASPERSKY LAB COVERED

ENTITIES (DEC 2023)

FAR 52.204-25 PROHIBITION ON CONTRACTING FOR CERTAIN TELECOMMUNICATIONS

AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (NOV 2021)

FAR 52.212-4 CONTRACT TERMS AND CONDITIONS – COMMERCIAL PRODUCTS AND

COMMERCIAL SERVICES (NOV 2023)

Addendum 1 to

FAR 52.212-4

ADDENDUM TO FAR 52.212-4 CONTRACT TERMS AND CONDITIONS—

COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (NOV 2023)

REFERENCES FAR 52.243-1 CHANGES-FIXED PRICE (AUG 1987)

ALTERNATE II (APR 1984)

FAR 52.243-1 CHANGES – FIXED-PRICE (AUG 1987) ALTERNATE I (APR 1984) 46

FAR 52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT

STATUTES OR EXECUTIVE ORDERS---COMMERCIAL PRODUCTS AND

COMMERCIAL SERVICES (MAR 2025) (DEVIATION 2025-O0003) AND

(DEVIATION 2025-O0004)

FAR 52.215-8 ORDER OF PRECEDENCE UNIFORM CONTRACT FORMAT (OCT 1997) 54

FAR 52.216-18 ORDERING (AUG 2020) 55

FAR 52.216-19 ORDER LIMITATIONS (OCT 1995) 55

FAR 52.216-20 DEFINITE QUANTITY (OCT 1995) 56

FAR 52.217-8 OPTION TO EXTEND SERVICES (NOV 1999) 56

FAR 52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000) 57

FAR 52.219-14 LIMITATIONS ON SUBCONTRACTING (OCT 2022) 57

FAR 52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REPRESENTATION (JAN 2025)

ALTERNATE I (MAR 2020)

FAR 52.222-1 NOTICE TO THE GOVERNMENT OF LABOR DISPUTES (FEB 1997) 59

FAR 52.222-35 EQUAL OPPORTUNITY FOR VETERANS (JUN 2020) 59

FAR 52.222-42 STATEMENT OF EQUIVALENT RATES FOR FEDERAL HIRES (MAY 2014) 60

FAR 52.223-5 POLLUTION PREVENTION AND RIGHT-TO-KNOW INFORMATION (MAY

2024)

FAR 52.223-10 WASTE REDUCTION PROGRAM (DEVIATION 2025-O0004) 61

FAR 52.227-1 AUTHORIZATION AND CONSENT (JUN 2020) 61

FAR 52.228-5 INSURANCE – WORK ON A GOVERNMENT INSTALLATION (JAN 1997) 62

FAR 52.229-3 FEDERAL, STATE, AND LOCAL TAXES (FEB 2013) 62

FAR 52.232-17 INTEREST (MAY 2014) 64

FAR 52.232-23 ASSIGNMENT OF CLAIMS (MAY 2014) 65

FAR 52.232-39 UNENFORCEABILITY OF UNAUTHORIZED OBLIGATIONS (JUN 2013) 65

FAR 52.233-1 DISPUTES (MAY 2014) 66

FAR 52.237-2 PROTECTION OF GOVERNMENT BUILDINGS, EQUIPMENT, AND

VEGETATION (APR 1984)

FAR 52.237-3 CONTINUITY OF SERVICES (JAN 1991) 68

FAR 52.242-13 BANKRUPTCY (JUL 1995) 69

FAR 52.246-25 LIMITATION OF LIABILITY-SERVICES (FEB 1997) 69

FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998) 70

FAR 52.253-1 COMPUTER GENERATED FORMS (JAN 1991) 70

DFARS

252.201-7000

CONTRACTING OFFICER'S REPRESENTATIVE (DEC 1991) 71

DFARS

252.203-7000

REQUIREMENTS RELATING TO COMPENSATION OF FORMER DOD

OFFICIALS (SEP 2011)

DFARS

252.203-7002

REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER RIGHTS

(DEC 2022)

DFARS

252.203-7003

AGENCY OFFICE OF THE INSPECTOR GENERAL (AUG 2019) 72

DFARS

252.204-7000

DISCLOSURE OF INFORMATION (OCT 2016) 72

DFARS

252.204-7003

CONTROL OF GOVERNMENT PERSONNEL WORK PRODUCT (APR 1992) 73

DFARS

252.204-7004

ANTITERRORISM AWARENESS TRAINING FOR CONTRACTORS (JAN 2023) 73

DFARS

252.204-7009

LIMITATIONS ON THE USE OR DISCLOSURE OF THIRD-PARTY

CONTRACTOR REPORTED CYBER INCIDENT INFORMATION (JAN 2023)

DFARS

252.204-7012

SAFEGUARDING COVERED DEFENSE INFORMATION AND CYBER

INCIDENT REPORTING (MAY 2024) (DEVIATION 2024-O0013 REVISIONS 1)

DFARS

252.204-7015

NOTICE OF AUTHORIZED DISCLOSURE OF INFORMATION FOR

LITIGATION SUPPORT (JAN 2023)

DFARS

252.204-7018

PROHIBITION ON THE ACQUISITION OF COVERED DEFENSE

TELECOMMUNICATIONS EQUIPMENT OR SERVICES (JAN 2023)

DFARS

252.204-7020

NIST SP 800-171 DOD ASSESSMENT REQUIREMENTS (NOV 2023) 84

DFARS

252.204-7021

CONTRACTOR COMPLIANCE WITH THE CYBERSECURITY MATURITY

MODEL CERTIFICATION LEVEL REQUIREMENT (JAN 2023)

DFARS

252.204-7023

REPORTING REQUIREMENTS FOR CONTRACTED SERVICES—BASIC (JUL

2021)

DFARS

252.205-7000

PROVISION OF INFORMATION TO COOPERATIVE AGREEMENT HOLDERS

(JUN 2023)

