SPE60324R0508 0004.pdf
PDF 13 KB Posted
- Solicitation number
- SPE60324R0508
- Issued by
-
Defense Logistics Agency Energy
About this file
This document is an amendment to solicitation SPE60324R0508 for non-personal, Government-owned, Contractor-operated (GOCO) Aircraft & Ground Fuel Services and Storage & Distribution services at Kirtland AFB, NM. The purpose of this amendment is to:
- Attach the pre-proposal slides and sign-in sheet from the pre-proposal conference held on August 07, 2024.
- Incorporate the updated Collective Bargaining Agreement (CBA) CBA-2023-748 Rev 1 extension agreement covering the performance period.
- Delete and replace the original Performance Work Statement (PWS) with a revised PWS dated August 22, 2024, which incorporates the requirements for contractor-furnished mobile refueling assets.
- Provide the answers to the offeror's questions.
The period of performance is from December 1, 2024 through November 30, 2028 with an option to extend for up to 5 additional years. This requirement is being solicited by the Defense Logistics Agency Energy.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NO.
See Block 14
4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
6. ISSUED BY CODE SPE603 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
CODE FACILITY CODE
SPE60324R0508
X
2024 JUL 17
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of OffersX is extended, X is not extended.
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
12. ACCOUNTING AND APPROPRIATION DATA (If required)
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.
IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc. ) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A NAME AND TITLE OF SIGNER (Type or print)
NSN 7540-01-152-8070
Previous edition unusable
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
16B. UNITED STATES OF AMERICA15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
(a) By completing Items 8 and 15, and returning
DLA ENERGY
BULK PETROLEUM SERVICES
8725 JOHN J. KINGMAN ROAD
FORT BELVOIR VA 22060
15C. DATE SIGNED 16C. DATE SIGNED
D. OTHER (Specify type of modification and authority)
8/28/2024
3. EFFECTIVE DATE
See Attached Continuation Sheet(s).
(X)
CHECK ONE
9A. AMENDMENT OF SOLICITATION NO.
9B. DATED (SEE ITEM 11)
13. THIS APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:
CONTINUED ON NEXT PAGE
PAGE 2 OF 3 PAGES
SPE60324R0508 - 0004
The purpose of amendment 0004 under solicitation SPE603-24-R-0508 is to:
1. Attach the pre-proposal slides and sign-in sheet which includes all participants who attended the pre-proposal conference held on August 07, 2024.
2. Incorporate the Collective Bargaining Agreement (CBA) CBA-2023-748 Rev 1 extension agreement beginning December 1, 2024, through November 30, 2025. (See Attachment V CBA 2023-748 Rev 0 and Rev 1).
3. Delete and replace in full the Performance Work Statement (PWS) dated May 23, 2024, with the revised Performance Work Statement (PWS) dated August 22, 2024, which incorporates the Appendix H Contractor Furnished Mobile Refueling Assets. (See Attachment I Kirtland PWS 22 Aug-24).
4. Incorporate the answers to the offeror’s questions. (See Attachment B).
5. All other terms and conditions remain the same.
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 3 OF 3 PAGES
SPE60324R0508 - 0004
Attachments
List of Attachments
Description File Name ATTACH_Attachment_B_K irtland_Questions_and_An swers
Attachment B Kirtland Questions and Answers.pdf
ATTACH_Attachment_I_Kir tland_PWS_22_Aug_24
Attachment I Kirtland PWS 22 Aug-24.pdf
ATTACH_Attachment_V_C BA_2023_748_Rev_0_and
_Rev_1
Attachment V CBA-2023-748 Rev 0 and
Rev 1.pdf ATTACH_Kirtland_sign_in_ sheet Kirtland PpC Sign In Sheet 08 07 2024_Redacted.pdf
ATTACH_Kirtland_preprop osal_slides
Kirtland Pre-proposal.pdf
PID Data - Custom Clause
Header C1
File details come from the government source that posted it. Updated .