DFARS

252.209-7004

SUBCONTRACTING WITH FIRMS THAT ARE OWNED OR CONTROLLED BY

THE GOVERNMENT OF A COUNTRY THAT IS A STATE SPONSOR OF

TERRORISM (MAY 2019)

DFARS

252.215-7016

NOTIFICATION TO OFFERORS—POSTAWARD DEBRIEFINGS (DEC 2022) 89

DFARS

252.219-7000

ADVANCING SMALL BUSINESS GROWTH (JUN 2023) 90

DFARS

252.223-7006

PROHIBITION ON STORAGE AND DISPOSAL OF TOXIC AND HAZARDOUS

MATERIALS (SEP 2014)

DFARS

252.225-7012

PREFERENCE FOR CERTAIN DOMESTIC COMMODITIES (APR 2022) 91

CLASS

DEVIATION

252.225-7966

PROHIBITION REGARDING RUSSIAN FOSSIL FUEL BUSINESS

OPERATIONS— REPRESENTATION (DEVIATION 2024-O0006, REVISION 1)

(MAR 2024)

CLASS

DEVIATION

252.225-7967

PROHIBITION REGARDING RUSSIAN FOSSIL FUEL BUSINESS

OPERATIONS (DEVIATION 2024-O0006, REVISION 1) (FEB 2024)

DFARS

252.226-7001

UTILIZATION OF INDIAN ORGANIZATIONS, INDIAN-OWNED ECONOMIC

ENTERPRISES, AND NATIVE HAWAIIN SMALL BUSINESS CONCERNS (JAN

2023)

DFARS

252.226-7003

DRUG-FREE WORK FORCE (AUG 2024) 99

252.232-7003

ELECTRONIC SUBMISSION OF PAYMENT REQUESTS AND RECEIVING

REPORTS (DEC 2018)

DFARS

252.232-7010

LEVIES ON CONTRACT PAYMENTS (DEC 2006) 102

DFARS

252.237-7010

PROHIBITION ON INTERROGATION OF DETAINEES BY CONTRACTOR

PERSONNEL (JAN 2023)

DFARS

252.237-7023

CONTINUATION OF ESSENTIAL CONTRACTOR SERVICES (OCT 2010) 103

DFARS

252.243-7001

PRICING OF CONTRACT MODIFICATIONS (DEC 1991) 105

DFARS

252.243-7002

REQUESTS FOR EQUITABLE ADJUSTMENT (DEC 2022) 105

DFARS

252.244-7000

SUBCONTRACTS FOR COMMERCIAL PRODUCTS OR COMMERCIAL

SERVICES (NOV 2023)

DFARS

252.246-7004

SAFETY OF FACILITIES, INFRASTRUCTURE, AND EQUIPMENT FOR

MILITARY OPERATIONS (OCT 2010)

DFARS

252.247-7023

TRANSPORATION OF SUPPLIES BY SEA (OCT 2024) 107

DLAD

5452.233-9001

DISPUTES – AGREEMENT TO USE ALTERNATIVE DISPUTE RESOLUTION

(JUN 2020)

I-0001 I116 RESPONSIBILITY FOR GOVERNMENT-OWNED PETROLEUM

PRODUCTS (DLA ENERGY JAN 2012)

I-0002 I119.04 INVENTORY CONTROL RECORDS AND SYSTEMS OF RECORD (DLA

ENERGY OCT 2023)

SECTION J – ATTACHMENTS

PERFORMANCE WORK STATEMENT (PWS) Attach I

PAST PERFORMANCE WORK QUESTIONNAIRE FORM Attach

II

PAST PERFORMANCE INFORMATION DISCLOSURE CONSENT FORM Attach

III

PAST PERFORMANCE REFERENCE LIST Attach

IV

NAS JACKSONVILLE COLLECTIVE BARGAINING AGREEMENT (CBA)

CBA-2021-237 REVISION 1

Attach V

NAVY QUALITY ASSURANCE SURVEILLANCE PLAN (QASP) Attach

VI

DLA ENERGY QUALITY ASSURANCE PROVISIONS (E-QAP) Attach

VII

SECTION K - REPRESENTATIONS, CERTIFICATIONS, AND OTHER STATEMENTS OF

OFFERORS OR RESPONDENTS

FAR 52.203-2 CERTIFICATE OF INDEPENDENT PRICE DETERMINATION (APR 1985) 125

FAR 52.203-11 CERTIFICATION AND DISCLOSURE REGARDING PAYMENTS TO

INFLUENCE CERTAIN FEDERAL TRANSACTIONS (SEP 2024)

FAR 52.204-16 COMMERCIAL AND GOVERNMENT ENTITY CODE REPORTING (AUG 2020) 126

FAR 52.204-17 OWNERSHIP OR CONTROL OF OFFEROR (AUG 2020) 127

FAR 52.204-20 PREDECESSOR OF OFFEROR (AUG 2020) 128

FAR 52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS AND

VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (NOV 2021)

FAR 52.204-26 COVERED TELECOMMUNICATIONS EQUIPMENT OR SERVICES-

REPRESENTATION (OCT 2020)

FAR 52.209-2 PROHIBITION ON CONTRACTING WITH INVERTED DOMESTIC

CORPORATIONS – REPRESENTATION (NOV 2015)

FAR 52.209-5 CERTIFICATION REGARDING RESPONSIBILITY MATTERS (AUG 2020) 133

FAR 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018) 135

FAR 52.209-11 REPRESENTATION BY CORPORATIONS REGARDING DELINQUENT TAX

LIABILITY OR A FELONY CONVICTION UNDER ANY FEDERAL LAW (FEB

2016)

FAR 52.219-1 SMALL BUSINESS PROGRAM REPRESENTATIONS (FEB 2024) ALTERNATE I

(FEB 2024)

FAR 52.223-1 BIOBASED PRODUCT CERTIFICATION (MAY 2024) 140

FAR 52.225-25 PROHIBITION ON CONTRACTING WITH ENTITIES ENGAGING IN CERTAIN

ACTIVITIES OR TRANSACTIONS RELATING TO IRAN – REPRESENTATION

AND CERTIFICAITONS (JUN 2020)

DFARS

252.203-7005

REPRESENTATION RELATING TO COMPENSATION OF FORMER DOD

OFFICIALS (SEP 2022)

DFARS

252.204-7008

COMPLIANCE WITH SAFEGUARDING COVERED DEFENSE INFORMATION

CONTROLS (OCT 2016)

252.204-7016

COVERED DEFENSE TELECOMMUNICATIONS EQUIPMENT OR

SERVICES—REPRESENTATION (DEC 2019)

DFARS

252.204-7017

PROHIBITION ON THE ACQUISITION OF COVERED DEFENSE

TELECOMMUNICATIONS EQUIPMENT OR SERVICES—REPRESENTATION

(MAY 2021)

K-0001 K33.01 AUTHORIZED NEGOTIATORS (DLA ENERGY APR 2007) 145

SECTION L – INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS OR

RESPONDENTS

FAR 52.204-7 SYSTEM FOR AWARD MANAGEMENT (NOV 2024) 146

Addendum to

FAR 52.212-1

INSTRUCTIONS TO OFFERORS—COMMERCIAL PRODUCTS AND

COMMERCIAL SERVICES (SEP 2023)

FAR 52.216-1 TYPE OF CONTRACT (APR 1984) 150

FAR 52.222-56 CERTIFICATION REGARDING TRAFFICKING IN PERSONS COMPLIANCE

PLAN (OCT 2020)

FAR 52.233-2 SERVICE OF PROTEST (SEP 2006) 151

FAR 52.237-1 SITE VISIT (APR 1984) 151

FAR 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998) 151

FAR 52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (NOV 2020) 152

FAR 52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES (NOV 2020) 152

DFARS

252.215-7008

ONLY ONE OFFER (DEC 2022) 152

DFARS

252.237-7024

NOTICE OF CONTINUATION OF ESSENTIAL CONTRACTOR SERVICES (OCT

2010)

L-0001 L1.02 PROPOSAL ACCEPTANCE PERIOD (DLA ENERGY NOV 1991) 154

L-0002 L2.11-4 EMAIL PROPOSALS (DLA ENERGY OCT 2010) 154

L-0003 L198 PREPROPOSAL CONFERENCE (SERVICES) (DLA ENERGY JUL 2018) 155

L-0004 PROCUREMENT NOTE L06 PROTEST TO THE AGENCY (DEC 2016) 156

L-0005 PROCUREMENT NOTE L34 CONTRACTOR TEAM ARRANGEMENTS –

SOLICITATION AND AWARD (JUL 2022)

SECTION M – EVALUATION FACTORS FOR AWARD

FAR 52.212-2 EVALUATION—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES

(NOV 2021)

FAR 52.217-5 EVALUATION OF OPTIONS (JUL 1990) 164

M-0001 M72 EVALUATION OF OFFERS (EXCEPTIONS/DEVIATIONS) (DLA ENERGY

APR 1997)

SECTION B - SUPPLIES OR SERVICES AND PRICES OR COSTS

SERVICES TO BE FURNISHED AND PRICES

The services to be furnished during the period specified herein and the unit prices are as follows:

BASE PERIOD

LINE ITEM 0001 (BASE): Alongside Aircraft Refueling, V20000042: (FIRM-FIXED PRICE)

The Contractor shall operate, maintain, manage and provide Government Owned Contractor Operated (GOCO) retail/bulk fuel services in accordance with the Performance Work Statement and all other terms and conditions set forth herein for the period December 1, 2025 through November 30, 2029. All costs associated with performing required services, including any startup costs, shall be included in the total price of CLIN 0001.

PLACE OF PERFORMANCE: NAS Jacksonville, FL

ITEM NO. SUPPLIES/SERVICES QUANTITY U/O UNIT PRICE TOTAL

0001 M1NA 48 Months $_________ $____________

OPTION PERIOD

LINE ITEM 0002 (OPTION): Alongside Aircraft Refueling, V20000042: (FIRM-FIXED PRICE) The Contractor shall operate, maintain, manage and provide Government Owned Contractor Operated (GOCO) retail/bulk fuel services in accordance with the Performance Work Statement and all other terms and conditions set forth herein for the period December 1, 2029 through November 30, 2034 (five-year Option). All costs associated with performing required services, including any startup costs, shall be included in the total price of CLIN 0002.

PLACE OF PERFORMANCE: NAS Jacksonville, FL

ITEM NO. SUPPLIES/SERVICES QUANTITY U/O UNIT PRICE TOTAL

0002 M1NA 60 Months $_________ $____________

SECTION C – SPECIFICATIONS – STATEMENT OF WORK (SOW)/STATEMENT OF

OBJECTIVES (SOO)/PERFORMANCE WORK STATEMENT (PWS)

The Performance Work Statement is attached as Attachment I.

SECTION E – INSPECTION AND ACCEPTANCE

FAR 52.246-4 INSPECTION OF SERVICES -- FIXED-PRICE (AUG 1996)

(a) Definition. “Services,” as used in this clause, includes services performed, workmanship, and material furnished or utilized in the performance of services.

(b) The Contractor shall provide and maintain an inspection system acceptable to the Government covering the services under this contract. Complete records of all inspection work performed by the Contractor shall be maintained and made available to the Government during contract performance and for as long afterwards as the contract requires.

(c) The Government has the right to inspect and test all services called for by the contract, to the extent practicable at all times and places during the term of the contract. The Government shall perform inspections and tests in a manner that will not unduly delay the work.

(d) If the Government performs inspections or tests on the premises of the Contractor or a subcontractor, the Contractor shall furnish, and shall require subcontractors to furnish, at no increase in contract price, all reasonable facilities and assistance for the safe and convenient performance of these duties.

(e) If any of the services do not conform with contract requirements, the Government may require the Contractor to perform the services again in conformity with contract requirements, at no increase in contract amount. When the defects in services cannot be corrected by reperformance, the Government may—

(1) Require the Contractor to take necessary action to ensure that future performance conforms to contract requirements; and

(2) Reduce the contract price to reflect the reduced value of the services performed.

(f) If the Contractor fails to promptly perform the services again or to take the necessary action to ensure future performance in conformity with contract requirements, the Government may—

(1) By contract or otherwise, perform the services and charge to the Contractor any cost incurred by the Government that is directly related to the performance of such service; or

(2) Terminate the contract for default.

THE QUALITY ASSURANCE PROVISIONS (QAP) LISTED IN THIS SECTION ARE HEREBY

INCORPORATED IN FULL TEXT UNDER ATTACHMENT VII OF THIS SOLICITATION

SECTION F - DELIVERIES OR PERFORMANCE

FAR 52.242-15 STOP-WORK ORDER (AUG 1989)

(a) The Contracting Officer may, at any time, by written order to the Contractor, require the Contractor to stop all, or any part, of the work called for by this contract for a period of 90 days after the order is delivered to the Contractor, and for any further period to which the parties may agree. The order shall be specifically identified as a stop-work order issued under this clause. Upon receipt of the order, the Contractor shall immediately comply with its terms and take all reasonable steps to minimize the incurrence of costs allocable to the work covered by the order during the period of work stoppage.

Within a period of 90 days after a stop-work is delivered to the Contractor, or within any extension of that period to which the parties shall have agreed, the Contracting Officer shall either—

(1) Cancel the stop-work order; or

(2) Terminate the work covered by the order as provided in the Default, or the Termination for Convenience of the Government, clause of this contract.

(b) If a stop-work order issued under this clause is canceled or the period of the order or any extension thereof expires, the Contractor shall resume work. The Contracting Officer shall make an equitable adjustment in the delivery schedule or contract price, or both, and the contract shall be modified, in writing, accordingly, if—

(1) The stop-work order results in an increase in the time required for, or in the Contractor’s cost properly allocable to, the performance of any part of this contract; and

(2) The Contractor asserts its right to the adjustment within 30 days after the end of the period of work stoppage; provided, that, if the Contracting Officer decides the facts justify the action, the Contracting Officer may receive and act upon the claim submitted at any time before final payment under this contract.

(c) If a stop-work order is not canceled and the work covered by the order is terminated for the convenience of the Government, the Contracting Officer shall allow reasonable costs resulting from the stop-work order in arriving at the termination settlement.

(d) If a stop-work order is not canceled and the work covered by the order is terminated for default, the Contracting Officer shall allow, by equitable adjustment or otherwise, reasonable costs resulting from the stop-work order.

(End of clause)

F-0001 F1.04 GENERAL RECEIVING AND STORING CONDITIONS (DLA ENERGY DEC 2017)

(a) Notice will be furnished to the Contractor of upcoming product receipts. The notice will include the method of receipt, the source, grade, or type of product, and any special instructions.

(b) The Contractor shall transfer and store each grade of product in a manner that preserves the quality of the product and will prevent contamination. The responsibility for preventing contamination rests with the Contractor.

(c) When requested, the Contractor will transfer product between tanks to consolidate like types or grades.

(d) Whenever a product is to be removed from a tank to accomplish cleaning or repair of the tank, or to change product, or to effect the release of the tank to the Contractor, the Contractor shall strip such tank to preclude loss of recoverable fuel. The Contractor shall provide the Quality Assurance Representative (QAR) with information pertaining to the amount of fuel deemed unrecoverable, the reason why the fuel cannot be recovered, and an analysis of the unrecovered fuel quality. All unrecoverable tank bottoms/line fill quantities will be reported to the Property Administrator for disposition instructions. Contaminated/off-specification product will be reported to the QAR in order to obtain disposition instructions. Tanks out of service for repair shall be removed from revenue until such time as they are returned to Government Service. Tanks out of service for cleaning shall be governed by the INSPECTION AND CLEANING OF BULK PETROLEUM STORAGE TANKS contract provision.

(e) Custody of product received by pipeline, and risk of loss thereof, shall pass from the carrier to the Contractor when the product passes the flange connecting the carrier's pipeline and the Contractor's pipeline.

(f) Custody of product received by transport truck, and risk of loss thereof, shall pass from the carrier to the Contractor when the product passes from the transport truck discharge hoses into the Contractor's receiving facilities.

(g) Custody of product received by tank car, and risk of loss thereof, shall pass from the carrier to the Contractor when the tank car comes to rest on the Contractor's siding.

(h) Custody of product received from tanker or barge, and risk of loss thereof, shall pass from the carrier to the Contractor when the fuel passes the vessel’s permanent hose connection.

(i) The Contractor shall be held accountable for demurrage charges arising from delay(s) in receipt by tank cars or transport trucks, except when the delay(s) are caused by reason beyond the control and without the fault or negligence of the Contractor and its subcontractors.

(j) The Contractor will prepare and process the following certificate on bond paper when it is necessary to upgrade or downgrade a product:

I certify that _________ gallons of _______ have been upgraded/downgraded (quantity) (product) from ___________________ to _____________. This action was required because (product) (product)

(enter reason for the action)

Signature of Contractor Representative

[ ] I concur with the Contractor’s certification.

[ ] I do not concur with the Contractor’s certification for the following reasons:

Signature of Quality Representative

(A receipt transaction will be reflected on the monthly stock report for the gain in product, with a shipment being reflected for the losing product.)

(k) The following subparagraphs apply only to barges and tankers.

(1) SCHEDULED ARRIVAL DATE AND BASIC ALLOWED LAYTIME.

(i) The Contractor shall be notified in advance of the scheduled arrival date. Each notice will specify the quantity to be delivered, the cargo number, the name of the vessel, and the scheduled arrival date. For tankers, the notice will also include the size of the vessel and the expected time of arrival. For tankers, the notice of delivery will be furnished at least 72 hours in advance of the scheduled arrival date; for barges, at least 48 hours in advance of the scheduled arrival date. The Government will provide the maximum notice practicable when the anticipated vessel transit time from the loading point is less than the 72/48 hours.

Changes in the scheduled arrival date that will provide less than the 48 hours notice for barges and the 72 hours notice for tankers will require the verbal approval of the Contractor. This verbal approval is to be confirmed in writing as soon as practicable.

(ii) The Contractor shall provide a reachable berth, free of charge, where the vessel can be safely moored and afloat with necessary access thereto as soon as possible, but no later than, for barges, within 3 hours after issue of notice of readiness to unload, and, for tankers, within 6 hours after issue of notice of readiness, PROVIDED --

(A) If the vessel is tendered for unloading on a date earlier than the last agreed scheduled arrival date, the Government’s vessel shall be unloaded as soon as possible in its proper turn with other vessels, and laytime shall not commence until the vessel moors alongside or, for barges, 3:00 A.M. local time; for tankers, 6:00 A.M. local time, on the last agreed scheduled arrival date, whichever occurs first.

(B) If the vessel is tendered for unloading later than 12:00 noon of the day following the last scheduled arrival date, the vessel shall be unloaded in its proper turn with other vessels. Laytime shall commence when the vessel moors alongside, provided a good faith effort is made by the Contractor to moor the vessel in its turn with other vessels as loading berths become available.

(iii) Laytime shall commence either (A) at the expiration of the notice period prescribed in subparagraph

(ii) above, berth or no berth, or (B) immediately when the vessel moors alongside, with or without notice of readiness, whichever occurs first.

(iv) Laytime, once started, shall continue 24 hours per day, 7 days per week, without interruption, from its commencement until unloading of the barge or tanker is completed and hoses have been disconnected.

(v) Unless otherwise provided in the Schedule, the Contractor shall be allowed and will complete unloading within laytime determined as follows:

(A) FOR BARGES: One hour for each 2,000 barrels of product to be unloaded.

(B) FOR TANKERS: Thirty-six hours of discharge of a full vessel cargo. When partial vessel cargoes are to be unloaded, the 36 hours will be prorated based on quantities discharged in each port.

(vi) Hoses and loading arms for unloading a barge or tanker will be furnished, connected, and disconnected by the Contractor.

(2) INCREASES TO BASIC ALLOWED LAYTIME.

(i) If, after laytime commences, the conditions or facilities of the barge or tanker to be unloaded do not permit unloading, basic allowed laytime shall be increased by the duration of the delay.

(ii) If the vessel is delayed in reaching its berth and the delay is caused by the fault of the vessel, basic allowed laytime shall be increased by the duration of the delay.

(iii) If the vessel owner’s or operator’s regulations prohibit unloading at any time after laytime has commenced, the lost time shall be added to the basic allowed laytime.

If, for any reason, the Contractor is delayed in unloading the barge or tanker because of actions of a Government representative, acting under the contract, that arise through no fault or negligence on the part of the Contractor or its subcontractors, basic allowed laytime shall be increased by the duration of the delay.

(i) There will be no increase to basic allowed laytime (nor other reductions to any resulting demurrage time) for saved laytime arising out of other loadings/discharges.

(ii) Delays, after commencement of laytime, attributed to causes beyond the control and without the fault or negligence of the Contractor or the U.S. Government will result in increasing the basic allowed laytime by one half of the delay time.

(3) PAYMENT OF DEMURRAGE. For all hours of laytime which elapse in excess of the basic allowed laytime for unloading provided for by subparagraph (k)(1)(v), or as otherwise provided in the Schedule, the Contractor shall pay demurrage to the Government as follows:

(i) USS, USNS, OR TIME CHARTERED VESSELS. At the demurrage rate for the vessel loaded computed to the nearest whole hour as published by the Military Sealift Command and in effect on the date the loading of the vessel is completed.

(ii) VOYAGE CHARTERED VESSELS. At the demurrage rate cited in the charter, except that the demurrage payable by the Contractor shall in no event exceed the demurrage expense incurred by the Government under the Charter.

F-0002 F1.14 DETERMINATION ON QUANTITY (STORAGE) (DLA ENERGY NOV 1997)

The total gallonage received into or shipped from the Contractor's facilities shall be determined as follows:

(a) RECEIPTS OR SHIPMENTS OF CRUDE AND FUELS OTHER THAN RESIDUAL

FUELS (by transport truck of 3500 gallons or less) (truck and trailer combination when delivering same product will be considered as one container or conveyance). On an actual gallonage basis, without temperature correction.

(b) RECEIPTS OR SHIPMENTS OF RESIDUAL FUELS (in excess of 3500 gallons of crude or other fuels by tank car or transport truck). On a gallonage basis corrected to 60oF.

(c) RECEIPTS OR SHIPMENTS BY TANKER OR BARGE OR PIPELINE. On a gallonage basis corrected to 60oF. Quantities shipped or received will be determined on the basis of shore tanks or tender gauges taken by the Contractor and authenticated by the Quality Representative (QR). The ship or carrier's representative may participate in these determinations. During the gauging of shore tanks, the tanker, barge, or carrier's representative may participate in the quantity determinations, and, in the case of tanker/barge shipments or receipts, the Contractor may participate in the operations on board the tanker or barge which are required to determine the quantity of product in the tanker or barge cargo tanks.

(d) In the case of receipts, the Contractor shall sign the bill of lading and other related documents for the actual quantity received as determined above. When requested by the QR, the Contractor shall investigate losses or gains in connection with receipts or shipments to determine if the cause is at the Contractor’s facility.

(e) MEASUREMENT STANDARDS. All measurements and calibrations made to determine quantity shall be in accordance with the most recent edition of the API Manual of Petroleum Measurement Standards (MPMS). Outside the United States, other technically equivalent national or international standards may be used. In addition, the following specific standards will be the referee method.

a. API MPMS Chapter 11.1, Volume Correction Factors (API 2540/ASTM D 1250/IP 200/ISO 91-1). Either the printed version or the computer subroutine version of the standard may be used. In case of disputes, the computer subroutine will be the referee method.

(i) For crude oils, JP4 and Jet B, use Volume I, Tables 5A and 6A (or Volume VII Tables 53A and 54A).

(ii) For lubricating oils, use Volume XIII, Tables 5D and 6D (or Volume XIV, Tables 53D and 54D).

(iii) For all other fuels and fuel oils, use Volume II, Tables 5B and 6B (or Volume VIII, Tables 53B and 54B).

(iv) For chemicals/additives, use Volume III, Table 6C (or Volume IX, Table 54C), or volume correct in accordance with the product specification.

(v) Volume XII, Table 52, shall be used to convert cubic meter at 15 degrees Centigrade to barrels at 60 degrees Fahrenheit. Convert liters at 15 degrees Centigrade to cubic meters at 15 degrees Centigrade by dividing by 1,000. Convert gallons at 60 degrees Fahrenheit to barrels at 60 degrees Fahrenheit by dividing by 42. Should foreign law restrict conversion by this method, the method required by law shall be stated in the offer.

(vi) If the original measurement is by weight and quantity is required in U.S. gallons, then--

(A) Volume XII, Table 58, shall be used to convert metric tons to U.S. gallons at 60 degrees Fahrenheit. Convert kilograms to metric tons by dividing by 1,000.

(B) Volume XI, Table 8, shall be used to convert pounds to U.S. gallons at 60 degrees Fahrenheit.

(2) API MPMS Chapter 4, Providing Systems. All meters used in determining product volume shall be calibrated using this standard with the frequency required by local regulations (foreign or domestic). If no local regulation exists, then the frequency of calibration shall be that recommended by the meter manufacturer or every 6 months, whichever is more frequent.

(3) API MPMS Chapter 12, Calculation of Petroleum Quantities. All calculations of net quantities shall be made in accordance with this chapter.

(f) In addition to gauging of storage tanks to determine quantities issued or received, the Contractor will gauge each active storage tank daily and each inactive storage tank weekly and compute physical inventories of the purpose of detecting loss of products.

F-0003 F76 CONTRACT PERIOD/PERFORMANCE REQUIREMENTS (STORAGE) (DLA ENERGY DEC 1991)

During the contract period, December 1, 2025, through November 30, 2029 (Base), and December 1, 2029, through November 30, 2034 (Option), the Contractor shall provide petroleum storage facilities and services at the following location:

Naval Air Station Jacksonville, FL

(Street address)

Jacksonville, FL (City/State/Zip)

SECTION G - CONTRACT ADMINISTRATION DATA

DFARS 252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)

(a) Definitions. As used in this clause— (b)

“Department of Defense Activity Address Code (DoDAAC)” is a six position code that uniquely identifies a unit, activity, or organization.

“Document type” means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).

“Local processing office (LPO)” is the office responsible for payment certification when payment certification is done external to the entitlement system.

“Payment request” and “receiving report” are defined in the clause at 252.232-7003 , Electronic Submission of Payment Requests and Receiving Reports.

(c) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003 , Electronic Submission of Payment Requests and Receiving Reports.

(d) WAWF access. To access WAWF, the Contractor shall—

(1) Have a designated electronic business point of contact in the System for Award

Management at https://www.sam.gov; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self- registration available at this web site.

(e) WAWF training. The Contractor should follow the training instructions of the WAWF Web- Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/

(f) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol.

(g) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:

(1) Document type. The Contractor shall submit payment requests using the following document type(s):

(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.

(ii) For fixed price line items— https://acquisition.gov/dfars/part-252-solicitation-provisions-and-contract-clauses#DFARS_252.232-7003 https://acquisition.gov/dfars/part-252-solicitation-provisions-and-contract-clauses#DFARS_252.232-7003 http://www.sam.gov;/ https://wawf.eb.mil/

(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.

(Contracting Officer: Insert applicable invoice and receiving report document type(s) for fixed price line items that require shipment of a deliverable.)

(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.

Invoice 2-in1 (Contracting Officer: Insert either “Invoice 2in1” or the applicable invoice and receiving report document type(s) for fixed price line items for services.)

(iii) For customary progress payments based on costs incurred, submit a progress payment request.

(iv) For performance based payments, submit a performance based payment request.

(v) For commercial financing, submit a commercial financing request.

(2) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213- 1 is included in the contract.

[Note: The Contractor may use a WAWF “combo” document type to create some combinations of invoice and receiving report in one step.]

(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.

Routing Data Table*

Data to be entered in WAWF

Note: Each location has a distinct “Inspect By DoDAAC” NAS Jacksonville, FL:

Field Name in

WAWF

Data to be entered in WAWF

Pay Official DoDAAC

SL4701

Issue By DoDAAC SPE603

Admin DoDAAC** SPE603

Inspect By DoDAAC

SE5N05; Extension REFUEL

Ship To Code N/A

Ship From Code N/A

Mark For Code N/A

Service Approver (DoDAAC)

N/A

Service Acceptor (DoDAAC)

SPE603; Extension REFUEL

Accept at Other DoDAAC

N/A

LPO DoDAAC N/A

DCAA Auditor DoDAAC

N/A

Other DoDAAC(s) N/A

Note: Each location has a distinct “Inspect By DoDAAC” NAS Jacksonville, FL:

Field Name in

WAWF

Data to be entered in WAWF

Pay Official DoDAAC

SL4701

Issue By DoDAAC SPE603

Admin DoDAAC** SPE603

Inspect By DoDAAC

SE5N05; Extension REFUEL

Ship To Code N/A

Ship From Code N/A

(4) Payment request. The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.

(5) Receiving report. The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F.

(a) WAWF point of contact.

(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity’s WAWF point of contact.

DLA Energy Help Desk Email: bsme.helpdesk@dla.mil (phone) (800) 446-4950

(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.

Mark For Code N/A

Service Approver (DoDAAC)

N/A

Service Acceptor (DoDAAC)

SPE603; Extension REFUEL

Accept at Other DoDAAC

N/A

LPO DoDAAC N/A

DCAA Auditor DoDAAC

N/A

Other DoDAAC(s) N/A mailto:bsme.helpdesk@dla.mil

SECTION H - SPECIAL CONTRACT REQUIREMENTS

H-0001 H11 GUARD SERVICE (DLA ENERGY MAR 1982)

(a) In the event the Government requires guard service and/or other protective services or facilities not otherwise provided by the Contractor pursuant to the terms of this contract, the Government shall have the right--

(1) To provide such service; or

(2) To require the Contractor to provide such guard service; and/or

(3) To require the Contractor to provide such other protective services or facilities.

(b) The actual cost of providing said services or facilities under (2) and/or (3) above will be for the account of the Government and will be recognized by a modification to this contract.

H-0002 PROCUREMENT NOTE H14 CONTRACTOR PERSONNEL SECURITY REQUIREMENTS (DEC 2021)

(a) Work to be performed under this contract or task order may, in full or in part, be performed at the Defense Logistics Agency (DLA) Headquarters (HQ), DLA field activity office(s), or other Federally-controlled facilities.

Prior to beginning work on a contract, DLA requires all contractor personnel working on the Federally-controlled facility to have, at a minimum, an initiated National Agency Check with Written Inquiries (NACI) or NACI equivalent and favorable completion of a Federal Bureau of Investigation (FBI) fingerprint check.

(b) Additionally, in accordance with Department of Defense (DoD) Regulation 5200.2-R, Personnel Security Programs, and DLA Issuance 4314, Personnel Security Program, all DoD contractor personnel who have access to Federally-controlled information systems must be assigned to positions which are designated at one of three information technology (IT) levels, each requiring a certain level of investigation and clearance, as follows:

(1) IT-I for an IT position requiring a single scope background investigation (SSBI) or SSBI equivalent; 37 38

(2) IT-II for an IT position requiring a National Agency check with Law and Credit (NACLC) or NACLC equivalent;

and

(3) IT-III for an IT position requiring a NACI or equivalent. Note: IT levels will be designated according to the criteria in DoD 5200.2-R.

(c) Previously completed security investigations may be accepted by the Government in lieu of new investigations if determined by the DLA Intelligence Personnel Security Office to be essentially equivalent in scope to the contract requirements. The length of time elapsed since the previous investigation will also be considered in determining whether a new investigation is warranted. To assist the Government in making this determination, the contractor must provide the following information to the respective DLA Intelligence Personnel Security Office immediately upon receipt of the contract. This information must be provided for each contractor employee who will perform work on a Federally-controlled facility and/or will require access to Federally-controlled information systems:

(1) Full name, with middle name, as applicable, with social security number;

(2) Citizenship status with date and place of birth;

(3) Proof of the individual’s favorably adjudicated background investigation or NACI, consisting of identification of the type of investigation performed, date of the favorable adjudication, name of the agency that made the favorable adjudication, and name of the agency that performed the investigation;

(4) Company name, address, phone and fax numbers with email address;

(5) Location of on-site workstation or phone number if off-site (if known by the time of award); and

(6) Delivery order or contract number and expiration date; and name of the contracting officer.

(d) The contracting officer will ensure that the contractor is notified as soon as a determination is made by the assigned or cognizant DLA Intelligence Personnel Security Office regarding acceptance of the previous investigation and clearance level.

(1) If a new investigation is deemed necessary, the contractor and contracting officer will be notified by the respective DLA Personnel Security Office after appropriate checks in DoD databases have been made.

(2) If the contractor employee requires access to classified information and currently does not have the appropriate clearance level and/or an active security clearance, the DLA Intelligence Personnel Security Office will relay this information to the contractor and contracting officer for further action. Investigations for contractor employees requiring access to classified information must be initiated by the contractor Facility Security Officer (FSO).

(3) The contracting officer will ensure that the respective DLA Intelligence Personnel Security Office initiates investigations for contractor employees not requiring access to classified information (i.e., IT or unescorted entry).

(4) It is the contractor’s responsibility to ensure that adequate information is provided and that each contractor employee completes the appropriate paperwork, as required either by the contracting officer or the DLA Intelligence Personnel Security Office, in order to begin the investigation process for the required clearance level.

(e) The contractor is responsible for ensuring that each contractor employee assigned to the position has the appropriate security clearance level. 39

(f) The contractor shall submit each request for IT access and investigation through the contracting officer to the assigned or cognizant DLA Intelligence Personnel Security Office. Requests shall include the following information and/or documentation:

(1) Standard Form (SF) 85, Questionnaire for Non-Sensitive Positions, or the SF 86, Questionnaire for National Security Positions (see note below);

(2) Proof of citizenship (i.e., an original or a certified copy of a birth certificate, passport, or naturalization certificate); and

(3) Form FD-258, Fingerprint Card (however, fingerprinting can be performed by the cognizant DLA Intelligence Personnel Security Office). (Note to (f)(1) above: An investigation request is facilitated through use of the SF 85 or the SF 86. These forms with instructions as well as the Optional Form (OF) 306, Declaration for Federal Employment, which is required with submission of the SF85 or SF 86, are available at the Office of Personnel Management’s (OPM) system called Electronic – Questionnaires for Investigations Processing (e-QIP). Hard copies of the SF85 and SF86 are available at OPM’s web-site, www.opm.gov, but hard copies of the forms are not accepted.) (g) Required documentation, listed above in paragraphs

(f) (1) through (3), must be provided by the contractor as directed by the contracting officer to the cognizant DLA Intelligence Personnel Security Office at the time of fingerprinting or prior to the DLA Intelligence Personnel Security Office releasing the investigation to OPM.

(h) Upon completion of the NACI, NACLC, SSBI, or other sufficient, appropriate investigation, the results of the investigation will be forwarded by OPM to the appropriate adjudication facility for eligibility determination or the DLA Intelligence Personnel Security Office for review and determination regarding the applicant’s suitability to occupy an unescorted entry position in performance of the DLA contract. Contractor personnel shall not commence work on this effort until the investigation has been favorably adjudicated or the contractor employee has been waived into the position pending completion of adjudication. The DLA Intelligence Personnel Security Office will ensure that results of investigations will be sent by OPM to the Department of Defense, Consolidated Adjudications Facility (DoD CAF) or DLA Intelligence Personnel Security Office.

(i) A waiver for IT level positions to allow assignment of an individual contractor employee to commence work prior to completion of the investigation may be granted in emergency situations when it is determined that a delay would be harmful to national security. A request for waiver will be considered only after the Government is in receipt of the individual contractor employee’s completed forms, the background investigation has been initiated, and favorable FBI fingerprint check has been conducted. The request for a waiver must be approved by the Commander/Director or Deputy Commander/Director of the site. The cognizant DLA Intelligence Personnel Security Office reserves the right to determine whether a waiver request will be forwarded for processing. The individual contractor employee for which the waiver is being requested may not be assigned to a position, that is, physically work at the Federally controlled facility and/or be granted access to Federally-controlled information systems, until the waiver has been approved.

(j) The requirements of this procurement note apply to the prime contractor and any subcontractors the prime contractor may employ during the course of this contract, as well as any temporary employees that may be hired by the contractor. The Government retains the right to request removal of contractor personnel, regardless of prior clearance or adjudication status 40 whose actions, while assigned to this contract, who are determined by the contracting officer to conflict with the interests of the Government. If such removal occurs, the contractor shall assign qualified personnel, with the required investigation, to any vacancy.

(k) All contractor personnel who are granted access to Government and/or Federally-controlled information systems shall observe all local automated information system (AIS) security policies and procedures. Violations of local AIS security policy, such as password sharing, performing personal work, file access violations, or browsing files outside the scope of the contract, will result in removal of the contractor employee from Government property and referral to the contractor for appropriate disciplinary action. Actions taken by the contractor in response to a violation will be evaluated and will be reflected in the contractor’s performance assessment for use in making future source selection decisions. In addition, based on the nature and extent of any violations of AIS security policy, the Government will consider whether it needs to pursue any other actions under the contract such as a possible termination.

(l) The contractor may also be required to obtain a Common Access Card (CAC) or Installation Access Badge for each contractor employee in accordance with procedures established by DLA. When a CAC is required, the contracting officer will ensure that the contractor follows the requirements of Homeland Security Presidential Directive 12 and any other CAC-related requirements in the contract. The contractor shall provide, on a monthly basis, a listing of all personnel working under the contract that have CACs.

(m) Contractor personnel must additionally receive operations security (OPSEC) and information security

(INFOSEC) awareness training. The DLA annual OPSEC refresher training and DLA annual INFOSEC training will satisfy these requirements and are available through the DLA Intelligence Office.

(n) When a contractor employee who has been granted a clearance is removed from the contract, the contractor shall provide an appropriately trained substitute who has met or will meet the investigative requirements of this procurement note. The substitute may not begin work on the contract without written documentation, signed by the contracting officer, stating that the new contractor employee has met one of the criteria set forth in paragraphs (c), (d), or (i) of this procurement note (i.e., acceptance of a previously completed security investigation, satisfactory completion of a new investigation, or a waiver allowing work to begin pending completion of an investigation).

Contractor individual employees removed from this contract as a result of a violation of local AIS security policy are removed for the duration of the contract.

(o) The following shall be completed for every employee of the Government contractor working on this contract upon contract expiration. Additionally, the contractor shall notify the contracting officer immediately in writing whenever a contractor employee working on this contract resigns, is reassigned, is terminated, or no longer requires admittance to the Federally-controlled facility or access to Federally-controlled information systems. When the contractor employee departs, the contractor will relay departure information to the cognizant DLA Intelligence Personnel Security Office and the Trusted Agent (TA) that entered the individual into the Trusted Associated Sponsorship System (TASS), so appropriate databases can be updated. The contractor will ensure each departed employee has completed the DLA J6 Out-Processing Checklist, when applicable, for the necessary security briefing, has returned any Government furnished equipment, returned the DoD CAC and DLA (or equivalent Installation) badge, returned any DoD or DLA vehicle decal, and requested deletion of local area network account with a prepared Department of Defense (DD) Form 2875. The contractor will be responsible for 41 any costs involved for failure to complete the out-processing, including recovery of Government property and investigation involved.

(p) These contractor security requirements do not excuse the contractor from meeting the delivery schedule/performance requirements set forth in the contract, or waive the delivery schedule/performance requirements in any way. The contractor shall meet the required delivery schedule/performance requirements unless the contracting officer grants a waiver or extension.

(q) The contractor shall not bill for personnel, who are not working on the contract while that contractor employee’s clearance investigation is pending.

H-0003 H19 REPORTING AND CONTAINING OIL SPILLS (DOMESTIC STORAGE) (DLA ENERGY JAN 2012)

(a) Immediately upon the discovery of a petroleum spill, leak, or seepage involving Defense Logistics Agency Energy (DLA Energy) owned product, the Contractor shall notify, by telephone,

(1) the Quality Representative,

(2) the designated Defense Energy Region, and (3) the Administrative Contracting Officer (ACO).

In addition, if the said spill, leak, or seepage has reached, or if it might possibly reach, navigable waters, the Contractor shall immediately…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .